This matter has come before the Hearmg Exanuner Commuttee on December 20,
1990 The members of the Comrmttee present are Verona Southern, Cha,uperson,
Harry Gibbons and Phil Hams
PROPOSAL
The sponsor, Redeemer Lutheran Chiuch, requests approval of a Zone
Reclassificanon, File No ZE-46-90, for the purpose of developing 34 apartments
(retirement aparnnents) on approxlmately 2 9 acres
FINDINGS OF FACT AND CONCLUSIONS
1 The property is generally located ui the Spokane Valley east of and adjacent to
Schafer Road and approxumately 350 feet southwest of Dishman Niica Road ui
Section 32, Township 25 N, Range 44 EWM, Spokane County, Washington
2 The comunittee adopts the Plammmg Department Report as a part of tlus record.
3 The exisang land use(s) in the area is pnmanly single family residences A church is
located across Schafer Roa.d from the site
4 The Comprehensive Plan designates tlus site as Urban The Urban category is
intended to provide for development of a city lilce envumnment, including residenual
densities of 1 to 17 wuts per acre This proposal is for 12 uruts per acre
5 The Artenal Road Plan designates Schafer Road as a minor artenal, with a
recommended nght of way width of 80 feet. Exisnng nght of way width is 60 feeL
The Engmeers office has requu-ad that 5 feet of additionai nght of way be dedicated
along Schafer Road and the 5 additional feet be set aside for future nght of way
acquisinon
6 The project is within the Pnonty Sewer Service Area (PSSA) Public Sewer Service
is requu-ed for the project
7 The existing zorung of the property descnbed m the apphcaaon is Agncultune,
previously established in 1959
8 The provisions of RCW 43 21C (The State Environmental Pohcy Act) have been
comphed with and a Deternunauon of Nonsignificance was issued
9 The legal requutments for public noace have been fulfilled.
10 The owners of adjacent lands expressed disapproval of the proposed use expressing
the following concerns
1
t ,
y
HEC Order for ZE-46-90 Page 2
a Project will increase traffic on Schafer Road and at the Schafer Road/Dishman
Niica Road intersection
b Lack of sidewalks on Schafer Road will create a safety hazand for pedestnans
including elderly residents of the proposal
c Nearby railroad creates noise which will d.isturb residents
d Bus sennce is not available at the site Elderly residents must cross Dishman
Niica Road to reach bus stop
e Projects access to Old Schafer Road will create safety hazard for children
curnendy using the road to nde bilces
f The anea is pnmanly single famfly housing The mulaple fanaily project is not
compatible
11 The proposed zoning does implement and conform to the Comprehensive Plan
12 1'he proposed use will not be detnmental to the pubhc health, safety, morals or
welfare
13 The Committee additionally finds/concludes
a. That the project will increase uaffic on Schafer Roa.d and at the intersection of
Schafer Road and Dishman Mica Road
b That the lack of pedestnan faciLees along Schafer Road may create a safety
hazard
c That the projects distance from mnsit faciliaes wnll limit transgortation options for
the residents
SZBDFB
The Hearmg Examiner Comnuaee, pursuant to the above Findings of Fact and
Conclusion, DENIES vvithout prejudice the apphcation of Redeemer Lutheran Church
for the zone reclassif'icaaon as descnbed in the apphcation ZE-46-90
Motion by Hams Seconded by Gibbons
Vote (3-0) UNANIMOUS TO DENY WITHOUT PREJLJDICE THE ZONE
RECLASSIFICATION
•1 s
1 r ,
HEC Order for ZE-46-90 Page 3
HEARING QLAMINER QQMMI'I'IEE
HEREBY ATTEST TO THE ABOVE FINDINGS, ORDER, AND VOTE
A,
Ch V
J
V
~
` V
ATI7EST
For WALLIS D HUBBARD
Planrung Dmtar
TEVE HO BIO SKI
Current Planrun strator
12-211-20
D=
kc
Pursuant to County regulaaons, any aggneved party has the nght to appeal this wntten
decision to the Spokane County Board of County Comnussioners vvithm ten (10) calendar
days of the signuig of this order Upon receipt of an appeal, a pubiic heanrig will be
scheduled. If you desire to file such an appeal, you must subrYUt a wntten appeal,
preferably on forms designed for such purpose, to the Board of County Comnussioners,
W 1116 Broadway, Spokane, WA 99260, along vvith $100 processing fee payable to the
Spokane County Treasurer
If you have any questions, please call the Planning Deparunent at 456-2205
rev 1/90
19
w '
NO 91 0345
BEFORE THE BOARD OF COUNTY COMMISSIONERS
OF SPOKANE COUNTY, WASHINGTON
IN TI-E MATTER OF ZONE RECLASSIFICATION ) FINDINGS OF
ZE-46-90 URBAN RESIDENTIAL -3 5(UR-3 5) ) FACT, CONDITIONS
URBAN RESIDENTIAL -12 (UR-12) ) AND DECISION
SPONSOR REDEEMER LU1'HER.AN CHURCH
THIS MATTER, being consldered by the Board of County Commussioners of
Spokane County, hereinafter referred to as the "Board", of an appeal of the Spokane
County Heanng Examiner Committee decision of December 20, 1990, wherein said
comnuttee denied the proposal to de-velop 34 renrement apartments
The Board received an appeal application on December 24, 1990 by Grant Person,
agent for Redeemer Lutheran Church
The Board held a de novo public heanng on January 29, 1991, and having fully
considered all testimony presented, and having ind.ividually acquainted themselves with
the vicinity and the site in quesnon, chd reach a decision on February 12, 1991, to grant
the appeal and approve the proposal subject to certain conditions and in doing so dld enter
the following
FINDINGS OF FACT
1 That the December 20, 1990 PLANNING REPORT was considered as well as
the staff presentanon before the Board
4 2 That the December 20, 1990 Hearing Examiner Committee Findings and Order
were considered
3 That the file of ZE-46-90 was available for consideranon by the Board
4 That the proper legal requirements for advernsing of the heanng before the Board
have been met
5 That the provisions of Chapter 43 21 C RCW (The State Environmental Policy
Act) have been complied wlth and a Determination of Nonslgnificance (DNS) was
issued The Board concurs with the Determination of Nonslgnificance
6 That the proposal is to be located on a 2 9 acre site located in the Spokane Valley
east of and adjacent to Schafer Road and approximately 350 feet southwest of the
intersection of the Dishman Mica Road and Schafer Road in Section 32,
Township 25 North, Range 44 EWM, Spokane County, Washington This is a
unique shaped site created as a result of the realignment of Old Schafer Road
7 That the density of the revised proposal is 12 dwelling units per acre 1'his
density is generally consistent with the Comprehensive Plan The
Comprehensive Plan provides that properties located within the Urban Category
may have densihes from one (1) to seventeen (17) units per acre when located
within the Pnonry Sewer Service Area (PSSA) boundanes
8 The proposal is located adjacent to single family residences on the southwest To
the northwest across Schafer Road from the site, the Redeemer Lutheran Church
ls located To the southeast across Old Schafer Road from the site single family
residences are located Adjacent to the site's northeast boundary the railroad nght
of way is located
9 Owners of property located near the proposal expressed disapproval of the
proposed use due to the following concerns
a The proposed renrement apartments are not companble with the existing
single family residences
~
.
ZE-46-90 BOCC FINDINGS AND DECISION Page 2
b The surrounding roadways are not adequate to accommodate the traffic that
would be generated by the proposal
c The water pressure in the area is not adequate to supply the proposal and
exisnng water uses
10 The Redeemer Lutheran Church onglnally owned the property upon which the
church is located, as well as the rezone proposal site, as one parcel The County
Enguieer's realignment of Schafer Road caused the Church's property to be
bisected This fact, along with the increased traffic on Schafer Road, demonstrate
changed conditions warranting the rezone request
11 Gary Kennelly, Counry Traffic Engineer, testified that Schafer Road was
designed to accommodate 6,000 vehicles per day and that the intersection of
Schafer Road and Dishman Mica Road is in the process of being upgraded This
fact substantiates that the proposal will not cause traffic problems
12 The record indicates that water will be supplied to the proposal by Spokane
County Water Distnct No 3 The Water Distnct has the legal obligation to make
available appropnate water supplies to propernes within its Distnct boundanes
accordingly the proposal makes adequate provisions for water service
13 The zone reclassificanon will not be demmental to the public health, safety,
morals or welfare, especially when conditions as provided for herein after
DECISION
From the foregoing Findings, the Board hereby APPROVES the appeal of
Redeemer Lutheran Church for the zone reclassification of Urban Residenual -3 5
(UR-3 5) to Urban Residential -12 (UR-12) for the property descnbed in the
application ZE-46-90 and provides the following
. CONDITIONS OF APPROVAL
1 No access, to include emergency access, will be allowed from the site to Old
Schafer Road
2 There shall be no storage of recreational vehicles, trailers or boats on the site
3 The applicant shall enter into an agreement, as prepared by the Spokane County
Prosecunng Attorney's Office, which shall limit the use of the site to 34
retirement apartments In the event the present or subsequent owners desire to
change the use from 34 retlrements apartments to apartments or any other use,
whether authonzed or not within the Urban Residential -12 (UR-12) zone, the
owner shall be responslble for malang applicanon to the Planning Department for
a change of condition This applicahon will require a public heanng The
agreement, as prepared by the Spokane County Prosecuting Attorney's Office
vvill be recorded in the Spokane County Auditor's Office and run with the land
IN REFERENCE T4 THE ATTACHED FINDINGS & ORDER, THE BC)ARD OF
CntJNTY COMMISSTONERS ADOPTS THE FOLLOWING CONDITIONS 4F,
APPRQVAL
PLANNING DEPARTMENT CUNDITIC)NS
1 The wning map sha11 be changed to Urban Residennal-12 (UR-12) after appeal
penod(s) have expued and all development shall comply with Urban Residential -
12 (UR-12) standards
2 Approval is requued by the Planning Director/designee of a specific ligheng and
signing plan for the descnbed propercy pnor to the release of any bullding
pennits
3 A specific landscape plan, planang schedule and provislons for maintenance
acceptable to the Planning Directoridesignee shall be subrrutted wnth a
performance bond for the project prior to release of buildhng pernuts
I
ZE-46-90 BOCC FINDINGS AND DECISION Page 3
Landscaping shall be installed and ma.intauned so that sight d.istance at access
points is not obscured or impaued
4 The Planmng Department shall file with the Spokane Counry Auditor, within the
same tune frame as allowed for an appeal from the final disposiaon, including
lapsing of appeal penod, a Title Notice, which shall generally provide as follows
"Pnor to the issuance of any building pernut for any building or any use on the
property descnbed herein, the applicant shall be responsible for complying with
the provisions of the Zoning Code for Spokane Caunty, Section 14 706 (Aquifer
Sensiuve Area Overlay Zone) The property which is the subject of this nonce is
more particularly descnbed as follows That pomon of the E 1C2 of the NE 1/4
descnbed as follows Beglnning at the intersectlon of the westerly nght of way
hne of the O W R& N Company Railroad nght of way and northwesterly of the
nght of way line of Old Schafer Road, thence southwesterly along said razlroad
nght of way 240 feet, thence north 59°36'42" west 44$ 48 feet, thence north
30° 11'30" west 475 feet, thence north 30 feet, thence north 42°35'S9" west
662 84 feet, thence south 69°57' 11 " east 535 20 feet to the westerly line of said
railroad nght of way, thence southerly along said nght of way line to the point of
beginning, except road and except that portion thereaf lying northwesterly of the
southeasterly nght of way line of Schafer Road as relocated, in Sectlon 32,
Township 25 North, Range 44 EWM, Spokane County, Washington
S The Planning Department shall prepare and record with the Spokane County
Auditor a Title Nonce noting that the property in quesaon is subject to a vanety of
speclal conditions imposed as a result of approval of a land use acnon This Title
Nohce shall serve as publlc nonce of the condiaons of approval affecting the
property in question The Title Notice should be recorded wnthin the same time
frame as allowed for an appeal and shall only, be released, in full or in part, by the
Planning Department The Title Notice shall generally provide as follows
The parcel of property legally described as (legal description) is the
subject of a land use action by the Board of County Commissioners
of Spokane County on January 29, 1991, imposing a variety of
special development cond,tions File No ZE-46-90 is available for
inspection and copying in the Spokane County Planning Department
6 The Spokane County Plammng Department shall prepare and record with the
County Audhtor a Title Nonce specifying a future land acquisiaon area for road
nght-of-way and ualities The reserved future acquisition area Title Notice shall be
released, in full or in part, by the Planning Department The notice should be
recorded vvithin the same time frame as an appeal and shall provide the following
a At least five feet of reserved future acquisition area for road nght-of-way and
utiliaes, in addition to the exisnng andlor newly dedicated nght-of-way along
Schafer Road NOTE The County Engineer has requued five feet of new
dedicaaon
b Future building and other setbacks required by the Spokane County Zoning
' Code shall be measured from the reserved future acuisinon area
c No required landscaping, parking, '208' areas, drainfield or allowed slgns
should be located within the future acquisition area for road nght-of-way and
utiliaes If any of the above improvements are made within this area, they
shall be relocated at the applicant's expense when roadway improvements are
made
d The future acquisition area, until acquired, shall be pnvate property and may
be used as allowe.d in the zone, except that any improvements (such as
landscaping, parking, surface drainage, drainfield, signs or others) shall be
consldered intenm uses
CQIJNTY ENGINEERING CONDITIONS
Pnor To The Issuance Of A Buildine Permit Or Use Of The Propertv As Pronosed
l Applicant shall dedicate 5 feet on Schafer Road for right-of-way
ZE-46-90 BOCC FINDINGS AND DECISION Page 4
2 Access germits for approaches to the county road system shall be obtained from
the Spokane County Engineer
3 The applicant shall submit for approval by the Spokane County Engineer road,
drainage and access plans
4 The applicant shall submit for approval by the Spokane County Eng-ineer and the
Spokane County Health Dismct a detailed combined on-site sewage system plan
and surface water disposal plan for the entue project, or portlon thereof, if the
development is to be phased
5 A parlang plan and traffic circulaaon plan shall be subrrntted and approved by the
Spokane County Engineer The deslgn, locanon and arrangement of parking
stalls shall be in accordance with standard traffic engineenng practices Paving or
surfacing as approved by the County Engineer, will be required for any portion of
the project which is to be occupied or traveled by vehicles
6 To construct the roadway improvements stated herein, the applicant may, wnth the
approval of the County Engineer, join in and be willing to parncipate in any
peauon or resoluaon which purpose is the formation of a Road Improvement
Ihsmct (RID) for said improvement, pursuant to RCW 36 88, as amended
Spokane County wYll not parcicipate in the cost of these improvements This is
applicable to Schafer Road
7 As an alternative method of constructing the road improvements stated herein, the
applicant may, with the approval of the County Englneer, accomplish the road
unprovements stated hereln by joimng and participating in a County Road Project
(CRP) to the extent of the required improvement Spokane County will not
participate in the cost of these improvements This is applicable to Schafer Road
8 The construction of the road improvements stated herein shall be accomplished as
approved by the Spokane County Engineer
9 The County Engineer has designated Typical Roadway Section Number One,
Secondary Artenal standard for the improvement of Schafer Road, wluch is
adjacent to the proposed development This will require the addition of
approximately 4- 6 feet of asphalt along the frontage of the development The
construcnon of curbing and sidewalk is also required
10 All required improvements shall conform to the current State of Washington
Standard Specificaaons for Road and Bndge Construcaon and other applicable
County standards andlor adopted resolutions pertaining to Road Standards and
Stormwater Management in effect at the date of construction, unless otherwise
approved by the County Engineer
11 Applicant shall construct a paved and delineated approach(es) to meet the existing
pavement on Schafer Road
12 Roadway standards, typical roadway Sections and drainage plan requirements are
found in Spokane Board of County Commissioners Resolution No 80-1592 as
amended and are applicable to this proposdl
13 This subdivision or development proposal is located within a drainage basin
which has been idenhfied by the Spokane County Engineer's office as having
stormwater runoff problems Since this plat or development proposal is affected
by or is a contnbutor to stormwater flows, propercy owners should participate in
the planning and implementaaon of a future basinwide stormwater management
system The follownng statement shall be placed in the plat dedication
"The owner(s) or successor(s) in interest agree to join in any County-approved
stormwater management program and to pay such rates and charges as may be
fixed through public heanngs for service or benefit obtained by the planning,
design, constructing, maintaining or operanon of stormwater control facilities "
14 The regulanons of the National Flood Insurance Program shall be observed since
the proposed plat is affected by a flood hazard zone A development pernut shall
be obtained from the County Engineer before construction or development begins
within any area of the special flood hazard zone (reference Spokane County
Ordinance No 88-0521)
u
ZE-46-90 BOCC FINDINGS AND DECISION Page 5
15 No construction work shall be performed within the existing or proposed public
nght-of-way until a pennit has been issued by the County Engineer All work
wnthin the public road nght-of-way is subject to inspection and approval by the
County Engineer
16 All requued construction within the existing or proposed pubhc nght-of-way is to
be completed pnor to the release of a build.ing permit, or a bond in an amount
estimated by the County Engineer to cover the cost of construcaon of
unprovements shall be filed wlth the Counry Engineer
17 Apphcant shall sign and record Spokane County Notice to the Public No 6 which
specifies the following
The owner(s) or successor(s) in interest agree to authonze the County to place
theu name(s) on a pehnon for the formation of a Road Improvement Dismct
(RID) by the peanon method pursuant to Chapter 36 88 RCW, which pention
includes the owner(s) property, and further not to object, by the signing of a
ballot, the formaaon of a RID by the resolution method pursuant to Chapter 36 88
RCW, which resolunon includes the owner(s) propercy If an RID is formed by
either the petinon or resolunon method, as provided for in Chapter 36 88 RCW,
the owner(s) or successor(s) further agree
(a) that the improvement or construction contemplated within the proposed RID is
feasible,
(b) that the benefits to be derlved from the formation of the RID by the property
included therein, together with the amount of any County participanon, exceeds
the cost and expense of formanon of the RID, and
(c) that the property within the proposed RID is sufficiently developed
Provlded further that the owner(s) or successor(s) shall retain the nght, as
authonzed under RCW 36 88 090, to object to any assessment on the property
° as a result of the improvements called for in conjunction with the formation of the
RID by either petinon or resolution method under Chapter 36 88 RCW
This requuement applies to Schafer Road, from which the subject parcel takes
access
18 The County Artenal Road Plan identifies Schafer Road as a M.inor Artenal The
existing nght-of-way wndth of 60 feet is not consistent with that specified in the
Plan In order to implement the Artenal Road Plan, in adciiaon to the requued
nght-of-way dedication, a smp of property S feet in width along the Schafer Road
frontage shall be set aslde in reserve This property may be acquired by Spokane
County at the time when artenal improvements are made to Schafer Road
19 County Engineenng has reviewed this proposal based on an elderly housing
concept Should these apartments be constructed for an occupancy other than for
elderly housing further revYew of road improvements shall be warranted
S'O ;NTY HEALTH DISTRICT CONDITIONS
1 Sewage disposal method shall be as authonzed by the Director of Utilities,
Spokane County
2 Water service shall be coordlnated through the Director of Utilines, Spokane
County
3 Water service shall be by an existing public water supply when approved by the
Reglonal EngYneer (Spokane), State Department of Health
4 A public sewer system will be made available for the project, and individual
sernce wnll be provided to each lot pnor to sale Use of individual on-site
sewage d.isposal systems shall not be authonzed
5 Use of pnvate wells and water systems is prohibited
f
ZE-46-90 BOCC FINDINGS AND DECISION Page 6
CnjTNTY VTII.ITIES DEPARTNiENT CONDITIONS
1 Applicant shall make connection to public sewer system Sewer connection
permit is required Plans and specificatlons are to be reviewed and approved by
the Ualiaes Department
SO PNTY BTJII,DINQ AND SAFETY DEPARTMENT CONDITIONS,
1 Requuements of Fue Distnct No 1 need to be satisfied dunng the building pernut
process
5POKANE C`OIJNTY AIR POLLt1TInN C'.ONTROL AtJTHORITY CONDTTInNS.
