2013, 02-19 Permit App: BLD-2013-0247 Accessory Buildinglane
Stie.0•0valle
y.
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite 8-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter@spokanevallev.orq
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT A PLICATION
N❑ NEW CONSTRUCTION 0 ADDITION/REMODELACCESSORY BUILDING
DECK LOTHE
SITE ADDRESS: 1(72 Z E, 0/9/79/010 &4"
ASSESSORS PARCEL NO.: j57(/,/127 LEGAL DESCRIPTION:
BUILDING OWNER NAME: TricC d'Mgt 05'(Lrk"
NAME:
ADDRESS:
on: SPOKANE VALLEY
STATE: WA ZIp:
PHONE: 2010 - 9 4{8'-5 ?33
FAX: CELL:
CONTACT NAME: LA C.R�/. / &in e iz ciU pave BeAZ.innJ,J
(-4-3 Il
PHONE: cit Z —k AX: 9251- LitOKI CELL:
CONTRACTOR NAME: a u 1(do q, Co/ misidr, 5 . ,zNC
MAILING ADDRESS: /4.1OZ /1 6, ,SPR43c Q AWL-
Crry: SPOKANE VALLEY STATE:'WA
PHONE: 92z- .43 O
FAX: 9247-41/4394:2 •CELL:
ZIP: jlo 37
CONTRACTOR LICENSE No.: BULLDCI933M5
EXPIRES: 7/25/13
CITY BUSINESS LICENSE NO.:
BULLDCI2i
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
****YOU MUST COMPLETE THE FOLLOWING****
)T APPLICABLE
Height to Peak: p l
(
Dimensions:
/Z `Y A09120" Z'
No. of Stories:
/
Total Habitable_ /'
Space: N
Main Floor SQ FT:
Upper FloAop ��p
Unfinis cement SQ
Finished Br M SQ
Garage SQ FT:
Deck/Covered 7hatlo SQ
FT: N
Impervious Syyyfffrface
Area: Af/ if
�c�l�
30% Slopes o
Property: A f
No. of Bedrooms:
Construction Type: Pr ie
Heat Source: e::
Sewer or Septiv• 5 rail
TOTAL COST OF PROJECT: $ / %1c
DISCLAIMERr� 1r-
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for constrYction'ar ova (Iwelling, a dwelling is/w II
be served by potable water. 2) Ownership of this City of Spokane Valley permit Inureto the property owner. 3) The signatory Is the property
owner or has permission to represent the property owner In this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of SpokaneiVelley Perinit'tt�enter. 5) The City of
Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes ofo(dinbnces a9 Plans or additional
information may be required to be submitted and subsequently approved before this a�pllcation can be processed.
CSV PERMIT CENTER
II rolect m W2-2013-0447
r,nrra
Effective October 28, 2007 I ?ri_ f I n iL V. I Page 1 of 2
Forms P:\Community Development\02 Administration\03 - Official Versions\Permit,Centel\Residential.Construet .Permit
App 10.28.07.doc
e, v - wo 4vg
os'
5
Lep
dc`7
OPP
NNING DEPT. APPROVED
udc,it
BY.
1t a/iq i 5
,e:1-- - 01 3 - 94-1
Spokane
lley°
Residential Driveway
PAVING WAIVER
Community Development— Planning Division
11703 E Sprague Ave Suite 6-3 ♦ Spokane Valley WA 99206
509.720.5026 ♦ Fax: 509.688.0037 ♦ planning@spokanevatlev.org
Spokane Valley Municipal Code (SVMC) Section 19.40.020.B; "All residential driveway and off-street parking areas shall be paved with
asphalt, Portland cement, grasscrete, paver blocks or other equivalent hard surface material". A paving waiver can only be granted if.
the structure you are proposing is not going to require a driveway for daily use.
— OWNER INFORMATION
PART II —DETAILS OF PAVING WAIVER.
1. Do you have an existing garage for parking daily use vehicles? 11. YES ❑ NO
2. Is the proposed detached structure used for storage only? 7 YES ❑ NO
3. Do you plan on using theCached structure to park vehicles? rjQYES ❑ NO If yes, then
what type of vehicles? '/ g V
4. Do you plan to conduct a business from proposed detached structure? ❑ YES NO If so, what
is the nature of your business?
PART III —AUTHORIZATION
I,(PRINT NAME) 37q.cK ost,s1it) 3 owner, hereby confirm that the information provided on this
form is true and correct. I acknowledge that any change in the foregoing conditions, could require
the City to impose paving requirements. I further agree to report any change in these conditions to
the Spokane Valley Community Development Department, Planning Division, within 30 days.
Owner Sig
(% 02// 9�;oi3
Date
PART IV — DECISION
STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALFr�OF THE COO MUNITY DEVELOPMENT
DIRECTOR AND FIND THE REQUEST IS GRANTED AT \\ �I 3O`
o 4i
SAID Aa'RE'l OR PERMIT #;
a -ba
Pla ing Divi ion Staff Signature Date
Created 6/27/11
Page 1 of 1
n5�-ea-,a/
PARCEL #: t/57 / (/27
OWNER NAME: V QL6C,
Q, 1
ti. Ldc 4u .
ADDRESS: ! / ?,Zt 2 E it c1
CITY: 5 4A (
C3Z l
J
(,7/
STATE: ()„jt
ZIP:
qQ
! < Z�+
P 9qa-5733
FAX:
CELL:
EMAIL:
PART II —DETAILS OF PAVING WAIVER.
1. Do you have an existing garage for parking daily use vehicles? 11. YES ❑ NO
2. Is the proposed detached structure used for storage only? 7 YES ❑ NO
3. Do you plan on using theCached structure to park vehicles? rjQYES ❑ NO If yes, then
what type of vehicles? '/ g V
4. Do you plan to conduct a business from proposed detached structure? ❑ YES NO If so, what
is the nature of your business?
PART III —AUTHORIZATION
I,(PRINT NAME) 37q.cK ost,s1it) 3 owner, hereby confirm that the information provided on this
form is true and correct. I acknowledge that any change in the foregoing conditions, could require
the City to impose paving requirements. I further agree to report any change in these conditions to
the Spokane Valley Community Development Department, Planning Division, within 30 days.
Owner Sig
(% 02// 9�;oi3
Date
PART IV — DECISION
STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALFr�OF THE COO MUNITY DEVELOPMENT
DIRECTOR AND FIND THE REQUEST IS GRANTED AT \\ �I 3O`
o 4i
SAID Aa'RE'l OR PERMIT #;
a -ba
Pla ing Divi ion Staff Signature Date
Created 6/27/11
Page 1 of 1