2009, 09-03 Permit App: 09002792 GarageProject Number: 09002792 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/3/2009 Page 1 of 2
Project Information:
Permit Use: 12 X 30 DET GAR Contact: LC BURT & SONS
Address: 20803 W EUCLID
C - S - Z: MEDICAL LAKE WA 99022
Setbacks: Front Left: Right: Rear: Phone: (509) 244-9269
Group Name:
Site Information: Project Name:
Plat Key: 000000 Name: Range
District: Nort
Parcel Number: 45054.0603 Block:
SiteAddress: 3216 N BUTLER RD
Location:: CSV
Lot:
Owner: Name: FOX, DOROTHY R
Address: 3216 N BUTLER RD
SPOKANE, WA 99206-4570
Zoning: MUC Mixed Use Center District
Water District: 026 I RV IN
Area: 1,400.00 Acres Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
9/2/2009 By: tmelbourn
Released By:.
Originally Released: 9/2/2009 By: cjjanssen
Permits:
Operator: JD Printed By: JD
Print Date: 9/3/2009
Project Number: 09002792 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/3/2009 Page 2 of 2
Contractor: LC BURT & SONS CONST LLC
Address: 20803 W EUCLID
MEDICAL LAKE WA 99022
Description Grp Type Notes
GARAGE U -I VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Building Permit
Firm: LC BURT & SONS CONST LLC
Phone: (000) 000-0000
This Application: Total Project:
Sq Ft Valuation Sq Ft Valuation
360 $6,840.00 360 $6,840.00
Totals: 360 $6,840.00 360 $6,840.00
Units Unit Desc
SELECT
SELECT
SELECT
Fee Amount
$139.25
$34.81
$4.50
Permit Total Fees: $178.56
Notes:
ALL RESIDENTIAL DRIVEWAYS MUST BE PAVED PER SECTION 19.40.020(B) SVMC
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount
$178.56 $178.56
$178.56 $178.56
Amount Paid
$34.81
Amount Owing
$143.75
$34.81 $143.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: .1D Printed By: JD Print Date: 9/3/2009
Spokane
valley.
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
Community Development
Residential Construction
Permit Application
PERMIT NUMBER: ?VIZ_
PERMIT FEE:
❑ New Construction
nAddition/Remodel
n Other:
V
Accessory Bldg
Li Deck
`—SITE ADDRESS: ' 1\1 cI L&k
[oh-
-
J4
- ASSESSORS PARCEL NO: • LEGAL DESCRIPTION:
c tix i �-:'Contractor
'"a ^ F t A -,4 f'
Butldmg Owner" a a
'{ r
a�,
Name: r 0 G i�
Name: L.: e 3 v/t .i' Sorts
�
Address: • 6 `V ♦ .D --(.Lr
2"� FLOOR SQ. FTG:
pt/ A
Address: 20 03 w C oc 0
Citys,0
' -
•
AI e
Ad
((��
,e State: w'T "yip ri. 0.•
yyC� q
Ciw ea;utl I� �- State: Lit)... Zipy,I 60834
Phones -09J q "/ 9 7 Fax: 09 . ) qq. /2 c„ I
HEAT
Contr cj�gqr tc N Exp Date:!
`�Ufi3�914�.-, 0s\a-
1 abi.11
;contact, Person„;,:, "; ':t ; _ 1 ;
SEWER QRASE`PSTea /)
City Business Lie. No: / p� ci �) II ,
`I
8-8'7
�!J o`-
(�
Name: t e,'l ,1 „at 4
Phone: -S 09 . 97 9- 11.
Describe the scope of work in detail:
2.LL,L4 Ottt'cht)) 6 Acct
Proposed Use: 6 A.2I 9 e .
Cost of Project: $ i0
J0
6 0
-H,0.t-. Inuf-, -
gown.
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
I
DIMENSIONS: '
# OF/STORIES:
TOTAL HABITABLE SPACE:
iv /RVIOUS
MAIN FLOOR TO SQ.
FTG: n ;/(�
2"� FLOOR SQ. FTG:
pt/ A
UNFIN BASEMENT SQ. FTG:
t/• n
IMPESURFACE
AREA:. PCI/A
FINISHEDD\BAS'EfVIOT
SQ. FTG: �I ! \
GARAvGI SQ. FTG: _
�(�
DECK/COY. PATIO SQ. FTG:
BC
30% SLOPES ON
PROPERTY: 9U (,)
# OF BEDRQOMS:
fik
5T (CAL -- TIO^ �MTY�PE:
HEAT
F
jc^
SEWER QRASE`PSTea /)
The permitee verifies, acknowledges and agrees by their signature that: 1) If thispermitis for construction of or on -a dwelling, the -
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Wiley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Wiley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE: -
Method of Payment:
❑ Cash [Check
Bankcard #:
Authorized Signature:
REVISED 2/15/07
L__—DATE:
g-3[_ c)
❑ Mastercard 0 VISA
Expires: VIN#:
RECEIVED BY
CITY OF SPOKANE VALLEY
BY:
SpkanValley®
�
For City Use Only
PLUS Project Number92
Project ddr
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target ate.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢
Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE - APPLICANT PINK - BUILDING FILE
REV 9/07
\dTll_nct "N SIZE
38'
7
N
Is
WOOD FEN CE
10'
I
lo'
•EXISTING
HOUSE
13'
-1515#
22,x. ,k t,
•
PLANNING DEPT. APPROVED
BY•( h}A) LUKv
DATE: clID 109
74.APOSE1) GPA ACE
ON Y;ST;NC
F_XISiiPIG CcnsCR b9,1--,/ovn� P.,,er-�
"CrAf1,1 UNK FENCE
36
12
*OCT r- INC E
t