1 Air pollution regulations requue that dust ertussions dunng demolinon,
construcaon and excavanon projects be controlled This may requue use of water
sprays, tarps, spnnklers or suspenslon of activity dunng certain weather
conditions Haul roads should be treated, and emissions from the transfer of
earthen matenal must be controlled, as well as emissions from all other
constructlon-related acaviaes
2 All traveled surfaces (ingress, egress, parking areas, access roads) must be paved
and kept clean
3 Measures must be taken to avoid the deposition of dirt and mud from unpaved
surfaces onto paved surfaces If tracking or spills occur on paved surfaces,
measures must be taken immediately to clean these surfaces
4 SCAPCA Regulation I, Arncle V, requires that a Nonce of Construcnon and
Applicahon for Approval be submitted to and approved by our agency pnor to the
construction, installation or establishment of an air pollution source
• 5 Debns generated as a result of thls project must be disposed by means other than
burning
BY THE ORDER OF THE BOARD THIS /2' DAY O ARCH, 1991
BOARD OF C MISSIONERS
ve Hass hairman
tJoh McB de .
Pamcia A Mummey
Vote of the Board of Spokane County Commissioners as follows
Commissioner Steve Hasson - Aye
Comrrussioner John McBnde - Aye
Comrrussioner Patncia Mummey - Aye
ATTEST
E DONAHRI-K
of the Board
By
4ose ontague, Deputy CffTk
, t
i
a ~
N ,
ZE-46-90 BOCC FINDINGS AND DECISION Page 7
QFFICIAL NnTICE FOR DATE AND PLACE FOR COMMENCING AN APPEAL
NO.TE n o WAC 197-11-6R0(5,; notice is here,~given ~h~ Board of
~ntv ommisslone,~r in con~,uncclon wlth the anproval of the a,bove-referenced m~r
(1) That time lirYUt for commencing an appeal of the approval of the above-
referenced matter, as provided by County ordinance, is thirty (30)
calendar days from the Board of County Commissioner's execution of the
above Findings of Fact, Decision and Conditions
(2) The time frame for appealing and SEPA issues with respect to the
approval of the above-referenced matter is thu-ty (30) days after the
execunon of the above Findings of Fact, Decision and Conditions
(3) The appeal of either the approval of the above-referenced matter or any
SEPA issues must be filed in the Spokane County Supenor Court or a
court of competent junsdiction as provided by law
C
~ ~ .
Blclq. Permit Fee Nc.. Fil.e No. -4- '
Pr -3.j ec t Name
Ad d r e ~ s F•ar c e l Nco
S onsc►r' s Name , Rhone #
r_Z f Z~1 1( t C7 c,ll ar_ Z: F'eY 5lx1
D,.AtE-- Suhmitted Descriptic-n Init i~..~ls
SPOKANE eOUIJTY PLANNING DEPARTMENT
APPLiC'ATION FOR ZOIVE REC'1-ASSTFIGATInIy
Date 4ctcber 8, 1990 Application No -L I • t, v c
Name of applicant Radeezrer Lutheran Giurch .
Street address of applicant S 3606 Schafer Road .
City Spakane State Wr Zip Code 99206 Phone 9 6-63h ~
Name of property owner(s) RedeP_mer Lutheran CJ2Urch
Authorized agent representing owner
(if other than owner) J Grant nerson (phone 623-1000)
Existing zoning classification Agricultural
Date existing zone classification established jq 5q
Existing use of property Vacant
Proposed zone classification UR"12
Proposed use of property Elderly/ Pets.rement Apas-tment
Legal descnP ti0n Of Prop erty pTN OF E~ OF NEia DAF BEG AT INTR OF WLY R/W LN OF OWR&N CO
RR R/W AND NWLY R/W LN OF OLD SHA~ER R.D TH SWLY ALG SD RD R/W 240FT TH N59DEG 36MIN 42SDS
W448 48FT TH N30DEG 111tiIIN 30SDS W475FT TH N30FT TH N42DEG 35MIN 59SDS W662 84FT TH S69DEG 57MIN
11SDS E535 20FT TO WLY LN OF SD RR R/W TH SLY ALG SD R/W LN TO POB EXC RD AND EXC THAT PTN
THEREOF LYING NWLY OF THE SELY R/W LINE OF SCHAFER ROAD AS RELOCATED
Section 32 Township 25 Range 44
Source of legal Title Obr-Panv - From CJoLmtv Peoords
Assessor's Parcel No (see tax statement) 45321 9103
Propeny size amnrox 100 , OOOSFpntage Approx 450 Feet on Schafer Pbad
Total amount of adjoining land controlled by this owner or sponsor 7-, acre - arross rd
Street address of property appnox S 3600 Schafer
If you do not hold title to the property affccted by this application, what is your
intcrest in it? Hold tttle
Please list previous Planning Dcpartment actions involving this property
none
ALL OF THE FOLLOWIING QUESTIONS MUST BE ANSWERED
1 What are the changed conditions of the slte area which you feel make this
proposal is warranted? a cli.sadvantacred Parcel not well su-Lted for sinale
familv deveJo-._t, no-c fazm land
2 What effect will the proposed zone reclassification have on the adjacent
properties'7 It will buffer the adiacent properties frorl the Pall Foad
tracks and near bv cormercial develornre.nt
This section of the application will provide the Planning Department's staff with
written verification that the applicant has had preliminary consultation
with the agencies identified Results of the preliminary consultation should be
incorporated in the proposal before final submittal to the Planning Department
~
~
/
~
APPLICATION FOR ZONE RECLASSIFICATION PAGE 2
1 CO[ TNTY ENGINEM'S 4FFTCE
A preliminary consultation has been held ta discuss the proposal Our
re ements : r submittal of this proposal for rezone have been satisfied
40
(Sig ature (Dat
2 SQI1N'TY UTILITiE$ OFFI(M
A preliminary consultation has been held to discuss the proposal Our
requirements for submittal of this proposal for rezone av bee
il-f ~ - n r.
sa fied The d ;Sgl nated water purveyor for this stte is
nat ure) (Date)
3 W ATER PLJR VEYlJR
a) The proposal (is)(rgmnve`) located within the boundary of our service
area
b) Satisfactory arrangements (iam)(have not) been made to serve this
proposal c) o,Ne.,-r%
c) We (are)(aftm%st) able to serve this site with adequateAwater
Fi/igz ~J7, ature) (Date)
4 gt1ILDING A._ND SAFETY DEPARTMENT
A preliminary consultation has been held to discuss the proposal Our
requirements for submittal of this proposal for rezone haye been satisfied
This proposal is flocated in Frre Distnct No
C ~7'y/ ~ t~i / y C;'c.
' (Signlature) ~ (Da4)
5 COtTNTY HEALTH DI TRiCT
A preliminary consultation has been held to discuss the proposal The
Ncalint has e informed of our requirements and standards
(SIg re) ~ (Date)
I THE UNDERSIGNED, SWEAR UNDER PENALTY OF PERJURY THAT THE ABOYE
RESPONSES ARE MADE TRUTHFUL.LY AND TO THE BEST OF MY KNOWLEDGE
I FURTHER SWEAR THAT j AM THE OWNER 4F RECORD OF THE SITE PROPOSED FOR ZONE
RECLASSIFICATION, OR IF NOT THE O R, ATTACHED HEREWITH IS WRITTEN
PERMISSION FROM D O NER RIZING MY ACTIONS ON HIS OR HER BEHALF
~..•.~i~N ~kkgned) Date
~•'p" t'IA s(%,dd~ S s 3CC~~ erG? te Phone
.
~ j • ~ j , C<<10--~~, Zip O ~
~f;1. Y .A,~ Date A
~
yo ~~S O41•''c~
t~E~sEA.,
SIGNATUR70APPLICAN/T- R ENT
/ o ,
Z _ ~/L Date 1
REV 4 9 fcu
- YUAM~v
• 3a ~~-Si~~C~
SPOKANE COUNTY PLANNING DEPARTMENT
' @-PFLjCATION FOR ZONE RECLASSTFICATION
Date October a, 1990 Application No
Name of applicant Fe'deerrer Lutheran Church
Street address of applicant S 3606 Schafer Rbad
City Spokane S tate Wr Zip Code 99 206 Phone 9 25-h 3h 3
h'ame of property owner(s) Redeemer Lutherar1_Q1UrXh
Authorized agent representing owner
(if other than owner) JGrant nerson (phone 623-1000)
Existing zoning classification Aqricu1tural
Date existing zone classiFcation established l q 54
Existing use of property Vaeant
Proposed zone classification UR-12
Proposed use of property Elderly/ Retireirent Apartment
Legal R R/W AND I~WLY d R/W ~N OF O~D o ~Hert AFER T R.D O TH E SWLY ALG SD RD E R/W T 24INTR 0FT OTH N59DEG 36MIN 2SDS F4ON CO
R.
W448 48FT TH N30DEG 11MIN 30SDS W475FT TH N30FT TH N42DEG 35MIN 59SDS W662 84FT TH S69DEG 57MIN
11SDS E535 20FT TO WLY LN OF SD RR R/W TH SLY ALG SD R/W LN TO POB EXC RD AND EXC THAT PTN
THEREOF LYING NWLY OF THE SELY R/W LINE OF SCHAFER ROAD AS RELOCATED
Section 32 Township 25 Range 44
Source of legal Tl.tle Cbmvanv - From Oountv Fleoords
Assessor's Parcel No (see tax statement) 45321 9103
Property size aporox 100 , OOOSFfpntage At)prox 450 Feet on Schafer Fba~i
Total amount of adjoining land controlled by this owner or sponsor 735 aere -agross rd
Street address of property approx S 3600 SchafPr
If you do not hold title to the property affected by this application, what is your
lnterest in it? Hold title
Please list previous Planning Department actions involving this property
none
ALL OF THE FOLLOyVIING QUFSTIONS MUST BE ANSWERED `
1 What are the changed conditions of the site area which you feel make this
proposal is warranted? a clisadvantaaed parcel not well suited for sinqle
fami.lv develo_nt. nor fazm land
2 What effect will the proposed zone reclassification have on the adjacent
properties? It will buffer the ad-lacent pronerties from the Rail Road
tracks and near bv oommrcial developrrnnt
This section of the application will provide the Planning Department's staff with
written verification that the applicant has had preliminary consultation
wich the agencies identified Results of the preliminary consultation should be
incorporated in the proposal before final submittal to the Planning Department
\
sw
>
r✓
• .
APPLICATION FOR ZONE RECLASSIFTCATION PAGE 2
1 COCJIVTY ENGINEER'S OFFICE
A preliminary consultation has been held to discuss the proposal Our
re ments r submittal of this proposal for rezone have been satisfied
/D lq 40
(Sig ature Dat
2 MjJNTY =ITIES nFFIM
A preliminary consultation has been held to discuss the proposal Our
requirements for submittal of this proposal for rezone av bee
sa fied The d gnated water purveyor for this site is 4•'#3
~--i~-qo
(S gnature) (Date)
3 W ATER PjEVIEYOR
a) The proposal (is)(r9wmK) located within the boundary of our service
area
b) Satisfactory anangements (Jimm)(have not) been made to serve this
proposal clovHesfiG
c) We (are)(afteast) able to serve this site with adequate~water
10~1 1990
( ignature) (Date)
4 BUTLDING AND SA.FETY DEPARTMENT
~~VY A preliminary consultation has been held to discuss the proposal Our
requirements for submittal of this proposal for rezone have been satisfied
This proposal is located in Fire District No
(Signature) (Date)
5 COUNTY HEALTH DISTRICT
A preliminary consultation has been held to discuss the proposal The
applicant has been informed of our requirements and standards
(Signature) (Date)
I, THE UNDERSIGNED, SWEAR UNDER PENALTY OF PERJURY THAT THE ABOVE
RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE
I FURTHER SWEAR THAT I AM THE OWNER OF RECORD OF THE SITE PROPOSED FOR ZONE
RECLASSIFTCATION, OR IF NOT THE O R, ATTACHED HEREWITH IS WRITTEN
PERMISSION FROM D NER RIZING MY ACTIONS ON HIS OR HER BEHALF
Date lqo
4~t,Y llNpsn e d ) .
i`~•ort%~A's•F`'~ S 3~d~ SCo~'-eY
dr s Ifaa4~e Phone 3 3
~ .Q
~ ~ • e~ ~o ~~.-P . C.v o-,e~x4 zip o ~
' • ~
Y Date
.9~e'S 1, ~ ~i /7 i ~ •
4g~ APg
}0 SEAL
,
SIGNATURE 0 APPLICANT R ENT
~.•~L. , Date
KEV 4 9 fcu
~ Number
S P 0 K A N E C 0 U N T Y E N G I N E ER
P R E L I M I N A R Y C 0 N S U L T A T I 0 N---
,
A. Project Name 4::~_:
PROPOSAL Number of Parcels•
Section ~ L T. 2_):~- N., R. E.W.M., Quarter 1 2 3 4
DEVELOPER Name
or Address.
AGENT Phone • Business (:~7 2- ! ~ Lp Q Home
Name : ~e_ 'd e- c ~ k
OWNER Address : S 3 r or.
Phone. Business 2.G 3a; Home
Name ~ 'S
0~~'5 ~
ENGINEER Address
Phone: Business Home
B. PRELIMI2IARY CONSULTATION. Date /D //7/ qd By.
Preliminary a) RLght-of-Way 7
Conditions b) Curb f? c ) Sidewalk 71
d ) Pave e) Approaches 4L~-~,,~ D e ~
f) DZsinage ~/e /
g) SCaCe/City Review Yes No ~ Remarks.
NOTE: This proposal must comply with Spokane County Regulations for Roads, Ap-proach and Drainage in New Construction; Board of County Commissioners Resolution
No. 80-1592 as amended. Conditions are preliminary and may change after field in-
¢pectiqp gqd zqyiaw gf Gougy xggArdoq
,
C. INSPECTION DaCe. By:
Remarks :
D. SPECIFIC CONDITIONS:
,
i
Fee Paid• Yes ✓ No Amount $:ZQD 00 r a h Check 411~
Planning Application Signed: Date ! O / J9 / 9 O BY •1 ~ 5►~~~n~
E. FzxAL Pz.AT cHEcxs
Fee Paid Date Amount Check Cash
Mathematical & Surveying Checks•
No. 1 Date By
No. 2 Date By
No. 3 Date By
Additional mathematical and Surveying Checks•
No. 4 Date By Fee Amt.&Dt.Pd.
No. S Date By Fee Amt.&Dt.Pd. ,
No. 6 Date By Fee Amt.&Dt.Pd.
No. 7 Date By Fee AmC.&Dt.Pd.
1/81
h
z
REDEEMER LUTHERAN CHURCH
132~
OATE INVOICE DESCRIPTION COMMENT AMOUNT
10/17/90 Repp, Emma ENGINEERING FEE 200 00
TO1AL 200 00
REDEEMER LUTHERAN CHURCH u s BANK OF WASHINGTON , 13 2:
S 3606 SCHAFER ROAD SPOKANE, WA 99206
SPOKANE WASHIN(3TON 98206 9158 1323 19 10-i250
10/17/90 $$***#x200 00
OATE AMOUNT
Two Hundred and
PAY Spokane Co Engineerzng
TO THE
OROER
OF Spokane, WA 992
C 7 ~
11100 13 ' 311' -1: L 2 5000 10 Si: LL67 3 L0 3 3 1n'
. , . . . - - . _ . . _ ~ r : . , ~ , - . ~.e~.i . ~ . , . . ~,or .e......_ e,._ ..~..c.a _.-.1~..., o._._.
~ ~
~
7C
• t t
. ~
N
F
~ O
R
OAT~ " J a
R CEIPT U M B E
~
~ RECEIVED FROAM QqgQg~~~
~
o Add ress i
gY -
O ~ .
~ ~'2 '~$80OLLARS $ ZU~~•
o FOR
N
~ ACCOUNT ~ HOW PAID '
y eECi►vNirvc I ~ I cAsH ~ I
G BALANCE /
~ AMOUIYT
y PAIO CHECK I ~
Mwae iN u S.A. BqLANCE ~ I MONEY
3 o w~tw,alonas ises DUE I ORDFR
BY ~
- ~ w _ . - _ • y: •-~r. ` - - _ _ - ~ _ ~ ~ _ .
_ . t~,"~.~i.~.«.r.. . w,k'fN _
r,4 f,r ~ • ~
t
r ~
~y+ r .
F J
7 ~
~
p'1
7
ti
K
~
r ~
~
z
xf
~
a
e
C
r
d~
r
DETERMINATION OF
NONSIGNIFICANCE - "DNS"
WAC 197-11-970 and Secaon 11 10 230(3)
SPOK:ANE ENVIRONMENTAL ORDINANCE
FILE NUMBER(S) ZE-46-90, VE-89-90
DESCRIPTION OF PROFOSAL Zone Reclassif'ication from Agncultural (A) to
Urban Residenaal-12 (LTR-12)
APPLICANT Redeemer Lutheran Church
South 3606 Schafer Road
Spokane, WA 99206
(509) 926-6363
LOCATION OF PROPOSAL Generally located in the Spokane Valley east of and
adjacent to Schafer Road and approxunately 350 feet southwest of Ihshman 1Vbca Road in
Secaon 32, Township 25 North, Range 44 EWM, Spokane County, Washington
LEAD AGENCY SPOK:ANE COUNTY PLANNING DEPART1ViENT
DETERNIINATION The lead agency for this proposal has deternuned that it does not
have a probable significant adverse unpact on the environment. An Envuonmental Impact
Statement (EIS) is LUirequired under RCW 43 21C 030(2)(c) This decision was made
after review of a completed envu-onmental checlclist and other uiforniation on file with the
lead agency Ttus uifoimation is available to the pubhc on request.
This DNS is issued under WAC 197-11-340(2), the lead agency vsnll not act on this
proposal for at least 15 days from the date issued (below) Comments regarding this
DNS must be submitted no later than 4:00 p.m., December 18, 1990, if
they are intended to alter the DNS.
RESPONSIBLE OFFICIAL WALLIS D HUBBARD, PLANNING DIRECTOR
By Tun Lawhead, Planner II
Phone (509) 456-2205
Address Spokane County Planrung Departinent
North 721 Jefferson
Spokane, WA 99260 ~
DATE ISSUE67
1990 SIGNATURE /
O RBGARMG ENVIRCNNENTAL UCNCEPNS ARE ATZHE HIFARING
loollitillil
APPEAL OF THIS DETERMINATION, after it becomes final, may be made to the
SFOKANE COUNTY PLANNING DEPARTMENT, North 721 Jefferson, Spokane, WA
99260 The appeal dea.dhne is the same as the above project's appeal deadlule, being ten
(10) calendar days after the signing of the decision to approve or disapprove the projecG
This appeal must be wntten and the appellant should be prepared to make specific factual
objecuons Contact the Planning Department to assist you with the specif'ics for a SEPA
appeal
This DNS was mailed to
1 WA State Department of Ecology (Olympia)
2 WA State Dept of Health
3 Sgokane County Health Distnct
4 Spokane County Engineer's Off'ice
5 Central Valley School Ihstnct -356
6 Fum Ihstnct -1
7 Spokane County Water Distnct -3
8 Spokane County Air Pollunon Control Authonty
~ t
SPOKANE COUNTY PLANNING DEPARTMENT
APpL,[CATION FOR ZONE RFCLASSiFICATION
Date October B, 1990 Application No Zl'- qtP -90 ~ V E SOI - / ~
Name of applicant Pedeerrer Lutheran Church
Strect address of appluant S 3606 Sc-hafer Raacl
City Spokane State Wr Zip Code 99206 . Phone 926-6 16 3
Namc of property owacr(s) Re(JUgM~r Lutheran Church
Authorizcd agcnt rcprescnting owner
(if other than ownec) J. Grant Person (phone 623-1000)
Existing zoning classification Acjr1cu1tural
~
Date existing zone classification established 1959
Exisung usc of propcrty Vacant
Proposed zoac classification UR-12
Proposcd usc of propcrty Elderly/ retl.rement Apartsnent
Leg al desCnptiOD Of pr0pCrty PTN OF E~ OF NE~i DAF BEG AT INTR OF WLY R/W LN OF OWR&N CO
RR R/W AND I~nTLY R/W LN OF OLD SHAFEFt RD TH SWLY ALG SD R.D R/W 24UFT TH NSyDEG :36MIN 42SDS
W448 48FT TH N30DEG 11MZN 30SDS W475FT TH N30FT TH N42DEG 35MIN 59SDS W662 84FT TH S69DEG 57MIN
11SDS E535 20FT TO WLY LN OF SD RR R/W TH SLY ALG SD R/W LN TO POB EXC RD AND EXC THAT PTN
THEREOF LYING NWLY OF THE SELY R/W LINE OF SCHAFER ROAD AS RELOCATED
Section 32 Township 25 Range 44
Source of legal Title Qo=anv - From Cbumtv reoords
Asscssor's Parcel No (see tax statement) 45321 9103
Property size atmnox 100 ,OOOSFfpntage Ap-pmx 45Q Feet on Sc-hafer Bad
Total amount of adjoining land controlled by this owner or sponsor 74 acre -wross rd
Rpro,x, S 3600 Srhafer
Street address of propcrty a
If you do not hold title to thc propcrty affected by this application, what is your
incerest in it? Ho
Please list previous Planning Depanment actions involving this property
none
ALL OF THE FOLLOWIIVG QLJESTIONS MUST BE ANSWERED
1 What are the changed conditions of the site area which you feel make this
proposal is warranted? a clisadvantaqed Paroel not well suited for sinctle
fam~~y develoxxnent, nor faxna land.
