Loading...
ZE-0021-01 . ~ ~ 5~~~~~ ~~~NTY HEARING ~~~INER RE Zone Reclassification from the UR-3 5 ) FINDYIVGS OF FACT, Zone to the I-2 Zone, ) CONCILUSgONS OF g.AVV, Applicant Bob and Teresa 1Vhlholland ) AND DECISION File No ZE-21-01 ) ) This matter commg on for public heanrig on June 5, 2002, the Heanrig Examiner, after review of the zone reclassification application and the entue record, hereby makes the following findings of fact, conclusions of law and decision 1. FINDINGS OF FAC'I' 1 The application requests a rezone of approximately 1 37 acres of land from the Urban Residential-3 5(UR-3 5) zone to the Light Industnal (I-2) zone, to develop a storage facility for recreanonal velucles 2 The site is generally located west of and adjacent to Barker Road, between and adjacent to Sharp Avenue and Sinto Avenue, in the NE '/4 of Section 18, Township 25 North, Range 45 EWM, Spokane County, Waslungton 3 The site is currently referenced as County Assessor's tax parcel nos 55181 2509 and 2510 The subject property is legally descnbed as Lots 1 and 2, Block 1, Bates Addition to Valley View Addition to Spokane, according to plat recorded in Volume E of Plats, Page 18, records of Spokane County, Waslungton 4 The applicant for the proposal and the owner of the site are Bob and Teresa 11hlholland, 1317 North Barker Road, Greenacres, WA 99016 5 The Heanng Exammer heard the application pursuant to the County Heanng Exammer Ordinance (County Resolution No 96-0171) and the County Heanng Exammer Rules of Procedure (County Resolution No 96-0294) 6 The Heanng Exammer conducted a site visit on June 3, 2002 A public heanng was held on the proposed rezone on June 5, 2002 The requirements for notice of pubhc heanng were met 7 The following persons testified at the public heanng Jun Falk Grreg Baldwin Division of Planrung Division of Engineerulg 1026 West Broadway 1026 West Broadway Spokane, WA 99260 Spokane, WA 99260-0240 HE Findulgs, Conclusions and Decision ZE-21-0 l Page 1 4 ~ Bob Milholland Teresa Milholland 1317 North Barker Road 1317 North Barker Road Greenacres, WA 99016 Greenacres, WA 99016 S andra Thomas 18602 East Sinto Greenacres, WA 99016 8 The Heanng Examiner reopened the record on July 3, 2002, to consider a revised site plan subnutted by the applicant, luruting access to the site from Sharp Road and Sinto Road, and to consider modified County Engmeeruig condihons of approval addressing such revised access The record was closed on July 22, 2002 9 The County Division of Plaruung issued a Determination of Nonsignificance for the project on Apn125, 2002 10 The Heanng Examuier takes notice of the County Generalized Comprehensive Plan, GMA Comprehensive Plan and Capital Facilities Plan, Phase I Development Regulations, County resolutions cited in tlus decision, County Artenal Road Plan maps, County official zorung maps, County Zotung Code, County Code, other apphcable development regulahons, and pnor land use decisions in the vicuuty 11 The record includes the documents m File No ZE-21-01 at the time of the pubhc heanng, the testimony and documents subnutted at the public heanng, the documents subnutted for the record between June 28 and July 22, 2002 regarding the revised site plan, and the items taken notice of by the Examiner 12 The site is 1 37 acres in size, rectangular ln shape and flat in topography The site is occupied by a smgle-fanuly residence located in the northeast comer of the site, a detached garage located along Sinto Avenue, and two, small detached sheds located along Barker Road The residence is served by an on-site sewage disposal system and public water T'he remainder of the site is covered with landscaping, native grasses, and scattered trees and shrubs 13 Effective January 1, 1991, the zonuig of the site was reclassified from the Agncultural Suburban zone of the now expired County Zorung Ordiriance to the UR-3 5 zone, pursuant to the Program to Implement the Spokane County Zorung Code The site is also located in the Aquifer Sensinve Area (ASA) Overlay zone and the Public Transit Benefit Area designated by the Zorung Code 14 On November 14, 2001, the applicant submitted a rezone application, envlronmental checklist, site plan and application fees The County Division of Plannmg found the subject applicahon to be "counter-complete" on November 16, 2001 15 On March 27, 2002, the applicant submitted a revised site plan On June 28, 2002, the applicant submitted a final revised site plan, hereinafter referred to as the "site plan of record" The revised site plans did not substantially modify the onginal site plan or rezone application, such that a new rezone application would be reqwred HE Findings, Conclusions and Decision ZE-21-01 Page 2 ' 16 The site plan of record illustrates use of the existing home on the site as a caretaker's residence, retention of the detached garage and removal of the two sheds The site plan ind.icates surfacing of the site with crushed gravel, a 30-foot wide entrance along Barker Road for the storage facility, a 20-foot wide entrance along Sinto Avenue for the caretaker's residence, and no access to Sharp Avenue The site plan of record also illustrates an 8-foot high chain luik fence around the penmeter of the subject property 17 No additional water or sewer services are proposed to serve the proposal The applicant proposes to install requued Type III penmeter landscaping adjacent to Barker Road, Sharp Avenue and Sinto Avenue, and along the west boundary of the property The envuonmental checklist indicates that approximately 30% of the site would be covered by recreahonal velucles, and that there would be 40 recreational velucle storage spaces 18 Effective January 15, 2002, the County unplemented a new Comprehensive Plan ("GMA Comprehensive Plan"), County Urban Growth Area (UGA) boundanes, and Phase I Development Regulations, all in implementahon of the State Growth Management Act The County also repealed the intenm development regulations previously adopted by the County under the State Growth Management Act See County Resoluhon Nos 2-0037 and 2-0470 19 The site and the surrounding area are designated in the County UGA Pnor to January 15, 2002, the site was designated inside the County's intenm urban growth area (NGA) boundanes 20 The Phase I Development Regulations allow a rezone application witlun the UGA that is "counter-complete" before the adophon of such regulations on January 15, 2002, and that is "inconsistent" with the "crossover zomng" of the property under the Phase I Development Regulations, to be processed under the comprehensive plan and land use regulahons in effect when the application became "counter-complete" If the rezone application is approved, the new zomng is effechve for a penod of one (1) year, and development of the property may proceed under the condrtions of the rezone provided a building permrt is subnutted withm the 1-year penod After one (1) year, the zomng of the property will revert back to the crossover zone 21 The Phase I Development Regulations designate the site in the Low Density Residenhal category of the GMA Comprehensive Plan, and retained the UR-3 5 zomng ("cross-over zone") of the site The proposed rezone of the site to the UR-22 zone is "inconsistent with" the crossover zomng of the site under the Phase I Development Regulations 22 The Examiner must consider the current rezone applicahon under the comprehensive plan and development regulations ul effect on November 14, 2001, the date when the applicahon became "counter-complete" Tlus includes the old Comprehensive Plan ("Comprebensrve Plan"), County Zorung Code, County Road Standards, intenm development regulations for land located inside the County's IUGA boundanes, and other development regulations in effect on November 14, 2001 23 The site and neighbonng land are designated in the Urban category of the Comprehensive Plan, except for the land lying east of Barker Road between Cataldo Avenue and Interstate 90, wluch land is designate in the Industnal category The site is also located witlun the Aquifer Sensitive Area, Pnonty Sewer Service Area and Urban Impact Area designated by the Comprehensive Plan HE Findings, Conclusions and Decision ZE-21-01 Page 3 ! 24 The Artenal Road Plan in the Comprehensive Plan designates Boone Avenue, east of Barker Road, and Barker Road, as Pruicipal Artenals All other roads in the vicuuty are considered Local Access roads Mission Avenue to the north is designated as a Mmor Artenal The Artenal Road Plan in the GMA Comprehensive Plan designates Barker Road as an Urban Pnncipal Artenal and Mission Avenue as an Urban Collector Artenal 25 Barker Road, Sharp Avenue and Sinto Avenue in the viciruty are currently 2-lane roads without curb or sidewalk Interstate 90 is located approxunately 1,000 feet south of the subject property The Barker Road/I-90 freeway interchange is located approximately 440 feet south of the site at its closest point " 26 The Phase I Development Regulations designate the land lying west of Barker Road in the area in the Low Density Residential category of the GMA Comprehensive Plan, and the land lying east of Barker Road, north of Boone Avenue, in the Medium Density Residential category Such regulations designate the land lying east of Barker Road, south of Boone Road, in the Light Industnal category, except for a parcel designated Regional Commercial at the southeast comer of Barker Road and Boone Avenue 27 The Phase I Development Regulations retained the UR-3 5 zoning of the land lying west of Barker Road in the vicuuty Such land is developed with single-family homes and some duplexes, with two exceptions as noted below New subdivisions have been developed east of Barker Road, north of Mission Avenue, in the vicinity 28 The Phase I Development Regulations reclassified the zoning of the parcel located north of the site, at the southwest corner of Mission Avenue and Barker Road, from the Neighborhood Business (B-1) zone to the UR-3 5 zone In 2001, the zoning of such parcel was rezoned to the B-1 zone, to make an existing non-conforming commercial use on such parcel a confomung use, and to allow unspecified commercial development of the parcel See Heanng Exanuner decision in File No ZE-29-00 The zonulg of the parcels lying immed.iately south and southwest of the site, across Sharp, was reclassified from the I-2 zone to the UR-7 zone Such parcels are improved with a converuence store with fuel islands, and an adjoining small stnp mall , 29 The Phase I Development Regulations reclassified the zorung of the land lying east of Barker Road in the viciruty, north of Boone Avenue, except for certaun land already zoned Urban Residential-7 (UR-7), from the UR-3 5 zone to the UR-7 zone Such land is developed with single-family homes and some duplexes, except for a learning center located directly east of the site across Barker Road Lot sizes on the east side of Barker Road are generally larger than on the west side 30 The Phase I Development Regulations retained the I-2 and B-3 zorung of the land lying southeast of the site and east of Barker Road, between Boone Avenue and I-90 Such land is developed with a mixture of light industrial and conunercial uses Scattered parcels of undeveloped land and a transit center are also found in the vicuuty 31 The "implementing zone" for the site under the Phase I Development Regulations is the UR-3 5 or UR-7 zones Such regulations prohibit the submittal of any new rezone application for the site after January 15, 2002 for any zone but the UR-3 5 and UR-7 zones HE Findings, Conclusions and Decision ZE-21-01 Page 4 32 Pursuant to County Resolution No 97-0874, the applicant must demonstrate the availability of public sewer for the project, or that the site is located inside the 6-year sewer capital improvement plan contained in the 1996 Update to the County Comprehensive Wastewater Management Plan (CWMP) 33 The srte is located outside the 6-year sewer capital improvement plan specified in the 1996 Update to the CWMP The conditions of approval recommended by County Uhlrties requue the apphcant to enter into a sewer connection agreement with the County and to connect to public sewer 34 A public sewer line is located approxunately 700 feet north of the site, north of 11hssion Avenue The apphcant has reached a preliminary understanduig with certain owners of property to connect the improvements on the subject properiy to the public sewer line to the north, through a pnvate sewer extension See letter dated September 18, 2001 from Playfalr Business Park to Robert Milholland This indicates that the extension of public sewer is feasible for the subject property, and can be made available by extending a pnvate sewer line to the site 35 The only opposinon to the proposal was expressed by Sandra Thomas, the owner of the smgle-fanuly home located directly west of the north half of the site Such owner objected to the proposal on the basis that it would increase traffic along Sinto Avenue, would be an eyesore, and the value of her property would be lowered 36 The I-2 zone is intended to implement the Industnal category of the Comprehensive Plan, not the Urban category in which the site is designated However, the Urban category contemplates light industnal uses located along the more heavily traveled streets, and only indicates that heavy industnal uses would be incompatible ui such category The Urban category discourages the development of single-fanuly homes along heavily traveled streets 37 The proposed rezone abuts and will take pruncipal access off Barker Road, which road is designated as a Prulcipal Artenal and is a heavily traveled street The Barker Road/I-90 Interchange is located less than a quarter nule to the south The site is located duectly across Sharp Avenue from intensive commerciaUindustnal uses The Industnal category is located approximately 400 feet southeast of the subject property 38 Recreational velucle and self-service storage uses typically do not generate much traffic and have business hours that are generally compahble with a residential neighborhood Such uses are intended serve residential neighborhoods 39 To nutigate the concerns of Sandra Thomas, the apphcant offered to place a nuie (9)-foot tall fence along the west boundary of the site adjacent to the Thomas property, and place smaller recreational velucles on the north half of the site The applicant also revised the site plan to eliminate recreational velucle access to Sinto Avenue 40 Zoning Code 14 632 355, establishing storage standards in the I-2 zone, requires " all raw matenals, firushed products, maclunery and equipment, including company-owned and operated trucks and motor velucles " to be stored withm an entirely enclosed building or sight-obscuring non-pierced fence not less than six (6) feet in height, and to a height that screens such items from HE Findings, Conclusions and Decision ZE-21-01 Page 5 J view at the ground level This requirement may be waived along certain boundanes of the site if adjacent properties are zoned in an industnal zone or have exishng industnal uses, and the owners of sa.id adjacent properties do not object 41 Zorung Code 14 810 020 (6) limits nonresidential fences in the I-2 zone to a maximum height of eight (8) feet 42 The Staff Report found that the fencing requuement in Zoning Code 14 632 355 applies to the recreational vehicles stored on the subject property Such fencmg requirement can be waived along the south property line if the uses on the land located across from the site to the south are considered industnal and the owner of the land consents 43 To provide a proper buffer and screerung along the west property lme of the site adjacent to the Thomas property, the fencing along such boundary should be at the maximum height allowed in the zone, i e eight (8) feet Within the front yard setback apphcable to the site along Smto Avenue, i e 40 feet from the north lot line of the site, the fence would be limited to a height of three (3) feet The setback standards of the I-2 zone prohibit the establishment of uses, including residential vehicle storage, withui the muumum setbacks required in the I-2 zone 44 Zoning Code 14 806 040 requues the applicant to mstall five (5) feet of Type III (see- through) landscaping adjacent to Sharp Avenue, Sinto Avenue and Barker Road, and to insta1120 feet of Type I(screen) adjacent to the west property line of the site The environmental checklist states that the applicant plans to install tall arborvitae shrubs along the west property boundary The Exanuner has added a requuement that recreational vehicles be stored at least 20 feet from the west property line of the subject property, to provide a proper buffer to the residences located to the west 45 Zoning Code 14 632 385 requues all uses in the I-2 zone to comply wlth air quality regulations, design all extenor lighting to be directed away from adjoirung properties, meet state noise standards, and comply with all federal, state and local laws and ordina.nces protective of soil, ground and surface water, air and human health 46 County Engineenng conditions of approval, as revised on July 11, 2002, require the applicant to dedicate nght of way to the County along adJ acent streets, and unprove Barker Road to a 5-lane artenal road sechon by adding pavement, curb and sidewalk The applicant is required to participate in the improvement of Sinto and Sharp Avenues through a future road unprovement distnct or County road project, if such occurs County Engmeenng conditions also requ.ire pavuig or surfacing for any portion of the site occupied or traveled by velucles 47 Sigiuficant changes have occurred in the area since the site was zoned UR-3 5 m 1991, which support approval of the rezone Tlus includes increased traffic along Barker Road and I- 90 in the viciruty, moderruzation of the HICO converuence store and stnp mall located directly south and southwest of the site, extension of pubhc sewer to the area, increased residential growth in the area increasing the demand for RV storage, the availabihty of public sewer, and designation of the site inside the County's IUGA boundanes HE Findings, Conclusions and Decision ZE-21-01 Page 6 . 48 The project has been conditioned for compliance with the development standards of the I-2 zone and other applicable provisions of the County Zoning Code, and the recommendations of the commenting public agencies 49 The rezone is subject to the one (1)-year restnchon on building pemuts unposed by the Phase I Development Regulahons 50 As conditioned by the Exaininer, the proposal will be reasonably compatible with neighborulg single-family homes and other land uses in the vicuuty Based on the above findings of fact, the Heanng Examiner enters the followmg II. COIVCLUSIONS OF LAW 1 The proposed rezone, as conditioned, generally conforms to the Comprehensive Plan 2 The proposed rezone bears a substantial relationship, and will not be detnmental, to the public health, safety or welfare 3 A change in economic, technological, or land use conditions has occurred to warrant the proposed rezone, and a substantial change of circumstances has occurred in the azea since the site was last zoned 4 The procedural requuements of the State Environmental Policy Act and the County's Local Environmental Ordinance have been met The proposal, as conditioned, will not have a sigruficant, probable adverse unpact on the environment 5 The proposal, as conditioned, complies with the I-2 zone, the County Zonulg Code and other apphcable development regulations 6 The proposed rezone meets the cntena established by VVashington case law for approving a rezone, and the cntena established in paragraphs 14 402 020 (1)(2) of the County Zorung Code for amending the County official zorung map 7 Approval of the land use application is appropnate under Section 11 of the County Hearulg Examiner Ordinance, adopted by County Resolution No 96-0171 III. DECISION Based on the above Findings of Fact and Conclusions of Law, the application for a rezone from the Urban Residenhal-3 5(UR-3 5) zone to the Light Industnal (I-2) zone, for development of a recreational velucle storage facility, is hereby approved, subject to the condzrions of approval of the public agencies stated below Any conditions of such agencies that have been added or sigruficantly revised by the Hearing Examiner are itahcized HE Findings, Conclusions and Decision ZE-21-01 Page 7 ~ Failure to comply with the condrtions of tlus approval may result in revocahon of this approval by the Heanng Exanuner Tlus approval does not waive the applicant's obligation to comply vcnth all other requuements of other agencies with junsdiction SPOKANE COiJNTY DMSION OF PLANIVING 1 All conditions imposed by the Heanng Examuier shall be binding on the "Applicant," which term shall include the owners and developers of the property, and theu heus, assigns and successors 2 The zone change applies to Lots 1 and 2, Block 1, Bates Addihon to Valley View Addirion to Spokane, according to plat recorded in Volume E of Plats, Page 18, records of Spokane County Auditor, Waslungton 3 The proposal shall comply with the Light Industnal(I-2) Zone and all other applicable Spokane County Zonmg Code regulations, as amended 4 The applicant sha11 develop the subject property in substantial conformance with the site plan of record submitted by the applicant on June 28, 2002 All aspects of the proposal shall be bind.ing on the development, including the proposed use Vanations to be approved by the Director of the Division of Planrung/designee as an admirustrative change of conditions shall only be allowed to meet regulation standards and condihons of approval 5 Approval is required by the Director of the Division of Plannulg/designee of a specific illumuiation plan for the descnbed property pnor to the release of any building pernuts All illununahon on site shall comply with Section 14 810 180 of the Spokane County Zonmg Code 6 Approval is required by the Duector of the Division of Planrung/designee of a specific sigiung plan for the descnbed property pnor to the release of any building permits Signage shall conform to Section 14 804 160 of the Spokane County Zonmg Code, as amended 7 A specific landscape plan, planhng schedule and provisions for maultenance in conformance with Chapter 14 806 of the Spokane County Zonuzg Code shall be subrrutted with a suitable guarantee for the project pnor to release of building permits