Loading...
2009, 05-18 Permit App: 09001077 Patio RoofProject Number: 09001077 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: PATIO ROOF Contact: LOVELL, D R & E D Address: 13513 E CATALDO LN C - S - Z: SPOKANE VALLEY, WA 99216-1096 Setbacks: Front Left: Right: Rear: Phone: (509) 926-8926 Group Name: Site Information: Project Name: Date: 5/18/2009 Page 1 of 2 Plat Key: Name: Range District: Nort Parcel Number: 45151.2004 Block: SiteAddress: 13513 E CATALDO LN Location:: CSV Zoning: R-3 SF Res District Water District: 010 VERA Lot: Owner: Name: LOVELL, D R & ED Address: 13513 E CATALDO LN SPOKANE VALLEY, WA 99216-109 Hold: ❑ Area: .46 Acres Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: ,-....._ , Review Building Plan Review Released By: Originally Released: 5/18/2009 By: TMELBOU Landuse/Zoning/HE Conditions Released By: Originally Released: 4/28/2009 By: cjjanssen Permits: e . Operator: jmm Printed By: jmm Print Date: 5/18/2009 n Project Number: 09001077 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/18/2009 Page 2 of 2 Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Tvoe Notes Sq Ft Valuation Sq Ft Valuation COV DECK R-3 VB PATIO 432 $6,480.00 432 $6,480.00 COVER Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Notes: Totals: 432 $6,480.00 432 $6,480.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $139.25 $4.50 S55.70 $199.45 Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $199.45 $199.45 $55.70 $143.75 $199.45 $199.45 $55.70 $143.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 5/18/2009 Spokane #Valley° Community Development Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAXP(509)688 v037LE`i www.spokanevalley:org. NS °I SFp'� 01-1/4(Residential Construction Permit Application vcI ; SITE ADDRESS: PERMIT NUMBER-/ 0-7 7 PERMIT FEE: (New Construction Accessory Bldg U Deck /Y 5 /Y (a% i /� o ition/Remodel j Other: A 7/2 ASSESSORS PARCEL NO: T j/ S/ ..eOO i/ /cfiAq /d171/ or /1/ Y2 off 6 X - LEGAL DESCRIPTION: ®/ /.r /„ 7 /JCS c /-1 S t-% O 6 /1-1 .5:/'Q2.7 d2 t3utldmg'Owner Contractor Name: 7/Od2a/6/ L G vC // Address:z / 7 S/,? CU r4 /da City: //�//ey State:kyG Zip: Phon 92 (772 f Fax: Name: Address: City: State: Zip: Phone: Fax: x , tContact Person . Name: eer^ Jc vC L/ Phone: 9 2C- t f.2 Describe the scope of work in detail: Contractor Lic No: Exp Date: City Business Lic. No: agiGniftet Starr btuNrtevfRy 290 5-42 Cost of Project: $ c70 200a— Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2"u FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DEC COV ATIO SQ. FTG: 30% SLOPES ON PROPERTY: L/J 5(5PTS/c-, # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Pen -nit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 9 Check DATE: 9 Mastercard 9 VISA Expires: VIN#: Spokane jValley • For City Use•Only.'. PLUS Project.Number ‘)-:-/.P. .7 Project Address /35/3, F C2t-7a/c/c 11703 E Sprague Ave Suite 8-3.4 Spokane Valley,WA 99206 ; '509.688.0036 • Fax 509.688:0037. permitcenter®spokanevalley org. •' As part of our on-going commitment to customer service during `the .review process' of your.pi'oject. application, we are providing you with a TARGET DATE for the initial technical application-review';If for. any reason we cannot meet this date, we,w•ill contact you with a revised target date, Your application review TARGET DATE is a9 The TARGET DATE is" the date we estimate your, project application will. have had its initial technical review. Itis not the date for approval dr permit issuance. a Smoother Project Applica i Submit complete, accurate plans•and documents. . _ Earn-timeMay be required for re -submittals as project application reviewers -work on inultip'le'applications and, it _ may he several daysheforethey can look at your new or revised information. .^ Designate'a specific contact person to communicate with the City. • • While the' person designated as the:applicant's contact person with the City can be changed, one"individuaI. with the - expertise for dealing with teviewe/-'comments would be the best choice for the entire review process. :,, r i Call staff regarding the status of your project only after the target date shown at the:top of the page.:: '. Although you should be contacted on or by. the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before' the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously - • • Steps in the Permit Process • 1. Counter Complete. Yowl application has been accepted as counter complete: This 'means, all' of the required:' documents, as indicated on your Pre -Application Checklist have been submitted' or have been. approved 'for ,deferred submittal. This does not prevent technical stafffrom requesting additional information as a,resultof their technical.rev ew. 2. Quality Check. The next step in the process is a quality check to make surethat the application isreviewable and,free from substantive flaws that would prevent technical staff' from completing the 'technical review once itis started::When this step is complete, your application will be routed to the appropriate staff and',remain in; their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete it is routed to technical staff for.` compliance review. Depending on -the type 'of project, technical siaff may include multiple reviewers.: You should, be contacted by phone,'fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete:'. 4. Permit Issuance: When the technical compliance.reviewFof the applicationis complete;,includingany.subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center,' When`all.sections: of the application are received, a Permit Specialist will 'process the application and contact ,the 'person, specified on:your. • application for permit pick-up. Information regarding fees and pre -construction meetings (if required) Will be provided by the Pen -nit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE REV 9/07 Qi H 2 S, 7 Fy 6 g- 16 PA 710 7c/6 { N - s — L I s. 3 I,RLANNING DEPT. APPROVED mocwskrr Lal ,2e 126 l BY Cl -12b -c-,---- DATE. hk25(01 T E °) O N U E 0) N c c • ¢ O ch N co 7 coN N LL H 0 0 CD0 L • co N co V O • o a M • O • 0 LL J z m O it