2 What effect will the proposed zone reclassification have on the adjacent
properties*7 It will buffer the ad-lacent properties from t-hQ Rail Road
tradcs and near bv comnerc.ial develomie..nt.
This section of the application will provide the Planning DepaRment's staff with
written verification that the applicant has had preliminary consultation
wich the agencics identified Results of the preliminary consultation should be
incorporated in the proposal before final submittal to the Planning Department
~
. ~ ~
APPLICATION FOR ZONE RECLASSIFICATION PAGE 2
= - - C~
1 COLJIVTY ENGINEER'S OHTCE
A prcliminary consultation has bcen held to discuss the proposal Our
rc mcAts , r submittal of this proposal for rezone have been satisfied
4 40
(Sig ature Dat
2 COUNTY UTILTTIES OFFICE
A preliminary consultation has been held to discuss the proposal Our
requirements for submittal of this proposal for rezone av bce
sa ficd Thc d ated water purveyor for this site is ~•#3
~
(S gnaturc) (Datc)
3 WATER PURVEYOR
a) Tha proposal (is)(mw%vst) locatcd within the boundary of our scrvice
arca
b) Satisfactory arrangements (A~)(have not) been made to serve this
proposal dom es-rc
c) Wa (are)(sftftst) able to serve this site with adequate~water
/990
~ ( ignature) (Date)
4 BUII.DING AND SAFE'I'Y DEPARTMENT
l' V y A preliminary consultation has been held to discuss the proposal Our
requiremcnts for submittal of this proposal for rezone hare been satisfied
Th,s proposal is located in F
' e Distnct No ~ 1
"Ir
(Sign ture) h(De)
5 S.'OUNI'Y HEALTH DISTRICT
A prcliminary consultation has becn held to discuss the proposal The
ahcan:t has 4eginformed of our re uirements and standards
) (Date)
I, THE UNDERSIGNED, SVVEAR UNDER PENALTY OF PERJURY THAT THE ASOVE
RFSPONSES ARE MADE TR Y AND TO THE BEST OF MY KNOWLEDGE
I FURTHER SWEAR THAT I AM THE OVVNER OF RECORD OF THE SITE PROFOSED FOR ZONE
RECLASSIFICATION, OR IF NOT THE O R, ATTACHED HEREWTTH IS WRITTEN
PERMISSION FROM D NER RIZING MY ACTIONS ON HIS OR HER BEHALF
.,~►.WY~~' ig n e d ) ~ . Date O
Phone ~ 2 6 G 3 G 3
~
~ _ .s.
zip o ~
.
A ~y~.
~ x~ '~}71 Y Datc
•.,FS % ,
~P~;.. c~
~7r ~i~sF.AL
SIGNATURE 0 PLICANT ENT
9
~ , . Date
REV 4 9 4~
fcu
~OFFICE OF THE COUIVTY ENGINEER
SPOKANE COU[VTY, WASHINGTON
December 3, 1990
To Spokane County Planning Department (Current Planning
Administrator)
From Spokane County Engineer's Department
Subject Conditions of Approval Zone Change No ZE 46-90
Applicants IVame Redeemer Lutheran Church
Section 32, Township 25 N, Range 44 EWM
re Zoninq
The following "Conditions of Approval" for the above referenced zone
change are submitted to the Spokane County Hearing Examiner Committee
for inclusion in the "Planning Report" and "Findings and Order" of
the public hearing scheduled December 20, 1990
Prior to the release of a building permit or use of the property as
proposed
E36 Applicant shall dedicate 5 feet on Schafer Road for right of
way
E40 Access permits for approaches to the County Road System shall be
obtained from the County Engineer
E43 Applicant shall submit for approval by the Spokane County
Engineer road, drainage and access plans
E44 The applicant shall submit for approval by the Spokane County
Engineer and the Spokane County Health District a detailed
combined on-site sewage system plan and surface water disposal
plan for the entire project or portion thereof if the
development is phased
E45 A parking plan and traffic circulation plan shall be submitted
and approved by the Spokane County Engineer The design,
location and arrangement of parking stalls shall be in
accordance with standard engineering practices Paving or
surfacing as approved by the County Engineer will be required
for any portion of the project which is to be occupied or
traveled by vehicles
r~ y
page 2
E46 To construct the zoadway improvements stated herein, the
applicant rnay, wxth the appraval of the County Engineer, Join in
and be willing tca participate in any petrtion or resolution
which gurpase is the formatYan of a Road Improvement District
(RIQ) for said irnprovement gursuant to RCW 36 88,, as amended
spokane Caunty wxll not participate in the cast of these
improvements This pravisian is applicable to Dld Schafer Road
and Schafer Road
E97 As an alterraative method of constructing the raad improvements
stated herein, the applicant rnay, with the approval of the
Cour~ty Engzneer, accomplYsh the road improvements stated herein
by joining and participatzng in a County Road Pzo)ect (CRP) ta
the extent of the rec~uired imgzovement. Sgokane Coun~y will not
pa~ticipate xr~ the cast of these imprnvements This provisivn
15 applicable to 5chafer Road and O1.d Schafer Road
E48 The construction of the raadway improvements stated hereYn shall
be accornplished as ag~~ovec~ by the Spakane Cour~ty Engineer.
E50 The County Engineer has designated Typical Raadway Sectlon
Number One, Lacal Access standard f or tne Ymprovernent of OId
Schafer Road which is ad)acent tv the proposed development ThYs
will require the addition +af 8-10 ft. of asphalt Curbrng and
sidewalk rnust also be canstructed
E50 The Caunty Engineer has desigrtated Typical Rvadway Section
Number One, Secandary Arterzal standard for the improvement Qf
Scha fer Road wh ich is ad iacent to the propased deve lopment This
wY11 require th~ addition of approximately 4-6 ft of asphalt
alonq the frantage of Che development CurbLng and sidewalk must
also be cvnstructed
E51 Alz required impravements sha1l conform to the current State of
Washingtan Standard Specifications foz Road and BrYdge
constructivn and ather applicable county standards and/or
adopted resolutinns pertaining pertaining ta Road Standards and
Stormwater Managemer~~ in effect at the date of canstructionr
unless otherwise appraved by the Count,y Engineer
E~ 3 The appl icant sha ll constx uct a paved and de lineated approach (s)
to meet tl~~ existing pavement an Schafer Road and Old Schafer
Road
page 3
E55 Roadway standards, typical roadway sections and drainage plari
requirements are found in Spokane Board of County Commissioners
resolution 80-1592 as amended and are applicable to this
proposal
E56 This plat or development proposal is located within a drainage
basin which has been identified by the Spokane County Engineer"s
Office as having stormwater runoff problems Since this plat or
development proposal is affected by or is a contributor to
stormwater flows, property owners should participate in the
planning and implementation of a future basinwide stormwater
management system The following "Condition of Approval" shall
be required
That the owner(s) or successor(s) in interest agree to 3oin
in any county approved Stormwater Management Program and to pay
such rates and charges as may be fixed through public hearings
for service or benefit obtained by the planning, design,
construction, maintaining or operation of stormwater control
facilities
E57 That the regulations of the National Flood Insurance Program be
observed since the proposed development is affected by a flood
hazard zone A development permit shall be obtained from the
County Engineer before construction or development begins within
any area of the special flood hazard zone (reference Spokane
County Ordinance 80-0726)
E58 No construction work is to be performed within the existing or
proposed right of way until a permit has been issued by the
County Engineer All work within the public road right of way is
subject to inspection and approval by the County Engineer
E59 All required construction within the existing or proposed public
right of way is to be completed prior to the release of a
building permit or a bond in an amount estimated by the County
Engineer to cover the cost of construction or improvements shall
be filed with the County Engineer
E59 Applicant shall sign and record Spokane County Notice to the
Public No 6 which specifies the folloWing
The owner(s) or successor(s) in interest agree to
authorize the County to place their name(s) on a petition for
the formation of a Road Improvement District (RID) by the
petition method pursuant to Chapter 36 88 RCW, which petitYOn
includes the owner(s) property If a RID is formed by either the
petition or resolutlon method, as provided for in Chapter 36 88
RCW, the owner(s) or successor(s) further agree (1) that the
i
- • page 4
improvement or construction contemplated within the proposed RID
is feasible, (2) that the benefits to be derived from the
formation of the RID by the property included therein, together
with the amount of any County participation, exceeds the cost
and expense of formation ot the RID and (3) that the property
within the proposed RID is sufficiently developed Provided,
further, the owner(s) or successor(s) shall retain the right, as
authorized under RCW 36 88 090, to object to any assessment on
the property as a result of the improvements called for in
conjunction with the formation of the RID by either petition or
resolution method under Chapter 36 88 RCW This provision is
applicable to Schafer Road and Old Schafer Road
E61 The County Arterial Road plan identifies Schafer Road as a Minor
Arterial The existing right of way width of 60 ft is not
consistent with that specified in The Plan In order to
implement the Arterial Road Plan it is recommended that in
addition to the required right of way dedication, a strip of
property 5 ft in width along the Schafer Road frontage be set
aside in reserve This property may be acquired by Spokane
County at the time when Arterial Improvements are made to
Schafer Road
r
Roadway Data
Existing Right of Way Schafer Road 60 ft
Right of Way width after dedication - 65 ft
Width of improved Roadway 36 ft
Type of roadway surface asphalt
Functional Classification---- Secondary Arterial
Special Conditions
County Engineering has reviewed this proposal based on an elderly
housing concept Should these apt units be constructed for a
occupancy other than for elderly housing further review of road
improvements shall be warranted
,
406
~
, v .
~
~
_ ,
-
1.- . .
~
c
- ~ -
~
"
Var4>-Jj
_ 'Vr~v .,.~-r' , ~~~Q''~(~,`.t~
bL~' . .
tJ-
~ - ~
S~
. 000 -
_
~ i ~ t,,%.
_
`
. ~ • ~ ~ ,
.r ~dL~~ ~ . ~
~
~
. . • Z,
.
lJ ~~A.~v~ ' • `''`.r ~
~
~
.
~
,
~
~ - - ~ e~(,13- 6z~-- a~
. , - . ~
~ ` ' ' •
LAr,
/ . .
`i
a~'~.1t•.. ` ` - ~ .
C~~`x ~ ~ •
~
• , . ~
.
~e . . . .
U00
.
.
O1 r
~2..^~f~; •N FA..~v
. . .
ka-
~
v ,
co rv b
~
Sc.v s s ~ ~ . ~
PLANNING DEPARTMENT REPORT
TO SPOKANE COUNTY HEARING EXAMINER COMMITTEE
FROM SPOKANE COUNTY PLANNING DEPARTMENT
DATE• December 20, 1990
SUBJECT Rezone No ZE-46-90, Zone Reclassification from Agncultural (A) to
Urban Residential-12 (UR-12)
Vanance No VE-89-90, To vary the building setback requuement from 55
feet firom centerhne to 45 feet from centerluie on Old Schafer Road
I GENERAL INFORMATION
Applicant Redeemer Lutheran Church
3606 South Schafer Road
Spokane, WA 99206
(509) 926-6363
Agent J Grant Person
4221 South Hollow
S pokane, WA 99206
I.ocation Generally located in the Spokane Valley east of and adjacent to (new)
Schafer Road and approximately 350 feet southwest of Dishman 1Vhca Road in
Section 32, Township 25 North, Range 44 EWM, Spokane County Washington
Proposal The request is to develop 34 retirement apartments The proposal
includes a 10 foot building setback vanance request to allow the building to be
constructed within 15 feet of Old Schafer Road nght of way The front yard setback
requirement is 25 feet from the property hne or 55 feet from the centerline of the
street, whichever is greater
II SITE ANALYSIS
Comprehensive Plan The Comprehensive Plan category for the site is Urban
The Urban category provides for residenaal densities up to 17 uruts per acre
The following Decision Guidehnes from the Urban category are apphcable to the
proposal
1 1 b Higher density developments such as mula fanuly should locate with direct
or near duect access to the major artenal systems rather than on intenor
neighborhood streets
12/90 HEC Staff Report for ZE-46-90 Page 4
»
.
1 3 3 All urban development proposals should requue public sanitary and storm
sewer systems or intenm sewer systems to protect water quality
153 Sidewalk facihties wffl be requued along artenals connecting residential
areas vvith commuiuty facihaes and/or commercial areas
155 Paved streets and street lights should be requued in Urban density
developmenL
The proposal is consistent wnth these guidehnes The site is also locateri inside the
Pnonty Sewer Service Area (PSSA)
Arterial Road Plan The Artenal Road Plan designates (new) Schafer Road as a
Mmor Artenal wnth a suggested nght of way of 80 feet The exisang nght of way
width is 60 feet The County Engineer has requued dedication of a 5 foot wide stnp
of land along Schafer Road In addition, a 5 foot stnp is to be set aside as a future
acquisition area
Zoning
Exi~,r g on SITE The existmg zoning was estabhshed as Agncultural (A) in 1959
When the new Zoning Code is implemented in January 1, 1991,
all existmg Agncultural (A), and Single Fanuly Residential (R-1)
Zones would be zone.d Urban Residennal3 5(UR-3 5)
To ~gi NnRT,H The property is zoned Agncultural (A)
To tgSOUTH The zonulg is Agncultural (A) and Single Family Residennal
(R-1)
To ft EA,ST The property is zoned Agncultural (A)
To the WEST The property is zoned Agncultural (A) and Single Family
Residential (R-1)
Land Use
Exi .~ing on SITF; Currendy vacant.
To the NnR T Church
To ft NnRTHEAST Railroad nght of way and vacant land
ST Single family residences
To the AST Single family residences
12/90 HEC Staff Report for ZE-46-90 Page 5
=46=90 V =89=90
1~ v
> ~ T;~rj. ~ ~ r ~ • • ~ , -
J 7• (1)4 , r..
1
11-110 ~ . 4,
~ r
i.5 9
3✓ ~ ~
c " ► ~ _ _ ~ o ~
i r r
% • iR'T~,'3ir
A,= 9~6-~7h►~ ~-r-y= r► r
~ v~, ~ ~(r o '1 •g • i~t f'
~ ~ rY ~ ~ t ! • a ~ ~ t { a!
\ ~ f
..L, ~Ar ~~~r7 •
~
~ ~ ~ ~ ~ J R ( 111 11 ~ t
~ , ~ ~1V1 + r
A I
/ a~'~ ~ ~?JPy ~ ~O
• ~
,o
~ / 1 ~ J ~ ~ ~ ~ ~ ` ~ / t ~ '~a ~ ~ "~♦~`1,~
~
2 12 124 , 76 ~ • ~ ` ~ ~ ' ~~O ~ ` L _ ~ ~3;~L~ •T
°p
v1 ♦
~
r '
:
O
o>• ~ O re r 1 44s /tt.
- ^ ~ o ~ aa ~-~A:.- ~ ,
p ♦ ~ oJ,
\
~ If 610
. ~
~ ~ • ~ ~ . Q ~ Q
76 a ' \ ~2 -
/2 67 ~
~C) ~ R-!
13-7s
~ ~ ~
_ _ _ ~
- - " , ~ -
r
v 1 :~k A A ~ • ~ ~ , .
~ ~ ~z 6~ ~5 " ~ ►
t ..~a~ .~..,4
~ - - - +
~ - ~
• ~ ~ ~ A~ Ff~ ~f 0 - ~ " ~ 4 ~
/
%
~ ~SA ~ ~ 0 ~ ,b•v~ "~"w`~ ~ i ~ ~ ~ J p f ~ •
= R(~ , /~l
y • 2
~
~ ri.
.
=~A S-i w -
79 72 ~ a O //f M
,R _ G,
1 ~l . . ~ ~ . ( 7 ' ~ ~ ♦
~ ~ 9 ~ or6i ad ~ • < ~ ~
~
~f~/ O Q !
ri d PONORA • ~ P/ C S p ~ ~ ii --~j•~ ~ o- I _
~
I2 67
M%
C4
9
' ~ ~ ~ 2 ~ ~ ' ReJ ~ - ♦
12/90 HEC Staff Report for ZE-46-90 Page 2
N
N
\
lD
C) ZONING FILE NUMBER VARIANCE FILE NUMBER
= RAILROAD
m
c-) . ,
-
.
, ~ _ • ,
V) s'
4 c~
a
~ E
(D
o
o , • ,
-s , A 11 . ,
r+ I
,
--1 % (10) UNIT WING ~ (12) UNIT wING
0 r
'1 i ~ •
N t v
m ~ c
,p 1 (12) uNit wiHC . p
Ol
I '
~ ~ E Z
o 7
~ a 9
` _ I p
0
o
COMA10115 AREA
. ,
\ ~ ~ A
/
~
<
. `
K
.
\ y b ~
rOCy • \ , T , ~ ' 1
y ~ 1`',~
PROJECT INFORMATION
u r~
9O EXISTING ZOHE EST 1959 -AG
VROPOSED 20NE U R lt
I T E
9 AREA 12E E00 S F 7 908 AC
1
~
_ IT~~i~+~ r w P S BUIlDINO COVERAOE (MAA 00%) 401
,
1 OPEM SPACE eu r ouo 110\
PE0U1RED PARKIHG
LO ~,~r ~ ( 1 S a J! UNITS ) 61
(D ~~~l~J^; SITE PLAN Pp0Yl0E0 OB
W lJ t a< <a I ta NT Of 91OG5 23
y C nIlV yAr va0n09E0 l UPdi
ELDERLY HOUSING
},V~1~ ,►oKA„f w ~
~
Site Characteristics
Site Sizg Approxunately 2 9 Acres
Existing B^ uildin,gs None
Topogma,y Flat
Vegetanon Grasses
Flood Hazard Ared The northern tip of the site is within the 100 year flood zone
No building is proposed within the flood hazard area
Proposed Site Plan
Uag 34 retirement apartments
Pronosed Bui1di= mulnple family structures
Buildhn; (s) Footnnnt Area approximately 30,000 square feet
Site Coverage approximately 25 percent
Maximum Structure HeiQht 25 feet
Buildi g Setbacks PRQP,,~SED REQI1IRED
Front Yard Schafer Rd 65 feet from centerline 55 feet from centerhne
*Front Yard Old Schafer Rd 45 feet from centerlune 55 feet from centerline
Side Yard (R) 67 feet 5 feet
Side Yard (L) 10 feet 5 feet
* Vanance Requu-ed
a kang 51 34
PIbD Se(~ B f~f nng TSphniaues
Type III see through buffer landscaping is requued along all lot hnes except for
dnveways Five foot wide planang stnps are requued in the side yards Twenty
foot wide planting smps are required along Schafer Road and Old Schafer Road
Type III landscaping consists of a mix of evergreen and deciduous shrubs, trees
and ground covers
Qthpr Site Pl r~onslderanoni
Old Schafer Road, a dead end street, lies adjacent to the site's eastern boundary
The proposed multiple family structure extends to within 15 feet of Old Schafer
Road and 45 feet from the centerline The building setback requuement is 55 feet
from the centerhne The sponsor has requested a vanance to allow construcnon
within 45 feet of the centerline of Old Schafer Road
12/90 HEC Staff Report for ZE-46-90 Page 6
II.o t e
The site plan subrrutted for r+eview by the Hearmg Examiner Committee is general in
nature Detailed review to determine compliance with all Ordinance regulations and
conditions of approval is recommended to be admuustraave and to occur at the
Building Pernut stage
III SITE DEVELOPMENT RECOMMENDATIONS
Density The proposed density is 117 dwelling units per acre which is wrthin the
maximum density permitted in the Urban Residenaal 12 (UR-12) zone
Buffering The proposed type III landscaping along all property boundanes meets
the requuements of the zoning code The proposed landscaping wdl help to buffer
the adjacent smgle family residences from the parlang areas on the site
Circulation/Access Pnmary access to the site will be from the dnveways on the
(new) Schafer Road Parlang areas may also be accessed from Old Schafer Road
The on site ftaffic clrculation design allows for direct access from Schafer Road to
Old Schafer Road This design eliminates the need to use Mercy Dnve through the
single fazruly neighborhood to access the parlang area from Old Schafer Road
Stormwater Drainage Compliance with "208" storm drainage standards is
required
Sewage Disposal The Utilines Department has required the proJect to connect to
the public sewer system
Water Suppiy Water wdl be supplied by Spokane County Water Dismct #3
Fire Protection Spokane County Fue Protecnon Distnct #1 will review fire flow
and fire hydrant plans pnor to issuance of building permits
I V SEPA ENVIRONMENTAL REVIEW
An Envumnmental Checklist was subrrutted by the sponsor and was reviewed by the
County Planning Department The review considered the specifics of the proposal,
other available information, County ordinances, other regulations and laws, possible
standard Cond.iaons of Approval, the Generalized Comprehensive Plan, and other
County policies and guideluies The Plannmg Department has deternuned that "No
probable significant adverse unpacts" would result from the proposal being developed
and has issued a Determinjdon of NonWnlficance, ("DNS")
The "DNS" was cuculated to eight other agencies of junsdiction and other
agenciesJdepartments affected by the future development for review and comment
The "DNS" comment penod ends December 18, 1990 and was advertised 15 calendar
days before said date in the newspaper, by letter to adjacent property owners wnthin
400 feet of the proposal, and by noace on a sign posted on the proposal site The
12/90 HEC Staff Report for ZE-46-90 Page 7
Heanng Examiner may consider addihonal envuonmental related testunony at the
pubhc hearing
V PLANNING DEPARTMENT SUMMARY
The proposed renrement apartments are consistent with the decision gwdehnes of the
Comprehensive Plan The proposal is also consistent with the design standards of
the Urban Residential -12 (UR-12) zone, except for the builduig setback requirement
from Old Schafer Road The site is unusual in that it features two front lot hnes
This fact does restnct the usable area of the site sigruficantly when both front yard
requirements are apphed
Since Old Schafer Road is a dead end smeet wnth very light traffic granting the setback
vanance will have relattvely little unpact on the public and adjacent propemes The
Planning Department recommends approval of the rezone and vanance as
condinoned
V I CONDTTIONS OF APPROVAL
1. All Conditions imposed by the Hearing Examiner Committee shall
be binding on the "Applicant," which term shall include the owner
or owners of the property, heirs, assigns, and successors.
