Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2008, 07-18 Permit App: 08002714 Repair Fire Damage
Proj ect' Number: 08002714 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/18/2008 Page 1 of 2 Project Information: Permit Use: FIRE DAMAGE -ROOF AND MAIN FLOOR - REWIRE DMG RUNS Setbacks: Front Site Information: Plat Key: Left: Right: Rear: Contact: CAPSTONE CONSTRUCTION CO Address: 2917 E FRANCIS AVE C - S - Z: SPOKANE, WA 99208 Phone: (509) 468-4981 Group Name: Project Name: Name: Range District: Nort Parcel Number: 45072.6707 Block: SiteAddress: 7917 E CARLISLE AVE Location:: CSV Lot: . Owner: Name: THOMETZ, DAVID D & ELLEN M Address: 3220 N ELY RD SPOKANE, WA 99212-2025 Zoning: R-2 SF Res Suburban District Water District: 002 ORCHARD AVENUE Hold: ❑ Area: 12,035 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: Originally Released: 7/18/2008 By: tmelbourn Permits: Building Permit Contractor: CAPSTONE CONSTRUCTION Firm: CAPSTONE CONSTRUCTION Address: 2917 E FRANCIS Phone: (509) 468-4981 SPOKANE WA 99208 This Application: Total Project: Description Grp fl Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB FIRE DMG 0 $100,000.00 0 $100,000.00 REPAIR Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 0 $100,000.00 0 $100,000.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Operator: jmm Printed By: jmm Fee Amount $993.75 $4.50 $397.50 Permit Total Fees: $1,395.75 Print Date: 7/18/2008 Project Number: 08002714 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/18/2008 Page 2 of 2 Notes• Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount $1,395.75 $1,395.75 Amount Paid $0.00 Amount Owine $1,395.75 $1,395.75 $1,395.75 $0.00 $1,395.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 7/18/2008 FEE 08 2007 13 53 FR COS) PERMIT CENTER 5096680037 TO 4685091 RECEIVED BY car e naney CoDevelopment Permit CenterSpokane Valley, WA 99206 ' -IY OF SPOKANE VALLE\ 11707 E Sprague Ave, Suite 1� (509)688-0036 FAX: (5 9)688.003713UL 1 42008 wwwspokancvalley.nrg f. \ PE;(MIT CENTER Residential Construction Permit Application P.02/02 PERMIT NUMBER:8F ,f PERMIT FEE: _ New Construction ❑ Addition/Remodel n Other: Accessory Bldg Deck • SITE ADDRESS / J 17 - ( .l4 le CI Stf �( SR 1<43 VAL-L.EY Wil ! vi.,Z ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner Contractor: C/4PJ't'E (2e)tlsnc9GT/©l,j Name:Name: �[L� xi, 7-/467,1 era_ rA? no—, (Li r it—, C+ 5 Address: 7q f7 tr. ‘_ ('v Li <L 4Q-Vt _ Address: 4.). 9/ 7 / /-R y ,,,, s City: State: (J Zip:W ,SPkwv� lt�u-�7 I � City: ,S�oKl�t-' State: Zip: ?%L;-• Phone: o Fax: - ��-sa Phone: 11� _�° r1 �� I i•5'r . ..• • Fax: �Eer"�I"ec9/ 30% SLOPES ON 1 PROPERTY: /04- Contractor Lic No: (p5T uo 4SS Exp Date: $ — / .- 07 Contact Person I SEWER OR SEPTIC? . sum 42 City Business Lic. No: Cibl"TCEi o(05S Namef7 /d C Phone: 4/ 3 5---/ 0 ofr Describe the Scope of work in detail: Cost of Project: $ /00,000 R p4)044et•E ra kiot,rj, k14Ljjj CZooe-- eeVag D4M✓{17EJD egos PROJECT USE: **************Tb f Il win 1NST be complete (write N/A if not applicable)********************** eoo HEIGHT TO PEAK: l y 1 �i DIMENSIONS: s`7rS-- # OF STORIES: ' TOTAL HABITABLE SPACE: cf SU�R/FACE MAIN FLOOR TO SQ. FTG: ' ( 17< 2NU FLOOR SQ. FTG: ijA UNFIN BASEMENT SQ. FTG: Liao IMPERVIOUS AREA: /�/%7_ FINISHED BASEMENT SQ. FTG: 1=AMM GARAGE 5Q. FTG:: 723 DECK/COV. PATIO SQ. FTC: 5(7 30% SLOPES ON 1 PROPERTY: /04- # OF BEDROOMS:CONSTRUCTION TYPE: 3 r, Pg- /Pict • HEAT SOURCE: 6:14 .5 SEWER OR SEPTIC? . sum 42 The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling Is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permi ' not -a- rmit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional infor - • - = = required to be submitted, and subsequently approved before this application can be processed... SIGNATURE: ' Method of Payment: 9 Cash 0. Check Bankcard #: Authorized Signature: REVISED 8/25/2005 ❑ Mastercard Expires: 7 tuv):"...