Landscaping shall be installed and maintained so that sight distance at access points and intersections is not obscured or unpaired consistent with the requirements of Chapter 14 810 of the Spokane County Zonmg Code 8 An eaght (8) foot high saght-obscurcng non pierced fence shall be anstalled along the west boundary of the northerly half of the site A muumum six (6)-foot lugh sight-obscuring fence shall be constructed along the other property lines of the subject site Such fencing shall comply with the designated "clear view tnangle" as specified in Section 14 810 of the Spokane County Zoiung Code 9 Storage cs prohcbated within 20 feet of the west property line, and within the minimum setbacks requared in the I-2 zone HE Findings, Conclusions and Decision ZE-21-01 Page 8 ° 10 The Spokane County Division of Planrung shall prepare and record with the County Auditor a Title Notice specifying a future land acquisition area for road nght-of-way and utihties The reserved future acquisition area Title Notice shall be released, in full or in part, by the Division of Planrung The notice should be recorded witlun the same time frame as a.n appeal and shall provide the following a At least eleven (11) feet of reserved future acquisition area for road nght-of-way and utilrties, in addition to the existing and/or newly dedicated nght-of-way along Barker Road NOTE The County Engineer has requued nuie (9) feet of new dedicahon along Barker Road b Future building and other setbacks requued by the Spokane County Zorung Code shall be measured from the reserved future acquisition area c No required landscaping, parking, '208' areas, drainfield or allowed signs should be located within the future acquisition area for road nght-of-way and uhhties If any of the above improvements are made within this area, they shall be relocated at the apphcant's expense when roadway unprovements are made d The future acquisition area, until acquued, shall be pnvate property and may be used as allowed in the zone, except that any unprovements (such as landscaping, parking, surface drainage, drainfield, signs or others) shall be considered intenm uses e The property owner shall be responsible for relocahng such "intenm" unprovements at the rime Spokane County makes roadway unprovements after acquinrig said future acquisrtion area 11 The Division of Plammmg shall prepare and record with the Spokane County Auditor a Title Notice, noting that the property ln question is subJect to a vanety of special condihons imposed as a result of approval of a land use action Tlus Title Nohce shall serve as public notice of the condltions of approval affecting the property in question The Title Nohce should be recorded within the same tune frame as allowed for an appeal and shall only be released, in full or in part, by the Division of Planrung The Title Notice shall generally provide as follows "The parcel of property legally descnbed as Lots 1 and 2, Block 1, Bates Addition to Valley View Addition to Spokane, according to plat recorded in Volume E of Plats, Page 18, records of Spokane County Auditor, Washington, is the subject of a zone reclassification by the Spokane County Heanng Examiner on August 15, 2002, imposing a vanety of special development conditions File No ZE-21-01 is available for inspection and copyYng in the Spokane County Division of Planrung 12 The Division of Planrung shall file with the Spokane County Auditor, withln the same hme frame as allowed for a.n appeal from the final disposihon, including lapsing of appeal penod, a Title Notice, which shall generally provide as follows "Pnor to the issuance of any building pernut for any buildmg or any use on the property descnbed herein, the applicant shall be responsible for complying with the provisions of the Zonuig Code for Spokane County, Section 14 706 (Aquifer Sensitive Area Overlay Zone) The HE Findings, Conclusions and Decision ZE-21-01 Page 9 Q property which is the subject of this notice is more particularly descnbed as follows (legal descnption) SPO%ANE C0UNTX BLJILI)IIVG AIVD CODE E1VFORCEIVIENT 1 The apphcant should contact the Division of Bwlding and Code Enforcement at the earhest possible stage m order to be informed of code requirements admirusteredlenforced as authonzed by the state Building Code Act Design/development concerns include addressing, fire apparatus access roads, fire hydrant flow, approved water systems, buildmg accessibility, construction type, occupancy classification, existing extenor wall protection and energy code requuements 2 The location of the proposed nuni-storage building is in conflict with the Zonuig Code and special consideration to building construction, firewalls and parapets should be considered by the applicant pnor to detemurung the final location of the building SPOI{ANE DIVISI0N OlF ENGINEERING AND ROAADS Prgor to assuance of a building perffiit or at the request of the C'ounty Engineer in conjunction with a County ltoacfl ProjectlItoad Ianprovernent District, wbichever comes f rst: 1 The applicant shall dedicate 9 feet on Barker Road for nght of way 2 The applicant shall dedicate 4 feet on Sharp Avenue and Surto Avenue for ngllt of way 3 The applicant shall dedicate the applicable radius on Sharp Avenue and Barker Road 4 The applicant shall dedicate the applicable radius on Barker Road and Sinto Avenue Prior to release of a 6uilding permit or use of pa-opetty as proposed: 5 Access pernuts for approaches to the County Road System shall be obtained from the County Engineer 6 A Professional Engineer (P E), licensed in the State of Washmgton, shall submrt road and storm drainage construction plans and a drainage report that conform to the versions of the Spokane County Standards for Road and Sewer Construcrion, the Guidelines for Stormwater Management, and all applicable federal, state, and local regulahons and laws that are in effect at the time of the plan subriuttal or at the tune of the development pernut application(s) The final road and storm drainage plans and dramage report shall receive the County Eng7neer's acceptance pnor to release of any Grading, Building, or Right-of-Way Permit 7 A parking plan and traffic cuculation plan shall be subrnitted and approved by the Spokane County Engineer The design, location and arrangement of parkuig stalls shall be u1 accordance with standard engineenng prachces Paving or surfacing as approved by the County Engineer will be required for any portion of the project wluch is to be occupied or traveled by velucles 8 To construct the roadway improvements stated hereul, the applicant may, with the approval HE Findings, Conclusions and Decision ZE-21-01 Page 10 ~ of the County Engineer, join in and participate in any pehtion or resolution the purpose of wluch is to form a Road Improvement Distnct (RID) for said improvements, pursuant to chapter 36 88 RCW, as amended Spokane County will not participate in the cost of such improvements Tlus provision is applicable to Sinto and Sharp Avenues 9 As an altemative method of constructing the road unprovements stated herein, the apphcant may, with the approval of the County Engineer, accomplish the road improvements by jouung and participating in a County Road Improvement Project (CRP) to the extent of the required unprovements Spokane County will not participate in the cost of these improvements Tlus provision is apphcable to Sinto and Sharp Avenues 10 The construction of the roadway improvements stated herein shall be accomplished as approved by the Spokane County Engineer 11 The County Engineer has designated a 5-Lane Pnncipal Artenal Roadway Section for the unprovement of Barker Road that is adjacent to the proposed development Tlus will require the installation of 17-19 feet of asphalt Curbing and sidewalk must also be constructed 12 The County Engineer has designated a Local Access Roadway Section for the unprovement of Sinto Avenue that is adjacent to the proposed development This will require the addition of approximately 11-13 feet of asphalt along the frontage of the development Curbing and sidewalk must also be constructed 13 The County Engineer has designated a Local Access Roadway Section for the unprovement of Sharp Avenue that is adjacent to the proposed development Tlus will require the addihon of approximately 11-13 feet of asphalt along the frontage of the development Curbing and sidewalk must also be constructed 14 All requued unprovements shall conform to the current State of Washuigton Standard Specifications for Road and Bndge construction and other apphcable county standards and/or adopted resolutions pertauung to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer 15 The applicant shall sign "Spokane County Nonce to the Public Number 6", which specifies the following "The owner(s) or successor(s) in interest agree that in consideration of Mutual Benefits now or to be hereafter denved, do for themselves, their heus, grantees, assigns and successor(s) in interest hereby request and authonze Spokane County to include the above descnbed property in a Road Improvement Distnct (RID) and to support the formation of a Road Improvement Distnct for improvement of the road(s) descnbed below by requesfiuig and authonzuig Spokane County to place their name(s) on a petition for the formarion of a Road Improvement Distnct pursuant to RCW 36 88 050, or by requeshng and authonzing Spokane County to cast theu ballot in favor of a RID being fonned under the resolution method pursuant to RCW 36 88 030, and/or by not filuig a protest against the formation of a RID being formed under the alternative resoluhon method provided for in RCW 36 88 065 and Chapter 35 43 RCW If an RID is proposed for improvement of the road(s) descnbed below, said owner(s) and HE Findings, Conclusions and Decision ZE-21-01 Page 11 . successor(s) further agree (1) that the improvements or construction contemplated within the proposed RID are feasible (2) that the benefits to be denved from the formation of the RID by the property included therein, together with the amount of any County participation, exceeds the cost and expense of formation of the RID, and (3) that the property witlun the proposed RID is sufficiently developed, provided, they, their heu-s, grantees, assigns and successor(s) shall retaui the nght, as authonzed under RCW 36 88 090, to object to any assessment(s) on the property as a result of the improvements called for in conjunction with the formahon of a RID by either the pehtion or resolution method under Chapter 36 88 RCW, and to appeal to the Supenor Court the decision of the Board of County Commissioners confirnung the final assessment roll, provided further, it is recogmzed that actual assessments may vary from assessment estimates as long as they do not exceed a figure equal to the increased true and fau value the improvement(s) add(s) to the property It is further acknowledged and agreed that at such time as a RID is created or any County Road Improvement project is authonzed by Spokane County, the improvements reqlured shall be at the sole expense of the owner(s) of property witlun the RID or served by the improvements without any monetary participation by Spokane County The RID waiver contained in tlus agreement shall expire after ten (10) years from the date of execution below Tlus provision is applicable to Sinto and Sharp Avenues " 16 Access to Sinto and Sharp Avenues (except for the exishng approach for the caretaker's residence) shall be prolubited until such time as specifically authonzed by the Spokane County Engineer 17 Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane County Resolution No 1-0298 as amended and are apphcable to tlus proposal 18 No construction work is to be performed within the existing or proposed nght of way unnl a pernut has been issued by the County Engineer All work within the pubhc road nght of way is subject to inspection and approval by the County Engineer 19 All required construction witlun the existing or proposed public nght of way is to be completed pnor to the release of a building permit or a bond in an amount estunated by the County Engmeer to cover the cost of construction or improvements shall be filed with the County Engineer 20 The County Artenai Road plan identifies Barker Road as a Pnncipal Artenal The existing nght of way width of 60 feet is not consistent with that specified in the plan In order to implement the Artenal Road Plan, a stnp of property 11 feet m width along the Barker Road frontage shall be set aside in reserve This property may be acquired by Spokane County at the time when Artenal Improvements are made to Barker Road 21 The applicant is advised that there may exist utilities either underground or overhead effecting the applicant's property, including property to be dedicated or set aside future acquisition Spokane County will assume no financial obligation for adjustments or relocanon regardmg these utilities The applicant should contact the applicable uhlities regarding responsibility for adjustment or relocation costs and to make arrangements for any necessary HE Findings, Conclusions and Decision ZE-21-01 Page 12 V work 22 The applicant shall grant applicable border easements adjacent to Spokane County Right of Way per Spokane County Standards 23 This proposed zone change is not being requested for a specific development proposal or site plan at this hme At such time a site plan is submitted for review, the apphcant shall subnut detailed traffic informahon for review by the County Engineer to determine what traffic impacts, if any, that the development would have on surrounding mfrastructure The applicant is advised that nutigation maybe required for off-site unprovements SPOKANE REGIONAI, HEALTH DIS'I'RICT 1 A combined surface water and sewage disposal detailed plan shall be approved by the Spokane County Engineer and Spokane Regional Health Distnct pnor to the issuance of any on- site sewage disposal pemut or building permit for tlus project 2 The sewage disposal method shall be as authonzed by the Director of Utihties, Spokane County 3 Water service shall be coorduiated through the Director of Utihties, Spokane County 4 Water service shall be by an existing public water supply when approved by the Regional Enguleer (Spokane), State Department of Health 5 The site of the irutial and replacement subsurface absorption system of the on-site sewage system shall be maintained so that it is free from encroachment by buildings and other structures The area shall not be covered by paving or any other unpervious matenal and shall not be subject to vehicular traffic 6 Subject to specific applicatioa approval and issuance of pernuts by the Health Officer, the use of an individual on-site sewage disposal system may be authonzed 7 The use of pnvate wells and water systems is prohibited SPOKANE COUNTY I)IVISION OF UTII.,I'I'IES 1 As per the Spokane County Zotung Code Phase One Development Regulahons, a wet (live) sewer connection to the area-wide public sewer system shall be constructed Sewer connechon pemut is requued Commercial developments shall subnut lustoncal and/or eshmated water usage pnor to the issuance of the connection pemut in order to establish sewer fees 2 The applicant is required to sign a sewer connection agreement pnor to issuance of a pernut to cormect 3 The applicant shall submit expressly to Spokane County Division of Utihties, "under separate cover", only those plan sheets showing sewer plans and specificahons for the public HE Findings, Conclusions and Decision ZE-21-01 Page 13 r sewer connections and facilihes for review and approval Commercial developments shall submit lustoncal and/or estimated water usage as part of the sewer plan submittal 4 Sewer plans acceptable to the Division of Uhlities shall be subnutted pnor to the issuance of the sewer connection pernut 5 Arrangements for payment of applicable sewer charges must be made pnor to issuance of sewer connection permit Sewer charges may include special connection charges and general facilities charges Charges may be substantial depending upon the nature of the development 6 Any water service for this project shall be provided in accordance with the Coordmated Water System Plan for Spokane County, as amended SPOKANE COUNTY AIR POLLUTIOIV CONTROg, AiJTHORYT'Y 1 All applicable air pollution control regulations must be met DATED this 15th day of August, 2042 SPOKAIVE COUN'I'Y HEARING EXArv[INEIt Mich el C Dempsey, WSBA Z8~'`35 HE Findings, Conclusions and Decision ZE-21-01 Page 14 e ~ NO'I'gCE OF FINAI, IDECISION AND NOTgaC]E OF RIGHT TO APPEAL Pursuant to Spokane County Resolution Nos 96-0171 and 96-0632, as modified by County Resolution No 1-0700, the decision of tiie Hearing Examiner on an application for a zone reclassification is final and eonclusive unless wYthin fourteen (14) days from the Examiner's wntten decision, a party of record aggneved by such decision files an appeal wlth the Board of County Comrrussioners of 5pokane County, Washingtan This decislon was mailed by certified mail to the Apphcant, and by regular mail to other parties of record, on August 15, 2002 THE APPEAL CLOSING DA'I'E IS AiJGUS'T 29, 2002. The camplete record in this matter, includLng this decision, is on file dunng the appeai penod with the U£fice of the Hearuig Exam.iner, Third Floor, Public Works Building, 1426 West Broadway Avenue, Spokane, Washington, 99264-0245, (509) 477-7490 The file may be inspected dunng normal working hours, listed as Monday - Fnday of each week, except holidays, between the hours of 8 30 a m and 5 OD p m Coples of the documents u1 the record will be made available at the cost set by Spokane County Pursuant to RCW 36 70B 130, affected property owners may request a change in valuation for property tax purposes notwithstanding any program of revaluation i-E Findings, Conclusions and Decisian ZE-21-0I Page 15 .111110 G C~ ~ - ~ j St ' ~ ~ C rc\ r►'~~~~,,~ ~ ~o v ~e _y ~Q~ Sfi~ ~ . ~ ~ , • _ U ~ l.%\ ~ ~ ✓ l. l ~ :r. y. ~ E~nR~ G ~ EziR~G 30' 30' ~ I VV 1' ~ 5' ~ 2', p 12' , 6' ~ 8' , l2' 2', 5' ~ 2' SIDEwAIK LEIJiE iRAFFIC . TRAFFIC LBIItE 9DEWAUf ANE LEfT TURN LANE 2% MI1 ?7G ApN - - - . ;i _ r m - '~Z1 SIDEWA K ~ , ' (TYP.~ ASPHALT CONC, PAVEAiF.NT` ~ C.S.B.C. T1PE 'B" CUR9 (TYp.) 3 LANE SECTION STA. 10+00 (BEGIN PROJECT) TO STA 23+00 (MISSION) ~ STA. 32+00 (INDIANA) TO END OF PROJECT ~ NOTE: AN AOpIT10NAl 17' RIGHT LANE 'Nlll BE ADQEO A1 415510N ALLONING A FREE RIGHT TURN. THtS fURN LANE WILL ALSO UNE UP WITH THE ADD171DNAL OUTSIDE LANE FR0M A1159ON TO INOIANA, ?P y 4 q m L. . ' ~f~ t4[ x~ lWtMA~10 sc~~E ~~"of Cointy y~s AppRd~fl fj~Oq~l gARKER ROAD TYPICAL SECTION SHEET _ hoiaaiw ~ srau~ vku,o~Public to~oA-oi~o ~ u I ld,rs ~ iw ~ (50) 417_3600 BARKER ROAD I-90 TO SPOKANE RIVER 10l1 noI wm Om+m ~ ~ ~ E%15TING E RI~wING RW I ExlSTING 30' 45' ~ 30" BOR4ER EASEMfNT ~ I I A) ~ 5' 12' 8' 5' 12' 12' 6• 2- SIPEWALK 9iKE TRAFFIC TRAFPiC TRAfFIC 6A E EXISIINC K LANE LEFTITUflN LP'iE 2% MlN 2X MIN ^--_'.-'n_-s~~~"" ~:~•r,_. ,-~'J ~ 4 ~`~-1 EXi511NG 5IDEWALK ~ QRAINACE (?YP.) A5PNA4T CONC. PAVEMENT/ ~ C.S.B.C. SWALE TYPE 'B* CURB EXISTING CURB NOTE: (TYP•) E%i311NC dRAINl~fE SWALE R~PLACE A5 i~E~WREp ;q g[ RE5GOPED AS REOUIRED. SWALE ALSO TO HAVE SPklNHLERS, TOp 501L, SOn AN4 ORYWkLLS. 4 LANE SECTIDN STA. 23+00 (MISSION) TO STA 32+00 (INDIANA) ~y J. C,q a }1111 ~~+~x ~ ilepa~tm~knaf publleyWwlU APP+~OVEO: Ss'°~ALBARKER ROAD TYPICAL $ECT1l~N SHEET I ~ i I I ~ ~~~~NdA 1p7d W. 9raaqroM Aw. ~M~ ~ 07M[t ~ saOKANe. w,. e9260-0170 BARKER ROAb - I-90 TO SPOKANE RIVER _L.ot1. ~ ~ w.' *.«mn _ ~UnCw [509) ~77-1b00 O~Ir. ¢lGZ eaII. e/l}IOa ~~GI?V rfkS ~ ~ V1''r--~' Siii~ET . As Buil[ Ptans Received ReZOI1@ F11eTf: 0 22 1 1 -U] ~ iloaa !'lans APPaoved Companionn F'iles: New f2oad Standards 5-15-93 Mylar Related Fi1es_ t"p_~;, , ~ Hearing: 05AT71-aw- -9:04 }3uilaling Dept: "I'tehnicai Reaie►v: 12/06/2001 3:15 , Harvard Rd PIan _ Cng Special Nees Preliminary, Rer'iew: Type: - Large Lot f31dg. Square Feet Date Rc;ceivi;d; I 1J16120QI Nlo. Lots; N'o.:1cre;: 1.38 Pr+aject Name UR-3.5 TQ 1-2 SELF SER.VICE STOILA,GE 40 CTNI1 S 1ViILHULLAND , Site Address W. 13ARKER, E. GftEENAC12L-S, N. SH~1,R.P, S. SINI'O, BAR,1iLR N. 1317 Applicnnt 'Conditions hiailed: Flood Zone No Phone Dist Schoo[ pisc 356 Rubert & Teresa Milho]lancf Fire Dist UI Range-Towns3iip.Seciioii: 45 - 25 - 1$ PAFtCEL(S): (tirst ~',U) Wazer Sour+ce Ptabl ie 5518I.2509 55181.2510 Sewer Saurcc Public f'O Q0X 75; +GREENACRLS, WA 99016 Phcar3t (509) 926-6435 - Eng E3illing Robert & Teresa Nlilhollanci ()wqer P(? f30X 755 Rnbert & Tereqa N1s117ollarid Surveyor GREENACRES, WA 99016 WilIiarcl C7 I3aat1<<eight Phone (509) 926-+5435 LANUMAI2IC SLlRVEYQRS P(3 8C)X 755 GRE ENAi['ItES, lA%:1 990I6 SPR.-1CiUE, W'A 99032- PO E3OX 354 Si~a~ed Nai»e: Phone (SCl9) ~~2~i-G435 ~'hune (5{}f~) 924-3945 ROE3ERT hrIILHC}1_LAND Btiild%np- 477-3675 ~fPlannine 477-7200 fEngineer 477-3600 Contact I31P 11M 1=ALK Contact I;ne G42EG 13ALaWIN Date Submitted Des+ct•iptiau Initials Eng Need 1'eehnically Complc:te Eng i~eed 1-iarvard Rci 149itigatioii Eng I'+1eec1 I?rainage Plans Eng Nced Tr~~flac Analysss L-ng NeccI Other 101101200I Eng Agree F'ay Fees Received Eng Final Plat F'ees Cornpleted CppY [f? ACCQt11'kLlilg Eng Agrce f'riorrty Fees Received 11A1412001 Eng F'i•c:finz Ptat Fees C'oinpleted 1 ~ Notice to Pub1ic: / Nattce to Public # 3 3 4 G Coniplctcd - or Nc:eils to be s~gned - - Design Deviation Dats:s (In-~.7ut) Uat~ ~l.iitts.4 lsar Hearing Date Decision App Den Conci Appld BCC Appealed to 13CC Decision App Den Cond AppId Caun Appealed tO COLrrt Decssion App I]en Cand App1d 5tarnped Mylars tu Secretary (Sand y) - - f 1 Stamped 203 Loc I'lans to Secretary (SandY) ~ ~ PrujectSt'.',tus ACtYVE' ENV'~~~EWS "VI"W_.