11 The zone change applies to the following real property
That portion of the E 1/2 of the NE 1/4 descnbed as follows Beginning at the
intersecnon of the westerly nght of way line of the O W R& N Company
Radroad nght of way and northwesterly of the nght of way line of Old Schafer
Road, thence southwesterly along saud railroad nght of way 240 feet, thence
north 59°36'42" west 448 48 feet, thence north 30°11'30" west 475 feet, thence
north 30 feet, thence north 42°35'S9" west 662 84 feet, thence south 69057'11
east 535 20 feet to the westerly line of said railroad nght of way, thence
southerly along said nght of way line to the point of beginning, except road and
except that pornon thereof lying northwesterly of the southeasterly nght of way
line of Schafer Road as relocated
COUNTY PLANNING DEPARTMENT
1 The zorung map shall be changed to Urban Residential-12 (UR-12) after appeal
penod(s) have expired and all development shall comply vvith Urban Residential -
12 (UR-12) standards
2 Approval is re,quu-ed by the Plannins Duector/designee of a specific hghting and
signing plan for the descnbed property pnor to the release of any buflding pernuts
3 A specific landscape plan, planting schedule and provisions for maintenance
acceptable to the Planning I?uector/designee shall be subrrutted with a performance
bond for the project pnor to release of building pernuts Landscaping shall be
12/90 HEC Staff Report for ZE-46-90 Page 8
uistalled and mauicauied so that sight distance at access points is not obscured or
impmred
4 The applicant shall develop subject property generally in accordance wnthin the
concept presented to the Heanng Body Vanaaons, when approved by the
Planning Duector/designee, may be permitted, including, but not lunited to budding
locaaon, landscape plans and general allowable uses of the permitted zone All
vanations must conform to regulations set forth in the Zoning Code for Spokane
County, and the onginal intent of the development plans shall be mauitauied
5 The Planning Department shall file with the Spokane County Aud.itor, wittun the
same time frame as allowed for an appeal from the final disposiaon, including
lapsing of appeal penod, a Title Noace, which shall generally provide as follows
"Pnor to the issuance of any building pernut for any bwlding or any use on the
property descnbed herein, the apphcant shall be responsible for complying with the
provisions of the Zoning Code for Spokane County, Secaon 14 706 (Aquifer
Sensinve Area Overlay Zone) The property which is the subject of this noace is
more parncularly descnbed as follows That portion of the E 1/2 of the NE 1/4
descnbed as follows Beginning at the intersecnon of the westerly nght of way line
of the O W R& N Company Railroad nght of way and northwesterly of the nght
of way line of Old Schafer Road, thence southwesterly along said railroad nght of
way 240 feet, thence north 59°36'42" west 448 48 feet, thence north 30°11'30"
west 475 feet, thence north 30 feet, thence north 42°35'S9" west 662 84 feet,
thence south 69057'11" east 535 20 feet to the westerly line of said railroad nght of
way, thence southerly along said nght of way line to the point of begulnmg, except
road and except that pornon thereof lying northwesterly of the southeasterly nght of
way line of Schafer Road as relocated, in Section 32, Township 25 North, Range
44 EWM, Spokane Counry, Washington
6 The Planning Department shall prepare and record with the Spokane County
Auditor a Title Notice noting that the property in quesaon is subject to a vanety of
special conditions imposed as a result of approval of a land use acaon This Title
Noace shall serve as public notice of the condiuons of approval affecang the
property in question The Title Notice should be recorded within the same time
frame as allowed for an appeal and shall only be released, in full or m part, by the
Planning Department The Title Notice shall generally provide as follows
The parcel of property legally described as (legal description) is the
subject of a land use action by a Spokane County Hearing Body or
Administrative Official on December 20, 1990, ,mposing a variety of
special development conditions File No ZE-46-90, VE-89-90 is
available for inspection and copying in the Spokane County Planning
Department
12/'90 HEC Staff Report for ZE-46-90 Page 9
COUNTY ENGINEER'S OFFICE
Pnor To The Issuance Of A Building Permit Or Use ()f The Propg,ty Aa Pm2gsed
1 Apphcant shall dedicate 5 feet on Schafer Road for nght-of-way
2 Access pernuts for approaches to the county road system shall be obtained from the
Spokane County Engineer
3 The apphcant shall subrrut for approval by the Spokane Counry Englneer road,
drainage and access plans
4 The applicant shall subrrut for approval by the Spokane County Engmeer and the
Spokane County Health Distnct a detailed combined on-site sewage system plan
and surface water disposal plan for the enare project, or pornon thereof, if the
development is to be phased
5 A parlang plan and traffic circulaaon plan shall be subrrutted and approved by the
Spokane County Engineer The design, locaaon and an-angement of pariang stalls
shall be in accordance with standard traffic engineenng pracnces Paving or
surfacing as approved by the County Engineer, will be requued for any pornon of
the project which is to be occupied or traveled by vehicles
6 To construct the roadway improvements stated herein, the applicant may, with the
approval of the County Engineer, join in and be wilhng to participate m any
pention or resoluaon which purpose is the formation of a Road Improvement
Distnct (RID) for saud improvement, pursuant to RCW 36 88, as amended
Spokane County vvill not parncipate in the cost of these improvements This is
apphcable to Old Schafer Road and Schafer Road
7 As an alternative method of construcang the road unprovements stated herein, the
apphcant may, vvith the approval of the County Engineer, accomplish the road
unprovements stated herein by joining and parncipating in a County Road Project
(CRP) to the extent of the requued unprovement Spokane County will not
parncipate in the cost of these improvements This is apphcable to Old Schafer
Road and Schafer Road
8 The constcuction of the road unprovements stated herein shall be accomplished as
approveri by the Spokane County Englneer
9 The County Engineer has designated Typical Roadway Section Number One, L.ocal
Access standard for the unprovement of Old Schafer Road, which is adjacent to the
proposed development This will require the addinon of approxunately 8- 10 feet
of asphalt along the frontage of the development The construcaon of curbing and
sidewalk is also required
10 The County Enguieer has designated Typical Roadway Section Number One,
Secondary Artenal standard for the improvement of Schafer Road, which is
adjacent to the proposed development This will requue the addiaon of
12/90 HEC Staff Report for ZE-46-90 Page 10
approxunately 4- 6 fe,et of asphalt along the frontage of the developmenL The
construction of curbuig and sidewalk is also required
11 All required unprovements shall conform to the current State of Washington
Standard Specificanons for Road and Bndge Construcaon and other apphcable
County standards andlor adopted resolutions pertaimng to Road Standards and
Stormwater Management in effect at the date of construcaon, unless othervvise
approved by the County Engineer
12 Applicant shall construct a paved and deluneated approach(es) to meet the existing
pavement on Old Schafer Road and Schafer Road.
13 Roadway standards, typical roadway sections and dranage plan re.quuements are
found in Spokane Board of County Commissioners Resolution No 80-1592 as
amended and are apphcable to this proposal
14 This subdivision or development proposal is located within a drainage basin which
has been identified by the Spokane County Engineer's office as having stormwater
runoff problems Since this plat or development proposal is affected by or is a
contnbutor to stormwater flows, property owners should pamcipate in the plammng
and unplementanon of a future basinwide stormwater management system The
following statement shall be placed in the plat dedicaaon
"The owner(s) or successor(s) in interest agree to join in any County-approved
stormwater management program and to pay such rates and charges as may be fixed
through pubhc heanngs for service or benefit obtained by the planning, design,
construcang, mauitairung or operaaon of stormwater control facilities "
15 The regulaaons of the Naaonal F1ood Insurance Program shall be observed smce
the proposed plat is affected by a flood hazard zone A development pernut shall be
obtained from the County Engineer before construction or development begins
within any area of the special flood hazard zone (reference Spokane County
Ordinance No 88-0521)
16 No construction work shall be performed within the existing or proposed pubhc
nght-of-way until a pernut has been issued by the County Engineer All work
witlun the public road nght-of-way is subject to inspection and approval by the
County Enguieer
All requu-ed construction within the exisang or proposed public nght-of-way is to
be completed pnor to the release of a bwldlng pemut, or a bond m an amount
estimated by the County Engineer to cover the cost of construcaon of improvements
shall be filed with the County Engineer
18 Apphcant shall sign and record Spokane County Noace to the Public No 6 wtuch
specifies t.he following
The owner(s) or successor(s) in interest agree to authonze the County to place theu
name(s) on a petinon for the fomzaaon of a Road Improvement Distnct (RID) by
the petition method pursuant to Chapter 36 88 RCW, which petition includes the
owner(s) properry, and further not to object, by the signing of a ballot, the
12/90 HEC Staff Report for ZE-46-90 Page 11
formaaon of a RID by the resolution method pursuant to Chapter 36 88 RCW,
which resoluuon includes the owner(s) property If an RID is formed by either the
peution or resoluuon method, as provided for in Chapter 36 88 RCW, the owner(s)
or successor(s) further agree
(a) that the unprovement or construcnon contemplated wYthin the proposed RID is
feasible,
(b) that the benefits to be denved from the formaaon of the RID by the property
uicluded therein, together with the amount of any County parncipanon,
exceeds the cost and expense of fonnation of the RID, and
(c) that the property wnthin the proposed RID is sufficiently developed
Provided further that the owner(s) or successor(s) shall retain the nght, as
authonzed under RCW 36 88 090, to object to any assessment on the property as a
result of the unprovements called for in conjuncnon wnth the formation of the RID
by either peution or resolution method under Chapter 36 88 RCW
This requumment appues to Old Schafer Road and Schafer Road, from which the
subject parcel takes access
19 The County Artenal Road Plan identifies Schafer Road as a Minor Artenal The
exisnng nght-of-way width of 60 feet is not consistent with that specified in the
Plan In order to unplement the Artenal Road Plan, in addiaon to the required
nght-of-way dedicauon, a stnp of property 5 feet in width along the Schafer Road
frontage shall be set aside in reserve This property may be acquued by Spokane
County at the time when artenal improvements are made to Schafer Road
20 County Engineenng has reviewed this proposal based on an elderly housmg
concept Should these apartments be constructed for an occupancy other than for
elderly housing further review of road improvements shall be warranted
COUNTY UTILITIES DEPARTMENT
1 Apphcant shall make connecaon to public sewer system Sewer connection pernut
is required Plans and specificaaons are to be reviewed and approved by the
Utlhties Department
COUNTY HEALTH DISTRICT
1 Sewage disposal method shall be as authonzed by the Duector of Utilines, Spokan,,
County
2 Water service shall be coordinated through the Duector of Utihties, Spokane
County
12/90 HEC Staff Report for ZE-46-90 Page 12
3 Water service shall be by an exisung pubhc water supply when approved by the
Regional Enguieer (Spokane), State Department of Health
4 A pubhc sewer system will be made available for the project, and individual service
will be provided to each lot pnor to sale Use of ind.ividual on-site sewage disposal
systems shall not be authonzed
S Use of pnvate wells and water systems is prohibited
COUNTY BUILDING AND SAFETY DEPARTMENT
1 Requuements of Fur. Ihstnct No 1 need to be satisfied dunng the bwlding pernut
process
SPOKANE COUNTY AIR POLLUTION CONTROL AUTHORITY
1 Au pollution regulations require that dust errussions dunng demoliaon, constrvction
and excavation projects be controlled This may requue use of water sprays, tarps,
spnnklers or suspension of acavity dunng certain weather conditions Haul roads
should be treated, and enussions from the transfer of earthen matenal must be
controlled, as well as errussions from all other construction-related acavihes
2 All traveled surfaces (ingress, egress, parking areas, access roads) must be paved
and kept clean
3 Measures must be taken to avoid the deposition of dirt and mud from unpaved
surfaces onto paved surfaces If traclang or spills occur on paved surfaces,
measures must be taken immediately to clean these surfaces
4 SCAPCA Regulauon I, Article V, requues that a Notice of Construcuon and
Apphcation for Approval be subrrutted to and approved by our agency pnor to the
construcnon, installation or estabLshment of an air polluaon source
5 Debns generated as a result of this project must be disposed by means other than
burning
sam
REV4/90 mo
12/'90 HEC Staff Report for ZE-46-90 Page 13
L~
FAX TRANSMITTAL -M#
~:~'~;~~,~~.1;'.1 ' • : • .+:.;:i'w.~;_~.,, .
SPOKANE COUNTY
:7i.~:.. 'i:~~: : ~ i,1~.J'.
.j• i• _ j ci'. I~c~ii;•' ~ a
•I t~''PF i:f,f ' . ) ~~'~:~'"•,:~1,,
,e Y' .4~ •'N,Ii.uf.:':
cOMMIsstontERS" oFFrcE
r. ~r•]"~•~ ~~:r~.
~ p'•y.; r'.i, `,.;5 .
~,'~~''v, `'.~~'v .s:~; • W. 1116 BROADWAY
• . • 'l~l~~., ~ r; ~ f.J ,,~Cd~'~,ny~;'i~~ ~;if:~.
' . N :7.:~ ri •
. .~~.y~ j;~~ ~-f ,~:~,r:.i,~,;:
.
r~~ ~ ~ ~ SPOKANE, WA. 99264-0140
; ,
PNONE {509} 456-2265
~
FaX: (509) 456-2274
. i~' ~ 4 • .
'~,t: •'•ir,?YN~~~v~~: .
' • :'4r t:: t.:~:~~r?.i .Y~;~,:;:: :n A E
~
Sp~Jw4NC CAtJklr C4VRT HOU6; •
TOs
NAME:
C4M PANY:
DEPARTMENT: ~
FAX N U MBER;
FRQlVf:
NAME:
~ PHONE: . .
rOYAI_ pAGCS lNCLUDING THIS COVER:
DESCRIPTION OF MA'fEFitAl:
DELIVEFiY INSTRUCTIONS:
H1GH r!IldRl7Y - L?E'LIVER 1MMEOlA7'ELY
~ PE.EASE CONFIRM RECEIPT igY nPN4N& nFAX
0 PLeASI! ArSPOND AT YOVR CONVtENCt
COMh4CNTS:
Z 0' d WdbO : Z T 66 Z`2 Nd.C OdS J,l I -iI lfl : Ol S~lWWOD A1ND 3Nd710dS : WMl_-J
' e
RECE! r ED
oEC'z ~ IM
'1'0 iHE 60AR0 0f CdlJNTY COM,N I S5I0"1ERS ~P~[Y ~t~~ce!0~`'.~►
ApPeal Fee - $140.40
od Ta ' s Ua te
Name : . Y . .
r.
Address: Zia Cade: 4- C►
,
BUGjnt?SS Ph011@i ~ .f+l~~~..~.~~~~:J ~ j~~>•~V~~
Nome PhonE:_,_
Flrar•ing Examiner Conmli ttcc*Action Beinu Awe-a1 erl ~
/?v:.~-f' C`~f ~l~r?j~. l> .~/C-. ~ l-'•- - ~ l~`°~(~`'~~`a.`_~
Ti-tl e : __e
y4 vv.~. ~ ..4-
Pr~l irninarv vubdivi.sion ^lurnber:,.
Zo np. . RNC:lcssification PtuviDefs
-
Da te of Haar• I ro~ Exami ner Coftmi tLee flc:tian : v
5ignatur.e:
t
~
Siol~at~.,r.G aP Au'thorize:l Rep~•es:e~~tative; -y.,r.4rilt-E'
itiddr.ess P 1~1;v-llv'~v
'!OUR REA5t1NS FOP. APPEAL .
t-
/Nl~ y7i~a f - J6~ f2.7 f .~'.S lJ t-. /~'cr' ~ y
Q - - •
~ f!_ 1
l/~^~. ~ !
~~~ci ~'''rk"3 / .J • /_~l.i.~1c~~J Ni a ,~':G~ .~~~'~~'t/ ° •L ~
~
~
OFF I GE U5E ' PII~Y
C4uies to ~ E
. ~lanni,~' Eiii~itteN_ws_' knv11^.Orlmer~#;dl NEaltli _
7 .
~
Fce. Received.: Chec-1, Cesh Reeeipt ~lumber'~-;~-~•;3
Ncarirtg Uate:
z0.' d WdSO:,7- sE6T •E Nd!' Od5 . f~l 1, 1 I 11-I : 0! 56WW0D A1N3 3Nd7f0dS : Wi7JA
, . .
200 Residential
This section summarizes triP generation (orall As expecled, tl7e single-family detacl7ed unit
types of residential.awellings. Each catcgory of has the highest generation ral-e per unit of all
residEntial housing, particularly single-ramily resident:ial uses. This is foIlowed by aparL-
detached housing and apartments, used data ments, with retirement communities having
from a wide rangc of unils with varying sizes, the lowest rate. The rate Eor planned unit cie-
price ranges, lacations and ages. Con- velopments, which has a mix of single-fam-ily,
sequently, therecould be as widea variaLion in detached units and apartments, is in bet%veei1
trips generated withi.n each category as tliere is these two ty►pes. Single-farnily detached unics
between different categorie.s. As expectcd, have the ~.iighest rate because: 1) They are th-c
dwelling units Lhat evere larger in- size, more largesi units in size and have more people and
expensivc: ar Far-ther away fTOm the central more vehicles per unii than any other lypes; 2)
Uusiness clistricts had a higher trip generation they are gecierally located farelier away from
rate per wzit than t,hose smaller in size, less ex- shopping centers, emplayment areas and other
pensive or closer to the CBD. However, other attractars than are other types; and 3) they
factors sucly as geographic location in the have fewer alternate modes available because
coun[ry and type of adjacent and 'nearby de- they are not as concenri-ated as other types of
veloprnent also had an e£fect on the generation units.
rate. Thus, only the above 'general sralement
(instead of some linear relationship) concern-
ing size, cosr anct location of dwelling unit and
, k6e incomE of the oceupant could be made.
Summary or Rate Tabies of the DiEferent Types of Dvuelling Units.
