Loading...
2008, 07-09 Permit App: 08002606 Patio Cover Replaced by 09001077*Wane~ jUalley Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Site Address: 13513 E CATALDO LN Parcel Number: 45151.2004 Zoning: R-3 Fire District: FD 01 Water District: VERA New project _Er Previous pre -app meeting El Plan revisions LJ Transmittal Date: Tuesday, July 08, 2008 Project Number: 08002606 Applicant: e-mail: Contact: e-mail: LOVELL, DR&ED 13513 E CATALDO LN SPOKANE, WA 99216-1096 (000) 000-0000 LOVELL, D R & E D 13513 E CATALDO LN SPOKANE, WA 99216-1096 (000) 000-0000 Contractor: OWNER ( ) - 0 Owner: LOVELL, D R & 13593 E CATAL SPOKANE, WA e-mail: Occupant: ail: Arch / Engin e-mail: D LN 216-1096 Project COVERED PATIO Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO SITE PLA PLAN N I Please send all plan review and project comments via e-mail to the highlighted individuals. Spokan�� jUalley Project Transmittal City of Spokane Valley Community Development Deparunent 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project fl Previous pre -app meeting El Plan revisions El Transmittal Date: Tuesday, July 08, 2008 Site Address: 13513 E CATALDO LN Parcel Number: 45151.2004 Zoning: R-3 Water District: VERA Fire District: FD 01 Project Number: 08002606 Applicant: LOVELL, D R & E D 13513 E CATALDO LN SPOKANE, WA 99216-1096 (000) 000-0000 e-mail: Contact: LOVELL, D R & E D 13513 E CATALDO LN SPOKANE, WA 99216-1096 (000) 000-0000 e-mail: Contractor: OWNER () - 0 Owner: LOVELL, D R & E D 13513 E CATALDO LN SPOKANE, WA 99216-1096 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: D D ECIEllMfE (n, JUL 0 0 Ka� UJ UULDNiki Project COVERED PATIO Description: Please send all plan review and project comments via e-mail to the highlighted individuals. Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION v 0q-1 &O 7° 07% SITE PLAN / ;L (V1 , g PLANS I 22i Please send all plan review and project comments via e-mail to the highlighted individuals. Spokane arioVa11ey° .i. -;,4143 «.^:f For City Use Only PLUS Project Number CYIjC,CYZGCC0 Project Address RS—) Z r 11703 E Sprague Ave Suite B-3 1' Spokane Valley WA 99206 509.688.0036 • Fax: 509.688:0037 • perniitcenter®spokanevalley.org As part of our en -going commitment to customer service during, the review- process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date: Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application ;W.11 have had: itsLinitial.technical review. It is not the date for approval. or permit issuance. Tips for a Smoother Project Application Review i Submit complete, accurate plans and documents. Erna lime may be required for re -submittals as project application reviewers work on multiple_applicalions and it. nay be several days before they can look at your new or revised information. . Designate a specific contact person to,communicate with the City.• - .. While the person designated as the applicant's contact person with the Citi can be changed, -one individual with the expertise for dealing with reviewer comments would be the best choice for the_entire review process. - i Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date. please feel free io contact us flyby haven't heard from us by your target date. Staff may contact you hefore the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process. 1. Counter Complete. Your application has been accepted. as• counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or •have been approved fordeferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the.application.is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review. once it is started. When this step is complete, your application. will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed'to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should -be contacted by phone, fax, email, or mail by your TARGETDATE.onee the initial technical compliance review is complete. ' 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person .specified on.your application for permit pick-up. Information regarding fees and pre -construction meetings (if required)-will.be provided by the Permit Specialist at that time. - - WHITE -APPLICANT PINK- BUILDING FILE REV 9/07 03/25/2004 THU 17:22 FAX 509 926 1519 TRANSNATION (J021/022 Parcel # Owner CoOwner Sitc Mail TxpyrNam TxpyrAdd Xfered Price Pr Xfer Pr Price Land Use Legal TRANSNATION TITLE INSURANCE COMPANY Spokane County Property Profile : 45151 2004 :LoveUDR&ED Bldg # : of 1 : 13513 E Cataldo Ln Spokane 