Loading...
2013, 01-25 Permit: SW-13000032 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -13000032 Permit Issued Date: 01/24/2013 Expiration Date: 01/25/2013 Project Description: Project Name: Permit Type: SEWER CONNECTION EDGERTON SEWER Primary Contac Applicant: Address: Phone: Email: A & P CONST & DEVLPMENT A & P CONST & DEVLPMENT 1349 W POLELINE AVE POST FALLS, ID 83854 208-818-5280 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessors Description Inspection Area: Zoning: 7117 E CARLISLE AVE 35121.6255 FIRST ADDITION TO EDGERTON EDGERTON 1ST ADD BLK 9 EXC N148' Water District: Orchard Avenue Irrigation District #6 Owner: Address: Phone: FEDERAL HOME LOAN MORTGAGE CORP PO BOX 650043 DALLAS, TX 75265-0043 Email: Fire District: Spokane Valley Fire Land Area: 20449 Square Feet CONTRACTOR INFORMATION: General Contractor PCONSPC955PL A & P CONST & DEVLPMENT 1349 W POLELINE AVE POST FALLS, ID 83854 208-818-5280 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $26.32 $125.00 $151.32 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area Date Printed: 01/24/2013 08:33:16 Printed by: IIS APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -13000032 01/24/2013 Expiration Date: 01/25/2013 CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 01/24/2013 08:33:16 Printed by: IIS APPPOOL\SmartGovProdApp