~ As BuiYi Flans Received Rezone Fi1e ZE-0021-01 -01 Rcaad Plans Appraved Companian Files: New Road S€andards 5-15-95 Mylar Related Files: Hcraring: Biii3dsng Dept: Technicai Fteview: 12/06f2001 3:I5 Pte(in~inary ~eview: ~~4. LI Harvard Rc~ Flan ~:I Eng Sperial Fees El Largc Lot Bidg. S'quare Feet Uatc Received: 11 /16I20D I No. Lats: IVa. Acres: 1.38 Project Name U!R-3.5 T(] I-Z SELF SERVdCE ST()RAGE 40 'fNITS NIILHOLLAND Site Address W. f3ARkER, E. GRLENACRLSs N. SH.fiRP, S. SIN`PO, f3ARfCER N. 1317 Applicaut Range-Toumship-Sectivn: 45 - 25 - 18 PARCEL(S): (first 20) Robertiv4ilhQ1land C'onciitionsMailed: 5518I.2509 55I8I.2510 1=1ood Zone No 1$717 E. Boone Watcr Source Publie Pf7 I3OX 755 Sewer Source ~'ublic ~r KEGNACR~ES, WA 99(?Ib Phorse (509) 926-6435 (509) 991-2415 Schao3 I]ist 356 Fire DisE 01 Phone DisC Eng Billing Owner Roben Milhalland Robert Mi1hoIiand 18717 E. Buone 18717 E. F3onnc Surveyor PG BC?X 735 F+D BOX 755 Williard D E3oatsvright GEtrENACRES, 1aVA 99016 GREENACRES, Wu'A 99016 LANDh1ARK SI;TRVEYORS Ph~ne 926-6~35 Phe~ne (50'9) 926~435 (505~) 811-2415 (509) - (509) 891-2415 SPRAGUE, WA 99432- PQ BQJ{ 354 Phone (509) 924-3905 Signecl Name: R(3I3EftT MILHOLLAND I3uildirsg 477-3675 /Pianning 477-7200 /Engineer 477-3600 Conract BIP JiM FALK Cantact En& GREG BALGMN Date Subrnifted Descrxption Initials ~ Eng Need 7"echnically Coniplete Eng Need i3arvard Rd kiatigation Etig Need Urainage Pians Eng Need Teaffic AnaEysis L-ng Need Other l 0/i dl2001 Eng Agree Pay Fees Keceived Eng Final Plat Fees Comp3eted Copy to AecQunting Eng Agrec Priarity Fees Receiwed 1 1114,"ZElD1 Eng 1'relim Plat Fees Completcd l J Naticc to Public d Notiee ta PubEec # 1 3 4 6 Canlpletc,d -or Needs to be signec! Design Deviat.ion Uates (In-C3ut) l 1 - 1 1 ~ - I f l I - ! f ! I' 1 l 1 l I 1 i I f 1 I ori quantses toi drainage itern calcu[ated Hearing Qate Decisian App Den Cond Appld BCC Appealeci to i3CC Qecision App Uen Cond Apptd Court Appealed to Court Decision App ben Cond Appid Stamped Mylars to Secretary (Sandy) ~ - / Starnped 208 Lot Plans to SecreEary (Sastdy) + , OFFICE OF ~ HE SPOKANE COUNTY E(VGIfVEER 1026 W Broadway Ave, Spokane, WA 99260-0170 (509) 477-3600 Fax (509) 477-2243 - _ - - s''°',t" cx"K" "ENGINEER'S COIVDBTIONS OF APPROVAL" ZONE TO Spokane County Division of Planning ~ • FROM Division of Engineering & Roads DATE July 11, 2002 PROJECT: UR-3.5 TO I-2 SELF SERVICE STORAGE 40 UNITS FILE ZE-0021 a01 Tech n ical/Review Date (12/06/2001 @ 3:15) Planner JIM FALK Hearing Date @ Review Date 615/2002- 7/11/2002 - Revased Sote Plan Conc9itions Sponsor/Appiicant ROBERT MILHOLLAND Section Township Range 18-25-45 The Spokane County Division of Engineering and Roads has reviewed the above referenced application The foilowing "Conditions of Approval" are submitted to the Spokane County Division of Planning for inclusion in the "Findings of Fact, Conclusions and Order/Decision" should the request be approved Prior to issuance of a building permit or at the request of the County Engineer en conjunction with a County Road ProjectlRoad Improvement Distroct, whichever comes first: 1. Applicant shall dedicate 9 feet on Barker Road for right of way 2 Applicant shall dedicate 4 feet on Sharp Avenue and Sinto Avenue for right of way 3 Applicant shall dedicate the applicable radius on Sharp Avenue and Barker Road 4 Applicant shall dedicate the applicable radius on Barker Road and Sinto Avenue Prior to release of a bu6lding permit or use of property as proposed: 5 Access permits for approaches to the County Road System shall be obtained from the County Engineer CC Applicant ROBERT MILHOLLAND Engineer/Surveyor BOATWRIGHT Planner JIM FALK Page 2 Engineers Hearing / Review / 12/06f2001 TR zE-0021-01 6 A Professional Engineer (P Elicensed in the State of Washington, shall submit road and storm dramage construction plans and a dramage report,that conform to the versions o# fihe Spokane Counfiy Standards for Road and Sewer Construction, the Guidelines for Stormwater IVlanagement, and all applicable federal, state, and local regulations and laws that are in effect at the time of the plan submittal or at the time of the development permit application(s) The final road and storm drainage plans and drainage report shall receive the Caunty Engineer's acceptance prior to release vf any Grading, Building, or Right-of-Way Permit 7 A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer The design, location and arrangement of parking stalls shall be in accordance with standard engineering practices Paving or surfacing as approved by the County Engineer will be required for any portion of the project which is to be occupied or traveled by vehicles 8. To cons$ruct the roadway improvements stated hereen, the appticant may, woth the approvai of $he County Engineer, Join Qn and be wi9ling to participate in any pegition vr resolution whoch purpose us the formatian of a Road ompravernent District (RID) for said improvement pursuant #o RGW 36.88, as amended. Spmkane County well nat participate in the cost of these irnprovements Thus provesoon is applocable to Sinto and Sharp r4venues, 9. As an aoternative method of cons$ructong the road improvernents stated hereora, $he applicant may, vvath the approvaB of the County Engeneer, accornplesh the road ompravements stated herean by joineng and participating on a County Raad Project (CRP) to the extent af the requAred irnprovement. Spokane Gounty wetl not participate in the cost of #hese imprmvemen$s. Thus provision is applicab@e to Sireto and Sharp Avenues. 10 The construction of 'the roadway improvements stated herein shall be accomplished as approved by the Spokane County Engineer 11 The County Engineer has designated a 5-Lane Principal Arterial Roadway Section for the imprvVement of Barker Road which is adj acent to the proposed development This will require the mstallation of 17-19 feet of asphalt Curbing and sidewalk must also be constructed 12 The County Engineer has designated a Local Access Roadway Section for the improvement of Sinto Avenue which is adjacent to the proposed development This will require the addition of approximately 11-13 feet of asphalt along the frontage of the development Curbing and sidewalk must also be constructed 13 The County Engineer has designated a Local Access Roadway Sectron for the improvement of Sharp Avenue which is adjacent to the praposed development This will require the addrtion of approximately 11-13 feet of asphalt along the frontage of the development Curbing and sidewalk must also be constructed Page 3 Engineers Hearing / Review / 12/06/2001 TR , ZE-0021-01 14 All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge construction and other applicable county standards and/or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer 15. Applican$ shall s6gn '°Spo6cane County Notoce to the Pubsic Number 6°° which specifies the folBowing: The owner(s) or successor(s) in interest agree that an consideration of Mutual Benefts novv or to be hereafter c0eroved, do for themselves, their heirs, grantees, assigns and successor(s) in onterest hereby request and authorize Spokane County to onclvde the above described property in a Road Improvement District (RID) and to support the formation of a RoacO Improvement District for improvement of $he road(s) described below by requesting ancl authorizing Spokane County to p0ace their narne(s) on a petition for the formation of a Road Irnprovement District pursuant to RC1nl 36.88.050, or by requesteng and authoriaing Spokane County to cast theer ballot in favor of a RID being formed under the resoaution enethoc0 pursuant to RCUV 36.88.030, and/or by not filing a protest against the formataon of a F21D being foraned uncBer the a9ternative resolution method proveded for in RCVV 36.88.065 and Chapter 35.43 FtCVV. If a RID is proposed for improvement of $he road(s) described be9ovv, said owner(s) and successor(s)further agree: (1) tha$ the improvernen4s or construction contervoplated within the proposed RID are feasible and (2) that the benefits to be derived from the forrnation of the RID by the property included therein, together with the arnount of any Coun$y partacipation, exceeds the cost and experase of formation of the RID, and (3) that the property within the proposed RID is sufficiently developed; provided, themselves, their heirs, grantees, assigns and successor(s) shall retain the right, as authorozed under RCVV 36.88.090, to object to any assessonen$(s) on the property as a resul$ of the improvernents calBed for in conjunction with $he formation of a RID by either the petition or resolution me4hod under Chapter 36.88 RCW and to appeal to the Superior Court the decision of the Board of County Comanissioners confirming the final assessrnen$ roll; proveded further, it is a-ecognized that actual assessments rnay vary frorn assessment estirnate so long as they do not exceed afigure equal to the increased true and fair value irnprovement(s) add(s) to the property. It is further acknowledged and agreed that at such tirne as a RID is created or any County Road Improvement project is authorized by Spokane County, the irnprovements requarec9 shalV be at the soYe expense of the owner(s) of property within the RID or served by the improvements without any rnonetary participation by SpoBcane County. The RID wraiver contaBned in this agreement shall expire after ten (10) years frorn the clate of execution below. This provision is appsicable to Sinto and Sharp Avenues. Page 9 Engineers , Hearing / Review / 12/06/2001 TR ZE-0021-01 16 Access to Sinto Avenue & Sharp Aveneue (except the existirog approach for the caretalker's residence) shall be pa-ohibitec9 untol such time as specificaBly authorizec9 by 4he Spokane County Engineer. 17 Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners resolution 1-0298 as amended and are applicable to this proposal 18 No construction work is to be performed within the existing or proposed right of way until a permit has been issued by the County Engineer All work within the public road right of way is subject to inspection and approval by the County Engineer 19 All required construction within the existing or proposed public right of way is to be completed prior to the release of a building permit or a bond in an amount estimated by the County Engineer to cover the cost of construction or improvements shall be filed with the County Engineer 20 The County Arterial Road plan identifies Barker Road as a Principal Arterial The existing right of way width of 60 feet is not consistent with that specified in the plan In order to implement the Arterial Road Plan it is recommended that in addition to the required right of way dedication, a strip of property 11 feet in width along the Barker Road frontage be set aside in reserve This property may be acquired by Spokane County at the time when Arterial Improvements are made to Barker Road 21 "The applicant is advised that there may exist utilities either underground or overhead effecting the applicant's property, including property to be dedicated or set aside future acquisition Spokane County will assume no finanaal obligation for adJustments or relocation regarding these utilities ""The applicant should contact the applicable utilities regarding responsibility for adjustment or relocation costs and to make arrangements for any necessary work " 22 The applicant shall grant applicable border easements adJacent to Spokane County Right of Way per Spokane County Standards 23 This proposed zone change is not being requested for a specific development proposal or site plan at this time At such time a site plan is submitted for review, the applicant shall submit detailed traffic information for review by the County Engineer to determine what traffic impacts, if any, that the development would have on surrounding infrastructure The applicant is advised that mitigation maybe required for off-site improvements END 't S P O K A N E C O U N T Y - _ ...o OFFICE OF THE HEARING EXAMINER MICHAEL C DEMPSEY, CHIEF EXAMINER Bob Milholland RECE VED 1317 N Barker Road Greenacres, WA 99016 JUL 0:' 2002 RE File No ZE-21-01, Request for Revision to Site Plan &VX4'~E COUNTY ENGINEER Dear Mr Milholland On July 3, 2002, I received a copy of your request to revise the site plan of record, vvith attachments, in the above matter, to eliminate access from Sharp Road and Sinto Road for the proposed recreational vehicle storage facility Access to Sinto Road would be lunited to a pnvate entrance for the caretaker's residence As I understand your letter, you would still dedicate nght of way along Sharp and Sinto as requested by County Engineeruig, but you do not want to unprove such roads as currently reqi.ured under County Engineeruig's conditions of approval You would still dedicate nght of way and improve Barker Road as currently requested by County Engineenng Bv a conv of this letter, I will allow one week, until5 00 p m on Julv 15, 2002, for Countv EngineerinQ, Countv Fue Distnct 1, Countv Division of Planruniz and Sandra Thomas to respond to the revised site plan nronosal Sincerely, 4, " 9. P / r 4 0,0,~ Michael C Dempsey Heanng Exanuner Enclosures c ~W~sion of Enguieenng and Roads im Palk, Division of Planiung Paul Chase, County Fire Distnct 1, 10319 E Sprague, Spokane, WA 99206 Sandra Thomas, 18602 E Sinto, Greenacres, WA 99016 1HIiD FLOOR PUBLIC WORKS BUILDIIVG 1026 wFSr BxoADwAY AvavvE, sPOKnxE, wasHvcrorr 99260-0245 PHONE (509) 477-7490 o FAX (509) 477-7478 9 TDD (509) 477-7133 1 i ~ E c E I w E 71 ~ JUL 3 2002 ~ m~ ~ SPOKANECOUNTY HEARtNG EXAMINER_ DATE July 2, 2002 TO iVlike Dempsey, County Hearing Examiner , FROM Jim Falk, Associate Planner Subject ZE-21-01 The applicant for the above referenced application submitted the attached revised site pian for your consideration Please note that he has eliminated ingress/egress from Sharp Road Access to Sinto Road is designated a private entrance for caretaker ingress and egress Also attached is a letter from the applicant stating his understanding of what road dedications are necessary and asking that you consider his revised site plan c Scott Engelhard ~ i ~ ! .ee r c F ~r ~r ~;~v~ • ~ ~ . . _ _ ~ 1 N/`~i~~~~ ~ tp y - a.• ~ ' . ~ • . I . ' ' ' . . . , • ~ I . . _ . . . ; ~ . . ~ 37. . . ~ _1:= _ , . . . ~ ~ . . ~ . rs . . _ . . ~ . . ~ . ~ ~ . ~ . 4 r • ' ~ ~ . . . _ ~ r r a v ~ j su e . ~ ~ . . . ' ~ ~ t " o ~ • _ . . ~ ~ ~ ~ . , ~ ,~UN 2 u 20~2 ~ ~ ~ ~ . ~";~v''h~: • ~ ~ ~ s: 1►1, v . ~1 A ~ ~ I R RECEIVED . . ~ . ~ ~ s~. SP4KANE COUN ~ i fiLE • ~ ~ COP,Y • . . . . t, ~ ~ ; ~ DIVISIpN OF PI.ANN ~ ING ~ • ; . , ' • ~"7 / / • ~ FILE COPY ~ • ~ T ' ~ : _ , . t ~;--~70-4 Revi s ed 3 5/~ . y~ eN-. eY ~i q+l 0 ~ =.1. G~- ~ ss ~ - ~ - - - - - - - - JFUA1&- for 0a ~ - ,aro a5&- a ~ ~ ~ S s e S~ar / e G~A14- c~ ~O V r - - - - - r O i T rL G( ~ d a a q o N ~ e, o ~ I/ e rs oSarlA~cl- ~ 5~q i P , G( eQ~~ tc, AlfN d s . ~ /i Q/V . o ~ 9 r'oM ie farl'~elv eW, /1 ►N ~ I✓ e- b D r < < ~ v ~ d (2- /''D o m ~o r l'o% 4j4? ~ ~ ( ~ ~ r 5 r 7'-Q , ~ dezo ve ome N~ '-/'o fAe Na Y s. fX a~ ~mv ~ e , ~ ~ / I0 / ~ C~ ~t/ ac~l'O~Q A/ cle ~ ~ ~ , / 5A ar ~ 5'i✓ o S~re~f ~eas~ c' ~~~~s ~ , ~ Goti 1~ Y ~ r~ t~ s~ ) o N o~ r 1Si oN oN - - ~ ~ - - -Y' -_1_- "~O' , + ► , , l • • y b . ~ . , ~ ~ - , STAFF REPORT TO THE HEARIIVG EXAMINER e` File ZE-21-01 SPOKA~ COUNTY DMSION OF PLAAINIMG HEARING DATE: June 5, 2002 at 9 00 a m FILE #a ZE-21-01 PRO'ECT PLANIVER: Jim Falk, Associate Planner PRO'EGT DESCRIPTIOPIo A request for a Zone Reclassification from Urban Residential-3 5(UR- 3 5) to Light Industrial (I-2) on approximately 1 37 acres of land to develop a recreation vehicle storage facility Pro~ect Data Project Lomtion and Asidress: Generally located west of and adjacent to Barker Road between Sharp Avenue and Sinto Avenue in the NE 1/4 of Section 18, Township 25, Range 45 E W M The site address is 1317 N Barker Road, Greenacres, WA Parcel Numbers: 55181 2510, 2509 Applicant ancl Ovvner: Bob and Teresa Milholland 1317 (V Barker Road. Greenacres, WA 99016 (509) 926-6435 Comprehensive Plan Categoty: Urban (U) Existing Zoning Designatione Urban Residential-3 5(UR-3 5) established in 1991, previously zoned Agricuitural Suburban (AS) (ZE-286-57) Existing Lancl Usea The proJect site is currently occupied by a single family residence, attached shop/storage building , and garage Surrounding Zoning and Land Uses: • Notth: Land located north of the project site is zoned Urban Residential-3 5(UR-3 5) established in 1991, previously zoned Agncultural Suburban (AS) (ZE-286-57) Land use is single family residences • South: Land located south of the project site is zoned Light industrial (I-2) established in 1991, previously zoned Restricted Industrial (RI) (ZE- 286-53) Land use is commercial businesses • East: Land located north of the proJect site is zoned Urban Residential-3 5(UR-3 5) established in 1991, previously zoned Agricultural Suburban (AS) (ZE-286-57) Land uses are single family residences and a church ZE-21-01 Staff Report - June 5, 2002 Pubiic Hearmg 1 of 11 , yVest: Land located west of the proJect site is zoned Urban Resitlential-3 5(UR-3 5) established in ~ 1991, previously zoned Agricultural Suburban (AS) (ZE-286-57) Land use is primanly singie family residences Use proposals and ' The following is a list of land use actions within ~ecentr Peoject Approvals ln the the vicinity of the proJect site rwhich have been Area, of ghas p~ject; approved within the past 10 years ZE-22-92, a Zone Reclassifcation of a 2 4 acre site from Urban Residential-3 5(UR-3 5) to Regional Business (B-3) to develop a RV sales and service business, located north of and adjacent to Interstate-90. 600 feet east of Barker Road, approved in June, 1992 by the Heanng Examiner Committee ZE-139A-76, a Change of Conditions to an existing Regional Business (B-3) Zone to allovu any use permitted in the Regional Business Zone, located south of and adjacen4 to Interstate-90, 800 feet east of Barker Road, approved by the Hearing Examiner Committee in December, 1994 ZE-22-94, a Zone Reclassification from Regional Business (B-3) to Regional Business (B-3) and Light Industnal (I-2) to develop product manufactunng and retail sales businesses, located north of Broadway and south of Interstate-90, 2000 feet east of Barker Road, approved by the Heanng Examiner Committee in June, 1994 ZE-17-94, an area wide Zone Reclassification and Comprehensive Plan amendment (CPA-79- 94) from Light Industrial (I-2) and Urban Residential-3 5(UR-3 5) to Suburban ' Residential-1 (SR-1), approved on July 19, 1994 by the Board of County Commissioners for the purpose of establishing the "North Greenacres - Neighborhood" located north of the proJect site ZE-43-96, a Zone Reclassification from Urban - Residential-3 5(UR-3 5) to Urban Residential- 22 (UR-22) to develop a 110 unit retirement center, located adjacent to and east of Barker - Road and adjacent to and south of LaBerry Drive, approved by the Hearing Examiner Committee in 1997 - - - ZE-29-00, a Zone Reclassification from Urban - - Residential-3 5(UR-3 5) to Neighborhood Busmess (B-1) for those uses allowed in the ZE-21-01 Staff Report - June 5, 2002 Public Heanng 2of11 Neighbbrliood Business (B-1) Zone, located at ' ' the southwest corner of the intersection of Barker Road and Mission Avenue, approved by the Hearing Examiner in February, 2001 ZE-27-97, a Zone Reclassification from Urban Residential-3 5(UR-3 5) Zone to the Light Industnal (I-2) Zone, on approximately 4 75 acres of land, for recreationai vehicle and boat sales, storage and repair, generally located along the north side of Appleway Avenue, approximately 1/3 mile east of the mtersection of Appleway Avenue and Barker Road, approved by the Hearing Examiner in September, 1999 ZE-5-00, a Zone Reclassification from Urban Residential-3 5(UR-3 5) to Light Industnal (I-2) on approximately 2 3 acres for truck and automobile trailer sales, located south of and adjacent to Broadway Avenue and approximately 350 feet west of Barker Road, approved by the Heanng Examiner in June, 2000 Land Divisoon Status: The project site includes two separate tax parcels descnbed as Lots 1 and 2, Block 1, Bates Addition to Valley View Addition -Shorefine Desiqnation: IT55i applica6le VVa-ter Purveyor: Consolidated Irngation District # 19 prowdes public water service to the site Siewage ii'isposai: The project lies outside the 15 Year Sewer Service Area and is currently served by a pnvate on-site sewage system P& T Partners signed a letter-of-intent to allow the applicant to connect into P& T's private sewer line The sewer line terminates within Barker Road at the HiCo Village located immediately south of the project site -Hre O'iftricM SpoKane Counfy-Hre ~tricflao 1 School District and Nearest K- The public schools located nearest to the project 12 Schools: site are the Barker Community Learning Center, Greenacres Elementary School, Greenacres Jr High School and Central Valley High School Nearest Arterial and Distance: The project site is located adjacent to Barker Road, which is designated as a Pnncipal Arterial by the Spokane County Arterial Road Plan Nearest Park.s and Distance: The County park facilities located nearest to the proposal are Sullivan Park, approximately 2 1/3 miles to the west, and the Liberty Lake and Meadowood Golf Courses, approximately 4 miles to the southeast Neighborhood Association: Mica View Neighborhood Association • This proposal is located inside the IUGA. ZE-21-01 Staff Report - June 5, 2002 Public Hearing 3 of 11 a This proposal is located inside the,Public Tr6nsp'6_hation Benefit Area (PrTBA) and'is I served by Spokane Transit Authority frex route 82. m This proposal is located outside all 1000' notification boundaries of designated Natural Resource Lands. GMALCxritecpl A Mps Aquifer Recha Amao The subject site is locatedinside both the Pnority Sewer Service Area (PSSA) and the Aquifer Sensitive Area (ASA) Overlay zone Fis~ &W90dI9fe Hab6$at COB1se1'liat6011 Not applicabie AreaSo PBoodpBaana ~ No4 applicable Geoeogaca09y Hazao°dous Aeeaso ~ Not applicable @~etiandsa ~ Not applicable SEPA Determination of Non-significance (DNS) issued on April 25, 2002 Comment period ended IViay 9, 2002 Notic6ng Publashed The Notice of Heanng was published in the Spokesman Review Legal Section on IViay 21, 2002 Ma61ed: Notice of Application and the Notice of Hearing were mailed to taxpayers/owners of property located within 400 feet of the boundaries of the subJect site on November 21, 2001 and April 23, 2002, respectively Sote Posged: The deadline for the applicant to post the site was Aprii 15, 2002 The sign was updated on April 22, 2002 with the current public hearing date 1724 Compliance Dates ApplecatAOn Accep$ed: November 14, 2001 Determanation of Corr9ple4eness issued: IVovember 16, 2001 Date Notice of Decision is Due: July 14, 2002 Reviewina Aaencoes , A total of 12 agencies were notified of the proposed Zone Reclassifcation on (Vovember 16, 2001 and April 4, 2002 and comments were due December 6, 2001 and Apnl 17, 2002 respectively - - - - ~Agenc6es No4afied Response- -Date Agencies Notiflecl Response - i Date _ ' Aeceived Receided Received Recbived Division of Engmeermg Yes 12-5-01 Spokane County Air No and Roads-Transport Pollution Control Auth ' Spokane Regional Health Yes 12-6-01 Stormwater Utility No District 4-17-02 Division of Building and Yes 11-26-01 Office of Historic No Code Enforcement Preservation Division of Utilities Yes 10-9-01 WA State Department No 12-26-01 of Transportation 4-22-02 Spokane County Fire Yes 11-28-01 Central Valley School No District IVo 1 District #356 ~ WA State Boundary No Consolidated Irngation No Review Board District # 19 ZE-21-01 , Staff Report - June 5, 2002 Public Heanng 4of11 ResRgnse s feget9 Aqenc6es of'Intea°esite Eo(nments were teceived from five'agencies and some of the comments are in ttie form'of recommended conditions of approval ~~sRWse~fMm theEMb06c., Comment was received from one person in opposition to the proposed zone reclassification Descrit~°o n of the Site: The proJect site is 1 37 acres in size, rectangular in shape and flat in topography The si4e is occupied by a singie family residence fronting Barker Road with an assessory garage Access to the site is gained from Barker Road Sinto Avenue borders the north property line for approximately 200 feet and Sharp Avenue borders the south property line for approximately 200 feet Sharp and Sinto Avenues are designated Local Access Roads by the Spokane County Artenai Road Plan Barker Road is a two way-two lane Principal Artenal that is absent of curb and sidewalk The existing singte family dwelling is served by an on-site sewage disposal system Consolidated Irrigation District # 19 provides water service to the site Descrapt6on of Surroundirea Area Singie family residential development consistent with the Urban Residential-3 5 zoning exists west and north of the site However, the area east of the project site is a mix of land uses ranging from a community leaming center, church, single family dwrellings and a manufactured home park further to the east A church is located further south of the learning center east of Barker Road Commercial and industrial zoned land can be found less than mile to the north and south of the site and it is developed with various commercial land uses such as a convenience store, fast food restaurant, motel, truck stop convenience facility (closed), paint store and a ceramics retail facility (closed) Barker Road intersects with Interstate-90 about 700 feet south of the proposal and Mission Avenue approximately 600 feet north of the proposal Project Descriptiono The applicant proposes a Zone Reclassifcation from Urban Residential- 3 5(UR-3 5) to Light Industrial (I-2) to develop a recreation vehicle storage facility No additional structures will be constructed to accommodate the recreational vehicles The single family dwelling and detached garage will remain and be occupied by the caretaker of the facility Two existing 20' by 20' structures will be removed Ingress and egress to the site is proposed from Barker, Sharp and Sinto streets The site would be surfaced with crushed gravel No additional water or sewer services are proposed to serve the proposal The applicant proposes to install Type III landscaping along Barker Road, Sharp and Sinto Avenues and along the west boundary of the property Additionally, the applicant proposes to construct a 8-foot high chain link fence on all four sides of his property Dackqroune6: The Zone Reclassification preapplication conference was held with the applicant on October 4, 2001 The applicant submitted the subJect Zone Reclassification application on November 14, 2001 The application was determined to be complete on November 16 2001 Notice of Application was timely issued on November 21, 2001 A technical review meeting for the proposed Zone Reclassification was held on December 6, 2001 Notice of the public hearing and the posting of the subject site occurred on April 15, 2002 The newspaper notice of the public hearing was not published, and as a result, the public hearing was rescheduled to June 5, 2002 Notice of the rescheduled public hearing was sent to neighboring landowners on April 23, 2002 and the notice was published in the newspaper on iV1ay 21, 2002 The applicant altered the property posting to reflect the June 5, 2002 heanng on April 22, 2002 The subJect property is located outside the 15 year sewer service area Sec4ion 8 of the Interim Development Regulation adopted to Implement the Interim Urban Growth Area (IUGA) boundary (See Resolution 97-0321) prohibits the approval of a Zone Reclassification of land located within the IUGA and outside the 15 Year Sewer Service Area established pursuant to the Spokane County Comprehensive Wastewater Management Plan uniess the proposal can demonstrate the availability of public sewer The applicant determined that a private sewer line extends south from a Spokane County sewer collection line in IVlission Avenue to serve the HiCo Village located south ZE-21-01 Staff Report - June 5, 2002 Public Heanng 5of11 . of the projeci site The sewer fine is owrmed by P& TMrfn4ship and is located east of and' adjacent to Barker Road J ' G ' The owner of the private sewer line, P& T Partners, states that the sewer line is a 2-inch diameter pressure line that runs east of the subject property on the east side of Barker Road and is presently connected to the Spokane County interceptor on Mission Avenue, north of the subject property The applicant submitted a letter from P & T Partners dated September 18, 2001 indicating the owner's intent 4o allow the proJect si4e to connec4 4o the private sewer line, subject 40 approval of the subject zone reclassification Stpff Anajysiso, Compeehensive Lane8 Use P9an: The subJect application was submitted pnor to the effective date of the new Comprehensive Plan which was January 15, 2002 County Resolution 2-0037, Section 1 adopted by the Board of Commissioners on January 15, 2002, provides that any Zone Reclassification application that does no4 comply with Resolution 2-0037 but is considered complete pnor to January 15, 2002, shall be allowed to proceed with the reclassification process under the Comprehensive Plan and land use regulations in effect at the time 4he application is made Since the subJect application was deemed complete November 16, 2002 t vuill be evaluated in this report for consistency with the Comprehensive Plan and the Spokane County Zoning Code in effect prior to adoption of Resolution 2-0037 County Resolution 2-0037, Section 1 also provides that if approved the zone shall be effective for one year from the date of final approval and building permits must be applied for during 4his time The subJect property is loca4ed within the Urban category of the Comprehensive Plan The Comprehensive Plan identifies the Urban category as the most diverse land use category within Spokane Coun4y and is intended to provide for the development of a"citylike° environment with intensive residential uses, and public facilities and services Urban areas include various land uses but primarily will be developed with single family homes, dupiexes and apartments and condominiums ranging in density from 1 to 17 dwelling units per acre Land within the Urban category of the Comprehensive Plan is provided with a full range of public utilities and facilities including public wa4er and sanitary sewer systems, storm sewer systems, paved streets, electricity, telephone, gas, cable services, schools, parks and libraries Manned fire stations, medical facilities, government offices and post offices may be dispersed throughout these areas Deasion Guidelines noted wi4hin the Comprehensive Plan are used to determine whether or not a particular proposal in the °Urban Category," as designated on the Land Use i1Aap, should be approved, conditioned or denied Those relevant Goals, ObJectives and Decision Guidelines include an analysis of how this proposal is or is not consistent with said Goals, Objectives and Decision Guidelines Detailed Definition B states that "Since urban areas will be the most in4ensely developed of all the categories, it is primarily a residential category of single family, two family, multifamily along with neighborhood commercial and light industrial uses The more intensive land uses such as light industriat and neighborhood commerciai will be focated near the heavily traveled stree4s, while the least intensive residential uses will be isolated from the noise and heavy traffic " The proposai is located on Barker Road which is designated a Principal Arterial by the Spokane County Arterial Road Plan Additionally, the proposal is approximately 700 feet north of an Interstate-90 Freeway road exchange Detailed Definition D states that due to the variety and mix of land uses and activities found in the Urban category, few land use activities would be inappropriate Many uses may require screernng or other standards to make them compatible with one another The proposed light industnal use is located in an area with a mix of residentiai, commercial retail and community facility uses ZE-21-01 Staff Report - June 5, 2002 Public Hearing 6 of 11 ' Screenmg and buffenng wnll be providdd as reRuired by the Spokane County Zaning Code to minimize visual impacts . 1 1 Decision Guideline 1 5 1 recommends the use of buffering and/or landscaping to mitigate the difference between proposed developments and exis4ing uses Section 14 806 040 of the Spokane County Zoning Code requires a strip of Type I landscaping, a minimum of 20 feet in width, along the west property line adJacent 4o the existing Urban Residential-3 5(UR-3 5) Zone A 5-foot width of Type III landscaping is required on the northeast and west boundaries of the site In addition to the landscaping requirements, Section 14 632 355 requires that 4he storage of materials, including trucks, motor vehicies and equipment shall be entirely screened by being located in a building or behind a sight-obscunng fence no4 less than six (6) feet in height The proposal as conditioned is consis4ent with this Decision Guideline Decision Guidelines 1 3 3 and 16 1 recommend the provision of sanitary and storm sewer for developments to protect water quality when the provision is consistent with County plans, policies and regulations The applicant is proposing to use the existing on-site sewage disposal system The applicant contends that the proposed recreational vehicle storage facility vuill not generate additional sewage compared to that generated by the existing single family home it serves The subject site has access to an existing private sewer line located adjacent to and east of Barker Road and can be utilized should the site be converted to more intensive light industrial uses in the future Storm sewers are not available a4 the site, however the recommended conditions of approval required the preparation of a stormwater management plan consistent with Spokane County Stormwater Nianagement Guidelines Objective 1 5 e recommends 4hat when a neighborhood expenences pressure for a change of character, such change shall be permitted upon appropriate review The proposed use is located within close proximity to a larger transportation networlc to include Interstate-90 and Mission Avenue Nlission Avenue is designated a Mmor Artenal by the Spokane County Arterial Road Plan The proposal is essentially a commercial service (as opposed to industnal) Commercial areas within 4he vicini4y of the proposal are located south, southeast and north of the subject property The property immediately north of the proposal is not being used for commercial purposes However, there is a commercial use further north at theintersection of Barker Road and (Vlission Avenue The site is also located adJacent to and east of a singie family residential neighborhood and there may be negative impacts from the proposed use on the surrounding residential uses The required landscaping and fencing will help to minimize the impacts of the use on the surrounding residential uses Decision Guideline 15 8 specifies that the appropnate review must take into consideration structure height in relation to height of structures surrounding the site and impact to the established architectural character of the neighborhood No consistent architectural character exists in the vianity as residential, business and community building styles vary Therefore, the proposal as conditioned will not adversely impact the character of adJacent development The differences that do exist will be mitigated by the installation and proper maintenance of required landscaping and fencing The proposal is located in the Aquifer Sensitive Area (ASA) Overiay Zone Section 10 of the Comprehensive Plan addresses water quality protection This chapter is intended to coordinate land uses over aquifers in the County The conditions of approval require compliance with the Spokane County Zoning ASA Overlay Zone requirements specified in Section 14 706 of the Spokane County Zoning Code Additionally, the conditions of approval require compliance with Spokane County stormwater management and erosion control requirements which include stormwater filtration requirements ZE-21-01 Staff Report - June 5, 2002 Pubiic Hearing 7of11 Decision Guideline10 16 stateS 4hat n'ew urban,land suburban type developmen4s within the~ adopted sewer service areas, dependent upon laca4ioh, •shail' be conditioned to require immediate connec4ion to sewer Objective 10 1 d specifies that "fill-in" development and development with densities which support existing or proposed sewrer systems will be preferred Spokane County's sewage collection system toge4her with a private seuder line extension is available to the project site and the owner of the private sewer line is vuilling and able to serve the proposal assuming the applicant compiies with all its sewer connection requirements The proposal as conditioned wilt allouv for on-site sewage disposal The proposal is essentially a°fill in" developmentas defned by the Comprehensive Pian, page 325 (Glossary) The proposal as conditioned is consistent wi4h Section 10's applicable Goals, ObJectives and Decision Guideline Sec4ion 21 of the Comprehensive Plan, Transporta4ion, addresses policies for assunng the provisions of appropnate and adequate transpor4ation facilities and sennces for all land use categories of the Comprehensive Plan Decision Guideline 21 1 3, 21 14 and 21 1 5 and ObJective 21 1 e recommend that land use proposals should include provisions for ex4ensions, alignments and adequate right-of way acquisition for roads designated as Arterials as called for on the Artenal Road (Vlap Long range widening requirements should be considered m developments loca4ed adjacent to arterials to anticipate for increased traffic volumes caused by future developments Stdewalks should at a minimum be provided along all artenal roads which lead 4o schools, parks and shopping districts and should be separated from roadways by a parking strip to provide for storage of plowed snow, street tree planting and pedestrian safe4y Barker Road is designated as a Pnncipal Arterial by the Spokane County Artenal Road Plan The Division of Engineering is recommending as conditions of approval additionai nght-of way dedication and Future Acquisition Area for the widening of Barker Road, and nght-of-w►ay dedication to es4ablish the appropnate radius at intersections of Barker Road and Sinto and Sharp Avenues Sidewalks and curbs do not exist along Barker Road The project site is located within the Interim Urban Growth Area (IUGA) established pursuan4 to RCW 36 70A, the Growth Management Act, and the zone reclassification appiication is consistent with the requirements of the Interim Regulations and County Growth IVlanagement Resolution 97- 0321, except Section 8 of said Resolution pertaining to sewer concurrency For a discussion on this matter refer to the above section entitled "Background n The proposal demonstrates consistency with the detailed definilon of the Urban category in that the site fronts on Barker Road, a Pnncipal Artenal and is located near a maJor Interstate-90 interchange with Barker Road Mission Avenue, located approximately 700 feet north of the proposal, provides access to the vianity of the proposal and is designated a 11Ainor Arterial by 4he Arterial Road Plan The site is served by a public water system and pubiic sewage collection is availabie by way of a private sewer line extension Sewer is available upon the establishment of a formal agreement between the applicant and P& T Partners to allow the project site to connect to the private sewer line should the site be developed to a more intensive use than the use proposed in the subJect zone reclassification application Paved streets, electricity, telephone, gas, cabie services, schools, and parks are also available IVlanned fire stations, medical facilities, and post offices are Iocated in the general vicinity of the proposal and provide service to the site In order to buffer the proposed commercial activity from adjacent single family development, required landscaping will be provided along property lines in conformance with Section 14 806 040 of the Spokane County Zoning Code The new Comprehensive Plan designates the su4ect property and property north, south and west of the subject property as Low Density Residential (LDR) The area east of the subJect property is designated iVledium Density Residential (MDR) The LDR category may be developed with residences up to 6 dwellings per acre The MDR category encourages the development of single family and multi family dwellings up to 15 units per acre f applicable, the following is a brief analysis of the proposal's consistency with the Comprehensive Plan currently in effect ZE-21-01 Staff Report - June 5, 2002 Public Heanng 8of11 c ' The purpose of the residen4ial land usd categories is specified on page 1.L-1 of the new Comprehensive Plan This portion of the plan establishes three separate categories for residential uses ranging from low to high density Low density residential includes a density range of 1 to and including 6 dwelling units per acre, medium density residentiai includes a range of greater than 6 to and including 15 dwelling units per acre and high density residential shall be greater than dwelling units per acre Design standards ensure neighborhood character and compatibility with adJacent uses Commerciai uses, with the exception of office use in high density residential areas, would only be permitted through changing the land use category wi4h a comprehensive plan amendment or through a neighborhood planning process This wording suggest that industrial use of residential categories is not acceptable and would only be permitted by changing the land use category by a comprehensive plan amendment or through a neighborhood planning process The Light Industry category, as specified on page UL-3, is intended for industrial areas that have a special emphasis and attention given to aesthetics, landscaping and intemal and community compatibility Light Industry areas are compnsed of predominantly industrial uses but may incorporate office and commercial uses that support and compliment the industrial area The Light Industry category may senie as a transitional category between heavy industrial areas and other less intensive land use categones The category may also serve as a visual buffer for heavy industrial areas adjacent to aesthetic corridors The immediate vicinity of the proposal includes a mix of land uses with no one type of use predominating in the area The Light Industrial Zone immediately south of the subject site is developed with commercial businesses rather than industrial uses An industrial trend istherefore not estabiished in the immediate vicinity of the proposal A light industnal zone designation of the subject property appears inconsistent with the purposes of the industrial zone category of the new Comprehensive Plan Zonang: The purpose of the proposed Light Industnal (I-2) zone is to is to meet the needs for industrial land identified in the Industrial category of the Comprehensive Plan and provide for uses that are all of a non-offensive nature The intent is to ailow for these uses by making them compatible with surrounding uses General characteristics of these areas include paved roads and sidewalks, public sewer and water, and a full line of public services including manned fire protection and public transit accessibility Public sewer and water, police and manned fire protection and public transit services are available to the subject property Existing zoning in the general vicinity of the site consists of Urban Residential-3 5(UR-3 5), Urban Residential-7 (UR-7), Neighborhood Business (B-1), Light Industnal (I-2) and Regional Business (B-3) The properties north, east and west of and adjacent to the site are zoned Urban Residential-3 5 and property south of the site is zoned Light Industnal (I-2) The proposal is essentially a commercial use and is a permitted use in the I-2 Zone Public water service is provided by Consolidated Irngation District A public sewer system is available upon the establishment of a formal agreement between P & T Partners and the property owner to connect to the private sewer Ime servmg the HiCo Village that is located immediately south of the proposal Electncity and natural gas service, telephone and cable services are available to serve the site Additional public facilities and services that are available to serve the site include paved roads, schools, police and f re protection The adoption of Resolution 2-0037 and implementation of the new Comprehensive Plan did not change the zornng designation on neighboring property north and west of the proposal However, the property on the south changed from Light Industrial (I-2) to Urban Residential-7 (UR-7) and the property on the east change from Urban Residential-3 5(UR-3 5) to UR-7 pursuant to Section 1 of the Phase I Regulations The following is an analysis of the proposal's consistency with the requirements of the 1-2 Zone in Section 14 632 of the Spokane County Zoning Code ZE-21-01 Staff Report - June 5, 2002 Public Heanng 9of11 Site P9an ~ata ProQosed ReQUired Building Coverage 6% 50% maximum Building Height unspecifed 40' flAinimum Lot Size 1 37 acres 15,000 square feet IViinimum Lot Frontage 700' 90' Landscaping Sinto Road 5' Type III 5' Type III Sharp Road 5' Type III 5' Type III East property line 5' Type III 5' Type III West proper4y line 5' Type III 20' Type I Building Setbacks* Front yard 44' from property line 35' from property line Rear yard not applicable not applicable Side yard 115' from prop line 5' per story Flanking yard 50' 35' from lot Ime The site plan does not illustrate the required 6' high sight-obscuring fence required for a vehicle storage area as specified by Spokane County Zoning Code, Section 14 632 355 The applicant states that he will provide an 8-foo4 chain-link fence on all four sides of his property as allowed by Section 14 810 020(2) of the Spokane Coun4y Zoning Code However, Section 14 632 355 requires that the fence must be sight-obscuring up to 6 feet in height Landscaping and fencmg vuithin the "clear view tnangle" located on the northeast and southeast corners of the site shall be in compliance with Section 14 810 020(2) of the Spokane County Zoning Code Please note that if the Zone Reclassification is approved, the existing residential use of the site will become non-conforming, provided that the residence will be conforming if the house is occupied by a caretaker as provided by Section14 632 220(1) of the Spokane County Zoning Code and as proposed by the applicant Parking: The off-stree4 parking requirements for self-service storage facilities applies to the subJect proposal as specifed by Section 14802 040(36) Said section requires one parking space be provided for the manager of the facility As conditioned, 4he proposal generally meets and/or exceeds the minimum development standards of the proposed Light Industrial (I-2) Zone The applicant will be required to demonstrate compliance with the landscaping, parking, illumination and signage requirements prior to issuance of building permits Detailed site plan review will be necessary to determine compliance with the required development standards and is recommended to occur administratively Staff Sumrraqa: The proposal as conditioned is generally consistent with applicable Goals, Objectives and Deasion Guidelines of the Urban category and Transportation Section of the Comprehensive Plan and the minimum developments standards of the Light Industrial (I-2) Zone The proposal is consistent with the Interim Development Regulation, Resolution # 97-0321, except Section 8 pertaining to sewer concurrency Attachments A Maps • Vicinity Map ZE-21-01 Staff Report - June 5, 2002 Public Hearmg 10 of 11 a Site Plan m Comprehensive Plan ' * Zoning B Conditions of Approval C Agency and Pubiic Comments ZE-21-01 Staff Report - June 5, 2002 Public Heanng 11 of 11 . . , , A7'TACHMEPET d4 MAP5 VICYNETY MAP SIYE DElELOPPNENT PLAN CONIP9tEHERlSI1/E PLAN MAP ZONING MAP . . , . ~ Vite ~ a te,~~e f. ~ e, ~ . P ~0 E,.ce.ys A~ a / jre~~lds - 1 ` ~ 0. 