2013, 01-25 Permit: SW-13000032 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -13000032
Permit Issued Date:
01/24/2013
Expiration Date: 01/25/2013
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
EDGERTON
SEWER
Primary Contac
Applicant:
Address:
Phone:
Email:
A & P CONST & DEVLPMENT
A & P CONST & DEVLPMENT
1349 W POLELINE AVE
POST FALLS, ID 83854
208-818-5280
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessors Description
Inspection Area:
Zoning:
7117 E CARLISLE AVE
35121.6255
FIRST ADDITION TO
EDGERTON
EDGERTON 1ST ADD BLK 9 EXC N148'
Water District: Orchard
Avenue Irrigation District
#6
Owner:
Address:
Phone:
FEDERAL HOME LOAN MORTGAGE
CORP
PO BOX 650043
DALLAS, TX 75265-0043
Email:
Fire District: Spokane Valley Fire
Land Area: 20449 Square Feet
CONTRACTOR INFORMATION:
General Contractor
PCONSPC955PL
A & P CONST & DEVLPMENT
1349 W POLELINE AVE
POST FALLS, ID 83854
208-818-5280
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1
$125.00 $125.00
Total Fee:
$125.00
$26.32
$125.00
$151.32
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
Date Printed: 01/24/2013 08:33:16
Printed by: IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -13000032 01/24/2013
Expiration Date: 01/25/2013
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 01/24/2013 08:33:16 Printed by: IIS APPPOOL\SmartGovProdApp