Type p f Dwelltrzg Unit Average 14/eekclay Vehiclc
Trip Erids per Unit
Average Maximum Minimum
210 Single-Family Detachecl Housing 10.0 2-1.9 4.3
220 Apartment, Gerieral 6.1 12.3 0.5
221 Low-Rise Apari ment 6.6 9.2 5.1
222 High-Rise Apartment 4.0 6.4 1.2
230 Condominium 5.2 11.8 0.6
240 Mobile I3ome 4.8 7.6 2.3
250 Retirement Community 3.3 _4.9 2.8
270 Planned Unit Development 7.8 14.4 5.8
Rev. 1982
1 • •
, 220 Apartment
Apartments in this analysis include both low- Trip Characteristics: The mcasured correlation
rise or "walk-ups" and high-rise multifamily coefficients are shown in the table.
dwellings Incluaed in this categoiy were all
the studies that did not spec~fy the typ~ The average weekday vehicle trip generation
was measured at 6.1 trip ends per apartment
(height) or apartment studied. An apartment is unit. However limited measuremcnts made
defined as a rental dwelling unit that is located since 1979 indicate a generation rate of 5.4
within the same building as at least three other vehicle trip ends per weekday per unit. As with
dwelling units. Examples of this category are
fourplexes and all types of apartment build- single-family dwellings, Saturday generation
is slightly higher and Sunday slightly lower.
ings. See the following tables.
Data were provided from 115 different studies
of apartments having an avcrage size o£ 267
units. The average development density was
21 7 units per acre with 2.1 persons per unit.
The average automobile ownership was mea-
sured at 1.3 vehicles per unit.
Equations and Correlation Between Weekday Vehicle Trip Ends (AWDVTE)
and the Independent Variables for Apartments.
Equations and Independent Varcables Correlation Coejficient (R)
AWDVTE = 263.2 + 2.433 x Number of Persons 0.975
_-134.9 + 5.508 x Number of Vehicles 0.963
= 68.8 + 5.853 x Number of Units 0.963
Acres 0.187
Units Per Acre -0.073
Rev. 1982
SUMMARY OF TRIP GENERATION RATES
Land Use/Building Type A= artmenfi ITE Land Use Code 220
Independent Variable-Trips per
Average Number Aveiage Size of
Trlp Maximum Minimum Correlahon of /ndependent
Rate Rate Rate Coefficient Studies Variable/Study
Average Weekday Vehicle Trip Ends 2.8 71
Peak A M. Enter 0.08 i 1 ~90
Hour Between Exit n 2 n i
-
of 7 and 9 Total 0.29 0_52 ~ 4_30
Adjacent P.M. Enter 0.23 1 11;24
Street Between Exit o, l4
Traffic 4 and 6 Total 0.41 0.77 n n Li 4 u icz
Peak A.M. Enter 0.08 Hour Exit 0_20 ~ iq~:)o
of Total n• 29 n-52 0 - I 0 3,q 4-N
Generator P M Enter 02~ i 9
Exit n-i h
Total ~
n - 41 n 77 ~ ---j~ ~
Saturday Vehicle Trip Ends
Peak Enter
Hour of Exit
Generator Total 25
- _
Sunday Vehicle Trip Ends 1 7 I1)17
Peak Enter
Hour of Exit
Generator Total 0 _ ? E G-h qli 7
Source Numbers -2-, LLt 95_4 6: 4, 10. 11. 12,. 1 ~ 14, 16, l q20. 24
~
35. 40, 72. 108
ITE Technical Committee 6A-6-Trip Generation Rates
Date: 1 q 7q. R Pir_ 1 4 R2
, SUMMARY OF TRIP GENERATION RAYES
Land Use/Building Type Apartment ITE Land Use Code 220
independent Variable-Trips per Vehicle
Average Number Average Srze of
Trip Maximum Mrnimum Correlatron of Independeni
Rate Rate Race Coefficient Studies VariablelStudy
Average Weekday Vehicle Trip Ends 5.1 8.6 2.9 63 360
Peak A M. Enter 0.1 1
Hour Between Exit 0.2 1
of 7 and 9 Total 0.3 29
Adjacent P M Enter 0.2 1
Street Between Exit 0.1 1
Traffic 4 and 6 Total 0.4 42
Peak A.M. Enter 0.1 1
Hour Exit 0.2 1
, of Total 0.3 29
Generator P.M. Enter 0.2 1
Exit 0.1 1
Total 0_ 4 4,;
Saturday Vehicle Trip Ends
Peak Enter
Hour of Exit
Generator Total I S
Sunday Vehicle Trip Ends + 2 R
Peak Enter
Hour of Exit
Generator Total 0.3
Source Numbers S, 6, 1 1,9i 13 , 14, 16 , 19 ?0_ ?4, 34 , 35 , 40 , 72
ITE Technical Committee 6A-6-Trip Generation Rates
Date: October 1, 1975
SUMMARY OF TRIP GENERATION RATES
Land Use/8uilding Type Apartment ITE Land Use Code 2.2C1
Independent Variable-Trips per Dwellino, ilni i:
Average Number Average Size of
Trip Maximum Minimum Correlation of Independent
Rate Rate RcVe Coefficrent Studies Variable/Study
Average Weekday Vehicle Trip Ends 6. q.~
115 --2-E7
Peak A.M. Enter 0.1 0.1 0_.0 21 24 h
Hour Between Exit n_ 4 n~ n i 9 11 n
of 7 and 9 Total n _c; 1_ n n i 7 u 9 i~
Adjacent P.M. Enter n_ h n _ R n ~ 9 Li 1; 1~
Street Between Exit n_P nr; n ~ 95 ID Ll 7 Traffic 4 and 6 Total 1
n 7 i~ n 1 00 'D ,7
Peak A.M. Enter ~ 0.1 ~ 0.1 0.0 ~ 17 ~;)60
Hour Exit 0.4 0.6 0.1 18 P C; p
of , Total 0.6 1.0 0_1 Rp 2 1~
Generator P.M. Enter 0,4 08 n_~ ~ ~ 2 1~ r)
Exit 0(1.~ n_l P1 4
r 3
Total n_7 1_ h n__ 1
Saturday Vehicle Trip Ends R Li
Peak Enter - ✓ ~
Hour of Exit n i
Generator Total n
Sunday Vehicle Trip Ends 7 1; , 7 IJ
Peak Enter Hour of Exit
~ _ . .
Generator Total ~
Sou rce N u m bers P.} Tl n,~11T12T l~T.l 1 6.7 1 Q 2 ? ti
0-,, - ~ 314-5 4.0.,
70 inn inR
I , ,
ITE Technical Committee 6A-6-Trip Generation Rates
Date: June 4-., 1975. Rev. 1982
221 Low-Rise Apartment
This category includes apartments in
buildings that are only one or two levels
(floors). An example of this is garden apart-
ments or suburban apartments. Twenty-txvo
studies contained dataon low-rise apartments.
See the following tables for the measured trip
genei•ation data.
~
Rev. 1982
SUMMARY OF TRIP GENERATION RATES
Land Use/Buiiding Type Low-Rise Apartment 1TE Land Use Code ~)91
Independent Variable-Trips per Dwellina 1Tni f-
Average Number Average Size of
Trip Maximum Mrnimum Correlation of Independent
Rate Rate Rate Coetficient Studies VariablelStudy
Average Weekday Vehicle Trip Ends 6. 6 9 I.D A li
Peak A.M. Enter 0.1 0,~ 0.1 93 911
Hour Between Exit n_ 4 (1 _ 7 n 9 03 211
of 7 and 9 Total 0.5 0.9 . 0.~ ;)n4
Adjacent P.M Enter 0.4 0. 6 0.~ ;)1 1
Street Between Exit 0.2 0.4 0.1 Pil
Traffic 4 and 6 Total 0.6 0.9 0.4 24 Pn 4
Peak A.M. Enter 0.1 0.,R 0.1 ~ 4
Hour Exit p,!} 0.7 p it ~Uc;
. of Total 0.6 0. q ~!i i
Generator P.M Enter 0.4 06 n~ aLi ' U~
Exit 0-2 0-4 n_I ti ~ti~
Total n 7 n 4 nq 01 00Q
Saturday Vehicle Trip Ends
7 . P 4 _ P !1 !1
Peak Enter n~ nh n i
Hourof Exit p, ~ 0.4 0.2 20 2 1
Generator Total 0.6 0.8 0._~ 21 __22$___ _
Sunday Vehicle Trip Ends 16.1 1 8.8 1 4.;) 1 21 2 2 R
Peak Enter 0,~ 0.7 ~ ~ p ~ I
Hour of Exit p,~ 0.1)_ 0. 1_ Pn Pl I
Generator Total 0_ 6 72 _0~
8
Source Numbers 11, 21. 71. ()8. 110
ITE Technical Committee 6A-6-Trip Generation Rates
Date 1()82
l • . •
222 High-Rise Apartment
High-rise apartmc;nts arc in buildings thrce or
more levels high. Only four studies contained
trip generation data, as summarized in the fol-
lowing tables.
Data Limitations: More data for both daily and peak
hours are needed to differentiate between
high- and low-rise apartment trip generation.
Rev. 1982
~ .
~ SUMMARY OF TRIP GENERATION RATES
Land UselBuilding Type Hi ~h -Ri sP Ai ar#-mPnt. ITE Land Use Code P9P
lndependent Variable-Trips per _-Di3rtP 1 l j n rr TTn i t-
Average Number Average Size of
Trip Maximum Minrmum Correlation of lndependent
Rate Rafe Rafe Coeflicient Studies VariablelStudy
Average Weekday Vehicle Trip Ends ~ n I; Li I~
Peak A.M. Enter q...I q~~ ~ 37-9
Hour 8etween Exit __0,2 3w~
of 7 and 9 Total p,'~ 0.9 0.2 ~ 4Q6
Ad jacent P.M. Enter 0.2 0.1 0.1 2 '17 9
Street Between Exit 0.2 0.2 0.1 2 ~ 7 9
Traffic 4 and 6 Total p, 4 0.9 0,~ 4 4 Q.b
Peak A.M. Enter
Hour Exit
of Total
Generator P.M. Enter
Exit
Total
Saturday Vehicie Trip Ends ~
Peak Enter
Hour of Exit
Generator Total _
Sunday Vehicle Trip Ends
Peak Enter
Hour of Exit
Generator Total
Source Numbers qq, ? R , 9R , i n q .
ITE Technical Committee 6A-6-Trip Generation Rates
Date: 19 ?r- RAl► igRg
,
Caution, limited sample
size, use carefully.
~ . - ~ .
250 Retirement Community
Rctirement communities-restricted to adults
or senior citizens--contain residential units
similar to apartments or condominiums and
are usually self-contained villages. They may
also contain special services such as medical
services, dining facilities and some limited
supporting retail facilities.
Only five studies conducted in the San Fran-
cisco Bay Area contained trip generation for
these communities. The average weekday ve-
hicle trip generation rate measured entering
and leaving the communities was 3.3 vehicle
trip ends per dwelling unit. See the Eollowing
table of rates.
,
.
1 ,
,
SUMMARY OF TRIP GENERATION RAYES
Land Use/Building Type Retirement Community ITE Land Use Code 250
Independent Vanable-Trips per Dwelling Unit
Average Number Average Srze of
Trip Maximum Minimum Correlation of Independent
Rate Rate Rate Coefficient Studres Varrable/Study
Average Weekday Vehicle Trip Ends 3.3 4.9 2.8 5 R.14
Peak A.M. Enter
Hour Between Exit
of 7 and 9 Total 0.4 0.6 0.2 S R34
Adjacent P.M. Enter
Street Between Exit
Traffic 4 and 6 Total 0.4 1.0 0.3 S RU
Peak A.M. ~ Enter I
Hour Exit
of Total 0.4 0.6 0_ 2 5 RU
Generator P.M. Enter
Exit
Totai 0_ 4 1.1 n.~
Saturday Vehicle Trip Ends + I~.6 I ~ ~ I s Q-4 ¢
Peak Enter
Hour of Exit
Generator Total
Sunday Vehicle Trip Ends
$~34
Peak Enter
Hour of Exit
Generator Total
Source Numbers R. l n
fTE Technical Committee 6A-6-Trip Generation Rates
Date: 1,9 7s
4~
z~ l
~ ~ s
C~o t 0
~ cc VN~'l _ P,@ P4 L)
~G
~ oF
V,
7'/
- pr/
Y`'~ I U~ 1
~
~.r-~ ~
A~~~
S pUA,`1. '
Wt Tt-~
s 15 r7 ~
(..v~ E~-
m~ ~
- SC- 1~" ~
~r'j, ~ ~ j ~N
~AJC 4Z C,
VJ ID Y~A
• ~ ~~L-~
04,
rLP`'"J -
e>~ ~~L
~
~ Lc~
oo T
4 c.~
L"} rz-
~ N 6
. C&I--'
, ~0 2 S t
40>C- t/V\ ~ us~~7
C,D v L"0 Q
,
GoJ~~f
l~ ~O T 0
r
t ~~C~_`~ -
jitJ
~v
~,c/~n rv
N
.✓Co ~C.C1
pt761
~
At~r
rLO ~Z ~ G_ ~
P, gL.
,v
1,0j~-►~"~"~
6-q _
,o~t
cc~~ a
,~~~6 P e~i
D C
c1 l 5 ~
P/1-00 l2c r,&c N.31"w-,19
elo
~,,C_ S ~
s-c~-- - T ~
ck
r~ v ,4ra, ~ (40 ~e, s
oF ~ ~
t 9 i 5 P~'`~ J
~
430
.----J-' o s. CO,,
L - L
e u&-'''
C'.Err`~ s~.t c I~- • ~
t t .Aq
0rTo,vs P-ftqpt Q
co'''
,05;A
124 t~~
~
j ~ ~ J
~w~s ~ t 7o
C.-
'T . p. /✓~to
S<~~
I~~`~~,,
s'~ ~r~r.~ ~o t
a s~ G5 ~
~ 00
G~
rps C&
n~
~ ► ,
CLJ
IIA6LCY
~A.)
r
5~~ co E~?i ~AL
A
-.~rP~ M Ez~y
_ /q,7$
~ s - ~
,,o ~
1 ~utt~" o ~ ~
. Ctwn.c.*A tID
C~o r.^,? LO~ D ~
Sc~ 04--D
~ vT
~ AY3v
~
c0 1
,,i ~~t~ f ~ p~,D►~~
~ 0~ ~
j r 6z, o
j
f~
/A a r /1 i
1ID,'`"-1,!'''~
t3~=~~``J r,✓~ , c..~ sar~--~~
c c
-
~
L u
ti
W t u' OT
PI't..o ~
hj° t
i~.~
~
y,n~
L..J(z c) ~1 c~
A.~-~~..
-o
12
~v
y\A
,
KK ~ - .r•
,.~w~...
~
..r' y . . ,.r.-.
...,,,r-.-
A~,,,,~ri•--
r _ -
:•~+r'I'^` -
~rt_y~i...~~. •
+~~M1 . _ .r
M-
..w"~
..-r.-r""~- " ~ ~ . ~
.~'~~~,..r.r"'~`.- y y
~,~,,,r-• . ..A^.~+ln"
. - i ~ T-
~
~V ` 0
~ SPOKANE ENVIRONMENTAL ORDINANCE
SECTION 11.10.230 [1-
SPOXANE,sFlfYIR010lENZAL ORaIMJYKE ~
. ,
(YAC 197-11-960) Section 11.10.230(1)
1 Envlromnental Chetklist
Puryost of CMckllst: F11e No.
The State Eevfronmental Do11cy Act (SEPA) chapt*r 17.21C RCH. requlres all qoverrmntal agenctes to conslEer the envlrormental tmoacts ot s proposal
before mk1nq Aetislons. An Envlronwental Impact Stateaent (EIS) wust be prepered tor ell proposals with proDable slynltttant adverse 1mpacts on
tAe awllty ot tAe envtronnent. Thr purpose ot this checklist ts to provlde tnformtion to help you and the &9ency ldentlty tmpects from your
proDosal (and to reduce or •void imqacts trom tAe proposal. if 1t can be done) and to help the aqency declEe whether an EIS 1s requtred.
Instructlons for Applfcants:
This environ.ental checklist asks you to describe soae Das1c intormetion aDout your proposal. 6overmienta) agencies use this checklist to detersnine
whether the env/ronmenta) laqects of your proposal are slgnifitant, requtrin9 preperatton ot an EIS. Answer the questlons briefly. with LRe most
DrKise lnforuatton knoMn, or give the best descriptton you can.
You .ust answer eacA questlon accurately •nd caretully. to tAe best ot your knw ledge. In most cases, you should De able to answer tAe questlons
frow your own oDservattons or projett plans vltAout the need to Afre experts. If you really do eot knoti the •rnwer, or 1/ a questlon das not apply
to your proposal. vrlte •do aot know• or •does not apply.• Caqlete aMwers to the Questlons ncw wy arold unnecessary Eelays later.
Soat Qvesttons ask a0out qovernwentsi ngulations, such as =oninq. sAorellnt. and lardmark desl9nations. AmMer these Questlons it you can. it you
Aaw proptews, the governwental agenttes can assist you.
TAe checklist questions apply to all parts ot your proposal. even if you plan to do tAea ovtr a perlod ot tlme or on 0ltferent parcels of land.
Attach anr addittonal tntoemtton tM t w11) destrlbe your proposal or Its envlronnental ettects. T1u agency to v1+1cA you suDmlt CA/s checklist may
ask you to explain your answers or provide addlttona) lnformattoe nasonaply Mlated to eete►aining 1t there way be slqnltlcant adverse lmpact.
Use ot checklist tor nonprojtct proposali:
Coaplete th/s checklist for nortproject proposals. even thouqh questlons ieay be ansMered 'does not apply'.
IM AD01TI0N. cwplete the SUDPIENENTAL S1iEET FOR NONPROJECT 11tTIONS(Part 0).
For nonpro,fect actlons. the references 1n the thetkllst to tAe wrds 'project.' 'appllcaM end •prope►ty or slte' sAould be read as 'proposal.•
'proposer.• and 'affected 9eographic area.' respectively.
A. BACICGROl1l10
1. '1me of proposM proJect. if appiicable: ~Pj:4('rn l./l & ke-40-al
VlWaTe
2. Mame ot Applicant: Ra-e-Pn~~i 771,eVGqjj6 `_/jrw c--/, '
3. Address and phone numper of appl tunt or contact person: .T, G- e Q/.Lf Pei- 50 4PIL .
5. 4f2z l o - SPok4T&-,r
" (aSA.. a04~
623-loo0 ov 72k -o/bo
4. Oate checklist prepared: 7 l q0
s. Aqencr reQuesttng cnecktist: PfL'irrss i sl 9 12-e ~T
6. ProposeE tfainy or schedule (including phasing, tt applltable): ' /
7• a. Oo you hsve any ptans tor futurt addittons. expansion, o► turther activtty related to or comerted with thls proposal? If res. explaln.
"hLfr~
b. Oo you mw+ or have options on land nearby or sEjatent to tA1s proposal? It yes, explain,
`iav ,~i~- ,ec A& ~C s'~' ~ ~ S ~.~-t.~•
8. llst any onriromiental intorwatton you knor about tMt hes b4sen prepared, or vi ll De prapared, dtroctly related to this proposal.
Rev.2/1/88 ~
1 '1,0v1uC 277-11-160) Eeetian 11.10.230(1) , sPOTAUR
A. lACKCROQAa (contlawd)
9• Oo 7ou lmev vtwclws appliutions &~odias for =ownwncal appcovals of otler propo"la dir*etly atfectiat che property eovered by rour
pcoposal! Lt Tts. trplsin.
10. List aay govecnmot approvsl& or persit• thai vill be needed [or your proposal. !f Imo..n. /
11. Give a eriet. camplete descrlption of yan[ propoael. lncludiag tlr propox*d we• and tM •i=e of ttti project •nd site. :'Mre are sevaral
Qurstioos Lte[ ia chi• clreklist that ask you io descsibe eertaia upects of your proposal. You do not nmod to repmt those answrs on this
psse.
AroQ4~~' ~ J La~ ~
o~.~- ' Lv
42LALIZ~yeS' o~
V" a4.• eL 3o To 3 L44 .
12. tccacion of tl+e proposal. Cive su[tleleat tAIOT1itL00 tor a persoa to uoderstaod the precise loutloa of your proposed projeec. including a
•cevet addcess. !i any. and seetioo. tovyhip aod raoge, !i knovn. If • propo"l vould oecur owr s raage of area, provtde the range or
bonadaries of tl+e •!te(e). Provtde • letal desetiptfon. •!te pLn. vlciaity mp. •e►d toposrapAie "p, iE raasonably avaiLble. t1!►ile yw
should submit aoy pLos reQuired by c!u aaeney. rou are not nQuired to duplicat• sap• or detailad plana submicted vich any perolt applicacion
reLted to thls cheeklist.
