2011, 02-15 Permit App: 11000335 Pole BuildingPro),ect Number: 11000335
Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 2/15/2011 Page 1 of 2
Project Information:
Permit Use: 24 X 24 POLE BLDG Contact: ALL STATES CONSTRUCTION
Address: 2724 S HAYFORD RD SUITE 1
C - S - Z: AIRWAY HEIGHTS, WA 99001
Setbacks: Front Left: Right: Rear: Phone: (509) 244-8777
Group Name:
Site Information: Project Name:
Plat Key: Name: Range
District: Nort
Parcel Number: 45152.1137 Block:
SiteAddress: 13002 E CATALDO AVE •
Location:: CSV
Zoning: R-3
Water District: 011
Area: 11,937 Sq
Nbr of Bldgs: 0
Review Information:-
Review
n onnahor::
SF Res District
MODERN
Ft Width: 0
Nbr of Dwellings: 0
Lot:
Owner: Name: ARLAND, GERALD W
Address: 13002 E CATALDO AVE
• SPOKANE VALLEY, WA 99216-293
Hold: ❑
Depth: '0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
2/10/2011 By: tmelbourn
Released By:
Originally Released:.
2/10/2011 By: CJJANSSE
Permits:
Operator: JD
Printed By: jmm
Print Date:
2/15/2011
Project Number: 11000335
Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 2/15/2011
Contractor: ALL STATES CONSTRUCTION
Address: 2724 S HAYFORD RD
AIRWAY HEIGHTS, WA 99001
Description Grp Type Notes
POLE BDLG U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
—WSBCCSURCHARGE
SFR / DUP SITE PLN REVIEW
Building Penni(
Page 2 of 2
Firm: ALL STATES CONSTRUCTION
Phone: (509) 725-0450
This Application: Total Project:
Sq Ft Valuation Sq Ft Valuation
576 $10,944.00 576 $10,944.00
Totals: 576 $10,944.00 576 $10,944.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Fee Amount
'' $195.25
$48.81 •
$4:50
$50.00
• $298.56
Notes:
Payment Summary: ,
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $298.56 $298.56 $48.81 $249.75
$298.56 $298.56
$48.81 $249.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information..:
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be.
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 2/15/2011
Spokane
./"Valley.
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 720-2540
Fax: (509) 688-0037
permitcenter@ sookanevalley.orq
(Staff Use Only)
/(-33C
PERMIT NUMBER:
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
® NEW CONSTRUCTION ❑ ADDITION/REMODEL ❑ ACCESSORY BUILDING
❑ DECK ❑ OTHER
SITE ADDRESS: 13Cd2- a CA -T/1 -L -bo -AL/ . aPOi tv4L&Ey, /'W 97./6
ASSESSORS PARCEL NO.: LI-SiS,2. 1 I 37 LEGAL DESCRIPTION: Opp HFcb-('Qart1 2-13'41 1,4+133
BUILDING OWNER NAME: 5EbAt—D j ra_t_A ib
NAME: GERALD -LD Y 4b
ADDRESS: ( 300 2 E
CITY: SY'VIc ie- viA-Lua y
PHONE: 3&'7— ARO — 4 c<i? FAX: CELL:
STATE:
WA.
ZIP:t 2.i (p
CONTACT NAME: DEP1$lb -Skit') g-Sk (12-E
PHONE: 5t9 -241-27- I FAX: SZ)9—Z144--87-72 CELL: 5Ol—filly-3
CONTRACTOR NAME: ALL 57"4 -TES C'rp S Q (GT(g NI
MAILING ADDRESS:
na ii C5 - N Fofa1Pb) 57E, .1--
CITY: A�kezu sj EfF(E T STATE: , ry/ i/.4. ZIp: 9%C01
PHONE: ca'q-- 244 0 777 FAX:5th 2'`77 — -$ TTS CELL:
EXPIRES: Oh/ /Z012- CITY BUSINESS LICENSE NO.: I C/21)ZDJ J
CONTRACTOR LICENSE No.: A LL-513C9097)T
DESCRIBE THE SCOPE OF WRK IN DETAIL AND INDICATE/USE & PROPOSED USE:
tC9MOi/czoe� 075 0/9/0i71'/j4i.3 - �e Oilgaff`.'// t �.q., f//4t Y r
Foot_ �._.e r'itr/k /O'/3s.j/ inns • /Jan n s J . 14 X $`- one mann, .