0 ~rtiv :L ~ ,0006) ~ r c ~ u V rQ S ra~~~ ~ _ ~ ~ ~ f~~ g tx~;►~~~~ ~ ~ ~ - ~ ro` •I' ~ - 1 AA . ~ ~ ~ - iE~. ~ ?V~ ~ ~ . RECEIVED 'k, SPdKANE COUN"Ty y 2002 ~ ~ ~ ~ ► ~RdR 2 7 ~ DIMISIQN AF P~N"Mt3 Revise 3"~r ~ A tc ess.~--- ~ ~ a, a ll ~No~ ~ ~1,,~•+~`, I t ~r 7 t'1 ao I ~ rA eN~.r ~ plan 5ite 1U19/0I t ~ ~ ~ ~ Z~~1~ ~ ~ . ~ ~/°~c~~~ty' M~ _ - ~ ` _ - , i os 04 . 06- , • ~ ~ , , ~ ~ _,-v-r4 Wpssi'llff r . VI y ~ ~ t . r~1,~i4~i~j~,iii ' il»~~~~, ~ ~ Bucks~ _ ~tt►n~~ lUUluty~+`111;11 ►tt . ~~~~r ► ►►~v ~~i~ti~~~ ~~~~~~~~r~ * , ~ v~~r► Z i~i~~~~4 ~ ~'4ti,~~h~~ti~ ~ ,~`►i~ i ~f~ ~~~y► ~~`u~~i~~~~,~~j~ i i ',1~S~y'~~~►~, ~%~J~t~; ~!~i~~,~, ~ 09 yU{} jJ OV Shoo p ~t► ~ ~ ~i~~~~~ fbR, vKp`n.~ ~ on RIver PVL a L ~ n ~ ,yptlsOIIP 8a1d~*~►° . ~ ~112 =-A If %ARQA---+ ~ MO~O colomp ~ oegrAt aroa'+ 'OJ do ~ Broad ~ $ etteld ~ ► y ¢ QLve ~ . . _ ts` ~ ~ ~ ea's I ~ M~vltw pl ~ - ~ 8e re ena~creS CiovGdille - ;,t EI.mendaN 2 v ~ I Greenacre `dg°Pn' ►'`i,L, 019 21 ~j . ` ~ 12tl~ 1 + . ~ ,a~~~' ~ 1 l ` ~ 4 , . . ^ n9/Ol ~fianitY N1aP inch - 2083 ft t~und~ 11 Z E021 001 Co~prehensive' 9..and Use Plan ~ i~ - - - - tu~,~~~,'~~,,~,, _ _ ,~,~nu~n~iu' r-• ~1 ~~~111'~~It~il~JolU ' o Mola I 6~eq►----- I II o ,u~i ~ ~iu~~ uu l u 1VII'l1 Illllill J~s~ul+r I- I I ann . n^ ~ ' ~ I ~''p p ~r . ~ ~ Augusm p ~ ~ XTa r ` i ~ $ I a f, I e ~ . i a I ' a 17 ~ . r-l--.~--•--~.. . - - ~ ~ . -a---- - - r ~ • i i ' ~ Ep - dD - - I • i ~ i ~ , ~ Scale 1 inch = 833 ft (rounded) 11/19/01 Comprehensive Land Use Plan Subject Property within IUGA &&-^ Subject Property within UTA a++++++~ Subject Property within PSSA Subject Property within ASA i Z&-21-01 1 1 Exo~ing Zoning , . . . . , 17 !4C SR-1 . . ~ ~ ~ Sw•1 17 C ''UR-8 5 286 67 ' ~ 7 UR- 1j ' 78 ~R-8 win~4 =o e ; u - oe 16278 - , Augusta pvt ' ZUR S 61 77 SR-917 98C UR-3.6 286 57 ~ i ~ : - : ' _ . - _ _ - - - - ~ - ~ •9 1]O/~ V G" ' R-S 5 28L 57 I UR-3•61288 57 UR ~ _ - _ ~ a. a : _..~+~m- . _ .s,' •:i . . _ • a UR 7 18 ~~r l ~ UR- 78 ~$66 ~ UR-7 84 84C ~ -8 5 2 o. ; a ~ 71 - (T7.2 5812 I ! f ~ _ . , ~ - 524657 _ ~ . 170C ~R-8 5 226 57 B-8 40 71 . . i . - 9 R-8 57Uk-8 226 57 ; 8-S 1A 70C l u - A.s 2 557 ~ Ui~• I-2 225 57 I-2 71 C ` P 5 226 . _ . . , . . ~ ~ . ~ ~ ~ - . _ . . o , I . _ _ _ . ~ B-S 159A M I 18 I 73522557 - 91 77C B-S 22 92C . . . _ J UR-8 5 225 57 UR-3 9!!IFJ . d _ , , . B-8 96 80C ~~t - . . . ' . - - - • - _ _ _ . , _ . _ . . . B-S 16 BOC ~ B-8138A 76C ' i.2 . , . ~ . , u A-a u - ~ ` uIR-a 2 5 s7 . R•S 6 286 ~1R•8 ' UR-8 6 2 1-2 2~181 C~ Scale 1 inch m 500 h(rounded) 11h9/01 Exis4ng Zoning . , , . , . ATTACtiiWEPDT B CONDMONS OF 64PPROVAL . . , . . i ~•LL - _ ~ - RECOMMEIVDED COIVDI"fYONS OF APPROVAL , I - FOR ZE-21-01 s Bi ~ I I I ~ DNISION OF PLANNING ~ SPOKAIST COUNUY ~ - - _ _ , . , . . . . _ . _ - . . 1 All conditions imposed by the Heanng Examiner shall be binding on the "Applicant," which term shall include the owner(s)of the property, heirs, assigns and successors 2 The zone change applies to the real property descnbed in Division of Planning file # ZE- 21-01, Assessor tax parcels 55181 2510 and 5511 2509 3 The proposai shall comply with the Light Industnal (I-2) Zone and all other appiicable Spokane County Zoning Code regulations, as amended 4 The applicant shall develop the subject property in conformance with the site plan presented to the Hearing Examiner on June 5, 2002 All aspects of the proposal shall be binding on the development, including the proposed use Vanations to be approved by the Director of the Division of Planning/designee as an administrative change of conditions shall only be allowed to meet regulation standards and conditions of approval 5 Approval is required by the Director of the Division of Planning/designee of a specific illumination plan for the described property prior to the release of any building permits All illumination on site shall comply with Section 14 810 180 of the Spokane County Zoning Code 6 Approval is required by the Director of the Division of Planning/designee of a specific signing plan for the described property prior to the release of any building permits Signage shall conform to Section 14 804 160 of the Spokane County Zoning Code, as amended 7 A specific landscape plan, planting schedule and provisions for maintenance in conformance with Chapter 14 806 of the Spokane Coun4y Zoning Code shall be submitted with a suitable guarantee for the project prior to release of building permits Landscaping shall be installed and maintained so that sight distance at access points and intersections is not obscured or impaired consistent with the requirements of Chapter 14 810 of the Spokane County Zoning Code 8 A minimum of six (6)-foot high sight-obscuring fence shall be constructed along the property lines of the subject site The fence shall demonstrate compliance with the designated "clear view triangle" as specified in Section 14 810 of the Spokane County Zoning Code 9 The Spokand County Division of Planning shal,l prepare and record with the County Auditor a Title iVotice specifying a future land ac4luisition area for road right-of-way and utilities The resenred future acquisition area Ti41e Notice shall be released, in full or in part, by 4he Division of Planning The notice should be recorded wi4hin the same time frame as an appeal and shall provide the following a At least eleven (11) feet of reserved future acquisition area for road nght-of-way and utilities, in addi4ion to the existing and/or nevuly dedicated right-of-way along Barker Road NOTE The County Engineer has required nine (9) feet of new dedication along Barker Road b Future building and other setbacks required by the Spokane County Zoning Code shall be measured from the reserved future acquisition area c No required landscaping, parking, '208' areas, drainfield or allowed signs shouid be located vuithin the future acquisition area for road right-of-w►ay and utilities If any of the above improvements are made within this area, they shall be relocated a4 4he applicant's expense when roadway improvements are made d The future acquisition area, until acquired, shall be private property and may be used as aliowed in the zone, except that any improvements (such as landscaping, parking, surFace drainage, drainfield, signs or others) shall be considered intenm uses e The property owner shall be responsible for relocating such "intenm" improvements at 4he time Spokane County makes roadway improvements after acquiring said future acquisition area 10 The Division of Planning shall prepare and record with the Spokane County Auditor a Title Notice noting that 4he property in question is subject to a variety of special conditions imposed as a resuit of approval of a land use action This Title Notice shall serve as public notice of the conditions of approval affecting the property in question The Title Notice should be recorded within the same time frame as ailowed for an appeal and shall only be released, in full or in part, by the Division of Planning The Title IVotice shall generally provide as follows The parcel of property eegally c9escribed as ( insert lega6 description from Division of Planning file # ZE-21-01) is the subJect of a IancO use actaon by the Spokarte County Flearing Exarroiner on [onsert date] imposing a variety of special cieveloprnent conc0itions. File no. ZE-21-01 6s avaalable for inspection and copying in the Spobcane County Divisaon og Planning. 11 The Division of Planning shali file with the Spokane County Auditor, within the same time frame as allowed for an appeal from the final disposition, including lapsing of appeal period, a Title Notice, which shall generally provide as follows "Prior to the issuance of any building permit for any building or any use on the property described herein, the applicant shall be responsible for complying with the provisions of the Zoning Code for Spokane County, Section 14 706 (Aquifer Sensitive Area Overlay Zone) The property which is the subject of this notice is more particularly described as follows (insert the description of 4he property from Division of Planning file # ZE-21-01) ~ ATTACIiN1ENT C AGEiVCY AND PUBLgC COMMENTS , - ~ S. ~kANE RECJIONAL HEALTH DISTL ~ ENVIRONMENTAL HEALTH DIVISION Inter-office Communication DATE Apnl 17, 2002 TO Jim Falk, Associate Planner, Spokane County Planning Division FROM Donald Copley, EHS II _ EHD, SRHD $PO RECEI~P~EI/ED COUNTY SUBJECT Proposed Zone Change ZE-21-01 (Milholland) APR 2 5 2002 D'V'~" OF PL.AN1d1NG 1 References a) Map of subject, scale 1" = 30', by Bob Milholland, dated March 26, 2002, received by tlus office March 28, 2002 b) Reconnaissance Geologic Map of the West Half of the Spokane Quadrangle, Washington and Idaho, Allan B Gnggs, 1966 c) Soil Surve_y, Spokane County, Washington, Soil Conservation Service, U S D A, March, 1968 d) Spokane County, Wasiungton, Engineenng Interpretations, Soil Conservation Service, U S D A, August, 1974 e) Spokane Countv Rules and Regulations for Sewage Disposal Systems, January 19, 1995 fl Logs of water wells in Range 44, 45E, Township 25N, Sections 7, 13, 17, 18, and 19 g) Map Greenacres Quadrangle, U S G S, 1973, and Spokane N E, U S G S, 1973 2 Findings a) This project lies over the Spokane-Rathdrum Aquifer b) The project is wnthin Critical Water Supply Service Area #3 and witlvn the service area of Consolidated Imgation Distnct Water supply vrnll be a public system c) The project is instde the Spokane County Comprehensive Wastewater Management Area, inside the General Sewer Service Area, and inside the Prionty Sewer Service Area recommended in the '201' Study The method of sewage disposal is subject to approval of the Duector of Utilrties, Spokane County, pursuant to County Resolution 80 0418 adopted March 24, 1980 The topography and soils in the area are generally suitable for use of individual on-site sewage disposal systems The lot is of the proper dunensions to permit the use of both an individual well and sewage system d) The project lies in a relatively flat area west of Barker Rd and north of Sharp Loca1 drasnageways are insigruficant ° Proposed Zone Change ZE-21-01 (N...Aolland) Page 2 e) Surface soils are classed by the U S Soil Conservation Service as Gamson gravely loam with 0% to 5% slopes They have a septic tank filter field limitation of slight There is also possible contamination of groundwater This soil would be classified as a Type IV f) Geologically, the soils are glaciofluvial deposits These geological structures generally yield moderate to very targe amounts of water Data from wells in the area referenced in section 1 f shows they are from 81' to 140' deep and have static water levels varying from 55' to 110' below the surface The Consolidated Imgation District has indicated that it can supply domestic use water for the project upon completion of agreements with the proponent 3 Required (mandatory) Conditions If Approved a) A combined surface water and sewage disposal detailed pian shall be approved by the Spokane County Engineer and Spokane Regional Health Distnct pnor to the issuance of any on-site sewage disposal permit or building permit for this project b) Sewage dtsposal method shall be as authonzed by the Director of Utilities, Spokane County c) Water service shall be coordinated through the Director of Utilities, Spokane County d) Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Health e) The site of the initial and replacement subsurface absorption system of the on-site sewage system shall be maintained so that it is free from encroachment by buildings and other structures The area shall not be covered by paving or any other impervious matenal and shall not be subject to vehicular traffic f) Subject to specific application approval and issuance of permits by the Health Officer, the use of ari individual on-site sewage disposal system may be authorized 4 Recommended Conditions of Approval a) Use of private wells and water systems is prohibited c Director of Utilities, Spokane County c Sponsor Bob Milholland 1317 N Barker Rd Greenacres, WA 99016 Landuse ltA7.E-21-0I MiIholland/ih . To: Jim Falk (Division of Planning) CC: From: Jim Red (Division of Utilities) Date: Monday. April 22, 2002 Subjec4: ZE-0021-01 Stage: Hearing Examiner Phase: Storage SS09 As per the Spokane County Zoning Code Phase One Development Regulations, a wet (live) sewer connection to the area-wide Public Sewer System is to be constructed Sewer connection permit is required Commercial developments shall submit historical and or estimated water usage prior to the issuance of the connection permit m order to establish sewer fees SS11 Applicant is required to sign a Sewer Connection Agreement prior to issuance of permit to connect Please contact Chad Coles at (509) 477-3604 concemmg this SS12A Applicant shail submit expressly to Spokane County Division of Utilities "under separate cover', only those plan sheets showing sewer pians and specifications for the public sewer connections and facilibes for review and approval Commercial developments shall submit historical and or estimated water usage as part of the sewer plan submittal SS12F Sewer pians acceptable to the Division of Utilities shall be submitted prior to the issuance of the sewer connection permit SS15A Arrangements for payment of applicable sewer charges must be made prior to issuance of sewer connection permit Sewer charges may inciude speaal connection charges and general facilities charges Charges may be substantial depending upon the nature of the development WS01 Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County, as amended ) a , . . ' , OFFICE OF THE SP0K4NE,COUIVTY ENGINEER 1026 W Broadway Ave, Spokane, WA 99260-0170 (509) 477-3600 Fax (509) 477-2243 spcvC~Y 6LGItlG'NEER9S CONDI 1 IONS O~F APPROVP'iL99 TR ZOAtlE TO Spokane County Division of Plannin , FROnl1. Division of Engineenng & Roads xt~ DATE December 5, 2001 . PROJECT: UR-3.51°O I-2 SELF SERVICE Sl'Oi2AGE 40 UNOI'S FILE ~o ZEm0021 -01 REPE OU~ Technical/Review Date (12/06/2001 @ 3:15) SPOKi4 Planner JIM FALK DEC 0 6 20M Heanng Date. @ Review Date DMSION OF PtANNINt3 Sponsor/Applicant ROBERT IVtILHOLLAIVD Section Towrnship Range 18-25-45 The Spokane County Division of Engineenng and Roads has reviewed the above referenced application The following "°Conditions of Approval" are submitted to the Spokane County Division of Planning for inclusion in the "Findings of Fact, Conclusions and Order/Decision" should the request be approved Praor to assuance of a buolc9ung permit oP at the request of the County Engoneer an conjunction with a County g Road ProjectlRoad Improvement District, whichever cornes fiu-st: 1 Applicant shali dedicate 9 feet o Barker Ro d for ri ht of way Z se s c~ ~o , ' py~Applicant shall dedicate the applicable raius on Sharp Avenue and Barker Road 3 Applicant shall dedicate the applicable radius on Barker Road and Sinto Avenue Proor to re9ease of abUilding permit or use of property as proposecl: 4 Access permits for approaches to the County Road System shall be obtained from the County Engineer 5. A Professional Engineer (P E), licensed in the State of Washington, shall submit road and storm drainage construction plans and a drainage report that conform to the versions of the Spokane County Standards for Road and Sewer Construction, the Guidelines for Stormwater IVlanagement, and ali applicable federai, state, and local regulations and laws that are in effect at the time of the plan submittal or at the time of the development permit application(s) The fnal road and storm drainage plans and drainage report shall receive the County Engineer's acceptance prior to release of any Grading, Building, or Right-of-Way Permit CC Applicant ROBERT MILHOLLAND Engineer/Surveyor BOATWRIGHT Planner JIM FALK Page 2 oEngineers I Hearinq / Review / 12/06/2001 TR . . ZE-0021-U1 ' , 6 A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer The design, location and arrangement of parking stalls shall be in accordance with standard engineering practices Paving or surfacing as approved by the County Engineer will be required for any portion of the project which is to be occupied or traveled by vehicles 7 The construction of the roadway improvements stated herein shall be accomplished as approved by the Spokane County Engineer 8 The County Engineer has designated a 5-Lane Principal Arterial Roadway Section for the improvement of Barker Road which is adjacent to the proposed development This will require the installation of 17-19 feet of asphalt Curbing and sidewalk must aiso be constructed 9 The County Engineer has designated a Local Access Roadway Section for the improvement of Sinto Avenue which is adjacent to the proposed development This will require the addition of approximately 11-13 feet of asphalt along the frontage of the development Curbing and sidewalk must also be constructed 10 The County Engineer has designated a Local Access Roadway Section for the improvement of Sharp Avenue which is adjacent to the proposed development This will require the addition of approximately 11-13 feet of asphalt along the frontage of the development Curbing and sidew►alk must also be constructed 11 All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge construction and other applicable county standards and/or adopted resolutions pertaining to Road Standards and Stormwater fVlanagement in effect at the date of construction, unless othervvise approved by the County Engineer 12 Roadway standards, typicai roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners resolution 1-0298 as amended and are applicable to this proposal 13 IVo construction work is to be performed within the existing or proposed nght of way until a permit has been issued by the County Engineer All work within the public road right of way is subject to inspection and approval by the County Engineer 14 All required construction within the existing or proposed public right of way is to be completed prior to the release of a building permit or a bond in an amount estimated by the County Engineer to cover the cost of construction or improvements shall be filed with the County Engineer 15. The County Arterial Road plan identifies Barker Road as a Prinapal Arterial The existing right of way width of 60 feet is not consistent with that specified in the plan In order to implement the Arterial Road Plan it is recommended that in addition to the required right of way dedication, a strip of property 11 feet in width along the Barker Road frontage be set aside in reserve This property may be acquired by Spokane County at the time when Arterial Improvements are made to Barker Road Page 3 Engineers y d . eearinq / Review / 12-/06/2001 TI. ZE-0021-01 16 "The applicant is advised that there may exist utilities either underground or overhead effecting the applicant's property, including property to be dedicated or set aside future acquosition Spokane County will assume no financial obligation for adjustments or relocation regarding these utilities ""The applicant should contact the applicable utilities regarding responsibility for adjustment or relocation costs and to make arrangements for any necessary work " 17 The applicant shall grant applicable border easements adjacent to Spokane County Right of V1/ay per Spokane County Standards 18 This proposed zone change is not being requested for a specific development proposal or site plan at this time At such time a site plan is submitted for review, the applicant shall submit detailed traffic information for review by the County Engineer to determine what traffic impacts, if any, that the development would have on surrounding infrastructure The applicant is advised that mitigation maybe required for off-site improvements END , • ~ { ~ , , } , , ~ . ~ SP4KANE COUN'TY DIVISICJN OF BUILDING &'CODE a _ ENFORCEMENT iazb vvEsT sROADvvAY AvENUE Affix SPOKANE' WA 99260 sPoIm CLUku'Y _ 509477-3675 SPOUCEIVt-D NE COUNTY R.ecommended Conditions NaV 2 6 2001 File Number: ZE-21-41 ZOIT~ CHA.IVGE LJR-3.5 ''O I-2 ION OF PLANNING The apphcant shvuld cantaet the Division of Bwlduig and Code Enforcement ae the earhest possible stage in order to be informed of code requirements adsninistered/enforced as authonzed by the State Bwldmg Code Act Design/development concerns include adda-essing, fire apparatus access roads, _fire hydrant flow, approved water systems, buildung accessibihty, constructAon type, occupancy classification, exustuig extenor wall protection and energy eode reqwrements Please note that the location of the proposed muu-storage bwldmg is in confLct with the Zonuig Code and special consideration to bu.illclmg constnzction, fire walls and parapets should be considered by the apphcant pnor to determining the final location of the builclmg Carnmerdnl Footing & foundutian Permit Apreement 01/09J00 . • ' OFFICE OF THE SPOKANE COUIVTY ENGINEER 1026 W Broadway Ave, Spokane, WA 99260-0170 (509) 477-3600 Fax (509) 477-2243 &~w cour-m "ENGINEER'S CONDITIONS OF APPROVAL" ZONE - TO Spokane County Division of Planning FROM Division of Engineering & Roads . DATE June 5, 2002 PROJECT. UR-3.5 TO I-2 SELF SERVICE STORAGE 40 U(VIl'S FILE ZE-0021-01 Technical/Review Date (12/06/2001 @ 3:15) Planner JIM FALK Heanng Date @ Review Date 6/5/2002 - Public Hearing Revision Sponsor/Applicant ROBERT MILHOLLAND Section Township Range 18-25-45 The Spokane County Division of Engineering and Roads has reviewed the above referenced application The following "Conditions of Approval" are submitted to the Spokane County Division of Planning for inclusion in the "Findings of Fact, Conclusions and Order/Decision" should the request be approved Prior to issuance of a building permit or at the request of the County Engineer an conjunc$ion with a County Ftoad Project/Road Improvement District, vvhechever comes first: 1 Applicant shall dedicate 9 feet on Barker Road for right of way 2 Applicant shall dedicate 4 feet on Sharp Avenue and Sinto Avenue for right of way 3 Applicant shall dedicate the applicable radius on Sharp Avenue and Barker Road 4 Applicant shall dedicate the applicable radius on Barker Road and Sinto Avenue Prior to release of a building perrnit or use of property as proposed: 5 Access permits for approaches to the County Road System shall be obtained from the County Engineer 6 A Professional Engineer (P E), licensed in the State of Washington, shall submit road and storm drainage construction plans and a drainage report that conform to the versions of the Spokane County Standards for Road and Sewer Construction, the Guidelines for Stormwater Management, and all applicable federal, state, and local regulations and laws that are in effect at the time of the plan submittal or at the time of the development permit application(s) The final road and storm drainage plans and drainage report shall receive the County Engineer's acceptance prior to release of any Grading, Building, or Right-of-Way Permit CC Applicant ROBERT MILHOLLAND Engineer/Surveyor BOATWRIGHT Planner JIM FALK ~ Page 2 Engineers , • ' Hearing / Review / 12/06/2001 TR ZE-0021-01 7 A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer The design, Iocation and arrangement of parking stalls shall be in accordance with standard engineering practices Paving or surfacing as approved by the County Engineer will be required for any portion of the project which is to be occupied or traveled by vehicles 8 The construction of the roadway improvements stated herein shall be accomplished as approved by the Spokane County Engineer 9 The County Engineer has designated a 5-Lane Principal Arterial Roadway Section for the improvement of Barker Road which is adjacent to the proposed development This will require the installation of 17-19 feet of asphalt Curbing and sidewalk must also be constructed 10 The County Engineer has designated a Local Access Roadway Section for the improvement of Sinto Avenue which is adjacent to the proposed development This will require the addition of approximately 11-13 feet of asphalt along the frontage of the development Curbing and sidewalk must also be constructed 11 The County Engineer has designated a Local Access Roadway Section for the improvement of Sharp Avenue which is adjacent to the proposed development This will require the addition of approximately 11-13 feet of asphalt along the frontage of the development Curbing and sidewalk must also be constructed 12 All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge construction and other appiicable county standards and/or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer 13 Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners resolution 1-0298 as amended and are applicable to this proposal 14 No construction work is to be performed within the existing or proposed right of way until a permit has been issued by the County Engineer All work within the public road right of way is subject to inspection and approval by the County Engineer 15 All required construction within the existing or proposed public right of way is to be completed prior to the release of a building permit or a bond in an amount estimated by the County Engineer to cover the cost of construction or improvements shall be filed with the County Engineer Page 3 Engineers , , . , • Hearing / Review / 12/06/2001 TR ' 2E-0021-01 ' 16 The County Arterial Road plan identifies Barker Road as a Principal Arterial The existing right of way width of 60 feet is not consistent with that specified in the plan In order to implement the Arterial Road Plan it is recommended that in addition to the required right of way dedication, a strip of property 11 feet in width along the Barker Road frontage be set aside in reserve This property may be acquired by Spokane County at the time when Arterial Improvements are made to Barker Road 17 "The applicant is advised that there may exist utilities either underground or overhead effecting the applicant's property, including property to be dedicated or set aside future acquisition Spokane County will assume no financial obligation for adJustments or relocation regarding these utilities ""The applicant should contact the applicable utilities regarding responsibility for adjustment or relocation costs and to make arrangements for any necessary work " 18 The applicant shali grant appiicable border easements adjacent to Spokane County Right of Way per Spokane County Standards 19 This proposed zone change is not being requested for a specific development proposal or site plan at this time At such time a site plan is submitted for review, the applicant shall submit detailed traffic information for review by the County Engineer to determine what traffic impacts, if any, that the development would have on surrounding infrastructure The applicant is advised that mitigation maybe required for off-site improvements END ~ . , • . . . , , . . S P O K A N E • ~ t Yy~``~S~ C O U N T Y A DIVISION OF THE PUBLIC WORKS DEPARTMENT DIVISION OF PLANNING M[CHAEL V. NEEDHAhi, DIRECTOR MEMORANDUM TO: Spokane County Division of Engineering & Roads; Scott Engelhard, c/o Sandy Kimball Spokane County Division of Engineering & Roads; John Hohman Spokane County Division of Utilities; Jim Red Spokane County Stormwater Utility; Brenda Sims Spokane Regional Health District; Steve Holderby Spokane County Division of Building & Code Enforcement; Jeff Forry Fire District No. 1 Consolidated Irrigation District No. 19 Washington State Department of Transportation, Greg Figg FROM: Jim Fa1k, Associate Planner ~ , DATE: April 4, 2002 SUBJECT: Review and comments for the hearing on May 1, 2002 at 9:00 a.m. FILE N0: ZE-21-01 BRIEF DESCRIPTION: A Zone Reclassification from Urban Residential-3.5 (UR- 3.5) to Light Industrial (I-2) on approximately 1.37 acres for storage of recreation vehicles. PARCEL NO: 55181.2509, 55181.2510 APPLICANT: Robert Milholland Note that the application and maps were previously circulated to your agency. Please note that tbe applicant has revised bis site plan to eliminate self-service storage facility from the proposal. Please review and return any comments to me by April 17, 2002. wc Attachments: Notice of Public Hearing 1026 W. BROADWAY • SPOKANE, WASHINGTON 99260-0220 PHONE: (509) 477-7200 9 FAX: (509) 477-2243 o TDD: (509) 477-7133 ~ . . . . NOH YCE' O!L' ` PUB811lC H1L`itRl11~ ~ ~~OKA1~ ~ ~OUNH Y HEAR1LNG EXAMI1`i ~R TOo All interested persons, and owners/taxpayers within 400 feet YOU AtE HEREBY IO10TIFIED THt1T A PUBLIC HEARI1vG WILL BE HELH) ON 'g'HE I.AND iJSE APPL,ICATION LISTED BELOW, AS FOLI.OWS: Applncataoan: File No. ZE-21-01 A Zone Reclassification from Urban Residential-3 5(UR- 3 S) to Light Industrial(I-2) on approximately 1 37 acres for storage of recreation velucles Parce1No(s): 551812509, 55181 2510 HearnIDg I)ate and 'I'iffie: May 1, 2002 at 9 00 a m Place: Commissioners Assembly Room, Lower Level, Spokane County Public Works Building, 1026 West Broadway, Spokane, Waslungton Owner/Applicant Bob and Teresa Milholland, 1317 N Bazker Rd, Greenacres, WA 99016, 509/926-6435 Address and Locationo Generally located in the Northeast quarter of Section 18, Township 25, Range 45 E W M The srte address is 1317 N Barker Road, Greenacres, WA Cotmprehensive PDan Urban (L) EZl3$ing ZOH11Y9g: Urban Residential-3 5(LJR-3 5) EnviconffientaD Deteranination: A Determination of Nonsigiuficance (DNS) was issued by the County Division of Planrung, as the lead agency on Apnl 16, 2002 The comment penod ends Apn130, 2002 ISelated Permits: In order for the project to be developed as proposed, addrtional pernuts must be obtained as reqwred by other local, state and federal agencies I)ivasion off Plamnnng Staff: Jun Falk, Associate Planner, (509) 477-7228 HEt#RIPiG EXAIVIINNEIt PItOCEIIDURES Hearing Process and Appeals: The heanng will be conducted under the rules of procedure adopted in Spokane County Resolution No 96-0294 All mterested persons may testify at the public heanng, aad may subYrut written comments and documents before or at the heanrig The Hearing Exarruner may limrt the tune given to speakers A speaker represenhng each side of the issue is encouraged Any appeal of the Hearuig Examiner's decision will be based on the record established before the Hearing Examiner, pursuant to County Resolution Nos 96-0171 Environmental appeals wnll follow the same procedural route as the underlying action All hearings will be conducted in facilrties that are accessible to persons vvith physical disabilities gnspectnon of File, Copies of gDocuments: A Staff Report wnll generally be available for inspechon seven days before the hearuig The Staff Report and application file may be ulspected at the Spokane County Division of Planning, 1' Floor Permit Center, Public Works Building, 1026 W Broadway, Spokane, WA 99260-0220, between 8 30 a m and 5 00 p m, weekdays,lVi-F, except holidays Copies of documents vvill be made available for the cost of reproduction If you have any queshons or special needs, please ca11 the Division at (509) 477-7200 Send wntten comments to the Spokane County Division of Planning, 1026 W Broadway, Spokane, WA 99260, Attn Jim Falk, ZE-21-01 Mohons must be made in writing and subnutted to the Spokane County Heazuig Examiner, 3`dFloor, Public Works Building, 1026 W Broadway, Spokane, WA 99260-0245 r e, . , (a ' _ . . ' Li~ - . ~ , . ' f - ~ _ (005 37 F ~ - _ ~ro(osedR ~C p 3~~ J ~ - . ~ , L~- ~ - 00 V' 1'" r V_ r L+~' • ' ~ V ~ 0 tk . ~ - ► aECEIvED sPOKANE couN-rY ~ - n , '01 MAR 2 7 200 , t D1VISION OF PLANNtNG Ac c 0 , . /J~/( V L N4. , . OFFICE OF THE SPOKANE COUfVTY ENGIIVEER 1026 W Broadway Ave, Spokane, WA 99260-0170 (509) 477-3600 Fax (509) 477-2243 ~C"-Kn "ENGIiVEER'S COIVDITOONS OF APPROVAL" TR ZONE TO Spokane County Division of Plannin FROM Division of Engineermg & Roads xt~ DATE December 5, 2001 . PROJECT. UR-3.5 TO I-2 SELF SERVICE STORAGE 40 UNITS FILE ZE-0021-01 Tech n ical/Review Date (12/06/2001 @ 3:15) Planner JIM FALK Hearing Date @ Review Date Sponsor/Appiicant ROBERT MILHOLLAND Section Township Range 18-25-45 The Spokane County Division of Engineering and Roads has reviewed the above referenced application The following "Conditions of Approval" are submitted to the Spokane County Division of Planning for inclusion in the "Findings of Fact, Conclusions and Order/Decision" should the request be approved Prior to issuance of a building permit or at the request of the County Engineer in conjunction w►ith a County Roac9 Project/Road Improvernent District, whichever comes first: 1 Applicant shall dedicate 9 feet on Barker Road for right of way 2 Applicant shall dedicate the applicable radius on Sharp Avenue and Barker Road 3 Applicant shall dedicate the applicable radius on Barker Road and Sinto Avenue Prior 4o release of a building permit or use of property as proposed: 4 Access permits for approaches to the County Road System shall be obtained from the County Engineer 5 A Professional Engineer (P E), licensed in the State of Washington, shail submit road and storm drainage construction plans and a drainage report that conform to the versions of the Spokane County Standards for Road and Sewer Construction, the Guidelines for Stormwater Management, and all applicabie federal, state, and local regulations and laws that are in effect at the time of the plan submittal or at the time of the development permit application(s) The final road and storm drainage plans and drainage report shall receive the County Engineer's acceptance prior to release of any Grading, Building, or Right-of-Way Permit CC Applicant ROBERT MILHOLLAND Cngineer/Surveyor BOATWRIGHT Planner JIM FALK Page 2 Engineers Hearing / Review / 12/06/2001 TR ZE-0021-01 6 A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer The design, location and arrangement of parking stalls shall be in accordance with standard engineering practices Paving or surfacing as approved by the County Engineer will be required for any portion of the project which is to be occupied or traveled by vehicles 7 The construction of the roadway improvements stated herein shall be accomplished as approved by the Spokane County Engineer 8 The County Engineer has designated a 5-Lane Principal Arterial Roadway Section for the improvement of Barker Road which is adjacent to the proposed development This will require the installation of 17-19 feet of asphalt Curbing and sidewalk must also be constructed 9 The County Engineer has designated a Local Access Roadway Section for the improvement of Sinto Avenue which is adJacent to the proposed development This will require the addition of approximately 11-13 feet of asphalt along the frontage of the development Curbing and sidewalk must also be constructed 10 The County Engineer has designated a Locai Access Roadway Section for the improvement of Sharp Avenue which is adjacent to the proposed development This will require the addition of approximately 11-13 feet of asphalt along the frontage of the development Curbing and sidewalk must also be constructed 11 All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge construction and other applicable county standards and/or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer 12 Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners resolution 1-0298 as amended and are applicable to this proposal 13 No construction work is to be performed within the existing or proposed right of way until a permit has been issued by the County Engineer All work within the public road right of way is subject to inspection and approval by the County Engineer 14 All required construction within the existing or proposed public right of way is to be completed prior to the release of a building permit or a bond in an amount estimated by the County Engineer to cover the cost of construction or improvements shall be filed with the County Engineer 15 The County Arterial Road plan identifies Barker Road as a Principal Arterial The existing right of way width of 60 feet is not consistent with that specified in the plan In order to implement the Arteriai Road Plan it is recommended that in addition to the required right of way dedication, a strip of property 11 feet in width along the Barker Road frontage be set aside in reserve This property may be acquired by Spokane County at the time when Arterial Improvements are made to Barker Road Page 3 Engineers Hearing / Review / 12/06/2001 TR ZE-0021-01 16 "The applicant is advised that there may exist utilities either underground or overhead effecting the applicant's property, including property to be dedicated or set aside future acquisition Spokane County wiil assume no financial obligation for adjustments or relocation regarding these utilities ""The applicant should contact the applicable utilities regarding responsibility for adjustment or relocation costs and to make arrangements for any necessary work " 17 The applicant shall grant applicable border easements adjacent to Spokane County Right of Way per Spokane County Standards 18 This proposed zone change is not being requested for a specific development proposal or site plan at this time At such time a site plan is submitted for review, the applicant shall submit detailed traffic information for review by the County Engineer to determine what traffic impacts, if any, that the development would have on surrounding infrastructure The applicant is advised that mitigation maybe required for off-site improvements END , , , , • Kirnball, Sandy From Nyberg, Gary Sent Monday, November 19, 2001 3 12 PM To Baldwin, Greg Cc Hohman, John, Kimball, Sandy Subject ZE-21-01 The zone change property is located within the Spokane Valley that is pre-approved for conventional drainage systems composed of standard grassy swales and drywells No concept drainage plan submittal is required Please include the attached standard condition in the staff report Std Condition doc 1 STANDAR CONDITION OFA TROVAL FOR ZONE CHANGE NO. ZE-21-01 Prepared By Gary Nyberg, Dev Srvcs Date 11-19-01 1 A Professional Engineer(P E), licensed in the State of Washington, shall submit road and storm drainage construction plans and a drainage report that conform to the versions of the Spokane County Standards for Road and Sewer Construction, the Guidehnes for Stormwater Management, and all applicable federal, state, and local regulations and laws that are in effect at the time of the plan submittal or at the time of the development permit application(s) The final road and storm drainage plans and drainage report shall receive the County Engineer's acceptance prior to release of any Grading, Building, or Right-of- Way Permit , PAGE 1 . 1-0 : 4 6:'10 19 NOV 2001 Road# Road Names.......... MPost.-Reference Descriptio Road Log Info.......... 00230 BARKER RD (START) .000 32ND AV U 16 LIGHT BITUM. 18 BARKER RD 1.820 STH AV U 16 LIGHT BITUM. 18 2.080 4TH AV U 16 LIGHT BITUM. 18 2.210 2ND AV (START) U 16 LIGHT BITUM. 18 2.330 SPRAGUE AV U 16 LIGHT BITUM. 22 2.510 LABERRY DR (START) U 16 LIGHT BITUM. 22 2.530 BOW AV (END) U 16 LIGHT BITUM. 22 2.570 APPLEWAY AV U 14 PAVED 36 2.640 COWLEY AV (END) U 14 PAVED 36 2.730 ALKI AV U 14 PAVED 36 2.800 BROADWAY AV (END) U 14 PAVED 36 2.830 BROADWAY AV (START) U 14 PAVED 36 2.860 I 90 EASTBOUND R.AMPS U 14 PAVED 36 2.930 I 90 OVERPASS U 14 PORTLAND CEMENT 24 3.050 CATALDO RD (START) U 14 PAVED 36 3.060 BOONE AV (END) U 14 PAVED 36 3.090 BOONE AV U 14 PAVED 36 3.150 SHARP AV (END) U 14 PAVED 36 3.210 SINTO AV (END) U 14 PAVED 36 3.270 MAXWELL AV (END) U 14 PAVED 36 3.340 MISSION AV U 14 PAVED 36 3.400 AUGUSTA AV (END) U 14 PAVED 36 3.460 BALDWIN AV (END) U 14 PAVED 36 3.510 INDIANA AV (START) U 14 PAVED 36 3.590 INDIANA AV (END) U 14 PAVED 36 3.690 RIVERWAY RD (END) U 14 PAVED 36 3.780 BR 5503 OVER SPOKANE U 14 PORTLAND CEMENT 26 3.960 JACKSON DR (START) U 14 PAVED 36 4.090 BUCKEYE AV (START) U 14 PAVED 36 4.170 GRACE AV (END) U 14 PAVED 36 4.340 EUCLID AV (START) U 14 PAVED 36 4.380 UPRR CROSSING #55051 U 14 PAVED 36 4.390 EUCLID AV (END) U 14 PAVED 36 4.510 BRIDGEPORT AV (END) U 14 PAVED 36 5.250 BNSF CROSSING #55061 U 14 LIGHT BITUM. 22 BARKER RD ( END ) 5.290 S R 290 ( TRENT ) U 14 L I GHT B I TUM . 22 00421 BARKER ST (START)(ME .000 MEDICAL LAKE CITY LI R 09 GRAVEL 24 BARKER ST (END) .130 BR.AYTON RD R 09 GRAVEL 24 2 Records Processed PAGE 1 , 1•0 : 4 6:'3 7 19 NOV 2001 Road# Road Names.......... MPost.-Reference Descriptio Road Log Info.......... 04484 SINTO AV (START) .000 PARK RD U 19 PAVED 36 SINTO AV .120 CENTER RD U 19 PAVED 36 S INTO AV ( END ) .250 ELLA RD ( STAR.T ) U 19 PAVED 36 04485 SINTO AV (START) .000 ELTON RD (END) U 19 PAVED 40 SINTO AV .060 DICK RD U 19 PAVED 40 .130 LEWIS RD U 19 PAVED 40 .190 VISTA RD U 19 LIGHT BITUM. 20 .250 MESA RD (START) U 19 LIGHT BITUM. 20 .310 BESSIE RD U 19 LIGHT BITUM. 20 .380 LAURA RD (START) U 19 LIGHT BITUM. 20 .440 SARGENT RD U 19 LIGHT BITUM. 20 .570 MARGUERITE RD U 19 LIGHT BITUM. 20 .690 ARGONNE RD U 19 PAVED 36 .750 MULLAN RD U 19 PAVED 34 .790 STOUT RD (END) U 19 LIGHT BITUM. 34 .940 LOCUST RD U 19 LIGHT BITUM. 18 SINTO AV (END) 1.010 BOEING RD U 19 LIGHT BITUM. 18 04488 SINTO AV (START) .000 WEST END TO OBERLIN U 19 PAVED 40 SINTO AV .120 OBERLIN RD (END) U 19 PAVED 40 SINTO AV (END) .220 UNIVERSITY RD U 19 PAVED 40 04489 SINTO AV (START) .000 WEST END TO WILBUR. R U 19 PAVED 28 SINTO AV .060 WILBUR RD U 19 GRADED/DRAINED 14 SINTO AV (END) .120 EAST END OF ROAD U 19 GRADED/DRAINED 14 04564 SINTO AV (START) .000 WEST END TO WOODLAWN U 19 PAVED 40 SINTO AV .060 WOODLAWN RD U 19 PAVED 36 SINTO AV (END) .190 MCDONALD RD U 19 PAVED 30 04671 SINTO AV (START) .000 BOLIVAR RD (END) U 19 PAVED 30 SINTO AV .040 BOLIVAR RD (START) U 19 PAVED 40 .110 BANNEN RD (END) U 19 PAVED 40 SINTO AV (END) .150 BEST RD U 19 PAVED 40 04712 SINTO AV & CT(LIBERT .000 MADSON ST R 09 PAVED 36 SINTO AV & CT .090 ETTA CT (END) R 09 PAVED 36 .150 WRIGHT BV R 09 PAVED 36 SINTO AV & CT (END) .190 EAST END OF ROAD R 09 PAVED 36 04482 SINTO AV (START) .000 WEST END TO BOWMAN R U 19 LIGHT BITUM. 22 SINTO AV (END) .040 BOWMAN RD U 19 LIGHT BITUM. 22 04487 SINTO AV (START) .000 SUNDERLAND RD U 19 LIGHT BITUM. 16 SINTO AV (END) .060 WOODRUFF RD U 19 LIGHT BITUM. 