S e -ef jL400-
,.yC ae&lop, SO "-z05(
~ L1' ~I -~f~.s t !'r-C~~G ~T- ~~2.I iJ Q~~/ /~O Q /v!~ / / /fCta. ~
~%9f1 L~JQ,/r
ioo~ 13. Does the proposed actioa lie vithio tl+t AQulfer Seerltiw Area (IISA)' °!ie Ceneral Sever Secvlee Area' :Ae Prlorlty SeMer Setvice Area' :Ae
City of SpokansT (See: Spokaae Couaty'• ASA OverLr 2oM AtLs tor eauadarles).
"0 Et COlPLl!LD bT APR,ICAHT
6. [NVIItOR`Q1P'.AI. Q.QQ.YfS
Ewalwtion For
Agencr Uee Only
1. eruR-n
a. Cenesa2 descripcion of tlr slte (elrele one):~S rolling. hilly. steep slopes. nouatainous.
o c I+er :
b. 'Jhsc is cM steepast slope on tl+e •!te (approsiaate poccent •lope)'.
c. '+1+at general type• of aoila ace toaad oo the •ite (lor eualple. eLr. sand, aravnl. paat, muct),
If rau kaor tAe eLsalilutioa of agrienltusal soiL. •poeifr tAes acd note ary prim tanLod.
d. Akee there surtace lodicatioes or hlstoe7 of uestable wi L le tha lmneElate vicini:y! it so.
descriDe.
2
, • ~ 'SPOKANE E11YiR0}QKMTAL OROINAlICE `
(MAC 197-11-960) Stttlon 11.10.230(1)'
S. ENYIRONIENTAL ELEMEKTS(tontinwd)
Evaluatton For
' AqfnCy Utf Only
Cescribe the purpose, type, and approximt• qwntltlti ot any t1111ng or q sd1n9 propo d.
tnatcsu :ource ot tttl. /~/j, h e v ~ t-~~ d. r. 9 ~Qy L:Iu i C}
9L ~c~ r~ i~„ _9 /a vi c etQ
f, tould eroston o aur as a result ot clearing, construction. or use7 It so, qenerally descrlbe.
Prc_lo ckb ly
g. Ilbout what percent of the s1te v111 ee cortred rtth tmQervlous surfsces atter ro~ett coMtrut-
tlon (lor exaaqle, •sp►+alt or bui141nqs)?
h. Proposed .easuns to reEute or Control eroslon, or otber 1mpscts to the terth. if any:
~Y ~ Iii~ ` ~ ~
~-e~
2. AIR
a. Yhat type ot emissforts to the a1r vould result fram the proposal (1.e.. dust, autaaobfle. odors
industrlal. wood sooke) during tonstruttton and vAen tAe profett is coepleted? if any,
yenerally destriDe and gfve approxlaate quaetltes 1f known.
JOL4 ; ' 9 Lc Cvo~Mucs;r..e.c1r
- S on, ~~k d~e ►sc e`J: -e 4E~t~e.~S S: a ~-r s
eQ~~~ 24_2:r~•
- b. Are there any oit-slte sovrres a~iss ons o odor t at wy affect rour proposal'► It so,
: generally descrlbe. ~O
c. Proposed arcasures to redute or conKrol emisstores or other irtpacts to air. 1f any:
9'Ya S,$ 94-
3. WATER _
a. Surfacc:
Ili ts there anr surfece water eody on or 1n tAe 1rweAlate vicintty of the site tncludlnq year-
round and seasonal streass, saltwter, lakes, poeds, wetlands)? It yes. de uribe type and '
provide Mys. If approprtate, state rhat stream or rlver tt tlows into.
SaA2L-4 SfiajvitAZ e's P,•,°,,t~ u,,,L.Q 44-,) e~~. ~.s.
.1~,~: r~ r o-v sS rZL-e/..~' ~ T.~ c~~' ~ Tlrt
_&'oYASQ,~
(2) Mil) the projed requtre any wrk aver. 1n. or •djacent to (with n Z00 teet) tAe describcd
vaters7 If yes, please descriD• 4nd attach avatlable plsn:. ~to 1 e c4- S) 101-e
Z o0 o~ ~c~ eclo
CcJe
3
• ' • ~ A~"'yiA~ ~
('aAt 197-11-960) Seetion 11.10.270(}, N-1 m
1. flIV1R0l1lQNlAL [t.DMMr"9 (continued)
Evalwtion ►oc
. k.ncy u.. onlr
(3) Lotimt• the aaonnt ot till and dradse mterial tAac wuld be ylaesd !a or cesond tcom the
suttac• vacer or wcLnds and indiute the ara oi the •!te that vauld Ee aitecteE. Ladieat•
cM sourat ol till mterial. '
s-ea.sQ '-Lal Q'-LA~
TAx t4eo
(4) Vill the proposal reQuire suctac• water vithdcawls or diverslonsi Ciw a Zeneral deserip-
cioo, purpoae. and approxlaate Quantities. !t knwn.
~ T 'LS 14 L7i C i O41,~c.~.
(5) Doe• the proposal 11s vitAia a IOG-peor tlood plain" If so. aote locatioe oa the site plan.
Tb-e M0 Aelcvl',h~evky 7LLP oY Th.c ~Orq&4,~y
~ 1-or-C,izJ-,E,ge (:QW• 'C& i6p,6o Y.ecir__~/ooc7' 4-v ,ea,
(S) Does the proporsl involw any diselarZe• ot vut• oatsrlal• co sucface vacerat If so.
deserlDe the t7Pe oi wste and aaticlpated voluoe oi diecharse.
b. Ccound:
(1) Ytll groundvater be vitAdrovn. or vlll vster Ee dleeharged to gcoundvater• Glve general
descripcion. putpose. and appro:iaate Quantltles, if {eiorn.
(2) DescriDe vasto oaterial ttsat vill M diseharged inco the aroued fram •eycie tasilc• or other
"oiter7r vaite crqwnt iacility. Oaseribe the general •ize of the sysces. the nusber o[
Rouse• to Ee •erved (if applieaple) or c!►e aumQer of persoro the sysces(s) are expected to
eerve.
P r o S-e c-~ t,v," •
(3) Desetibe aay srstems. otM r thsa tl+oss dssigned for the dispo wl oi sanicary vasta.
installed tor the putpose of diochargins [luids belov the ground suciaes (lnelude• systeas sueh
as those for the dispoeal of storm vatet or drsinas• Erm floor draleu). DascriDe the typa ot
~qeces. the asoun[ of mrterial to De dlsposed o[ tArough the systes and tM [ype• of satsrlale
likely co be disposed of (includina materials vhieh oay eater the syst e laaEvercently chrough
npills or Ak• • result of ficetiQhcin= aetivicien).
~r{' .lL..T ~ ~ TD ~ LZy..~~ S 777Y N1
jOS . '
(i) Yill aur chaieals (especlallr organie solvent• or petrolsuu fuels) be •cored in apova-
=rpund or uadet=round •toca e tanluf If so. vtut type• aod quantitias ot oaterials vill De
stoeed' ,
4
/ trorr►NZ gXvUrMa" oILDtHANZ i
(Wnc ir-ii-'bo) s.uio,+ u.io.iwcl; '
3. LNVfRONlg1RAL EUDffif!S (lOAL1mtld)
evaluatlon Toi
I
.nn u.. o~r
Ag
(S) % VAat proaetiw masures vill be talun to iiuure tlut l~lu or *pilla of aar eMsleals •tor*d or wsd oe •ite vill not M•Ilowd to parcolat• to stouoQvatet (thi• laclude• eusure•
co kNp eMulcals out of dispossl •rsteso descriDed l0 7p(2) aoe1 3e(7)1
Qss &-2~ T S~lcs or u s-f
cy~o__ - Q 7yi ..w 77,0, u.,
-Miri ov ei vri oct..~ ~s tv~t
4.Y-P'a~-
c. Vater Runotf (ineludicg •toc9 vacer):
(1) Describe tAe •oureo ot nmo[t (loeluding scors vatet) and aet:wd ot collection and dispowl
i[ any (leulude Quan[ities, it known). WMre vill thi• water tlovi Yill chl• water Ilov lnto
other vaters? Ii so. descrlbe.
/~~y~': .a Q~4
~
(2) Uill soy cMaicals pe •tored. handlsd oT wad on cM •ite in a loution vhere a •pill ot
leak vill droin to surtace or aroundvator or to a stots water dispoaal srstm dtsehar6lna to
suriace os grounA.wcor? 421-7,
(3) Cauld vaaie mcer1a1• ea[er grouad or surfue vatersT If ao. 6antrally descti0t.
l
d. PTOpokd musure• to reduce or eonttol surfaee. scwnd, end tvno[t water ivpacts. tf anr (!t
t the proposed utioo 11e• vithia cM Aduifer Seeuittw Area De esDselallr eleat oa exylawciona
r relA[!eg to tat111tie• cooternlai Saetiona 7D(4). 30(5). and 3c(2) of thie checkliet):
y. Pt.&,\S
a. Teck or cicclt trpt ot vegecacion tound on cM •ita:
declduoua tree: alder, oaple. aopen. ocher.
everareen cree: fir. eedat. pine. other.
ehsubs.
_~grais.
puture.
eTOp or Sraia.
vec eoil pLots. ca[tail. Euccereup. Dullrwh. stuak cadDaQe. other.
water plants: water lilly. ea1Qcana. silfoll. otAer.
POO, ocher cype• o( veRetatioa. (,t,/% /a/ (N.QQpXyG~
D. VAat Iciod aad aaouat oi w=etation vill De sesowd or alcered! ~
-S-dzl2d
c. List threatened or eudaagtrod speeLes lmovn to Dt on or e►ear e!►* site. ~
d. Proposed landscapin~. us• o[ oative pLets, or otArr ~easuns to presern or enAaac• w=eLation
oe ch• site. ii anr:
S
. ' ~ svOcM ErnVIRWMKrAL oRninuNCE ~
~
e. fIIVIROlIMEhT1lL ELdiE11'1`5 ~contlnueal
fvoluitian Far
S. J111I14ALS ' AgehCy ll3! QAly
A. Circle any hirds and antasrls whici+ haMt 6een oDsertrad oe or niur Tt+e site or art knorrp ta br cn
or neir the s1Lc:
birds: #rk heran, eagle, sangbirds. other; .
MRmra81#: deer, beart elk, 6eartrF csther'
f1sn: basa. salmon, trout, Rltiring, snellflsn. other:
otfi rr ^
b. List sny threatened or endanqered speticS known to he on or near the s1te.
do ►llo t
C. Ls Oe site pari of a migratioit rou[e? If !a, explain. I~~I
d. Proposed aeasti+'+as ta prestr+►e ort enriente tiildlife. 1f aoy: { r°
~
d3=r ~ 12_ZZ 1-0 J,- -'h ca
9« ENERGY M!D HA1URAL RESOURCES
a. 11hat kints of efrrgy lelettf#c, naLural gas* xaod stare, salar) will be usad ta ve9et tiar
the ccWarted project'i energy needs2 Re3tri6e rhether it x111 he ust-d fer hea ting, nanufac-
turing. eItc. ~ .
h. wauld your praject affect the pa#eot{a1 use of iOlaP energ,3F Dy 3djaCeM[ prOplrtiies? If sa,
generally deSCri6e,
c. What kiinds af enerqy canserrratian fratufrs are included in the plans af thlx praposa4? List
other proposed masures to redute or tvnlrol enerqp tmpacts, tif anr:
7. EHY[RONliEllTAL 14EALT#1
a. Are there any tnxirornaental he4lt% haxards, includfng exposure to tcxit chemlcals* r#sk cf fire
aind explcsion. spilT. ar hazar~tQUS waste, #hat could occur as a"sul# of this prapasal3 14 so,
de9trxht.
(a) Destti4e spetiel energsncy servita: thaL miqht be required.
~
~
~ • f •!l~.."d + . 40Y~iIC~ ~ .
~ t(YAt 197-11-960) Sectlon 11.10.230(1)
1. t'IVSROIQQIRA3. E3EM@1TS (eontinued)
tvalwtion for
. Aa.acp 0.. only
tttVIR0m21Tf/1L tEAL:K (contioned)
(2) Proposed wasures to reduee or control •=.troassatal hulth hasards. if auy:
~ • "
b. Noise:
(1) What t7De• of noise e:isc !o the are• vhich mar affect ywr project (for eusple: tra[fic.
equtpaent, operatioa. other?
(2) lfiat typo• and lsvels oi noise vould De cruted bp or aNOCiated vlth tM projeet on a
sAort-teev ot a long-teeo Easi• (tor euample: trattic. conttuetion. o9ecacion. otAet)' Iadieate
vhat ha►rs nolwe vould eost irom the site.
tt 1
, '06-
/
wf- ~
/
(3) YroposeE kasure to reduee or con[rol noise imputs. !f any:
`
.9 ol
dk.'%9_
8. U`ID AND SHORELIf1E USE -
a. What is the cusrent use ot che •ice and ad aeent .
~ Dropertie*•
' /J • ' ;
~C
b. ltas the •ite Deen uaad for agrieulture' It •o. deactibe.
c. Describe any structures on the sita.
d. Vill any •trucCures be desolished! Ii so, vhleh9 ~Q
e. What i• the eurrent soaing elasslficatioe of the aiteT /ff+SY/Gc~{ {ip,t
f. What fs the current cmprehensiae pLn dom16oation of the •ite'
g. 1t app1luDle, vtut 1• tAs turreni slareliee auter pso=ras deslgaaticn ot the •itel
lor/ay' /Gqb~
h. !la• anr part of the slts Leen elawified u aa 'eavironmentally sensitive' arqt If so,
specify.
1. Approsiaately Mv aany peoyla vmld resld• os vork in tM complatsd pro'ectT
4oo' o? ,576.
7
GTG[AM II17IMOMnJL OmIliAllCe ~
(VAC 197-11-960) S.etion 11.10.270(1,
D. LNVIftOttf~1R~L L1.~QiRS (cootiowA)
Lvaluation Iror
11geae7r Use Only
Approaisatdly !wv aany psoplo would tlsa noaplated projaet dteplaeet
k. Proyosed srsure• to avoid os r+duee dlspLesent lopaets. !f aayt
1. Proposed saaeures to •noure t!r pcopotal 1• eoopatibla vith a:isties sed peo}eetad Lnd uses at►d
plans. if aay: . .Z,-r.
. - ~ _
.
c`
9. f10USINC
A. Approxisately hov oaej umits would be ptoIVided it a T Tnsie~t• vfirtl►er higt+-. 1 Ir. or
lorineom hovsioa. %2_0
b. Appro:l~tely hov maar uaits, it aey. would et elialwtedt InElute vhexMr hish-. uiddlr. or
lov-latoN housiA;.
c. Yroposod woure* to mduee or contcol housina irpaccs. ii aay:
10. AESTQETTCS
a. Nhat i• t!r callest height of any proDosad •tcucture(@). aot ioeluding aetsnnasf Vhac is the
prlacipal ezcerior Duildina sacarial(s) pcopostd!
llelm,A~ / ♦
c12:~ /?aso 1, vy .
/Q a oit c.v 1I/ dc •
b. t11►at vievo in tM ia~diate viciaitr would be altered or oEstrucctdT
4M~
e'l
c. Proposed seasure• to redues or eoattol aestAetic la9acts, if aay:
ll. LIC1C' A.`tD CL.ARL
a. 'rhat type of light ot gLre vill the propoosl produeiet 'fiat ti~ oi day would it sainlt oeeur• ~
w - or~
e. Could 11gAt or gLse trou t!►e tialsIwO projeet 0e a "tec7 lasard or intesfese vltR •ievst
t / /i~i~•~ &
f
c. What e:isting otf-sits sources oI li=!ft or gLre sa7 aitett yws propovalt
c ~ d_ *
40
d. Fropossd wsure• to cedue• or eoacrol light and glare lapeets, it aaps
Li~1~lf~ •
d
gpORAPFL RIYIRON}QNTAI. ORDINAMCE ~
(VAC 197-11-960) Section 11.10.230(K , ,
1. E1NI110lOQ1RAL II.ZKNTS (tootlnwd)
Evalwtior Tor
k.acr u.. only
12. RLC1lLASION
a. Vhat'desige►ated and laioeml tecrutionsl opporcuaitles at* io cM ismadisto dcinicyt
D. Yould the pcopassd pcoject Eispl&e• snr esisting recreatioeul vses• If •o, AtKTSM.
0
c. Proposed wsure• to reduee or coe[rol lspsccs oa reereatioa. lneluding reereatiotil opportuai-
tie• to b* provided bp the yrorec os applicant. anr: , ` .
.
11. AIS'.'OAIC AtdD CULTCJ1tAL P1tZSL1tVATtON
a. Ate there any place• or oDjaets liated oa or proposed tor er cioaal, atace oc local ptesena-
tion ngiater• kmvo to Ee on or ae:t to the eiteT If so. 6entra117r deseclDe.
190 e. Centrallr MscriDe anr landw rka oc svtdance oE Rlacotte arcQaeolosiesl. u ientitic or cultural
isportanea Imovn to E+ oa or nent to the site.
~Qa
c. Proposed oeasure• to reduce or eoatrol lopaccs. if anr:
,~✓4 ..V
16. Tt,AtIS POR': ATION
a. Identitr public streets and highvays servina the •ice sed describe proposed acces• to the
existing streei srstes. SRoron •tts pLni, if any
141<4 1
b. I• •ice currencly merred by pu011c traaiit? It not. vtti t is the apqco:iaa~c,e~ d~iacance to the
nearasc traaslt •top" ~
c. [tov esny parlclns spaces vonld the couplated projset haveT Hov aaery vould cl+e project eliminate'
.
; p D.~~ • ~
d. Will the proposal nquiro aey aov rwd@ or screece. oc improverats [o esioting road• or screecs
not including drivtvaysT .t so, genetslly deseribe (indieate vhetlur public or privats).
e. Wtll the proj*et use (or oecur iu cM taasdiace vieinic7r of) vates. rsil. or air trsnsportation!
I[ w , aeoerally descciba. .
9
.
e ~
(VAC 197-11-960) Seccion 11.10.230(1) % MT'ORwlIL "LiAlRdMMlriw1. ORDI11AltCE l
1. LNVIROZQTM':AL LLDKEN'I'S (tontinwd)
Evalwcion Tor
' Ag.acy u.. oray
f Hov sany whleuL t trips per dar vould a genersced bp the eaepleted projeett it lmwm.
indicace vhen paat vould occur.
Av~u~ fi
^
g Proposcd sessures co reduee or concrol cransportation imyacts. if aay:
eLLf ) TG.f-+r
15 PUELIC SEAVTCES
a. 1lould the project eesult in an ineraased need for qublie •ervicos (for esample. fire proteetioe.
police proteetion. Realth eare. schools, other)i I! •o. senerally descria.
b. Proposed mp sure• to rsducc or coatsol Eirect iepact• on puelie •ervices. 18 aay:
' ~✓lLL.L~ - ~~"1.r ~ ~ /
114 v 1mr-e9 c. /al-,
i
16. U'ILI:'IES
s. Circle utilit currently avai L ble at the •ite: leetrlcit tural sm vace . refv
•ervice, epfi . manltary sevec, •eptic srst a. ot
G"v a~ ~ v~• ss ?"l~-t /P ~Q,
b. DeseriEe the utilltie• tAat aro proposed tor the pm yect. the utilicy providiaa the •erviee and
the gereral construetioo aetivities on the •ite or !a the ierdiate vieinity vhleh aiaht De
needed.
1 ~
lilJ a S,P
KS oo
~ {ie&.
C. SICNATURL
1. the undersigned. svear undas the penalty of pesjusp cltit the above respoi»e• a~e "d• eruthiullr anQ to the bast ot mr ImwledQe. Ialso
understaad thac. should thero be any villful nisrepreseatacioa or villiul Lck of full diselosure on ry porto t M a en my vitAdrav anr
deterninatioa ot aotuiQn111eance cl+at it daht leaw !a reliance upon thls eErekliet.
Date : Proponeet
(Please PTiet or Type)
Yroponent: ACdreu: JC, Z/
(S1 ture) '
PAone: /X O-~ ~<k .-'6 2 3 -/CZ,-v'
Psrwn completiot fors: Ao ArlS ' Qats: l0& 7/90
P,one: ~-'OG ~ .
