2008, 07-09 Permit App: 08002606 Patio Cover Replaced by 09001077*Wane~
jUalley
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
Site Address: 13513 E CATALDO LN
Parcel Number: 45151.2004
Zoning: R-3
Fire District: FD 01
Water District: VERA
New project _Er
Previous pre -app meeting El
Plan revisions LJ
Transmittal Date:
Tuesday, July 08, 2008
Project Number: 08002606
Applicant:
e-mail:
Contact:
e-mail:
LOVELL, DR&ED
13513 E CATALDO LN
SPOKANE, WA 99216-1096
(000) 000-0000
LOVELL, D R & E D
13513 E CATALDO LN
SPOKANE, WA 99216-1096
(000) 000-0000
Contractor: OWNER
( ) - 0
Owner: LOVELL, D R &
13593 E CATAL
SPOKANE, WA
e-mail:
Occupant:
ail:
Arch / Engin
e-mail:
D
LN
216-1096
Project COVERED PATIO
Description:
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
SITE PLA
PLAN
N
I
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Spokan��
jUalley
Project
Transmittal
City of Spokane Valley
Community Development
Deparunent
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project fl
Previous pre -app meeting El
Plan revisions El
Transmittal Date:
Tuesday, July 08, 2008
Site Address: 13513 E CATALDO LN
Parcel Number: 45151.2004
Zoning: R-3 Water District: VERA
Fire District: FD 01
Project Number: 08002606
Applicant: LOVELL, D R & E D
13513 E CATALDO LN
SPOKANE, WA 99216-1096
(000) 000-0000
e-mail:
Contact: LOVELL, D R & E D
13513 E CATALDO LN
SPOKANE, WA 99216-1096
(000) 000-0000
e-mail:
Contractor: OWNER
() - 0
Owner: LOVELL, D R & E D
13513 E CATALDO LN
SPOKANE, WA 99216-1096
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
D
D
ECIEllMfE (n,
JUL 0 0 Ka� UJ
UULDNiki
Project COVERED PATIO
Description:
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATION
v
0q-1
&O 7°
07%
SITE PLAN
/
;L
(V1
, g
PLANS
I
22i
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Spokane
arioVa11ey°
.i. -;,4143 «.^:f
For City Use Only
PLUS Project Number CYIjC,CYZGCC0
Project Address
RS—) Z r
11703 E Sprague Ave Suite B-3 1' Spokane Valley WA 99206
509.688.0036 • Fax: 509.688:0037 • perniitcenter®spokanevalley.org
As part of our en -going commitment to customer service during, the review- process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date:
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application ;W.11 have had: itsLinitial.technical
review. It is not the date for approval. or permit issuance.
Tips for a Smoother Project Application Review
i Submit complete, accurate plans and documents.
Erna lime may be required for re -submittals as project application reviewers work on multiple_applicalions and it.
nay be several days before they can look at your new or revised information. .
Designate a specific contact person to,communicate with the City.•
- ..
While the person designated as the applicant's contact person with the Citi can be changed, -one individual with the
expertise for dealing with reviewer comments would be the best choice for the_entire review process. -
i Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date. please feel free io contact us flyby haven't heard from us
by your target date. Staff may contact you hefore the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process.
1. Counter Complete. Your application has been accepted. as• counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or •have been approved fordeferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the.application.is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review. once it is started. When
this step is complete, your application. will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed'to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should -be contacted by
phone, fax, email, or mail by your TARGETDATE.onee the initial technical compliance review is complete. '
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person .specified on.your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required)-will.be provided by
the Permit Specialist at that time. - -
WHITE -APPLICANT PINK- BUILDING FILE REV 9/07
03/25/2004 THU 17:22 FAX 509 926 1519 TRANSNATION
(J021/022
Parcel #
Owner
CoOwner
Sitc
Mail
TxpyrNam
TxpyrAdd
Xfered
Price
Pr Xfer
Pr Price
Land Use
Legal
TRANSNATION TITLE INSURANCE COMPANY
Spokane County Property Profile
: 45151 2004
:LoveUDR&ED
Bldg # : of 1
: 13513 E Cataldo Ln Spokane 99216
13513 E Cataldo Ln Spokane Wa 99216
: Lovell Donald R & Eileen
: 13513 E Cataldo Ave Spokane Wa 99216
: 04/05/1994 Doc #
: $24,000 Qualified Deed : Warranty
• PrDoc#
: 11 Res,Single Family Residence
: yERA PTN OF NI/2 OF S1/2 OF BLK 103
DESC AS LTD OF SP92-782 OF
Nghbrhd : Opor2
Census : Tract : 118.00
Bedrooms :3
TotlBaths :2.00
HalfBaths :
FullBaths :2
Air Cond :
Heating : Forced
HeatSourc ; : Gas
Fireplace
Rng/Oven .
TrashComp :
Disltwstir .
GarbgDisp :
Intercom .
Vacuum
Pool
•
Block : 2
Living SF
Bldg SF
Bsmt
BsmtFin %
Stories
Attic
Quality
Condition
Bldg Matl
Style
RoofCover
RoofShape
Extior Wall
Interior
Foundation
: 1,312
: 1,312
: 98
:No
: Avg
Excel
. Compo Shingle
: Gable
: Other
: Drywall
: Concrete
TRANSFER INFORMATION
Total : $129,600 -
Land : $22.000
Struct :$107,600
%Imprvd :83.