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:
/�/
Dimensions:
'� %X o�Y
No. of Stories:
D/1z�
Total Habitabl
Space: A./ .0
Main Floor
�.
Upper Flomi62?
e�
Unfinished Basement SQ
Fm /A
Finished Bas>zment SQ
30: I�
Garag SQ FT:
S 76 °V:,
C
Deck/ o ered Patio SQ
FT / J
us
Impervious Surface
Area: is/5/
30% lopes on
Property: A
No. of Bedrooms: (/:/
Construction Type:p,, f -/,,,,
Heat Source: iy4
Sewer or Sepik: /1t4.
TOTAL COST OF PROJECT: $ /c9 pop
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit Is for construction or on a dwelling, the dwelling Is/will
be served by potable water. 2) Ownership of thls City of Spokane Valley permit Inure to the property owner. 3) The signatory Is the property
owner or has permission to represent the property owner In this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit Is no ermit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be requ d to submitted and subsequent approved before this application can be processed.
Signature
Date:O,//
Updated 1-11-11 Page 1 of 1
http://www.spokanevalley.org/filestorage/ 124/938/210/948/1496/building_permit_-_residential-11-11-11.doc
.1'
,
Spokane
valley
• For City Use Only •
PLUS Project.Number / I � 5
Project Address
'11703 E Sprague Ave Suite B-3 4 Spokane Vattey WA 99206
509.688.0036 4 Fax 509.688.0037 ♦ perm tcenter@spokSnevatley org'`
i`.
As part of our on-going commitmentdto. customer, service' during the review: es
procs of- your project;,
application; we are providing, you. with a TARGET' pATE Tor the, initial technical application,review: If for';
any reason :we cannot meet this date, .we will contact you with.a revisgd:target date::.
Your application review TARGTEDATE is L �t1,
`'
_The TARGET DATE. is the date:we estimate'your:projectapplication willhave
review.. it is not the;date for approval 'or;permit issuance.
initial technical
i
Tips'for a Smoother Project Application Review'
Submit complete, accurate plans and docurrients., •
1...rtrn time n!nut he required foh re suhniihals as project.application /CVtewerc'uo/k on-/intltiple,npphcattoiis;and at •
map be several days before they can look gt.vour new or revered lnformato1
Designate a specific contact person'to'communicate with the City.. "
H'/ti/e the pe/san designated as the applicant's contact• person mith the City cern he chdnged one: individual "watt the •
4k'- - f,
cxpertise for, dealing with reviewer comment -woidd•be,the-best choice fn. the entiee r criers pl Dews.
Call staff regarding the status of your project only after the target date shown at the top'of the page.
Although you should be contacted on or by the target date, please feel filee.to contactus"ifyou haren't Beard ji-oni(us •
by your -target dale.,Slgff'nay contact you before /he -target date if the initial; i yiewtls' complete- 6y folloWing this
procedure, you will SaVe time and allinv die reviewers compleielthe wOrrk. nio're'expe'di
1. Counter Complete. Your application has, been accepted as,countcr complete This "means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted :or `/ hate 'been,. -approved for i, deterred
submittal. This does not prevent;tcchnical staff from.requcsting tddrtonal;mformdtion is a result 'Cif their technical, revte v.''
2. Quality Check. The next step in the process is a quality check to Make sure that the application is reViett tbleand free,
frons substantive flaws that wouldpreventtechnical staff from. completing the'technical.re""sie\v once it is started. :When
this step is coniplctc, your application Will berouted to the'apptopriatestiff and -`remain' in their review.queue until' it
come's up for review. -
3. Technical Compliance, Once an application: is administratively complete It is routed to;technlcalstatf for compliance
review. Depending on the type of project, •technical staff may Incldde'Multiple 'reviewers.. You should be contacted: by
phone, fax, email; or mail by your TARCET'DATE once: the, initial technicalrcompli ince review incomplete
4. Permit Issuance, When the technical compliance. review of the application'is complete,;ihcluding any subsequent re .
submittals; each revicw'er will approve their section of the application and route it:to the Permit Center -When all sections
•
of the application are. received, a Permit Specialist will process the application and contact the; person'specilied; on your.
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by, ;
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
D.1 dvr wk f
47'y 5-7,cs7l ,.4,7/4i./41 10,4,
.023;It Abuse
rey// /s/5-4 •//37
G.`7.11r wa 4 f ey • o, Sire/
17
So e
5
! %p
PLANNING. DEPT. APPROVED
IDATE: 311 DI I
/ - 033S-
13
33513 co � l