FOR STAF. VSz MMT
St.it .ab.<<., reri.~ing c►~ckli.t:
6ased on this •taff reviev oi the enM rons atal checklist aad otf+er pertlneAt lafotaatioo, the staif: /
A. ~ / Gonelude• tAat thsrt are ao DrobaDle sianifi unt adverse lapaet• and recommaad• • deteninatioe of aono lsnifieaoes.
B. Cooelude• tlyt probaele, •igeificsnt adw rse eovironmecal ispacts do *xist tor thw eurrea► proposal •nd reeowod• a aitigated deter
mination oi noasigniileaaee vitb eooditiow .
C. Cooclude• tAat t!►ere are probaDle •ise►ifieant adwrse aoH toaNntal iapaet• aod reeaoeed• a deteemioation of signltiesoee.
•ILTf1C !LS - :73.00
10
, . . . ~ !
1 ~
~
~
. ~ ~ ~
SPOKANE ENVIRONMENTAL ORDINANCE
SECTION 11,10.230 -1-
SPOKANE ENYIRONMEMTAL ORDINANCE
(MAC 197-11-960) Settion 11.10.230(1) . • • •
Environmental Checklist
F11e Ho.
Purpose of Checklist:
The State Environmental Policy Act (SEPA) chapter 43.21C RCU, requires all governmental agencies to conslEer the environmental iiapacts of a proposal
before rnaking Aecisions. An Environmental Impact Statement (EIS) must De prepared for all proposals with probable significant adverse inpacts on
the quality of the environment. The purpose of this checklist 15 to provide inforsnation to help you and the agency identlfy impatts from your
proposal (and to reduce or avotd impacts from the proposal, if tt can be done) and to help the agency decide whether an EIS is required.
lnstructions for Applicants•
This environrnental checklist asks you to describe sone basic information abw t your proposal. Governmental agencies use this checklist to determine
whether the environnental lmpacts of your proposal are significant, requlring preparation of an EIS. Answer the questions brtefly, with the most
precise inforraation known, or give the best description you can.
You must ansrer each Question accurately and carefully, to the best of your knowledge. In most cases, you should De able to answer the questions
from your own observations or project plans without the need to hfre experts. If you really do not knoa the answer, or if a question does not apply
to your proposal. write 'do not know' or 'does not apply.' Complete answers to the questlons now may avoid unnecessary delays later.
Sone questions ask about governmental regulations, such as toning, shoreline, and landmark designations. Answer these questions if you can If you
have probleRS, the governmental agencies can assist you.
The checklist questlons apply to ali parts of your proposal, even 1f you plan to do thein over a period of time or on different parcels of land.
Attach any additional informstton that will descrlEe your proposa) or its environnental effects. The agency to which you submit Chis checkiist may
ask you to ezpialn your answers or provide addittonal lnfonnatlon reasonably related to deterr+ining if there may be signlfitant adverse impact.
Use of checkllst for nonproJect proposals•
Ccxnplete this checklist for nonproject proposals, even thou9h questions may De answered 'dces not aoply'.
IN ADDITION, caaplete the SUDPLEIIENTAL SHEET FOR NOKPROJECT ACTIONS(Part 0).
For nonproject acttons, the references in the checklist te the words 'project," *applicant.' and 'property or site' should be read as 'proposal,"
'proposer.' and 'affected geographlc area,' respectively.
A. 81lCKGR0UN0
l. 'lame of proposed project, if appllcable: _J? e 44 P~
~
2. 4ame of App 1lcant - /1 -f'•4'' J-i..l Ht. L-t
3. Address and phone number of appl icant or contact person•
.
~ 4lJv t i :r 7.-- - f? % (c•
4, Oate checklist prepareC:
S. Agency requesting checkiist- ~~I'~,~/~f~f i~L! ej~•~ /~T';
6. Proposed timing or schedule (lncludlnq phasing, if applicable). .3~ / / 7
7. a. Uo you have any plans for future addltions, expansion, or further activity related to or cortnected with this proposall If yes, explain.
A/Li
b. Do you own or have options on land nearby or adjacent to this praposal7 If yes, explain.
c2 ; ,f.,s ~/a t~ C ` ~i ~ t: ~r c ;T Y Z90,'1-2 c' - 7:4 -CV •S iv e-~.y.~I
8. List any environrt+ental information you know about that has been prepared, or will be prepared, dlrectly related to this proposal.
(Yr3 c.~ 7'. C(. a...s
Rev.2/1/88 ~
9POlU1fE E?IVIRONlENfAL ORDINANCE
(VAC 197-11-960) SectioA 11 10.230(1)
A. 9AC1CCa0IIi7D (contlnued) . • ' ,
9. Do you kaov vhecher appllcatlona are Dending for governmencal approvnle of other proposale directly affeccing the property covernd Dy your
propoeal' If yes, explain. /j~0
10. Llet aey government approvala or peroita thac vi 11 be needed for your proposal, Lf knovn
11 Give a brief, completn description of ywr propoeal, lncluding the proposed uaes and the eize of the projecc and slce. :'here are several
questiorte lacer in thie cluckliat tha[ ask you to describe cectain aepects of your proposal You do noc need to repeat those ansvers on chis
page
:-~v 1-~9o_`•
~T e C^~ v, ~LG iI" -~4~ ~ ~b~.• ri~' / 2~ ~ r d/H Lr~~~ l Y Gi'1~ {r'~ ~ t ~
~,i I~zf t' ~ ' X ~s ~3z') %U 3
~ v
12. Locatioo of the pTOpoaal. Give sutficienc inlormation Eor a person to underetand the preciee location of your propoaed project, including a
etreet address, it any, and section, tovru hip &nd [snge, Lf knovn. I[ e proposel vould occur over a range oE area, provtde the range or
Doundaries of the eice(s). ProvtAe a legal descripcion, •ite plan, vicinity map, and copographic map, tf reaeonaDly available. While you
ehauld aubmit any pLana required by the agnncy, you sre not requlred to dupllcace msps or decailed plans submitted vtth any permit applicacion
relaced co thia checkllsc
%
r _ 7~, d G l~i Gt 'L';4
T, / NL.C- L vit+' 1 i ~4 V
,t~ % •`i G;,.~' ~c Y .
~ 13. Does the proposed acclon lie vichin the Aquifer Seneicive Area (ASA)' 'he Ceneral Sever Secvice Area' The Prioclty Sever Servtce Area' -he
Ctty oE Spokane7 (Sce Spokane Councy'e ASA Overlay Zone At1aa for boundartes)
'0 BB COMFLE'.'LD BT APPI.ICAN[
B. FF9IR04TMN".AL ¢LEliEiTS
Evaluatton For
Agency Use Only
1 EAR:'ii
a Cx::e^z'_ description of the elce (circle one):[tlla~~ rolling, hlLly, steep slopes, mountalnoue,
o c he r vt%'
b 'lhat is the steepeat elope on the slCe (approximate percent slope)' 1071,
c 'fiat general cypes of soila are found on the alte (for example, clay, eaad, gravel, peat, muck)'
If you knov the claeeification of agcicultural aolls, epecify chem and note uny prime farmland
S~ .G r ~L. • . Cl/ti] .a ~C .c . % I ~ ~-C~• :r.-(
d. kre cRere aurface lndicatione or hiacory of unatable soila in the immediate vicini;y? If so,
describe i(,1n
2
, .
SPOKANE ENVIROHNENTAL ORDINANCE
(uAC 191-11-960) Section 11.10.230(1) . ~
B. ENYIRONMENTAL ELEMENTS(continueE)
Evaluation For
Agency Use Only
e. DescriDe the purpose. type, and approxlmate quantitie~ of any filling or grading proposed. ~
Indfcate source of fill. iti~~h s~.f' o i l, f= eri t•- /L ~i V-- ` /lJ / H ALr et2..-1
f. Could erosion o aur as a result of clearing, construction, or use? If so, generally describe.
g, ADout v+hat percent of the site will be covered with inpervious surfaces after ro,~ect construc-
tlon (for exarnple, asphalt or butldings)7 !~,j_?~~ A
h. ProposeC mensures to reduce or control erosion, or other impacts to the earth, if any.
7~ ~~~J V ir !
~ J L/r'V 'ica
2. AIR
a. what type of emissions to the atr would result from the proposal (i.e., dust, auta+iobile, odors
industrial, wood smoke) during construction and when the project is completed7 If any,
generaliy describe and give approximate quantites if known.
n
w v i N~ Ld s'~.c~ c,i. La:. C' v~ r~ ,
~XX L-ll.( ( TL - ~✓ts,~~/ lsl~.1'~' 1
S ~C i 7~. G 7 . ~ C- ✓iZ s , j r C` . f
_S'
_p
~ v 1'11 <~,Vrs &e t r ti
b. Are there any off-site sources erniss ions or odor t
at may affect your proposal7 If so,
generally describe. ~U /Lec►
c Proposed measures to reduce ar control emissions or other tmpacts to air, if any:
1, uATER
a. Surface.
there any surface water body on or in the iinmediate vlcinity of the site including year-
round and seasonai streams. saltWater, lakes, ponds, wetlands)7 if yes, describe Cype and
provide names. If appropriate, state what stream or river it florrs into.
~G v H ~ ~ f'Gt ..S cti : ~ t ~.~t ~ ~S ~r• i ~ ~ ) i ~ c ~y 1 LC..~ C'_ T' .G, C
G2--i.L,eti. /.i C G•- ~ ~ S -,7i~i /L .S ~
(2) will the project require any rrork over, in, or adjacent to (with n 200 feet) the described
xaters7 If yes, please describe and attach available plans. ro .i 4? c..J~'
. r
~O~ ile-,
3
SPORANE ENVIROt7HU1'fAL OADINA2tCE
(14AC 197-11-960) Section 11.10 210(1,
. ' ~
B. ENVIRON!{ENTAL ELIIKEN"S (continued)
Evaluaclon For
Agency Use Only
Eetimate the amounc of flll and dredge material thet vould be placed in or reeoved from the
surfnce water ot vetlande and indicate the azen of the ei[e that vould be affected. Irtdicate
the source of f111 materlal. ~fJ~ ~~-ti3t`% ~ Gf l-; s-•'Cr~ G-~' t-EZ•...4-, t J. ; (~C.y~ . -)'t-C4-
.
;~-o-
~ • G~
(4) u111 che propoeal require aurface water vlthdravals or diveralons' Cive a oeneral Aesctip-
tion, purpose, and approximace quantitiea, if kno++n
_T T ij 1L-'
(S) Does the proposal lie vlchin a lOQ-ye&r flood plain' If eo, noce location on the ette plan
T 1-►_~ s ~ts~•.- /-li -e--w I ~ Ti
l ~ L 6 C r.% / -r s( I ~-7~i:~• /C7 :i If''C~ p jt7/C50eP' Av f'e,,
(5) Doea the propoeal Snvolve any diecharaes of vesce materiala to surface vaterat IE ao,
dencribe the type of vaste and anticipated volume of dtscharge.
b Cround•
(1) 41l11 groundva[er be vichdravn, or vtll water be discharged to groundvater' Cive gencral
descripcion, purpose, and npproxima[e quantltlea, if knovn
Deecribe vasce material that vill be diecharged into the grounA from aeptic tanke or other
eaa![ary vaste Creatnenc facillcy Describe che general eize of che eystem, the number oE
houses to be served (lf appllcaDle) or the numbec of pereons the ayetem(s) are expected co
serve.
P I`" ~ .,4 c U✓ . j ~ ~ f? ~C71-ti.. G 1 ~ ~ ~ ~--~.4U~ ~
(1) Deaeribe any systems, other than choee deeigned for the diepoeal of eanicary vaeEc,
Snetalled for che purpoee of dlecharging tluide belov the g[ound eurface (lnclude• ayeteme such
ao thore for the dlspoeal of etocm water or dralnage fros floor dcaine). Deaeribe che cype of
syatem, the auounc of macerial to be dleposed of through the syeteo and the typea of macerials
likely to be dlapoeed of (irtcludLng materials vhlch may enter the eyetem inadvectently thraugh
spilie or ae a reaulc of firefighting actlvltles)
z19iY' 1/ i. C_3 '/V ✓ vi^..
~ v,~ -G v Z-~*___. '.L d: `1 v~,G=tl- i~ c'~ C~ ~c•' i r.~ a J -t'
(4) Vill any chemlcals (eapeclally organic aolvente or pecroleum fueis) be scored in above-
ground or underground etoraga taafce? If so, vhac typee and Que►ntitles of macerlals vlll be
etored'
4
9POlUNE EtNTRONKLNTAL ORDI2IA?tCE
(WAC 191-11-960) Section 11.10.230(1,
. • • .
B. CNVIRO:i}MiLAL ELE!{E'N':S (conclnued)
rvaluatlon For
Agencq Uae Only
(5) uhat proteecive cu asurea will be taken to inaure thwt leake or epills of any chemicala
etored or uaed on site will not be alloved [o percolate to groundvater (this includes oesauTee
to keep chemicale wt of dispoeal syateme deacribed in 3b(2) and 3b(3)?
,0,0 A/0 7L ~/t- ~C.~•~. v-"- / L!
L
'!54 ~r Y
~ ✓ i vJ ~ ~%i Yrl ~c7 ~ 9 ~-a 1~..5' r.~ ',3- /`"-c-4 ~i" % ~ L t'-t~°' ~c~ ✓ ~4 .-ti1 S ~-cp~~
c 'aater Runoff (ineluding sto m vater)
(1) Deacribe the eouzce of runoff (including etorm vater) and mec'iod of colleccion and diaposal
if any (include quantities, if knovn) Where will thie water flov7 uill chie water flov lnto
ocher vatera' If so, deacrlbe.
iC', i c-< L>~-'~!"`',~J- ~.-~..~t-- ~°[.c, Gc= 1~ ~~~.%l C~ li
c-.-.~~t3~6. `f'" ti'y...._~ " -G✓Ll.~-~ ~ ~7_~T~-t~.sr.~~c..~
~.Cf t_"`~C•''--'-~~ a--4~ - - ~
(2) :7111 any chemicale be scored, handled or used on tRe alte !n a location vhere a spill or
leak will dcatn to aurface or groundvater or to a ecoro vacer dlaposal syetem diecharging co
eurface or groundvater~ ,Oul7 ,
Could vaete maceriais enter ground or eurface .nters7 II no, genetally deecribe.
dO Av e, 7'-' e;' k Pc= c_~-- "7'/t Z1..t"-
L1:iGl~cY'
• ~
G
d Propoeed meaeures to reduce or concrol aurface, ground, and runoff vater tmpacta, tf any (if
[ che proposed actlon 11es vithin the AQulfer Sensitive Aree be especially cleac on exylenetiona
r relatlng to facllltlee concerning Sectlon• 3b(4), 7D(5), end 3c(2) of thla checkllat).
IS' f ti ^'L:-jLe--'L
s vi.,trrs
a ':heck or circle cype of vegecacion found on the eice
deciduous cree. alder, oaple, aspen, ocher.
evetgzeen tree• tir, cedar, pine, othec
shrub•
L/ graes.
paeture
crop or graln
vet aoil plante, cattall. buc[ercup, bullrueh, ekunk cabbege, other
water plance uatec Illly, eelgraeo, milfoll, other
L/ other typea of veqetatlon. i,(l iI G/ C.V YC&ZCI
b Whac kind and amount of vegetation will be reaoved or altered? G(/i ~Gr Lf
<I-G'
c liec threatened or endangered apecies knovn co be on or neer the site. <LCi
d Propoeed landacaping, use oE ontive plante. or other aeeauree to preaetve or enhance vegetation
on the s it e, i f nny • t- ge ->V
.
~u;_f..~.l.~ ~`t.~:~.ti- U~-c~-ct~.~_.~._~
/
5
SPOKANE ENYtRONMENTAL ORDINANCE
(uAC 197-11-460) Section 11.10.230(1
B. ENYIRONMENTAL ELEMENTS (continued) ~ Evaluation for
5. ANIMALS Agency Use Only
a. Circle any birds and animals which have been observed on or nenr the site or are known to be on
or near the stte:
birds- awk heron, eagie, songbirds, other Ro »s,
i
mamnals: deer, bear, elk. beaver, other
fish bass, salmon, trout. herrinq, shellfSsh, other•
other
b. List any threatened or endangered species known to be on or near the site.
c. ts the site part of a migration route7 (f so, explain. /{/e;
d Proposed neasures to preserve or enhante wilGlife, tf any. /t/c I
/LLti' 7h ll.- cZ.-~. C= s7 t) it c: _la )67.! Vl- /
d A
5 ENERGY ANO VATURAL RESOURCES
a. uhat kinds of energy (electric, natural gas, wood stove. solar) will be used to meet the
the completed project's energy needs' Describe whether it wSll be useE for heating, manufac-
turing, etc.
~~~~~~:..~~c..--~ . ~.C:~r~..-+1.~~~^,'~'~ T `~1~`~~~'a`•~ ~ ~ /r
b. Would your project affect the potential use of solar energy by adjacent properties' If so,
generally describe.
c. tlhat kinds of energy conservation features are included in the plans of this proposa17 list
oiher proposed measures to reCuce or control energy tmpacts, if any
~
1 ENYIRONMENTAL HEALTH
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire
and explosion, spiil, or hazardous waste, that could occur as a result of this proposal7 if so,
describe.
/V0 ~ -F' /t h .r~ ~ !rt
(1) DescriDe special emergency services that might be required.
cr ~16j 71-
6
- c
SPORANE ENVIRONriENfAL ORDINAttCE
(uAC 197-11-960) Section 11 10.230(1)
B. E`tVIRONKEtTfAL EI.Y?ffiJTS (continued)
EvaluaClon For
Agency Uae Only
EI7VIRONiEtT:AL HEAL:'H (contlnued)
(2) Propoeed oeaeuree to reduce or control :.tronmental health hesarde, lf any.
.
~
r ~
C.v,~.~
D Noiee
(1) NAac types of no18e exist in che erea vhich mey nffecc your pro,Jec[ (foT example: traffic,
equipment, operation, ocher7
7
What types and levels of no18e vauld De creaced by or aeoociated vich the projecc on a
ehorc-cerm or a long-eerei baale (for exsople craffic, conatruction, operacion, other)' Indicate
vhat houts noise vould cooe from the site
v ~
, ✓'L.~irs~~-sC. :.~y~: / y ~~Y.<<yy~ ~O ~Z~.~~--~c' •-.r ~ •
~ CJ'.~..r,,..! f ~~a.~ ~.s...~-~_ ~ ~'Ys,~,[► •.F ,
c
LL~Lj~L.~l=- / ✓j/r7'l~v l~?~mG~C~~Et a.~..~ .
~
(1) Propoeed oessure to reduce or eoncrol nolae tapacce, if any.
a
~"'Y.~'~'~~i`~iG/1.~C'"L~~ ~ {r• L1~7 ~`~r~. L ~ L.e~ I4.- £ ~l-~~7" ~
~ ~ 4 ~ .sY'_ G"`".-I ~'`~✓t s~..r Ci.~z+E_• :C~ ~ S~/'t~ ~'L..~~ ~ ~
8. LA'ro AATD SHORELINE USE
a. What is che current uae of the eite and ndjacent propertiee' J1 `t'
/1. ~7
~'LP,e~~ l --...s:.F'.>l
r i
b. llae che site been ueed for agricultuTe' It eo, deecrlbe
/ V /-v,/ / / -i
~ r
c Deautbe any ecruccure• on che aice
d. uill any ecructures be demoliahed' If eo, vhich"
~
e u+iat !e the current zoning cleaelficacion of the site? ,I~ ~YI L~, f Le YQ~
f t7hac Sa the current caopTeheneive plan deelgnation of the alce'
g if applicable, vhac 1e the current ehoreline master prograa designa[lon of the e1te*
IL 97 lb l'..-e-
h Haa any part of the site Deen clasoified ee an 'eoviroamentnlly eensitive' area' If so,
epeclfy
1. Approximacely how naoy people vould reside or vork in Che completed project?
.
7
~
, . SPOICADTE ENVIAONNENLAL ORAINANCE
(WAC 197-11-960) Sectlon 11.10.2300, . , y
B. ENVIRONKENf1►L %LE`tEtTfS (contiaued)
°valuation For
Agency Uae Only
j Approximacely hov many people would the completed projecc displace? -e
k Propoaed meaaurea to avoid or reduce dieplacement impec[s, if any:
1. Propoeed meaeures to eneure the pcopoeal is competible vi[h exietiag and projected land ueee and
plans, if any: . .
