Loading...
2012, 10-17 Permit App: BLD-2012-1847 Pole BuildingSpokane _#Valleyk Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter(Thsooka nevallev. orq (5\t- 29tt- Ltcn RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ❑ NEW CONSTRUCTION 9 ADDITION/REMODEL 9 DECK1 Ave OTHER SITE ADDRESS: '027 - Cri-akA0 ASSESSORS PARCEL NO.: 451 f.. LEGAL DESCRIPTIO BUILDING OWNER NAME: Clot ajar DING Project #.13117:21a. RECEIVED, OCT 1 7 2012 CSvv PFRMIT CENTER SUtsi NAME: ADDRESS: 5oc 41olzec 4502AJvt 7 E Cc.d0 Ps Cm: Spokane_ VO-tley STATE: C,0 Z • . PHONE: FAX: CELL: CONTACT NAME: PHONE: FAX: CELL: CONTRACTOR NAME: C$`5 Cn✓ts4'rtc& -inn Ok�i9O �P 5 MAILING ADDRESS: 525 3 cis Ler el Cm: C•(reefiAcce5 STATE: 1.31 A ZIP: Q /t]) , FAX: 509-9211=f027 CELL: 961- e) Lt, 37 PHONE: CONTRACTOR LICENSE NO.: C 0,401\1406.022,1H EXPIRES: 7_14 Cm BUSINESS LICENSE NO.: £OZ 637._ cit DESCRIBE THE SCOPE OF WORK IN pETAIL AND INDICATE USE & PROPOSED USE: 30c"(O04 To\e BK ;/t9 ****YOU MUST COMPLETE THE FOLLOWING**** APPLICABLE Height to Peak: 2 1 I Dimensions:No. as y0 of Stories: Total Habitable Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ FT: Finished Basement SQ FT: Garage SQ FT: /, I2t0 s4 Deck/Covered Patio SQ FT: Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms: Construction Type: ?41& Heat Source: ege-wegor Septic: TOTAL COST OF PROJECT: $ %(o,ggb DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required o be submitted and subsequently approved before this application can be processed. Effective October 28, 2007 Page 1 of 2 P:\Community Development\02 Administra ion\03 Forms - Official Versions\Permit Center\Residential Construction Permit App 10.28.07.doc 1 r -'w Site ,000Valley Target Date sheet For City Use Only PLUS Project NO, Zf2 itiy7 Project Address 77 i ca ktd cl n 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 1 permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is G 141 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and docuthents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific.contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise i for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us ifyou haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure thatthe application is reviewable and free from substanti'e flaws that wouldprevent technical staff from completing the technical review once it is started. When this step is • complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, •teclmical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical, compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. lttformation regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 100' w ?roposeJ 12004 3(� T F 55 f'332 ' 3G� IDS{' 4162? E Ccckc_tio Ave PstrccI Hsi S�2.& PLAI\IOG DEP1 • APPRO JED Project # \16 _fi RECEIVED OCT 1 7 2012 CSV PERMIT CENTER SUB # REV. # Oct 22 12 03:32p C&S Construction • S`pokan'e jVa.11ey 509-924-9027 p.2 Residential Driveway PAVING WAIVER Community Development— Planning Division 11703 E Sprague Ave Suite 8-3 0 Spokane Valley WA 99206 509.720.5026 0 Fax: 509.688.0037 0 plannin2izsnokanevallev.orq .Spokane Valley Municipal Code (SVMC) Section 19.40.020.B; "All residential driveway and off-street parking areas shall be paved with asphalt, Portland cement, grasscrete, paver blocks or other equivalent hard surface material". A paving waiver can only be granted If the structure you are proposing is not going to require a driveway for dally use. PART I — OWNER INFORMATION OWNER NAME: iJ c= ADDRESS: *)L7 y, Lo_ke..,A C3 f11i C1rv: �lC,�2 i/I,- y PHONE: FAX: CELL: PARCEL #: STATE: 1y431; ZJP:Oftake. 992)7_ EMAIL: PART II —DETAILS OF PAVING WAIVER 1. Do you have an existing garage for parking daily use vehicles? J YES ❑ NO 2. Is the proposed detached structure used for storage only? S YES ❑ NO 3. Do you plan on using the detached structure t o park vehicles? ❑ YES FT NO if yes, then what type of vehicles? 4. Do you plan to conduct a business from proposed detached structure? ❑ YES fci NO If so, what is the nature of your business? PART III —AUTHORIZATION I,(PRINT NAME) -*71-10,--2 j i? owner, hereby confirm that the information provided on this form is true and correct' ,I acknowledge that any change in the foregoing conditions, could require the City to impose paving requirements. I further agree to report any change in these conditions to th&Spokane Valiey/Community Development,Department, Planning Division, within 30 days. Owner gnature oc'//7 ?u'? Date ' i PART IV — DECISION STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT DPIFXECTOR AND FIND THE REQUEST IS GRANTED AT (p��) I%2 7 >' 1;26-6/6 SAID ADDRESS FOR PERMIT# LL3 /. — /Byy Plannir(g Division Staff Signature /O/Za/i >_ Date Created 6127111 Received Time Oct. 22. 2012 3:13PM No. 0604 Page 1 of 1