2012, 08-30 Permit: SW-12002091 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002091
Permit Issued Date:
08/30/2012
Expiration Date: ' •
Project Description: SEWER CONNECTION
Project Name: VERADALE HEIGHTS PH III
Permit Type: SEWER
Primary Contact: NORM'S EXCAVATING INC
Applicant: NORM'S EXCAVATING INC
Address: PO BOX 574
VERADALE, WA 99037
Phone: 509-928-0580
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area:
Zoning:
14315 E CATALDO AVE
45142.0324
5th ADDITION TO
VERADALE HEIGHTS
VERADALE HEIGHTS 5TH ADDITION & 14-25-44
LT 6 BLK 3 TOGETHER WITH PTN S1/2 OF N1/2
OF W1/2 OF W1/2 OF SE 1 /4 OF N W 1 /4 DAF: BEG
AT NW COR OF LT 6 BLK 5 OF SD ADD TH N TO
N LN SD S1/2 TH E ALG N LN TO NE
Water District:
Consolidated Irrigation
District #19
Owner:
Address:
Phone:
Email:
HUGHES, NATALIE
14315 E CATALDO AVE
SPOKANE VALLEY, WA 99216
Fire District: Spokane Valley Fire
Land Area: 39949 Square Feet
CONTRACTOR INFORMATION'
General Contractor
NORMSEI972BM
NORM'S EXCAVATING INC
PO BOX 574
VERADALE, WA 99037
509-928-0580
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Date Printed: 08/30/2012 07:45:52
Printed by: IIS APPPOOLWSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT'
Application Number: SW -12002091
Inside Public Transit Benefit Area
Permit Issued Date:
08/30/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 08/30/2012 07:45:52
Printed by: IIS APPPOOLASP.NET v4.0