~i~►s /~~G-y.-+-aK .G-G•: C~' % ~ i ',Y~`P ~,,s
~ ~~,,~1, ✓l.~.,.~ ~cic.~ ~~-~~t=.-, ~-~--~.s o ~-L k--ztz, ~"~.,c. ,
f ~
9 IIOUSINC
a Approximately hov meny unite would be provided !f any' Indlcate vheChet hlgh-, `ol dle-, or
lowtcycome housing. - Alt'
b Approalmately hov many unite, if any, would be eliminaced2 indicate vhecher high-, middle-, or
lov-Lncome houaing• -s --a'-
c. PTOposed measures [o reduce or control housing impacts, 1t any:
10. AESTIIETTCS
a trhst la the talleat helght of any proposed sCructure(a), not irtcluding antennae? uhat te the
prlocipal exterior building aaterial(e) proposed"
..5 f v t" f c. ~~i U~~✓ 1! ~~v~ ~7 .,~v
b IJhat vieve in the inmediate vicinicy would be alcered or obatrvcted7
/ ~.t~ - - ~L~ ~s-~'' ~ u..~~ ~.-c
~~1ti.C~ .I~~„~.-~..~~c:--+~..3~ ~ •
c Propoaed meaeures co rcduce or control aeathetic impaccs, if any• ,
~ f'~,.a ~i[.i''~,~-~~I..e6•~'L~~~ _ ~~j ~ a~t..~Y ~
~~'K~iCs.' tK.L.C.~•GVC..-ad~ f ~~~'1•
~ /
11 LIGH" MD G1.dfiE
a '7hat cype of light or glace vill che proposal producet '7lut tioe of day would it meinly occur'
~ 2,~ ~~c.~.-r---~ G^~~.- c~..~G-~..['--t. rr'l ~-'`•a....r~ t= ~
b Could lighc or glare fron thn finiahed project be a safecy hazard or interfere vi h vieve? '
490 110 k' _~..40;
c tfhat exieting off-eite sources of light or glare may affect your propoeal7
~ .`iV~~ /~'r i~L~s%✓ <~J ~T %~i.c.s,
v p`
d. Propoaed meaeures co reduce or control light and glare impacce, if any•
~
j,4e
8
. ..ibr- , .
SPOIUNE EIiVIROMMEMAL ORDINANCE
(uAC 197-11-960) Sectlon 11.10.230(1
B. ENVIRONKENTAL ELEMENf5 (contlnued)
Evaluacion For
12. RECREATIOp Agency Uee Only
a. Whac deelgna[ed and infocmal recreational opportunitiea are in the immediate vicinity'
b uould the propoaed ptojec[ dlaplace any ezieting recrea[lo m 1 usea7 IE so, deeerlbe.
c Proposed meaaures to reduce or control impacce on recreation, tncluding recrentionel opportuni-
tiee to be provlded by the projec[ or applicanc, if any
`Z:?1 '-~..~.cr,%r e,
,...-4 r~-LlZl r '1 /
13 F1I570PIC AND CULTURAL PRESERVA:IOti
a. Are chere any places or ob]ecte 1leted on or propoeed for national, scete or local preaerva-
clon reglster• Icaovn co be on oc next to the slte? If ao, generally descrlbe
71--
b Generally descrlbe any landoarko or evidence of hlstorlc archaeologlcai, scien[Sflc or cultural
importance Sanovn co be on or next co the sice
'.✓r' / f f j ~~'~~t~7i,.~
c Proposed oeaeuree =o reduce or control iepaccs, lf any
A C7 u f
14 : I',At15 POA'ATI01i
a, Idencify public etreeta and hlghvaye eerving the eite and de9eribe propooed accese to the
exiscinE ncreet ayscem Shov-on elte plans, if any
F ZL~7f'~C1P.~ , o~ /~1_l'__-f'_.rE.~,~.~-12.L~J r'" li t,B'►'+
~L~-~...irv....( ~ ~7"l~G.~-/"~.~' [~,•,a L4 L-c :'~~'1t,..1..~ 4/Q~'i
b le elte currencly eetved by publlc translc' Lf not, vhat is the approxiaate dl9cance to the
neareac [racu![ etop'
c Ilov many parking epacee vould the coapleced pro)ect have' tlev many vould the projecc eliminate'
d ulll the propoeal requice any nev roade or atreeca, or lmprovements co existing roada or screete
noc lrtcluding dclveveye) c eo, generally describe (lndlcute vhethe[ public or prlvate)
. 11-0
e. utll the project uee (or occur Ln the immediace vicloicy of) water, rail, or air traneportutlon?
If eo, generally deacribe.
9
~ r
SPORANE CNVIRONMENTAL ORDIiIANCE
(WAC 197-11-964) Sec[lon 11 10.230(1)
B. E2JVIP.ON?i2H"AL ELETiENTS (continued)
Eveluatlon For
Agencq Use Only
f Nov many vehicular trips per day vould be generated by the coepleced project7 If Vcaovn,
indicote vhen peak vould occur
UOri /t 1/cj i- A..,~ Lc.
~ /~Lsr'•t~Zct ~,~il ~_~,~,.~-9 Gi'i'-.~rLC--~1L ~Lu-►.~ z`~-~. -
(-~[~i- Cd~K.•C~. C-"t~'~~/L!G/C-c-L~-Q G7/~.i.. L.L/'~~~..l. L GJ~►'~~..Ic-~f v~"~ ~ lf~ i
~
g Proposed measures to reduce or control transpor[ation iopacte, if any.
~~~J In ..v
15 PUBLIC SERVICES
a 147ou1C the project result in an increased need tor public servtcee (for e:emple, fire procection,
police proceccion, healch care, schoole, other)' If so, generally describe
b. Proposed measures co reduce or control ditect iwpacte on public servicee, i` any•
XGe~ 1¢~Pe G ti-~e1~
~..I~t~?_ %?Z .rCt --•-~'ea~~ ' .GY✓~ L~/~ /C,'v~.~' Y Cf/~:dti t-~
41 v K f ,~~~E'~•, l!fL,
/
16 U'ILI71£5 y
a Clrcle ucilit currencl avalleble at the site 1•c[rlcic ~acural d ~ate refua '
aervice, elephone, eanicary sever, eepLic syBCem, oE e `
, n
,
Tv< <c i~ s .
b Describe the utilltlee tha[ are propoeed for the projecc, the ucility provSding the eervlce and
the oeneral construction activltiee on the eite or 1n the imoedlete vlcinlty vhich migh[ be
needed.
/ Y'G~ i7~ / ✓ ~ / ~L / V / 4 0 -WC-V
~ c. ..r .~.~r., (5 ,s~ c-~~~-cv ; s 3'} . ..ya S ~°'c.~. c.~ 1~ ~ . r~ ,~.~.•K (fi~~Z~,,, ~ c.,.,G n ~
/I/ / / al / S:L I.-
t".S~~n
j -i v _
C. SICNATURP
I, the undersigned, evea r under the penalcy of perjury tReC the above reeponsee are made trvthfully and to the beec of my kn w.+ledge I also
underscand thnt, otiould there be eny villful mlssepresentetion or vlllful laek of [ull diecloeurc on my parc, the aReney may vlthdrav any
determinstlon of nonsignificnnce that it might leaue in reliance upon thia cheekllet.
Date ~6 Proponent ii-C~' ~G`l~//'~~v'G~'~-.~ r1~s%~~
(Please Prln[ or Type)
Proponent Addreee !~G-<_1-1
~ (Sil!(nacurc)
Phone : /6 Z j
Person completinE form ~ C'' Y L7
Da[e /~/i .71
•
Phone.
POR STAPP USE ONLY
Staft member(e) revieving checkliec
Based on this ataff revlev of the environmental checkliet and other pertlnent informatlnn, the etuff
A. Concludee that chere are no probable eignificant adveroe impacte and recoamends a determinacton of nonsigniflcance
8. Concludes [ha[ probable eignificant adveree environmental impacte do exist for the cu nen► propoeal nnd recommertde a mitlgated deter-
minatlon of noneigniflcaace vich tondiCiorte.
C. Concludes that there are probable eignlficap[ edverie environmeatal lmpac[s and recommenda a determimtion of eignifieance.
PILINC PY3 - $75 00
10
~
Swi.
'T ~ ~
~
~
~
~
3~oa
D1C.J)
,
~
.
~ y
t
~ • ~
.v '
•
e
=46m9O V =89m9O
E
~ - ~ , - - ' . _ J:~...-- J::! L~ , y ~
, - . . . . . • . . . . . - . .
4 ~ N : , . • : _ • C
L4 26+n
~ ' ' ~ • ~ ly : ' ~ ~ ~ c~~. ~ _ F tA
_A_ V~-----~ - r, . • `
i C ' ~ ' ' ' • , ~ ~ (,f,
~ \~G_C~ _ ZBTN • ~2~1I1 ~ • -
~ • • . . . _ - - . Y S - - • ~~e ~
- \ . . : . . . . . • • . Cw~
29th ~ Ave
~ .i- ~1 C . . _ ~ . - . . . . . , I . . . ~ . ~ :
~ •1 - 301 h ' Av e ~ . ~ " .
\ . ' • . • . . . . . . . • • . . . , ' • i.
d , , ~ ' ~'1 C) • ~ . Q
o ' . ujU 31 s t • ~ ~ ; q v e . ~ 13T .
a . . . . , . . . . . , . . . ~ _
-fz
32nd Ave u)
_ ~ l ~ ~ ' ; : • . . . . . . . . . . . . • ~`I-'~3 2►~ ~vE ~ : . . • ' I'3~~~rLr>• .
Yc : f~~.••' ~ . . 3 . ~ 't
~ '5 4 TN
~ ~ ~ , , • ~ ~
C ~ . . . . . . , . r .
, • F j47N U :
_ ~ \ ~ • S Z f. 'SSTH /~VC • • L~ . ~ :
. : 2 W ~ ; I:, • 3 •
• \ . ~ - ~ . fl . s~ t
cz 'o
3STU ~
c. ~ Q ~O 3ca T N /lv E r
~ ~ ~ `Z- ~ ~ . . . . . ..t; • • •
~ L 53
~ • ~ ~ 3 7 T t-t p AVE . • . . . . ~
~
Q
C-2 : ~l 3 •Y o
~
! LL 4 ` , ~ pT~t,
~ w - - ~ . . 3 3 - - -
N
3~GIMM~.I'L.C)N Q•(/ " , O V!'~ OC 4 2-
co w ~ o
~ ^ ~ ~ , t • / C ~ D
^ ; ON~ ~ ' t r 44
YH
~ Cl)
, ♦ s ~ • ( ~ ~
• ~ . r 0
~ . ` u~ + ~ ~ • t ~ r . C' \ .
~~.~,~i~~~ ~ ~ J. ) ♦ \
1 1 . • . V ~y ( ~?.c 4 ~ ~ ~ll~ r - - _ _ - - ~ .
CNESTrz2
r ~ ~ ^
r-~ . V E N . . . , . ~.-rEM
~ . e~--r:-~ . . . , . . . . . . . . . . . . . . , , ,
•s t..: ar ~ ~ , s , • c • . . . • • u.•_ • t • : e'a. • . . . : _ . ~ -
. i • r ~ v • - ~
- j ' • - - _ LAJ
u 3
a(oT u A%4 E (D c~ ' ^
(~~•~1VE ~ 1 . u.~ 0
. UE ~ ~ ~ ~ • 3 a
~ ;
ol.
U. a 4 n
47T11 ~~'1~
~ QV F.
. F3_T.H__ - •
~ f
J
J
1 -
. . , S
4~ 2, , , z..
~ f i s c. :
32 25 44-
` or 4
~ • O 7
Q _ S6f'2/ E ~ ~ J1i,l:` - -
~ - - - l ~
~ ~ ~+r•s \ ~ - - - ' .
\ C-
O 1 ~
~
r f1 :z ~
N
• r. ~ . ~ . \
j"" • • ~ ~
et~ , o
~ . ~ ~ • ,v y ~ Ti.M►oaARV \ z
a 11 R~ ~ - t • ~C~.o~Url■ ~y
~ ' ~ l2-S o \
~
dl •
~ ~ t + • ~ r J~f, ° 4
f~ +
~ s 4 s° . • 1 / \
~ ;6 s ~ s f s t
e • o
• ~ z rO • i•~ 1 .
f Q ~ . ~ ~ . f
. z M \
► ~s . ~ Ii s
' .,rA
' ct , \
~ ` L N~ ~
: ~ ~ I t 3,^. ,t." N ~ ,s . - i o,~ ~
~ ~ " • a
, i.
e ' p ~ W. 4r.
~ ~ ( ~ I `
4 to
s " ~ S = . ' L • e~' + ` S ~
%f
. --t. • ~ ` • f\\ J
, hu ` .r~ 'Y_// ~ ~ ' , .s .
~ ~ s ~ • _ 9 • ~ ~
~ ~/O r.4 tj '
~ •ti1 S• p ~ Tl
" • ' ~ , - - •1 ~
= • ~l Y~ _)r,
CiMtit~~iN Air.Jl-O.ap~
,r-~ ~ 0 II L?
I S • ~f ~ ' ~i '
2 ♦ ~ - ` ~ ~ y Cl ~t
~ { ~ c~ ~ . O
ap , t
r•
~
j ~
1r •
e F _'fu . ~.~^~A
L » • ri N
~ " ► -71 a p } : st.~r
0
~ Y 3 4
Q 'i~Q : ~ 1 F.',nni. ~ ~ • P l ~ ~ve z' ~ ~"C
a ~ ' ~ + ~
` 9r.. ~ ~f << • • ~ ~ ~ . ~
~ 8 ~ ~ ~ • ~ . 0 ~
a
r
~ • ~ .
4"NO cr.
s t t, ~ ~(f 1
~ - ~ nr
2 1 4 4L As~_ « o " ~
~ ~
2 ~ ~ i ~t ~
4 ♦ ~ ~ L 4t V Z, 4!or. CT y'~
. ~ ~ 1 • ~y ~ It -
$ ' r
n
7 4 ~ ~ ~
^t
.4
:
7 6 5 5 44 ♦h cor. + E 32
or
' .-y.
,
.
No - 3 Z - ~ - ri o ' 0 •333 4~ _ -~yJPs•.e•w q ~JL
y
r
L
~
~ d. .
k
_ ,
. ` ~
' ~ ' • t ~
• a4 ~ ~ f' ~ ~ ~ ~
~ ~ A~ y ~ •
T
~ ir ~
~
8AY e.
~ ~ .
* ~!*4 i • ~ ~ •..J
fo IR
'riLh'1P04L&c.y
~~I► * 06
~ ~ .
pp
116 r+l~
to
~ #7 #
: r
r.
_ \ * 1461 + ~ .
•
s
~i~ ~i s ~ ~ ~ ~ ~ ~ ' ~ ~ ~ •
10
`o
e ~ ~ t
: ~ _ • ~ ~ ~
Fe r~• ~i 8 ~ ~ . .
~ . ~ ~s . . ~ • .
1 d.~ ~ ` t~ ~ ~ ~t ~
' ~ #iv~• AJoc~f C"k
~ ~ . .
~ ~ • ~J. t
air #4 PJI i"
dt
. ~
r ~+~.r.~► ~ ~r ~r!'~:~~^- ~ : ' ~ ' . ~ ~ .
a
~ /+n ~ 'fi/•• ~ ! f ~ * ~
it
!ir PL ' ~ ~
~ •
~ ~ . ~ - 0
~ 0
F.K
. ~
~rI '8 aal +s A4W%!
4. K
M` ~ ~ ~ • p' +G~ r~ ►01 IY
-+N
~ + of'
i
RAllROAD ZONING FILE NUMBEA YARIANCE FILE NUMBER
~ ~+4 ~r4 i~ Ni► I
~
, I • , ~ ~ ~ ~ ~ ~t ,
i • / , j ; 1•
`AN• L~1~ VY~M ~
(10) UNIT WIMO I»I uNiT wiMO
• ~ ' ~ ~ / YF
R 0
. 1
11:) uNir wiMa ~p
~
I ~
I L i l
9Q '
COYYONS Al1EA
~ ✓ -
~
' ~'1 °o~,+,. ~.r, ~ • ~ ~
J*
~ , " ' - i ~ , ~ ~I . ~ ~ ~
~ C
y , . , ` .
,q ~ , ,
PROJECT INFORMATION
0'O LXIITINO =OM[ t6T, 1169 -A0.
PIIOPOiED i0N[ U.R. 13
~ y,,,~►r IITL All[A 120,190 t.F. 2.905 AC.
SUIlDIMO COYlIIAOE (YAX.OOf) 40%
X 0/[M II►ACt r&rueu*u401
PEOUI11E0 PAIIKINO ~
( 1.6 x 74 UNITi 1 '41
i1T! ►LAN ►IIOYIO[D
Bcw ~ ruv NT. 0/ S1D0l. 21' :
Nll ~
• • ~ \
~ YICINI~T YA/ S /IIO►0{t0 : 11 WIIT
ELDERLY HOUSING
frrr~G~ r4
~ i • . - ' - . . . . . . . « 'I
J
.
i
rn ~
fI /
~
~
I
- - - -
Iz ~
1
~ 4P
l ~ 16
~ ~ • ~ ~
\
• v ~
~ . ~ `
.
L• ~
y• ` ~
~ . \
. • ~ / J~
J
f J /
1 ~
• /
\
t &406 ~
.
~
~ ~ /
~ \ , ~
. ~
,
,
,
.
~
REDEEMER VILLAGE ~
RETIREMENY CENTER - J
sPOKANE, wA. .
~
e
~k ► • 7; . ~ , `
w.i . , N•C
t~,~, lf ► • t' : ~ '~':5;..;-yi~~~ { } „i~ el
~ • 7. ~f ~ , . ~
t ~
. . f ♦ (i. ..F , ~ . . •t'-
A,.ta,
~ "y~ . • . . N ;F w,
~ ~J' ~ ~ r `f~~:a s ~*"'r" f _Z "z' t~:~:
~l~ 1 ~ ' ~ ' ' ~d ~ L YI. ~t.~.~ ~ 'K:f,.~~ ~ - ~ ~ `
t ~ ~ s Y t~~ ~ ""-1 •i - . . I~,
~j!~r. ~"~~~~~~i1"i . ; ' c~y~ "•~-f•'` ~ +,~i~s' : . ' , ' ~r~
.r
c
D S, ,r. i V v ~:%''''rr ~ ~~~yl~Ky~:'~ ~ ~i 7~~.,~ - ~e'.'"~- ~ ~i
°'1 ~ , , t 11s ~ -.~..~c"- ~ "
+t~10~f~~~
4 ^ 1 , • „w,,.~~ ~f~ ~
~ "~~+4~. ~~'•~x- + , ~ M~~;~ t. ~nr'r 1.~~-! "P~~r~~~ - ' .
~ ~d, ~ • ~i11 _ 4 ~ .
~jt~ ~i~~ • , ~r ~iF~'~',' . , ~J ♦ 1 ~ - i •5~,~ ` .
, ~ ~~~L ~ ~ ~y-•• 1. w'~r~
1. '.i
~ - r ~ ~ - ~ ~ r'r• 'f
. ~ ~,~y _ ~ , . . ,,y.±±IT. ♦tr ~,7 t i i~ ' ~ , .
-7r~~ ~ ~ ~ ~ ~ ; ~ ~ ~ • 1 , . .
1. j= ~~~~f~t'-~ I• 1.~
t w:t.' ; ' .'yt • . yr T ~ ~ ` ~ ~ ~ ' . ~I"~
~L. ~T"~ ~ ` - ~.•~~i1~~~ ~ . ~y~:~~~ ~ ~.~..l~`~
• r • ~ ~
ti ` ~'r y = ~ ~ f i-r-'~' ~ r, ~
. . ~ I _
. - ~ L • ~ • -
- „ ~ ~~.•s~.r~.- "
. ~ ~ ~ , . 4ft
.
.i ♦ Y . : ~ y ~ wt. ~ N • . .
. ~!1°} ~ f . ~ • ~ ' ~w-- ~ • - •
4}rQ'1~ ,~w
~ ' . . • . t. . - .
w.
r ! t,,... , . .
• '
Nt ~~N1ER
~Q~ AE?~aE1AE
. EDEE~Ea Y~`~
R
AVi
3STN ~
~
+ RM'ti
,
~
,
.
.
30I4S pANE0 9+
. sL ~G
~
~
a~
0
• zONF- C
,
/ c
• v ~ i~ . ` ~ '
. ,
_ 32
. ~
V
~ • ~ '
■ • • • ~ ~ ~ ~ t t ~ ~ ~