Excise# :5451
Exempt
Type
TaxDist : Spokane Valley
2003 Tax : $2.011.30
IrrTax
SWTax
TaxRate :.01545751307
School : CENTRAT, VALLEY
S: 15 T: 25N R: 44E Q: NE
Phone
Owner 509-926-8926
Tenant
Lot Acres
Lot SF
Lot Dimens
Garage
Garage SF
Deck
Deck SF
Patio
Patio SF
Porch
Porch SF
Year Built
FloorCover
Misclmpvl
Units
:.46
: 20,038
: 142 X 140
: Attached
:609
: 1994
: CrpAvinyl
OWNERS NAMES DATE DOC#
PRICE
DEED LOAN TYPE
This information is deemed reliable. but is not guaranteed
Spokane
_Valley-
Community Development
Residential Construction n New Construction
Permit Application X.-Addition/Remodel
Other:
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036' FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER:
PERMIT FEE:
Accessory Bldg
Deck
SITE ADDRESS:
) /5 (G7-4(7•4
ASSESSORS PARCEL NO: 4 5- 157. Z OC,L/ LEGAL DESCRIPTION: I/4 /M f7/U °t /1'' 4/4
ti • i•a J- _ n - — w 7^ w
Building: Owner:
a comp
DIMENSI S:
/ii����
Name: 1,7lr,a v ,c,v ! /
Name: g fi
Address. , / 3 S /7 l'. r,/„,,,,. 6.,.•
HEIGHT TO PEAK:
4F" - /0 . �
city:4://,..4,,,c State: syr
// t,/
Zip: °19 .2i6
/%/'`ie4c
Phone: Fax:
f 26,
124, ..j.,...7 6,
City:
Contact Person
Name: /7 on GG' f
Phone: S' 6
Describe the scope of work in detail:
Contractor:
a comp
DIMENSI S:
/ii����
• # OF STORIES:
Name: g fi
TOTAL HABITABLE SPACE:
HEIGHT TO PEAK:
4F" - /0 . �
Address:
2ND FLOOR SQ. FTG:
%�
UNFIN BASEMENT SQ. FTG:
I/A
City:
State:
Zip:
Phone:
Fax:
# OF BEDROOMS:
/OiX
Contractor Lic No:
Exp Date:
SEWER OR'SEPTI
-
/k/,( '---
City Business Lic. No:
Cost of Project: $ 2 aa
Patio, Rai
Proposed Use:
MUST b lete• (write NIA if not applicable)**********************
- ne luuuvving
The__
a comp
DIMENSI S:
/ii����
• # OF STORIES:
TOTAL HABITABLE SPACE:
HEIGHT TO PEAK:
4F" - /0 . �
MAIN FLOOR TO SQ.
� /,
FTG:FA('
/7
2ND FLOOR SQ. FTG:
%�
UNFIN BASEMENT SQ. FTG:
I/A
IMPERVIOUS SURFACE
AREA: /1//i_`AS
FINISHED ENT
FTG:
GAYG/E Q. FTG:
/v
DECK/COV. PATIO SQ. FTG:
4/JZ
30% SLOPES ON /),,,,i4SQ.
PROPERTY: 4.
# OF BEDROOMS:
/OiX
CONSTRUCTION TYPE:
kt//04/
-HEATS URC :
/i''A
SEWER OR'SEPTI
-
/k/,( '---
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE: �/ � DATE:7-- ,p--___ o�
Method of Payment:
❑ Cash ❑ Check ❑ Mastercard ❑ VISA
Bankcard #: Expires: VIN#:
Authorized Signature:
REVISED 7/15/07
Building America
f/ 74
?z'f/e 7
PLANNING DEPT. APPROVED
BY'
DATE: T : moi°
►•
6
7h
7610 N. Frbya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com
WA#BUILDAI011M7 OR #136329
770,4
Building Americo
the. /?mss% G4 %'6c
e o� r4 r/de, 7-6 /.6"
7610 N. Freya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com
WA #BUILDAI011 M7 OR #136329
7r2,4
Building America
" 1j
Xb
y6
7610 N. Freya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com
WA #BUILDA1011 M7 OR #136329
/2'
16"
.
�U
121
/2'
I
" 1j
Xb
y6
7610 N. Freya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com
WA #BUILDA1011 M7 OR #136329
'-rail
Building America
/Z
k6'
2'1) yx IS- %;
• 2 r:/.
7610 N. Freya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com
OR #136329
WA #BUILDAI011 M7
Building Americo
12.
7610 N. Freya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com
WA #BUILDAI011 M7 OR #136329
Building America
•
•
Tot
7610 N. Freya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com
WA #BUILDA1011 M7 OR #136329
Building America
r 2''
5AS1/2cc%
36' 3
l
i 1 r -t
L a
•71—
L
/ 2"
I, l H
uhor 7/j haus€tv/r4 Jy w�,oJ J(rew
1.14 To i¢c T.,osi a/ //e, a iia
- 6,.
L
i i 2
2: Zeikel
¢ •
rani Yfr,;ee yn�(,l+? `�'�4/"
7610 N. Freya • Spokane, WA 99217 • (509) 462-0535 • Fax (509) 462-0540 • Toll Free (877) 462-0535 • www.buildingam.com
WA #BUILDAI011 M7 OR #136329
7
x6
6
30
r 7
E °)
o
• O
E m
o
c • cc
a_ 0
5
N
0
N
co
O0
co
X
tC
co
10
N
co
Q)
O
N
N
m
m
a
0
C
t9
r
oa 2
• 0
as
0 0
Z en
m
0 x
a
^. 3