99216 13513 E Cataldo Ln Spokane Wa 99216 : Lovell Donald R & Eileen : 13513 E Cataldo Ave Spokane Wa 99216 : 04/05/1994 Doc # : $24,000 Qualified Deed : Warranty • PrDoc# : 11 Res,Single Family Residence : yERA PTN OF NI/2 OF S1/2 OF BLK 103 DESC AS LTD OF SP92-782 OF Nghbrhd : Opor2 Census : Tract : 118.00 Bedrooms :3 TotlBaths :2.00 HalfBaths : FullBaths :2 Air Cond : Heating : Forced HeatSourc ; : Gas Fireplace Rng/Oven . TrashComp : Disltwstir . GarbgDisp : Intercom . Vacuum Pool • Block : 2 Living SF Bldg SF Bsmt BsmtFin % Stories Attic Quality Condition Bldg Matl Style RoofCover RoofShape Extior Wall Interior Foundation : 1,312 : 1,312 : 98 :No : Avg Excel . Compo Shingle : Gable : Other : Drywall : Concrete TRANSFER INFORMATION Total : $129,600 - Land : $22.000 Struct :$107,600 %Imprvd :83. Excise# :5451 Exempt Type TaxDist : Spokane Valley 2003 Tax : $2.011.30 IrrTax SWTax TaxRate :.01545751307 School : CENTRAT, VALLEY S: 15 T: 25N R: 44E Q: NE Phone Owner 509-926-8926 Tenant Lot Acres Lot SF Lot Dimens Garage Garage SF Deck Deck SF Patio Patio SF Porch Porch SF Year Built FloorCover Misclmpvl Units :.46 : 20,038 : 142 X 140 : Attached :609 : 1994 : CrpAvinyl OWNERS NAMES DATE DOC# PRICE DEED LOAN TYPE This information is deemed reliable. but is not guaranteed Spokane _Valley- Community Development Residential Construction n New Construction Permit Application X.-Addition/Remodel Other: Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036' FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER: PERMIT FEE: Accessory Bldg Deck SITE ADDRESS: ) /5 (G7-4(7•4 ASSESSORS PARCEL NO: 4 5- 157. Z OC,L/ LEGAL DESCRIPTION: I/4 /M f7/U °t /1'' 4/4 ti • i•a J- _ n - — w 7^ w Building: Owner: a comp DIMENSI S: /ii���� Name: 1,7lr,a v ,c,v ! / Name: g fi Address. , / 3 S /7 l'. r,/„,,,,. 6.,.• HEIGHT TO PEAK: 4F" - /0 . � city:4://,..4,,,c State: syr // t,/ Zip: °19 .2i6 /%/'`ie4c Phone: Fax: f 26, 124, ..j.,...7 6, City: Contact Person Name: /7 on GG' f Phone: S' 6 Describe the scope of work in detail: Contractor: a comp DIMENSI S: /ii���� • # OF STORIES: Name: g fi TOTAL HABITABLE SPACE: HEIGHT TO PEAK: 4F" - /0 . � Address: 2ND FLOOR SQ. FTG: %� UNFIN BASEMENT SQ. FTG: I/A City: State: Zip: Phone: Fax: # OF BEDROOMS: /OiX Contractor Lic No: Exp Date: SEWER OR'SEPTI - /k/,( '--- City Business Lic. No: Cost of Project: $ 2 aa Patio, Rai Proposed Use: MUST b lete• (write NIA if not applicable)********************** - ne luuuvving The__ a comp DIMENSI S: /ii���� • # OF STORIES: TOTAL HABITABLE SPACE: HEIGHT TO PEAK: 4F" - /0 . � MAIN FLOOR TO SQ. � /, FTG:FA(' /7 2ND FLOOR SQ. FTG: %� UNFIN BASEMENT SQ. FTG: I/A IMPERVIOUS SURFACE AREA: /1//i_`AS FINISHED ENT FTG: GAYG/E Q. FTG: /v DECK/COV. PATIO SQ. FTG: 4/JZ 30% SLOPES ON /),,,,i4SQ. PROPERTY: 4. # OF BEDROOMS: /OiX CONSTRUCTION TYPE: kt//04/ -HEATS URC : /i''A SEWER OR'SEPTI - /k/,( '--- The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: �/ � DATE:7-- ,p--___ o� Method of Payment: ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED 7/15/07 Building America f/ 74 ?z'f/e 7 PLANNING DEPT. APPROVED BY' DATE: T : moi° ►• 6 7h 7610 N. Frbya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com WA#BUILDAI011M7 OR #136329 770,4 Building Americo the. /?mss% G4 %'6c e o� r4 r/de, 7-6 /.6" 7610 N. Freya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com WA #BUILDAI011 M7 OR #136329 7r2,4 Building America " 1j Xb y6 7610 N. Freya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com WA #BUILDA1011 M7 OR #136329 /2' 16" . �U 121 /2' I " 1j Xb y6 7610 N. Freya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com WA #BUILDA1011 M7 OR #136329 '-rail Building America /Z k6' 2'1) yx IS- %; • 2 r:/. 7610 N. Freya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com OR #136329 WA #BUILDAI011 M7 Building Americo 12. 7610 N. Freya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com WA #BUILDAI011 M7 OR #136329 Building America • • Tot 7610 N. Freya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com WA #BUILDA1011 M7 OR #136329 Building America r 2'' 5AS1/2cc% 36' 3 l i 1 r -t L a •71— L / 2" I, l H uhor 7/j haus€tv/r4 Jy w�,oJ J(rew 1.14 To i¢c T.,osi a/ //e, a iia - 6,. L i i 2 2: Zeikel ¢ • rani Yfr,;ee yn�(,l+? `�'�4/" 7610 N. Freya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com WA #BUILDAI011 M7 OR #136329 7 x6 6 30 r 7 E °) o • O E m o c • cc a_ 0 5 N 0 N co O0 co X tC co 10 N co Q) O N N m m a 0 C t9 r oa 2 • 0 as 0 0 Z en m 0 x a ^. 3