Loading...
2012, 09-13 Permit: SW-12002191 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002191 Permit Issued Date: 09/13/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: VALLEYVIEW Permit Type: SEWER Primary Contact: NORMS EXCAVATING INC Applicant: NORMS EXCAVATING INC Address: PO BOX 574 VERADALE, WA 99037 Phone: 509-928-0580 Email: SITE INFORMATION Site Address: 1616 S BUTTERCUP ST Owner: WILCOX, PETER E Parcel Number: 35261.0213 Address: 1616 S BUTTERCUP ST SPOKANE, WA 99212-3215 Subdivision: HEATHER PARK Phone: ADDITION Assessor's Description: HEATHER PARK ADD L13 B2 Email: Inspection Area: Water District: Spokane Fire District: Fire District 8 County Water District #3 Zoning: Land Area: 12623 Square Feet CONTRACTOR INFORMATION' General Contractor NORMSEI972BM NORM'S EXCAVATING INC PO BOX 574 VERADALE, WA 99037 509-928-0580 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 5125.00 FEE DETAIL. Processing - Utilities Utilities Permit Total Fee: $125.00 325.94 $125.00 $150.94 CONDITIONS' Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 09/13/2012 08:34:55 Printed by: 115 APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT cv Permit Issued Date: Application Number: SW -12002191 09/13/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 09/13/2012 08:34:55 Printed by: 115 APPPOOLWSP.NET v4.0