2010, 01-04 Permit App: 09004064 Egress Windows, HeaderProject Number: 09004064 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 1/4/2010 Page 1 of 2
Project Information:
Permit Use: 2 NEW EGRESS WINDOWS / NEW HEADER ON 1 Contact: DR CONSTRUCTION SERVICES
WINDOW Address: 6916 N W ISCOM B
C - S - Z: SPOKANE WA 99208
Setbacks: Front Left: Right: Rear: Phone: (509) 489-8239
Group Name:
Site Information: Project Name:
Plat Key: 001834 Name: OPPORTUNITY TR # 01-354 District: Nort
Parcel Number: 45171.1212
Block: 66 Lot:
SiteAddress: 10219 E BROADWAY AVE
Location:: CSV
Zoning: R-3 SF Res District
Water District:
Area: 20,004 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Owner: Name: LIEN, NANCY A
Address: 10219 E BROADWAY AVE
SPOKANE, WA 99206-3838
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Permits:
Released By
Originally Released: 1/4/2010 By: tmelbourn
Contractor: D R CONSTRUCTION SERVICES
Address: PO BOX 48241 Phone: (509) 489-8239
SPOKANE WA 99228
Building Permit
Firm: D R CONSTRUCTION SERVICES L
This Application: Total Project:
Description Crp Type Notes Sq Ft Valuation Su Ft Valuation
l&2 FAMILY R-3 VB EGRESS 0 $1,000.00 0 $1,000.00
WINDOWS
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $1,000.00 0 $1,000.00
Units Unit Desc Fee Amount
1 SELECT $69.25
1 SELECT $4.50
1 SELECT $27.70
Operator: JD Printed By: jmm
Permit Total Fees: $101.45
Print Date: 1/4/2010
Project Number: 09004064 Inv: 1
Notes:
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 1/4/2010 Page 2 of 2
Payment Summary: , ..
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $101.45 $101.45 $27.70 $73.75
$101.45 5101.45
$27.70 $73.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 1/4/2010
i
S ®bane
aaggigalley.
Community Development
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER: (43 (g l
PERMIT FEE:
Residential Construction New Construction U Accessory Bldg
Permit Application Addition/Remodel Deck
)(Other:
SITE ADDRESS: ! C)1 \C\ & \cGvl'LOt&\p c Ro 4.\Cv1ne._,
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Budding Owner;;
TContractdr
Name:{t1/4„, e.' t- N
Address: 1 c 2\
City: ti‘s\, tc\\C\\State: x,1)1\ Zip:
Phone: "l Z^Srtc o ' Fax:
Name: t\ 1N &Y @S 3\(e
Address: t „t\i.0 N\ \A) \ ,
City:S..QC\i\t„\`cst State: 1,0 Zip4f\-1.OU
Contact; Person, s-.
Name:t- U T\AS .Nth\ CV \'L�
Phone: 1-.) %t..‘
Phone: ,L_)% ..\ Fax:,/_,) _0I vC\
Comer ctor Lic o: voN Exp Date:
City Business Lic. No:
mot? StS -cwcst_ -5492 Ce\\
Describe the scope of work in detail: Cost of Project: $ LOW
? c \\ (3 ec;cr.: -,c\ew
Proposed Use: cC
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMENSIONS: •
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2Nu FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIG NATURE::ow\�C\\:sk"A�w\�,
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15107
❑ Check
DATE: l 2- -
Mastercard ❑ VISA
Expires: VIN#:
—'- ThECEI' ED
CSV PERMIT CENTER
DEC 2rr��220 9
Project # , cx>t
Name (J( )
Submittal #
Spokane
Valley
. For City Use Only
PLUS Project Number ncnirn U(YrH
Project Address -
I
n-71 F iia fled t
. 11703 E Sprague Ave Suite B-3. ♦'Spokane Vatley WA 99206
509.688.0036 ♦ Fax: 509.688.0037• permitcenter®spokanevalley.org
•
As part of our on-going commitment to customer service during ,the review,process of.your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for`
any reason we cannot meet this date, we will contact you with a'revised targetdate..
.17: Iz�
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your. project application will have had its initial- technical
review. It is not the date for approval or permit issuance.' •
Tips for'aSmoother Project Application Review
Submit complete, accurate plaits and documents.
Ecua.time nzay'be required for re -submittals as project.cpplication reviewers'ltork•orramtltiple.applications and. it
May be several days before they can look at pour new or revised information. • .
9 • Designate a specific contact person to communicate with the City. - -
While the person designated as the applicant's contact peuson with the city' cnn..be!chanoerl, one individual With the
•
'expertise.for dealing with reviewer comments would be the best choice for the enure ievieu process.
Call staff regarding the status.''of your project only after the target date shown at the top of the page: • •
•
Although you should be contacted on or by the target date, please feel free to contactus if you Oven '1,,
heard froinus
by your larger 'dale. Staff may contact you before the target date. if the initial rcwiew, is conrplete. 'By. folloiving this
procedu-e, you will save tune'and allow the re. to complete the Work more expeditiously. ,
Stcpsin the Permit Process
.
1. Counter Complete: Your application has been accepted, as countercomplete. This means all of
the required
documents, as indicated on your Pre -Application Checklist have'becnisubmitted ..or, have • been approved .for .deferred
submittal, This does not prevent technical staif_from requesting additional information'as a;result of their technical review:
2. Quality Check. The next step in the process is a quality check, to make sure that the: application is reviewable and free
from substantive flaws that•would prevent technical staff from completing the technical review. once itis started.; When
this step is complete, your application will .be routed. to the appropriate; staff and. remain 'in ,their review queue until .it
comes up for review.
•
i
3, TechnicalCompliance: Once an application is administratively complete, it is routed,to technical staff for compliance
review. Depending on the type of'project„technical staff Inay. include multiple reviewers You should' be, contacted by
phone, fax, email, or mail•by your, TARGET DATE once the initial technical.coinpliance review is complete. •
4. Permit issuance. When -the technical compliance review of the application. is complete; including'any..subsequent re -
submittals, each reviewer will approve their section of the application and route it to'theiPerinit tenter: When `all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07