16 04490 SINTO AV (START) .000 SR 27 (PINES) U 19 PAVED 36 S INTO AV ( END ) .120 HOUK RD ( START ) U 19 PAVED 36 04491 SINTO AV (START) .000 GREENACRES RD U 19 PAVED 18 SINTO AV (END) .240 BARKER RD U 19 PAVED 18 04705 SINTO AV (START) .000 VAN MARTER RD (END) U 19 PAVED 36 SINTO AV (END) .070 EAST END OF ROAD U 19 PAVED 36 12 Records Processed PAGE 1 1•0 : 4 6:5 8 19 NOV 2001 Road# Road Names.......... MPost.-RiefeYence Descriptio Road Log Info.......... 04451 SHARP AV (START) .000 R.AILROAD AV (START) U 19 LIGHT BITUM. 18 SHARP AV .080 YARDLEY RD (END) U 17 LIGHT BITUM. 18 .210 STANLEY RD U 17 LIGHT BITUM. 18 .330 HOWE ST U 17 LIGHT BITUM. 18 .460 FANCHER RD U 19 PAVED 24 .480 FANCHER FRONTAGE RD U 19 PAVED 24 .550 SEEHORN RD (END) U 19 PAVED 24 .640 LAKE RD (END) U 19 PAVED 30 .800 DYER RD (END) U 19 PAVED 22 SHARP AV (END) .970 THIERMAN ST U 19 PAVED 22 04456 SHARP AV (START) .000 BOEING RD (START) U 19 LIGHT BITUM. 18 SHARP AV .060 FARR RD U 19 LIGHT BITUM. 18 SHARP AV (END) .120 SUNDERLAND RD (START U 19 LIGHT BITUM. 18 04457 SHARP AV (START) .000 FELTS RD U 19 PAVED 40 SHARP AV .160 OBERLIN RD ( STAR.T ) U 19 PAVED 40 .170 OBERLIN RD (END) U 19 PAVED 40 SHARP AV (END) .240 UNIVERSITY RD U 19 PAVED 40 04645 SHARP AV (START) .000 EVERGREEN RD U 19 PAVED 40 SHARP AV .080 BOLIVAR RD (START) U 19 PAVED 40 SHARP AV (END) .190 BANNEN RD U 19 PAVED 40 04651 SHARP AV (START) .000 WEST END TO WOODLAWN U 19 PAVED 36 SHARP AV .060 WOODLAWN RD (START) U 19 PAVED 36 SHARP AV (END) .130 WOODLAWN RD EAST TO U 19 PAVED 36 04685 SHARP AV (START) .000 BEST RD U 19 PAVED 40 SHARP AV .060 REES RD (END) U 19 PAVED 40 .120 CALVIN RD (END) U 19 PAVED 40 SHARP AV ( END ) .180 WARREN RD ( END ) U 19 PAVED 40 04453 SHARP AV (START) .000 BOWMAN RD U 19 LIGHT BITUM. 16 SHARP AV (END) .040 PARK RD U 19 LIGHT BITUM. 16 04454 SHARP AV (START) .000 LILY RD U 19 LIGHT BITUM. 22 SHARP AV (END) .110 BOWMAN RD U 19 LIGHT BITUM. 22 04455 SHARP AV (START) .000 BESSIE RD U 19 PAVED 40 SHARP AV (END) .120 SAR.GENT RD U 19 PAVED 40 04458 SHARP AV (START) .OOO GREENACRES RD U 19 PAVED 18 SHARP AV (END) .240 BARKER RD U 19 PAVED 18 04724 SHARP DR (LIBERTY LA .000 WRIGHT BV U 19 PAVED 32 SHARP DR (END) .020 EAST END OF ROAD U 19 PAVED 32 .080 MITCHELL (NONESTABLI 11 Records Processed . • . , , . S P O K A N E O U N T Y DNLSION OF PLANNING A DMSION OF THE PUBLIC WORKS DEPARI'MENT MICHAEL V. NEEDHAM, DIRECTOR I MF.MnRANni1Al TO: D1V1SlOI1 Ot EIlgII1c;eI'1T1g aI1d IZOadS - I I'c1IlSpUI'[at10I1 Lllgllleel'lIlg; 5cott Engelhard, c/o Sandy Kimball Division of Engineering and Roads- Development Services; John Hohman Division of Utilities - Information Management; Jim Red Division of Utilities - Stormwater Utility; Brenda Sims Spokane Regional Health District; Steve Holderby Division of Building & Code Enforcement, Jeff Forry, Ron Hand Spokane County A ir Pollution Control Authority, Chuck Studer Central Valley School District No. 356 Spokane County Fire District No. 1 Consolidated Irrigation District No. 19 WA State Boundary Review Board; Susan Winchell WA State Department of Transportation, Greg Figg Office of Historic Preservation, Teresa Brum FROM: Jim Falk, Associate Planner ocz- DATE: November 16, 2001 SUBJECT: ZE-21-01; A Zone Reclassification from Urban Residential-3.5 (UR-3. 5) to Light Industrial (I-2) on approximately 1.37 acres for a self-service storage facility to include storage of recreational vehicles. TECHNICAL REVIEW MEETING December 6 2001 at 3:15 P.M. Public Works Building 1"° floor Conference Room 2C) Please review the above application and use the attached TECHNICAL REVIEW MEETING FoRM for your comments. The Division of Planning encourages you to attend this meeting. The sponsor and representative have also been invited to attend this meeting. If you cannot attend, please forward three (3) copies of your review comments on the ~ attached form to me for the meeting. The attached TECHNICAL REVIEW FORMS will be given to the sponsor at the meeting and included in the Division of Planning file. Thanks for your cooperation. If you have any questions about the application, please contact me at 477-7200. NOTE: The Division of Planning is circulating the SEPA Checklist for comments. T6is will be the only time you will be able to comment regarding the SEPA Checklist for this project. Attachments: Technical Review Form, Project Application, Site Plan, Vicinity Map, SEPA Checklist Copy without enclosures: Robert & Teresa Milholland, PO Box 755, Greenacres, WA 9016 1026 W. BROADWAY • SPOKANE, WASHINGTON 99260-0220 PHONE: (509) 477-7200 • FAx: (509) 477-2243 • TDD: (509) 477-7133 r • , , " ` Spokane Caunty Division of Planning Technical Review Meeting Meeting Date and Time. December 6, 2001 @ 3:15 p.m. Froject File No.: ZE-21-01 Prflject Locatian: Generally located in the NE /a of Section 18, Township 25 N., Range 45 EWM. The site address is 1317 N. Barker Road, Greenacres, WA Comprehensive Plan: Urban Prvject Description: Zvne Reclassificativn from Urban Residential-3.5 (UR-3.5) to Light Industrial (I-2) on approximately 1.37 acres for a self service storage facility ta iriclude storage of recreatianal vehicles. Parcel No(s): 55181.2509 551$1.251{! +QuvnerlApplicant: Robert & Teresa Milholland PO Box 755 1317 N. Barker Rd. Greenacres, WA 99016 5091926-6435 Project Planner: Jirn Falk J • 1 • • 1 , , • ~ZONE RECLASSIFICATION APPLICATI014 ' PaGE 2 of 5 . Address and Location of proposal _3 [7 . Section Township Range Name of p blic/private road(s) providing access s~r~e r- Width of property fronting on public/private road Does the proposal have access to an arterial or planned arterial? Yes r No Name(s) of arterial roads ~ Y o Qd ir A~e~ egal description of roperty for each zone reclasXV06'r pr po sed : _ . ~ J o - e aAd Bmc-~ IL Is / o~✓ / A/ , 0 _ o ~ a Afe 4~~'o -d I /y re ~o r~p d ~ . ~ ~ Existin s r ' ' ~ i~ --t~ t':'. ` = ~ gzone to proposed zone(s) for the following described property: (Attach legal description stamped by land surveyor or provide below.) I - ~ 7ZA` D = 01Zri'l n u ~ ~ Cl' p~~,_ i., Nal Li %O"e . " " V ~ BC e ~ ' p. - p 'T o If you do not hold title to the property, what is your interest in it? ~ tP 3T~ , •r JQ S FXPIiaF~ t are the changed conditi ns ~of.~the area whi h yoU feel m ke this proposal warranted? G~ ~ - r /Ma/ ~ , 40- ' ~ • 'i W . ~ R'a . ~~'ea ~ r~~- G7 F-1 ~r. dc re~s x ~ e<-&s rf zQlo& a f~~~Go rNe~ of -R!~*rA'er- aa 1Y1sf , , • . ' . . . ' ZONE RECLASSIFtCATION APPLlCAT10M PAGE 3 of 5 What factors support the zone rec{assification? Consistency with the Comprehensive Plan .~'~''h ~►1 2~~ ~r , 6 N~ roaj OrF Compliance with purpose and intent of zoning v/Q Of th e~~ ti ~l~"~ ~ ~~~i' ~ ~ra ~ aw~ ~,ur~► . thaw 52M 01~ the ~ ~t.~ ecf Description of changed conditions of the area that ou feel make this pro osal warranted ~ -~reew~ ~ 5 • ~ a. v Kt fia~~ ~ e r' ofio r ..o , c l.a l ke,:rh( xye 6mmer r ~ What impact will the proposed zone recfassification have on the adjace it properties? ar~ ~ rc la o i u~e- Wh t measures d you ro se to miti ate your proposal's impact on surrounding land use? ~rdajv 4e,reV~v 0`Y en I r WL f • - w m~ I d ~ -to Banker • PART 11 FIRE MARSHALL / FIRE DISTRICT ~ RCW 36.70 6 requires early coordination and information A. THIS PROPOSAL IS WITHIN FIRE PROTECTION DISTRICT NO. / B. WHAT IMPROVEMENTS NEED TO BE MADE TO MEET THE DISTRICTS FIRE PROTECTION u&~~~ 1-4- yk 3 w..~e.. , RE UIREMENTS? . i~ ~.-a. 10 • ~t„_ G~k..S~'~~ ~ - l J • C. SEE ATTACHED LETTER DATED: . D. REQUIRED FIRE FLOW (gallons per minute): l hav r~ev' 7h e posa! and have advised the applicant of the Fire Districr requiremenfs. SIGNATURE T1TLE DATE . . . , ZONE RECLASSIFICATION APPLICATION PAGE 4 of 5 WATER PURVEYOR RCW 36.70 B requires early coordination and information A. THIS PROPOSAL IS WITHIN WATER DISTRICT: 6'-S.1'4kt ..Te-a. B. SATISFACTORY ARRANGEMENTS FOR DOMESTIC WATER AND FIRE FLOW HAVE BEEN ' MADE AS FOLLOWS: A WATER SYSTEM PLAN MUST BE PREPARED: YES NO (}4 REQUIREMENTS: ~r ~ Y J C. SEE ATTACHED LETTER DATED: 1 h evie ed the ro osal d have advised the applicant of the District requirements. IGNAT E TITLE DATE SPOKANE REGIONAL HEALTH DISTRICT I RCW 36.70 B requires early coordination and information V A PRELIMINARY DISCUSSION HAS TAKEN PLACE, A COMPLETE APPLICATION MUST I NCLU DE: j B. SEE AITACHED LETTER DATED: After a preliminary review of the proposal, I have advised the applicant of some of the Spokane Regi na! Health requirements. A complete and detailed review wi/l be provided after the app/ication is sub itted, which will result in a complete list of requirements and conditions rega►ding Health provisi s for the proposal. . ? ~i~ / A0;2~~ '/Z SIGNATURE TITLE DATE f SEWER PURVEYOR (City of Spokane or Liberty Lake) RCW 36.70 B requires eariy coordination and infomnation A PRELIMINARY DISCUSSION HAS TAKEN PLACE, A COMPLETE APPLICATION MUST INCLUDE: G.Gc4rep e~S}~A rI B. SEE ATTACHED LETTER DATED: After a pre/iminary r+eview of the proposal, I have advised the applicant of some of the Sewer requirements. A complete and detailed review will be provided after the application is submitted, which will result in a complete /ist of requirements and conditions regarding Sewer provislons for the proposal. . . SIGNATURE TITLE OA E r , ZONE RECLASSIFICATION APPLICATION' PAGE 5 of 5 SURVEYOR VERIFICATION I, the undersigned, a licensed land surveyor, have completed the information requested for the zoning map and written legal descrip *on ' k p. BC~qT~ Signed i Date _~D ''F Wasti I c'' Address ~ Phone o~ - ~ City State L~iv1 PART III .......••SJ - L q LANO SIGNATURE OF PROPERTY OWNERS OR LETTER OF AUTHORIZATION EXPfRES 12/3! D I, the undersigned, swear or affirm under penalty of perjury that the above responses are made truthfully and to the best of my knowledge. I further swear or affirm that I am the owner of record of the area proposed for the previously identified land use action, or, if not the owner, attached herewith is written permission from the owner authorizing my actions on his/her 7*,Z00-ei574 Signed Date Address d • /56X 7~S Phone City r <:E>- e/'Y/GZC r e 5 State zip i at of plic ~ e Date ~ ~ - 2~o/ ~ State of Washington ) ) ss: County of Spokane ) Signed an swom or affirmed before me on this ~ day of , 2000', ~ b,, IG~oI la n~ Notary 'M WANDA T. CLARK Notary Public in and for the State of Washington residing NOTARY PUBLIC at STATE OF WASHINGTON EXPIRES JANUARY 6, 2003 My appointment expires d/O wq fida,- 7 ~ 7~~Y k, PART IV TO BE COMPLETED BY THE DIVISION OF PIANNING Date submitted File number Date accepted By Total fees Receipt number . ~ ~ ♦ 1 f ~ ~ c RECENED SPOKANE COUNTY HOY 14 2001 DtViSiON OF PLANN1NG SPOKANE ENVIRONIUIENTAL ORDINANCE SECTION 11.10.230;1- ~ I . , ~ . , ' . SEPA. ENVIRONMENTAL CxECxi.xST WAC 197-11-960 Spokane Environmental Ordinance Section 11.10.230(1) PURPOSE OF CHECKLIST • The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmencal agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals wiLh probable sijnificant adverse impacts on the quality of the environmenc. The purpose of this checklist is to provide information to help you and the agency identify impact from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. INSTR UCTIONS FOR APPLICANTS . This environmental checklist asks yoU to describe some basic information about your proposal. Governmental agencies use this 'checklist to determine whether the environsnental unpacts or your proposal are si~nificant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the quescions from your own observations or project plans without the need to hire eYperts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or "does not apply". Complete answers to the questions now may avoid unnecessary delay0ater. ' Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these question if you can. If you have problems, the governmental agencies can assist you. The checl•:list questions apply to all parLS of your proposal, even if you plan to do them over a period of time or an different parcels of land. Attach any additional information that will help descnbe your proposal or its environmental effecu. The agency to which you submit this checklisL may ask you to explain your answers or provide additional inforrnation reasonably related Lo determining if there may be significant adverse impact. USE OF CHECKLIST FOR NON-PR4IECT PROPOSALS: Complete this checklist for non-project proposals, even though queszions may be answered "does noL apply." Di ADDITI0N, complete the SUPPLE~MENTAL SHEET FOR NO~i-PROJECT AC"TIOVS (part D). w ' n n rr For non-project actions, the references in the checklist to the words proJect, applicant, an "property or sice" saould be read as "proposal, proposer," and "affected geographic area," respectively. Spokane Envi: onmental Ordinance Checklist Pa~e 2 of 21 , . . • ' . . . . A. BACKGROUND FILE/PROJECT NO. 1. Name of proposed project, if applicable: 2. Name of applicant: ~1`~ol~a~ ~ 1~cLer~- 3. Address and phone number of applicant and contact person: 11,1317 Barker ~ 4. Date checklist prepared: 5. Agency requesting checklist: ~ Cou~s/ s f oN 6. Proposed timing or schedule (including phasing, if applicable): -fr o s e ~o e~/ e /o ;.4/ e4rl, 2l~l~2 . . ~ c~ . , 5pokane Environmental Ordinance Checklist Page 3 of 21 I ~ . ' . . • , , , , , t A. BACKGROUND (concinued): 7. a. Do you have any plans for future additions, eYpansion, or furcher activity related to or connected wiLh this proposal? If yes, explain. /Q b. Do otivn or have options on land nearby or adjacent to this proposal? If yes, esplain. vo 8. List any environmencal information you know about that has been prepared, or will be prepared, directly related to this proposal. 12o n/of Gw-w w 9. Do you know whether applications are pendingj or g°Seain~ approvals of other proposals directly affecting the property covered by your proposal. If y, eYpl t Gt ~ v . ~ ~ 10. List any government approvals or permits that will be needed for your proposal, if known. k-llt' ~erml ! e 2. D/✓o ` ~ G~ o ~PlQ ILlr Spokane Environmental Ordinance Checklist Page 4 of 21 ' • i • . ! a 1 ~ A. BACK.GRC?UNDi (CQntfnutd). 11. Give a brief, complete descrigtion of your prop~sa-1, fncluding the propased uses and the size of the project and site. There are several questions later in this checUst that ask you tv describe certain aspects of your proposal. Yau cfo not need to repeat those answers on thss pa;e. Th 6) 60, ~o / s^ ~ l L/l q e ~ ~ ~ ~~'L f ~ / I 1 ~ ~ - ~ of a ~ r0 _ ~ O~'~ h14 1 ~ ~ 0 ~ . ~ I C, ka-Z;V i~',~ -62kc`e , ~ 12. Location of the proposal. Give sufficient infarmativn for a person to understand zhe precise location of your proposed project, including a street address, if any, and seCTion, tawnship and range, ~f known. If a praposal would occur aver aranae of area, Frovide the range or bQUndaries of tbe site(s). Provide a learal description, site plan, vicinity map, and topagraphie map, if reasonably available. Whiie you should s-ubmic any plans required by the aaency, you ar'e not required ta duplicate maps or deiailed plans submitTed with any pernm"t application related to this ehecklisx. Aovre-5-57 b~G{/L~~~d ~ Ivt/3~',~` Barker ~ ~~~rl~i • &-r ~,I~c~ Gt~/✓c~ ~/~I'~p ~'e/ rg~(/ S ~ , ~ o a Lll "e 4rJ . ~ 13. DoeS the proposed action lie iwithin the Aquifer Sensitive Area (ASr'1)? The General Sewer Se;viee Area? Z'he Priority Sewer Service Area? The City of Sp4kane? (5ee: SpQkane Caunry's ASA Overlay zone Atlas fvr b4undaries). Y(2,:5 Spokarre Environment~l Ordir:a:,ce Checlt2isz Pa~e 5 of 21 Evaluation For . , ► , Agency Use Only TO BE COMPLETED BY APPLICANT B. ENVIRONMENTAL ELEMENTS: 1. EARTI-i a. General description of the site (circle one): flat, rolling, hilly, steep slopes, mountainous, other: b. What is the steepest slope on the site (approximate percent slope)? P19 ~ s ~D f q /1i ~ / c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classificacion of agricultural soils, specify them and note any prime farmland. . ra ve / ~ d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. A/O e. Describe the purpose, type and approximate quantities of any filling or grad.inc, proposed. Indicate source of f'll. 1'g, r'o V~ ~ Q~ ~ C YL! S~1ed r~~ y f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. ~ Spokane Environmental Ordinance Checklist Page 6 of 21 ' ' . . , . - Ewaluation For Aglency Use Only B. ENVIRC?N1VIEIVTAL ELEMENTS (Cantinued): g. About what percent of the site will be covered with impervious surfaces after projeet cons ction (far example, asphalt or buildings)? /C~/ c~ h. Progosed rneasures tQ red ce or control erQSion, ar other impacts to the earth, if any: .5;7 ,4 ~ 2. AIR a. What type of ernissians ta the air would result fram the proposal (i.e., dust, autorrznbile, odors, industrial, waod smoke) during construction and when the praject is 2c5,npleted? If any, enerally descri e and give appraximace quantities, if known. ~S F I 1I b. Are there any off-site sources af eznissions or odor that may affect yaixr prdposal? If so nerally describe. 0 c. Prop sed rneasures ta eduee ar contrvl emissions vr other unpacts Eo a.ir, if any: ~c~ ~''O ~ / Spokane Environzriental Ordinanee Checklist Pa-e 7 or ? 1 Evaluation For Agency Use Only B. ENVIRONNIENTAL ELEMENTS (Continued): ' 5. ANIiNIALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other: mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other: b. List ~y,threatened or endan ered species nown to be on or near the site. G S ~ c. Is the site partP f a migration rouLe? If so, explain. d. Propose easures to prese e or enhanc wildlife, if any: ~ / 6. ENERGY AND Nr1TURAL RESOLTZCES a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meeL the compleced project's energy needs? Describe whether it will be used for heatin , manuf cturing, etc. 0XIi /16 I ~ I'd X b. Would your project affect the potential use of solar energy by adjacent properties? If so, gene ally describe. Spokane Environmental Ordinance Checklist Page 12 of 21 ' . • i , • , , . . . ' ' ' Evaluation For • • • • ' Ajency Use Only B. EiNVIRONMENTAL ELEibIENTS (Continued): c. What kinds of energy conservation features are included in the plans of this proposal? List v roposed measures to re e or control enerry impacts, jf any: . 4 d r5 1~ ye-V / 7. ENVIRONMENTAL HEALTH a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and eYplosion, spill, or hazardous waste, that could occur as a result of this propos ? f so, describe. O 1) Descr'be special e erge cy services that might be required. ~Q 2) Proposed measures to reduce or control Pnvironmental healt azards, it ai;iy~ D (f NO ~ ~v ~ b. Noise 1} `Xlhat types of noise exist in the area which may affect your project (for esample: traffic equipment, opera ion, othe>X/ S ~J/D ~ qp . ~ 2) What types and levels of noise would be created by or associated with the project on a shon-cerm or a long-term basis (for example: traffic, construction, ope:ation, other)? Indi ate wt hours noise w guld co fr h site. . ~ Np oN 7;~e 5 t~Gt c~ ~ tZ 1 6' fr 4~ Spokane Environmental Ordinance Checklist Page 13 oi 21 • . , , , , Evaluation For ' Ajency Use Only B. EiNVIRONIvIENTAL ELEMENTS (Continued): c. Proposed measures to reduce or control impacts on recreation, including recreation opportunitie t provided by the project or applicant, if any: 13. HISTORIC AND CULTURAL PRESERVATION a. Are there any places or objects listed on, or proposed for, national, state, or local preservatio r isters, known to be on or next to the site? If so, generally describe. ~ b. Generally describe any landmarks or evidence of historic, archaeological, scientific or cultural ~ po ance known to be on or next to the site. E L . Proposed rne sy~es to reduce or control impacts, if any: 14. TRANSPORTATION , a. Identify public streets and highways serving the site and describe proposed access to the sisting street system. Show on site plans, if any. , P r /2dv fa~~ ~ 6. Is site currently served by public transit? If not, what is the approsimate distance to the nearesL transit stop? y~ ~ Spokane Environrnental Ordinance Checklist P3ge 1 S of 21 • • . Evaluation For Agency Use Only B. ENVIRONMENTAL ELEMEN?S (Continued): c. How many parking spaces would the completed project have? How many would the project eliminate? r ~ d. Will the proposal require any new roads or streets, or improvements to e:cisting roads or streets, not including driveways? If so, generally describe (indicate whether public or private). ~ e. Will the project use (or occur in the immediate viciniry oo water, rail, or air transpona 'o ? If so, generally describe. D f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would oc . rl` 41q do ~ g. Proposed meansuf~ s o reduce or control transportation impacts, if any: 15. PUBLIC SERVICES a. Would the project result in an increased need for public services (for example: fire protection, police prote tion, health care, schools, other)? If so, generallv describe. ~ 1e J Spokane Environmental Or3inance Checklist Page 19 of 21 . , . • , Evaluation For ~ Aacncy Usc Only B. ENVIftdNiVfENTAI. ELLMEiNTS {Cantinued}: 6. Pro~osed m a ures to reduce or control direct impa ts on public ei'ViSt if any. , 7' ! ~ ~t~'' c~ ~ - /r~ ~i A/'/ 16. L.T7iLITIES a. Circle ucili€ies currently available at the site: ecE~iciv~ natural gas, aee efuse ~ service, ceph~, ~aryr se we, septic system, other, b. Describe the utilities thaz are proposed for ehe project, the utility providing the service, and che general construction activicies on the size or in the immediate viciriity which be needed. f o,►r ~ G~~"~ 7~ ~ V44- rC) c. szGiNATURE I, the undersigned, swear uAder the penalty of perjury that the above responses are made truthfii?ly and tc the best of mY knowledge• I also unders'tand that, should there be any wi11fuI misrepresentation or willful Ipek of {u11 disclosure an my pan, the aaencv mav withdraw any aeternninatiuri c~► r1r~i1-~i~rii~i~.ar~ce rha~ it mi~h€ issue in reliance upon this chPcklist. ~ DaCe. ~ 2-? PraPonent: //67 /V Proponent: ` (Please t,ype or print) . (Signature) Address: CitY, Statea Zip. 44~z Phone: Persan compietinc, the farm: Date: I~~~ r . Phane: f Z' p Spakane Environmen; 1 Ordinance Che4klisE Pa;e 20 of 21 A ` ' 1 3 ~ 1 • ~ FOR STAFF USE ONLY Staff Member(s) Reviewing Checklist: Based on this staff review of the environmental checklist and other pertinent information, the staff: A. Concludes that there are no probable significant adverse impacts and recommends a decermination of nonsignificance (DNS). B. Concludes that probable significant adverse environmental impacts do exist for the current proposal and recommends a mitigated determination of nonsignificance with conditions (~IDNS). C. Concludes that there are probable significant adverse environmental impacts and recommends a determination of significance (DS). REFER TO FEE SCHEDULE FOR FILING FEE - Spokane Environmental Ordinance Checklist Page 21 of 2 1 r ~ 1 . ~ ,A A . ~ ~ S C] I{. N L ~x~`~ • ~~f ~i~~'~~~~`ti~ ; ~ C7 L1 N "l, D1V1510N (3p Ci*1CINT:CIiWG ANi3 ROAD5 I1 DIVISION Or- "i'f•CL' 1'U13[.IC WOIZICa Dr-['ARTMIiNT Williiiit A. jolirlti, i'.C., CUtiizly [,iiginccr REGEWEQ SPOKANE CC►UNTY AGIZLEMENT TC) PAY I+EES NOV 142001 ~ - ~ / / nn~s~~~ ~ ~z,~v~~~ i.rrcIrv~~r~~t's Actt~:1:~YILIV'r r~un~ta3~;tt 'F'liis agreemcm laetweeiz Spokane Cvuiity ancl M , c. r~n , whose interc:st in tIie project is C40b, -7 ,W ne , , F , , is citteretl iiito this clfty oF _ ,~ctoL~° r , 20 C)/.This agt'eemeitit is applicablc to ilic projccl known as: RJ C~1f ~ /4~ • 'i'hiil [i1C t13dIV1CIUaIS a11d paXIleS iS-tk113eCI l1CCe111 aS I1aY111g a11 1t11C1`CSE lC1 lilC aL3oVt'. ClCSGC1bCd pI'C►[lCl't1' or pru.ject 4►grce ~o (1ie l'o1iom+ing; l. lteitilibursc Spokalic Coiiiity l'or projec1 i'cvicW 'WILI iIltil)ceciuli CCcs as specif iecl in Chapcer 9.14 o1' tllc Slwkaujc Cotiitt}► Co(ie. 