--- ❑ VISA VIN#: '1, TOTAL PAGE.02 ** asoDalley° For City Use Only PLUS Project Number 87-,)7/(1 Project Address 99/ 7 9' efts it .P(,( 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 1 Fax: 509.688.0037.• permitcente4spokanevalley:org As part of our on-going commitment to customer service during the review process of Schur project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date., - Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application '.will havethad its initial` technical review. It is not the date for approval or permit issuance. • Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. F,.vtra lime may be required jhr re -submittals as project application reviewers work on'multiple applications and it • may be several daps before they can look at your new or revised information. • Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual witli the expertise for dealing with reviewer comments would be the best choice for the entire review' process. • i Call staff regarding the status of your project only after the target date shown at the top:of the page.: Although you should be contacted 011 or by the target date, please feel jive to contact us if you haven / heardfrons us by your target. date. Staff nay contact you before the target date if the -initial review is complete. By following this, procedure, you will save time and allow the reviewers to complete the work'mo"e expeditioisly. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete.. This means all. of.the `required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2..Quality Check. The next step in the process is a quality check to make sure that the application is'reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in•their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed totechnical staff for compliance review. Depending on the type of project; technical staff may'include multiple reviewers.' -You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technicaj compliance review is Complete. - • 4. Permit Issuance. When the technical compliance review of the application is.complete, including any subsequent re-' submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application-. and contact the person specified on your application for permit pick-up. Information regarding, fees and pre -construction meetings (if required): will be provided by, • the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 S s okane Valley Project Transmittal City of Spokane Valley Community: Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Newproject Previous pre -app meeting ❑ Plan revisions U Transmittal Date: Monday, July 14, 2008 Site Address: 7917 E CARLISLE AVE Parcel Number: 45072.6707 Zoning: R-2 Fire District: FD 01 Project Number: 08002714 Water District: ORCHARD AVENUE Applicant: e-mail: Contact: e-mail: Contractor: CAPSTONE CONSTRUCTION CO 2917 E FRANCIS AVE SPOKANE, WA 99208 (509) 468-4981 CAPSTONE CONSTRUCTION CO 2917 E FRANCIS AVE SPOKANE. WA 99208 (509) 468-4981 CAPSTONE CONSTRUCTION 2917 E FRANCIS SPOKANE WA 99208 (509) 468-4981 Owner: THOMETZ, DAVID D & ELLEN M 3220 N ELY RD SPOKANE, WA 99212-2025 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: FECEOWEIDI JUL 14. �?EDRUOLEMkil Project FIRE DAMAGE -ROOF AND MAIN FLOOR -REWIRE DMG RUNS Description: APPLICATIO CONSTRUCTION PLAN N e TD c IB I ding 1 Landuse Engineer Utilities Health Fire Dist Assessor Please send all plan review and project comments via e-mail to the highlighted individuals.