2012, 07-17 Permit: SW-12001769 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001769
Permit Issued Date:
07/17/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
VERADALE HTS
SEWER
Primary Contact:
Applicant:
Address:
Phone:
Email:
H & R COMPLETE
H & R COMPLETE
PO BOX 749
NEWMAN LAKE-, WA 99025
509-218-8336
SITE INFORMATION:
Site Address: 14111 E DESMET AVE
Parcel Number: 45142.3413
Subdivision: 14TH ADDITION TO
VERADALE HEIGHTS
Assessor's Description: 14TH ADDITION TO VERADALE HEIGHTS L13 B1
Inspection Area:
Water District:
Consolidated Irrigation
District #19
Zoning:
Owner:
Address:
Phone:
FEDERAL NATIONAL MORTGAGE
ASSOCIATION
PO BOX 650043
DALLAS, TX 75265-0043
Email:
Fire District: Spokane Valley Fire
Land Area: 12096 Square Feet
CONTRACTOR INFORMATION:
General Contractor
HRCOMI*972DD
H & R COMPLETE
PO BOX 749 •
NEWMAN, LAKE-, WA 99025
509-218-8336
DETAILS:
Class
Type
Quantity
Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1
$125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 07/17/2012 12:26:54
Printed by: 118 APPPOOLIASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001769 07/17/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 07/17/2012 12:26:54
Printed by: IIS APPPOOL\ASP.NET v4.0