'r1ie l'ces wil1 be basecl vn ac<<tial salary casts iiicurrcd by Spokaulc Cotinty fur projicci rcvicws anci 1 ai- inspcc:liuns plus a lt'.ll I)C1'(:G11t il4Il1'lIIl1Sil'a[S1,t'. Cllill'4Jey ttncl wi11 bc: bi11ec1 113t?11tIlIy as accruec1. Any billitlb a111C3111115 CIUi:, iiielticiing titny expcnscs isYCUC-rec! in tlrc cUllcclioir oF an averdue accounr, ll3llSt bC pa1(I p1•ior to tlye Catinty's acccptancc nf the prqject i'or ~ lilitig. ll` tt prujccl is ctpp1'ovccJ atici/or 1i1cd wiltt a balance stil1 owatig, tlie: tmpaics balancc sli-all he laaicl wiEllin 30 days oF thc itivoice cltite. 2. "I'13e Eit}clersigriecl agrees thae tlicsc fees are clue ancl payabIe upoit receipt of' [ife villirig iis spcciliid above. ~ 3. Aiiy li1VUlCCS i1DI j`laid witlyin 30 tlays of tlie iiivUicc ciate will be coiisiclercd tielijiqL»iit. If' I'itiy outszaitcling balaiice otl tlle lccouiYt for tllis project rs ilvt paicl witliin 30 clays of clie i»vaice clate, no furttier reviews af tl» praject clvcuizients 4vil1 be coi7cluceecl uilt'rl the esitii•e accoutlt baIilI1Ce iS paid. 11siy iaaiaiice oii the accotiiit fvr this pi'ojec:t otut paid within 65 cl.iys of tlic iiivoice ciacc anay resttlt it1 legal aetivn or llie initiatioii oC o[Iier collectioti proceclures, ilicltitli~Ig M[`c:i•~-ai eu ',I coltec:liosi a$ency. Tile Snollsor wi1l be liablc fox• aiiy a»d all cxpeiises itzctirreci by the Coizii(y foi- tile c:uilecsicaia of owercftrc aeccauncs. 11.`I I1C 111011lllly blllillg Sllf?4lICI I.}C StllI lIl IIlC'. UttciItiun Of; NAMC. R017&-rf !ADDltLSS; .,ga7( -7!!5r5 . C lTl' , S"l'A,TE.: +c~°A/Ct [ r&- S A' Gc 511 r Z1i) CODE: 171~IOr~E 92-6y~~.5!~71'jIONL !f 2: F A X !l: _ E-PvSail f!. I utaclcc°stanti t1iat Cailure lo pay tliese fecs iiiay I-csult iri dc:l<ry in coityplctinn or approval of tIlc prc.jcca cyl• o[lic:r pnssible sanctions. ❑ If tfiis fee tigreement is cQaiipieteci by soizieoiic oi1icr lhan tlie Spoiisor {i.e., tftc projecE awncr or << priracipal in the firm sriotisQrins (lze project}, stich as tiie E-azsineer clesigiiing (lic proj+ect, tlicn writtcn autlioriza[iati frain the Spansor specilically .111II1o1•iziiig tlxc f1gciit trr cxcc:titc this I"ec Agi-csrsi:ciit is attachecl to (Iais Fce Asreeiiigrlt, S[GNATUIZ C By: ~ ~ erT ►~4 c~ llqN~ (I'ItiN'I' NAML) ~ti+,`1"[J1tN l'~;l~I,,'1' CQt'1''i'~? S~'QI:~1N1; C[~Ui~'1'1' I;NCINIsl;1tS 1:111:rgrrc1'te.tlol 2174ri1(J ltl?f 11' Brcyacl►ti-ni' M,e S{xotu►itic 1ti'A 99260-0170 (;fl)) 477-3600 Vr11: (509) 477-2743 'l'131). (509) 324-3166 , • r" - SPOKANE COUNTY JMVISION OF BUILDING ' AND CO'DE'ENFORCEMENT fit 1026 WESZ' BROADWAY AVENUE • SPOKAvE, WA 99260-0050 SKx*f G;W- ~ Site Information Project Information ~ Site Address: 1317 N BARKER RD Project Number: 01005797 Inv: Z Issue Date: GREENAC'lZ1'S. W:A ()'?()l r=; PerEnir i1,c: %}~--,1-()1 Parcel Number: 55181.25ta'1 Subdivision: LJNKNOWN Applicant: M1LI IOLLAND, IZUl3ElZ'Y8i TERI:~. Block: Lot: 1317 N BARKER RD Zoning: UNK Unknown GREENACRES, WA 99016-9413 P}ione: (;()9) 926-64 3~ Contact: MII,HOLLAND, ROBLRT K: TT'RF,SA Owner: MII,HOLLAND, ROBERT & TERESA I 1317 N BARKER RD Address: 1317 N BARKER RD GREENACRES, WA 99016-9413 Phone: (SU') i 1,;2()-()4;; GREENACRES, WA 99016-9413 Building Inspecr~:; ` . T, I ' 5etbacks - Front: I,c~ft: Right: Rear: Water Dist : Group Name: Project Name: ~ Permits ~ Zolte Clto7tge Contractor: Liceaue ENGINEERS REVIEW $200.00 ENVIItONMENTAL REVIEW S75.00 REZONE TO I-1, I-Z, I-3 2 $2,419.00 UTII.IT'IES REVIEW $100.00 Total Pernut Fee: $2,794.00 M Payment Summary ~ Total Fees AmountPaid AmountOwing Tran Date ReceipL# Pavment Amt $2,794.00 $2,794.00 $0.00 11/14/01 9129 $2,794.00 Printed By: WENDEL, GLORIA Page 1 of 1 ~ • . ~ • • Spokane County Public Works Department Division of Building & Code Enforcenu,,nt Receipt , .l~~L'C'i'a~1~ .`[3'i~1b_'i'.' „~~`J !.',~tillf?;:'l' _~1'lti1~J~'j• Projects Full Project Nbr Inv Nbr Fge,4,nt Iny_41no Owing PAID P,».r 01005797 2 $2,794.00 $2,794.00 $2,794.00 $2,794.00 W-! Total: $2,794.00 $2,794.00 $2,794.00 $2,794.00 Miscellaneous Items Total PAID: $2,794.00 Tender ffTe Check Acct Balance CC Nbr ~ Dnte TENDERED Check1 558825 1,836.00 Payer: ROBERT MILHOLLAND Check2 3286 958.00 Payer: ROBERT MMILHOLLAND i Tota! TENDERED: 2,794.00 Over / (Short) $0.00 Change $0.00 Notes: Trarn Date / Time: 11 /14/01 3:46:27 PM By: GWendel Logon User: gwende) Station: GWENDEL Override By: Printed: 11/14/01 3:46:28 PM Page 1 of 1 DETERMINATION OF NONSIGNIFICANCE - "DNS" WAC 197-11-970 and Section 11.10.230(3) SPOKANE ENVIRONMENTAL ORDINANCE FILE NiTMBER: ZE-21-01 DESCRIPTION OF PROPOSAL: A Zone Reclassification from Urban Residential-3.5 (UR- 3.5) to Light Industrial (I-2) on approximately 1.37 acres for storage of recreation vehicles. 1 PARCEL NO.: 55181.2509, 55181.2510 HEARING DATE AND TIME: June 5, 2002 at 9:00 a.m. APPLICANT: Bob & Teresa Milholland, 1317 N. Barker Rd, Greenacres, WA 99016; 509/926-6435 LOCATION OF PROPOSAL: Generally located in the Northeast quarter of Section 18, Township 25, Range 45 E.W.M. The site address is 1317 N. Barker Road, Greenacres, WA LEAD AGENCY: SPOKANE COUNTY DIVISION OF PLANNING DETERMINATION: The lead agency for this proposal has determined that it does aot have a probable significant adverse impact on the environment. This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. This DNS is issued under WAC 197-11-340(2); the lead agency will not act on this proposal for at least 14 days from the date issued (below). Comments regarding this DNS must be submitted no later than 5:00 p.m., May 9, 2002 if t6ey are intended to alter the DNS. All comments s6ould be sent to the contact person listed below. RESPONSIBLE OFFICIAL: By: Jim Falk, Associate Planner Spokane County Division of Planning 1026 W. Broadway Ave. Spokane, WA 99 0-0220 (509) 477-7228 • DATE ISSUED: April 25, 2002 SIGNATURE: CONffVIQ~TIS REGARDING IIWIRONMIIVI'AL OONCEEtNS ARE WELCJOME AT TI-E HEARING. APPEAL OF THIS DETERMINATION, after it becomes final, may be made to the SPOKANE COUNTY DIVISION OF PLANNING, 1 st Floor, 1026 W. Broadway, Spokane, WA 99260. The appeal deadline is ten (10) calendar days after the signing of the decision to approve or disapprove the project. This appeal must be written and the appellant should be prepared to make specific factual objections. Contact the Division of Planning to assist you with the specifics for a SEPA appeal. This DNS was mailed to: 1. WA State Deparlment of Ecology (Olympia) 2. Spokane County Division of Engineering, Transportation Engineering; Scott Engelhard 3. Spokane County Division of Engineering, Development Services; John Hohman 4. Spokane County Division of Utilities; Jim Red 5. Spokane County Stormwater Utility; Brenda Sims 6. Spokane Regional Health District; Steve Holderby 7. Spokane County Division of Building and Code Enforcement, Jeff Forry 8. Washington State Department of Transportation; Greg Figg 9. Spokane County Fire Protection District No. 1 10. Consolidated Irrigation District No. 19 ~ , b ,/•'~'rr Nv ryw ~ • ` . , ~ / r ~,°'l R ~ r u.i~~~ii~r~ .,I / I ~ „IJ.MIA/'t1 . . • ~iaP~x,1/°%"''°y ~vc o~Nna.vyi~vylJ"""~/N..nw/~iN7 f ' f Jyw0040s Pfy rJ/MVVi~' /rN ! • ~'~~r/we~vµ/~i/r~i~ire ~stix~Q/~a t~.y~sn w~w,v,4~ /+w 0 y~s y/d* vo^v++ j+vAleywi.r ws.0iw ~it~,~✓~ur rvre yy -,,/I &,tyr I ; ~p~ 1• Io JV YA ~ V I~~ • YI fM/ . k v !lvc~~ r"/ 1 ~ /v'oo^"9fvv tl / ~y,~~MIlil~w~^ro'r rv • ' ~IOIXI /Cf~// ✓Oj/WOO%Op P'l~ ~~IAI/A/tlCI✓%I./qS/A/7Il ~►Y~ ~YI~MN1/~ ~ y,l O9 cy iw o/ w roy 6f X///w' uroV~og •~iu ~u"+r~o% ~ r .,u~oiw~N4 wn y vosl ~Y~•I'ysp~/,ArP ~;,'o~t~y~ u/ ~ tt IY ~~s',I II~ ~sa,w:o.rMoN~roy F . oi 4~'P n . . . . , y N~3iv 1, I..._ . j~w:n. • I Y-A~ / • • • j • ~~~~~~~p~` YON~i9o/sp~rA7r~r~,0/ . i s`. . elW~sjp1w"v+W ~w,,,.Pr o~,►...•y *.'yl1*a'&YM 9 r.,,ylAe f M 2 " ~ ' . • r M'wpr~Q'YY ,l ~^~"'a~Y rrrYr~Q7~M • z v aj~ r 9 ~ ~ , ~ , foi/ i~y , ~~r ! •ri ay rW c a~ u► ' ' . , v~~e~.~o~ i l+e.q Oyl &AM ve y,i i 9'~e"ny ~ r s, r ...rm ...sy go J j~ ~ ~ . _ 1 ~MPO' IYM,~+IfY~ ~l//~r,Y/►/it YI/////NM yWW~1/~/,// Iw/J./I~' I I 1 r ~ ~ '~A~l 27dNlV ~ f~ v~ yr/rd~pr e✓~rr~w~pr~wr~sir~ J~/JtlA/~ivo ~ryvfy~~~ ikyy I ~ , ~ ~~rvo~»lvis9/w'°/PIOf YN~I~I~ YMI~/1 lti'rAv,M~vy~wrr "wqr I ,a`j ~ • ~i,y ~~eN '?~/9~°%1'~ °/'Yo~i~►~~ ,~q~.~y °P~^v °'~~"'l~~S °Y v!y~ ' l' f I yb ir ~ Mi r~ / "YMWr •9 w •l/lYM ~V f» ~AY f/yr YI VMey , ' /'f9' ' 3yv~o~~v~r~~~o ~'y w' ~ I T o~r ; r 9 ~ uo{~aic~o~ v ~o~iuiyrrM'avv,yods~' ~ ~ ~ . . ~ 0 a.?Qai7 ' - I :(d001 •RJNI! 3141.>t ~ i • F f s P pj t a s oi a ri I ~ ~ ~31*,Lvxoas ~ . - - ~.7A0 ~sd i1IOI.LIQQN' : A A31A A311VA „ . . ~ y-'T/ "''~t'' t t / !ny ~t~ ;b ~ ~ ^ .f ~L"~ - • • • ' • • • ~a'Y~ - ' ' °'~~\Jt"y/ ,.U'Y' ~ ~Ad 3N /d . . , . • '+!,7r{(~l5't\~(f~+'; =.'i§,~ ~ . . ( ~ I . . . , . , I I _ _ _ ~ ~i I I, .1 S P (D K A N E C A DIVISION OFTHE PUBLIC WORKS UG:`:~.i. DNISION OF PLANNING MICHAEL V. NEEDHAM, DIRECTOR NIL'N1O1tA_'tilll'AI TO: Spokane County llivision of Engineering & Roads; Scott Engelhard, c/o Sand,, Kimball Spokane County Division of Engineering & Roads; John Hohman Spokane County Division of Utilities; Jim Red Spokane County Stormwater Utility; Brenda Sims Spokane Regional Health District; Steve Holderby Spokane County Division of Building & Code Enforcement; Jeff Forr), Fire District No. 1 Consolidated Irrigation District No. 19 Washington State Department of Transportation, Greg Figg FROM: Jim Falk, Associate Planner DATE: Apri123, 2002 THIS HEARING PREVIOUSI.YS(`13EI)['1,E1) F01d MAY 1, 200? 11AS I3FEN 1\10VEI) TO JUNF, 5, 0 2 .VY 9:0~~-k N 1. IA L 1': N 0:Li_: i - u i BRIEF DESCRIPTION: A Zone Reclassification from Urban Residential-3.5 (UR- 3.5) to Light Industrial(I-2) on approximately 1.37 acres for stora,,C recreation vehicles. PARCEL NO: 55181.2509, 55181.2510 APPLICANT: Robert Milholland Note that the application and maps were previously circulated to your agency. 1026 W. BROADWAY • SPOKANE, WASHINGTON 99260-0220 PHONE: (509) 477-7200 9 FAX: (509) 477-2243 9 TDD: (509) 477-7133 AL I y.. S P O K A N E ~ C O U N T Y OFFICE OF THE HEARING EXAMINER MICHAEL C. DEMPSEY, CHIEF EXAMINER MEMORANDUM To: John Pederson, Division of Planning From: Mike Dempsey, Hearing Examiner;;/;~ ~ Re: File Nos. ZE-21-01 and VE-1-02, Rescheduling of Public Hearings Date: April 16, 2002 It has been brought to my attention that the deadline for providing notice of hearing by publication in the above two matters, currently scheduled for hearing before me on May 11 2002, cannot be provided timely under County Resolution No. 1-0700. Compliance with notice of hearing requirements is essential to the Hearing Examiner's jurisdiction under the County Hearing Examiner Ordinance. Any action taken by the Examiner at the public hearing could be voided if notice requirements have not been met. Accordingly, the above hearings will have to be rescheduled to the earliest available date where notice requirements can be met. Since the Division of Planning is responsible for providing notice by publication where required for land use applications, I would ask that the Division of Planning absorb the cost of providing new notice for the above applications. I also wanted to comment on the interplay between the notice of hearings requirements of the County Zoning Code and County Resolution No. 1-0700 for Type II project applications. With regard to mailed notice of hearing, the requirements of the County Zoning Code control over those found in paragraph 13.700.106 (2)(a) of Resolution No. 1-0700. However, the posting and publication notice of hearing requirements of paragraphs 13.700.106 (2)(b) and (2)(c) of Resolution No. 1-0700 must be followed for all Type II applications, and also control over any inconsistent posting or publication requirements of the Zoning Code for such applications. c: Applicants in File Nos. ZE-21-01 and VE-1-02 THIItD FLOOR PUBLIC WoRKS BUIL.DING 1026 WFST BROADWAY AVENUE, SPOKANB, WASI-IDVGTON 99260-0245 PHOIVE: (509) 477-7490 9 FAX: (509) 477-7478 • TDD: (509) 477-7133 ~ re++~"a ~ , 3~ KANE~~UN~ ~ SP+~ ov 1 a 200~ DMS;O" QF ~ ~ :Cras~~ ~ . . . S~ I VJA, w 0 . ~ . • - • •~j r ~ ~ ~ ~ ~49W ~ . ~ ~trt i ~ ♦ n 4 ~ ` . ~ Cs ~ 3 S1TE PIA~ s ~ pF R~CO~D / 3At ~ ..1 . . + Parcel: 551812509 Ovmer: MILHOLLAND, ROBERT & TERESA k 7 CoOwner. Ovmer Address 1317 N BARKER RD GREENACRES WA 99016-9413 USA , ~ ~ . ~ Site Address 1317 N BARKER RD GREENACRES . - ~ Legal Descripbion BATES VALLEY VIEW LT 1 BLK ~ f ~•,~••q - ~ - ~ ~ - ~ ' • , ~ n j ~ qu , t ~ Q -Dz, ► 'ti ~ I ~ 9 . . ~ ~2933 OFI-1 19 ► - ~ .r.--~ ~ ~ Notice: This is not a legal document. Data depicted on this map is general & subject to constant revision. It is intended for reference use only. Legal documents should be obtained from the appropnate agency. Parcel: 55181,2510 Owner: MILHOLLAND, ROBERT & TERESA CoOwner: Owner Address ~ 1317 N BARKER RD GREENACRES WA 99016-9413 USA iv@l' ~ ~ Site Address UNKNOWIV/ GREENACRES Legal Description ~ BATES VALLEY VIEW LT 2 BLK ~ ~ 1 r 0 - _1 ~ m ' 1 1 i IL e ~ et: ~ y0 EF- 2g3 pFF 1°~~ E2 Notice: This is not a legal document. Data depicted an this map is general & subject to constant revision. It is intended for reference use only. Legal documents should be obtained from the appropriate agency. 251~,I~,45E~`'l.• 5FC I`~/ R~~ OFFtGIAi. PLAT !E5 GA L: 0o FT. ~~NE eou►,rrY oC L o ~ a t . . '+1~•a f:~?~~, ...~t~..~'. „ ,..r F. '•I• Mr, ~ ~ ' ~4I e ~j 1 ~ i ~ r.., ~ r ~r; .n f } ' ~r •r j . ~.r f • 40 7 V li 17 a FO 3♦ ii avE. ~N, 1699~"~0~ lA~w~►~~/~ I _ ~4 ~ii ~1n' 8 17 MISSI O T 4 `~74*~ ~Y~ ' trr Ul ~ d 7 A~;~ !2 « i ' ~ 1 ~Q 'ba~ V ~ 1 ~ ' ~ ~o A er I , tf1 , . N ~8 ► y t"'~•h~ i N• l6 g• 40 T y^ 4 ~ ~i s s` ~ 2 ~ ~ ~ ` 1• ` ~ ; ~ n \Q ro ~ a ; ) yr r' S 4 3 C. n ~ QR o v u a T i ~ ~r-~- ~ ~ ':;f• 'C l~j'r N I r . ' ti ~p~ + r U ~o ~~1; ' ~ ` ; ~ ; • '4 64 4 iS ii `•:tiN ~ rt N lo' ~ ~ i . 2 j1 (l ~ ~ I • , + 10 +o dl ' 121 ~ ~~1G NQI$8°~'3f ' ' ; 140p41~ ~ , 'J1'04~' ~ ' _ ,<~roroN . vo~rH SAM_ ¢F_ rt (nt~- ~e' Q ' ✓i n • , * vwAmn~ Tn .~a• I ~ 'il i~ by Nti68~~ ' t 0 + h ~ r"~ ~ J~, ~ ~ 5Z 3 ~~N ~ ty! t6R ~ ~ ~ / N ` ~ R ~9 ~ 2O 19 • ~ ~ /',3~ ~gy ; 1 I• r 29 U b ~ ~ i ' I tl . A° ~ rc~ 0 ,~'~c%` ~ ~ ' r F 0~,,: ~ r i• ~3 ry (,Vij C,OIT pt h 0 » /6 e! ~ . :r, F2~NT GE ~ER 1~:1 ~ D, ~168g PS.~r~LP~R Y~ j<' 1{r~~ •4;' 1 Lr.- ' ...r ~ ,~,,,,r•~•, , , ,~;,,~,~,..~..~...r.r.. i 1,~ ~ ,,5 - 54 ~ t, : 55~ o,b N, i~lt r,a • y~ 30 ~2 ~ ~ ~o 0 16~ \ ~ ~ c: 26 ~~b ~ ; ~ t~ ~ d ic g t 27 • ~ ' i.~r C ` ~ aot p'~ ~ ' +1 n •~,.1 I ~ 'KMpI ~ Nl I ~ f y Gr. ~~K RD. (Sce TmWAV PLh►ts) ~ ~ I M(~ DWAY'h 24 , ~ . ....wr'_... ~ i ~ ~ , ~ r• ~ ~ 4 ' ~ ~ i 1, ~ , IS ' 'Ot~I YI • , A , . I . ~ . 1 ~I . . . .i , .i~ + . ' r . , . r , ~ F ~ :Y J . _ . . . . ~ " ~ . . - . - . L ~ ~ . . , . . j ~te . ~ ~ . f . . ' ; ~ ~ j ' . . . . , . ! ( ~ •i '~p, . • ' ' : . ry : , ~F.i - . . • , ` i. i : j~ :.r ; ' _ •o• f ) h L - - f T' . I~ ~ t } ~ ~ ~ ' ~ ~ ti : F . f , C.a' ~ - 1 . . . a ~1 - ~ , - . ~ . ~ ~ • . ~ ' ~ - ~ ~ ' • . ' ~ 1 ' - . t{ ~ • ~ ~ , f ry ~ • ~ .r f ~wF. : _ . ~ .-a •j ~ ~ r . . - 1 . - ~ 1.` . 1 _L:~ ` i { ' • .f ~ ~ ~ ' ' ' _ ~ . 1 .r ~ 7~ r ~-J ~s t ~ - • , s ~ -t . ~ ~ 3 ,j i j. • ' . ;l' ~ : i~ t - . ~ ~ ~ ~ C _ ~ , ~ ~ F ' a r - ` 4, '~(j~ 1J ' ~ A " ~S" 1 ~ . . •F 14 ! 1 .Y "V~~~ ~~%r i ~ _ 45~ - Z' ('(J . ~ _Y . ?N= i ,Q 1 - ~ ' ~ _g . ~ - ~ _ , -0 t J - . . ~ _ _ 1 j . ~ ~ ~ 5 ~ ~ 1 ♦ L _ { ~ ' ~ ~ 1 ~ V „ . - ~ ' . ~ . . ~ ~ j ~ . ~ ~ v Q ~ \ ~ ~J~: • . y ~ ~ • ~ ~ ~ ~ ~ f . I~ • ~ . ~ ~ ~ • ~ ~ ~ ~ f•~ ir \ ~I ' ~ : ~.p . . t~ ~ .i: . ~ ~ . z-.~.~;. ~ ~ , ~ ~i ; i • ~b - ~ i _1 ti ~ ~1~ ~ ~ , ~ Q • , . - ~ , ~e. ~ ~ ~ 1 . • ' ~ ~ . , _ ~Z:~ . AN ~ , , 0 ' ' ~ ~ • ~ ~ • ~ ~ ~ ~ - ' _ . ; . ~ v 4 ' , ~ ; . • ~"~.,-~b~C` ~ - • ` ' ~ ~ • . ~ ~ 1 j •.t. \~j . W: ~ • ~ W ~ y g ~ ~ ~ ~ r~ ' ~ ~ F ' - -F--.~~ . ~ D - :o~ ~ . ~ ~ ~ , • : ~ r-~` o •f1.j ~ ~ 1j ~ 1 . _ c G~ ~ ~..`c^..~` . ' , ~ , ` ~ i . ~!O Z;.~ ~ ~ t ~ ~'i . ia' ~ 7 ~~\°~~'4CLt'r,~1 . ~ ~v . ~ ti ~ ~ ►.~.tl ~ ~ . ~ ~ , 'r~:~lt ' J ~ ~ ~ ~ ~ V.~ ;a o ~ ~ . ~ ~L:Ct", . - , . . 3 ~ ~ d -3 • ~ ~ . . . s~ ~ ~ , • . ~ J _ :~~~i . - ~ t t ~ . _ _ ; . - , ~ ~ ~ _ ~ ' ` ' C . > . ' - , . 'a ~ - . ' ~ ; , . . . - • ~ ' . ~ ii y • . • - ~ . . - . ~ • - ~ ; . - ~ 'i .~N Y ` , _ • . - f ' s . . a: .-,'T.-` . . • Y ui 1 . J .:L i~rl ` ~ bT ~ ♦ ~ . . /r. ~ „ ' . r.):.. . `r • -"'-L91:!/L'S; . • . . . . . , ~ V ' 72t " . i ~ Z a~~ , . OLZ . j ~ _ , `t ~ _ ~ ' ~ ~ ~ i' ~ ~ F«: ~ , H ^ ' f.• ;t~-~, t ~ N ~ • ~ ~ '1 . . . . ~ • , 1 • ~ ' , ~i i ' " ~ ~ ' . ~ ~ ~ ~ . ' . ~ . . -N . - : ! - "Sj . ~ . ~ ~ ' ~ ' . . - . ` _ . i • ' • ~ _ . . , . ' . . _ . . . _ . . . _ _ . : , . _ ° ~ f ~ ~ ' ' • - ~ J ~ . ' _ . ~ ' * . 3 i 5 . < .i a..~ ~ - ~ ~ ~ _ . . . , ~ + i, ~ 1~ • 'i. _ _ _ ~ ~ . / y - , " ' ' ~ : ~ . _ "•M, . , ; ~ t . . . ~ ' ' . ~ e~ . ZA . . - :-01 ~ v~_ - . _ _ - i . ~ ~ :1 ' , .Y - ~ ; . . _ _ _ - . Li : _ :p • ~ . ~ , ~ , , . - - of`~ ~j ; • a~f ~ ; t , . ~ ~ ~ o - - - - ~ ~ ~ r ~ ~ . , ~ -}m v. < Q ~ s . ` " ..1. ' p " ' ' ' . ' • { ' ti ~ ' . " ` ~ - _ . .1 •;w , ~ • . I . - - ~ - - - - - - , . _ . . j _ .t: - . - . ; . - _ . ~ . . ; . _ I ; : •`i ; ' . _ _ - _ . . . . . _ . i , . _ . . . : y~ u~ ~ . . • ~ i 1l , q~ j . . . . ~ • • ~ 4 , ~ ~ ' 2~: . . ~ • • I ' r ~ ' v ~ ri ~ ' . r ~ + Q y ~ . ~ J • , ~ . ~ ~O ' . .V e ' N - ~ : . ~ ~ ~ ~ ' \ ■ ~ 1 ; • ~ , . . _ pd o6z 'od . o~z - . - ~ . . • . : r ~ ~ T ' ' ~ . - i~ . . ` . " ~ . • _ ' ~ :I • t' - , r - ~ _ - • - • Y ~ . 1 L" ~ , N . ~ ' . , • • b r . I , . ~ . - : • ~ ~ . ~ ~ - - - = , . ~ . ' . .r , ' . S , r . ~ _ . aM~^. , _ . _ 1 . . . ...::u- 7 • c••--r ~r• -q r^- ° ~ ~ - A `c r.- 1 ti . :p - ` 3'ti_ z - i > r ~~~i ~i-~ l~r~. ~~5~_;,. a' ' ~ , * • r € f ~ ,r. ~'''~~45~' 1~.:~ Z •~1 ~~'Y . . _ . ~ d r s ~ : h. ~ ik C ~J J ~ ~ 7 f~.:s„~~ ' ~ : y ♦ . ~ 4- . w~~♦ .F.~''~ ~ ~,a ~y~,~~ ~ y -a`• l~~ ~ ; \ ~x ;~...n. 4 ~ #AV* V ft ~ n Ar. . y, b~ ~ ` , ~ y 1 ~ . . E . ' x ~ • ~ • ; ~ ` ~ ~ 1 ` i p A !1;;~ w < 1 " r _ ^ qw ~ ~ - ~ ~ r a ~~t-~' .Y,1,,,•~~~,~'~ " f. ♦ ` r ~ ~ ~ r! _o • ~~~yM - ~ .00 r;- + < . x~ , ~r s t tir- ' rt 1 ` 3 'h4 ~ ~ ' rt ~ q. i: J A ~'•ir ~i - ~ a , ~ ~ ~ ~ A _ ~ ~ ~ ° ~ y.. "~i = ~i,p•1,~. * ~ ~ .g ~ a r , ~ ~ F1~ f j ,y'. . e a. i ! . . ~ ~ " C ~ •~L 1 •,'.v•'' r~ r y ~ . J ~ ~ • JV ~ 6 , . I h I,y _ R v x 1 '~4 ys F ~ ~ ~ •r, . ~ ~ ~ . _ ; ~ ~ . ~ .l ~ r y yR~ h~ , • , ~ ~ ~ R~ ~ ~ ~ •i3t' . ~ ;+l~Y ' ~ . ~ ~ ~ r ~ a~ , + ` ~ j ~ ~ ' . 4 - ~'►t'r ~'c ' ~ , • ~ A~b ~ ~ * v 'i ~ ;s. • • , i_. i,~t•• ~ ~ . ~ ' a,~ ~ y" ~ ~ ~ ~ ~ r a~ ' w ~:l• ' e ~ ~ ~ . - ~ ° ~ 4 . , s~ ~ _ ~ ~ 66'~ .~''',.C_ `•:v..,~ • ~~1~6~~:~ . . ~ - ~~c ro. ~u;~:. . ~ ~ ~ "w*. 4~~~ e _ ~t - • ~ " ~ r s- x~•a.. r 3 t_ ii x'' ~ • ~ A a.+ _ k 753.°r "a.~.. ~~r~ . . k~ Y~ ~ ~•~y . ~ dd~ ~ i{ r . ' ~ . ,aa,~ .,n ~ ~ /r •y~ \ ~ f ~ ~ ~ ~ yy . ,~4 ~~11,, y _ , ~ ; • _ . ~ t• a r • ~ s- 5f ~ 1~ 'L{- ~ i / . l ♦ ' x 1 • ~ .^d ~ " . 4'~' • - _ ' ~ , . ~,j: ~"e . ~ a I~ : ~ ~OYsy ~ t • : t' . .a.. / . t i'? z' ? J y -u . . . ~ . • a.; t ~,y.,yp~_~~ . . ~ 4•~~ t<'7 ~r`_ti~`" .t_, r 4 ~ ~R +sr ,i;~, ~ ! ~ r~ t,R- zs }a ~ i iQ ~rf _ ~rr~ ~ i n ~ S O K A N E O U N T Y OFFICE OF THE HEARING EXAMINER MICHAEL C. DEMPSEY, CHIEF EXAMINER July 16, 2002 Sandra Thomas 18602 E. Sinto Greenacres, WA 99016 RE: File No. ZE-21-01, Request for Revision to Site Plan Dear Ms. Thomas: Please find enclosed a copy of the revised conditions of approval recommended by County Engineering for the above rezone proposal. These conditions a11ow the applicant to defer making improvements to Sinto and Sharp Avenues until a road improvement district is formed or a county road project is initiated to make such improvements, the timing of which methods of improvement is indefinite. The conditions also prohibit access to such roads for the project, except for use by the caretaker's residence at the existing access to Sinto. If you have questions regarding these conditions, please contact Greg Baldwin of County Engineering at 477-7254. I will allow vou unti15:00 p.m. on Mondav. Julv 22, for Countv Engineerim, Countv Fire District 1, Countv Division of Planniniz and Sandra Thomas to resvond in writin2 to the revised conditions. Sincerely, ' l ,/-7 ct 6'. Michael C. Dempsey Hearing Examiner Enclosure c: Greg Baldwin, Division of Engineering and Roads Jim Falk; Division of Planning Paul Chase, County Fire District 1, 10319 E. Sprague, Spokane, WA 99206 Bob Milholland, 1317 N. Barker Road, Greenacres, WA 99016 T'HRD Ft.00R PUBLIC WORKS BUILDING 1026 WEST BROADWAY AVENUE, SPOKANE, WASHNGT'ON 99260-0245 PHOrvE: (509) 477-7490 • FAX: (509) 477-7478 • TDD: (509) 477-7133 ~ 'A. ' - ' ` I • _ 1 O 1 ~ g ~ a ol ~ ~ • X x ''<< ~ r . / ~ . ~ ! / 1.~ e ~ ~ 1 • ~ A ~ ~ i, i ~ r ~ i~ - A ~ -r ' i~"~ i t ~ a ~4r ~s;+~•~ . ~ ~ ~ ~ ~ r ~ ~ . . . 1},. ~'1 l• ~ , \ ~ ' ~ t r' si I . , ~ r•. i ~J i~ ; . ~ OIITM 110A0 ~ Y ' i ~ ~ . o ~ R~ ~ ~ pl tri I ~ ~ 4d ~l VWArbA Ma 3 ~ ~ ~ REVISnNS pRAwN OA~r t!1/Oa ` ~ ~ PuN SY 4A1E !1ESCR DElptm JOS N0..I-t95 02 SPOKANE COUNIY, WASHINCION IRY 9AW DESCS AMnov[o_-feF re ►a. er 9!~ oESCR o THOMA., DEAN dc HOSKINS 1NC. ~ ~ ~ P~~ ENOINECRINO CONSUITANTS ' ORGT Mt,L1-902C4AN-fV41SPCLL M6►RMM _ ypK,yaC WAl911010TON ` IL