Loading...
2010, 10-29 Permit App: 10003583 DeckProject Number: 10003583 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 16 x 12 DECK Contact: BOYD, STEVEN R & SHELLEY A Address: 14613 E CATALDO AVE C - S - Z: SPOKNE VALLEY, WA 99216 Setbacks: Front Left: Right: Rear: Phone: (509) 327-4256 Group Name: Site Information: Project Name: Date: 10/29/2010 Page 1 of 2 Plat Key: 002762 Name: VERADALE HEIGHTS District: East Parcel Number: 45142.0102 Block: SiteAddress: 14613 E CATALDO AVE Location:: CSV Lot: Owner: Name: BOYD, STEVEN R & SHELLEY A Address: 14613 E CATALDO AVE SPOKNE VALLEY, WA 99216 Zoning: R-3 SF Res District Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: 12,095 Sq Ft Width: 93 Depth: 130 Right Of Way (ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 10/29/2010 By: TMELBOU Landuse/Zoning/HE Conditions Released By: Originally Released: 10/28/2010 By: kkendall Permits: Operator: JD Printed By: .11) Print Date: 10/29/2010 Project Number: 10003583 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 10/29/2010 Page 2 of 2 Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sci Ft Valuation DECK OPEN R-3 VB 192 $2,880.00 192 $2,880.00 Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 192 $2,880.00 192 $2,880.00 Units Unit Desc Fee Amount 1 SELECT $83.25 1 SELECT $4.50 1 SELECT $33.30 Permit Total Fees: $121.05 Notes• Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $121.05 $121.05 $33.30 $87.75 $121.05 $121.05 $33.30 $87.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 10/29/2010 Permit Center Sclrr or 11703 E Sprague Ave, Suite B-3 pokane Spokane Valley, WA 99206 Valley° (509)688-0036 FAX: (509)688-0037 v J www.spokanevalley.org Community Development Residential Construction Permit Application PERMIT NUMBER:/0. k 3 PERMIT FEE: New Construction J Accessory Bldg Addition/Remodel Deck Other: SITE ADDRESS: 11-4 1 3 £ , catald o Ave , ASSESSORS PARCEL NO: LI 5 1'-1 L. 01 0 2 LEGAL DESCRIPTION: V a RAPALe HTS STN LZ ea Building Owner: Contractor: r k2\y N ea;/ 6 u' LDt:. R... : ' " � ' • ' Name: 5TGVEN $r 3r4e1.4.ey eoYD Name: Address 1440I'4 E- C-ATA-Lpc A,,E Address: - City: S foKAr4E VAL1.et State: W A Zip: g9ZI io City: State: Zip: - Phone: (509) g q1 ,..ici s Fax: Phone: - Fax: DECK/COV. PATIO SQ. FTG: Contractor.Lic No: Exp Date: .Contact Person # OF BEDROOMS: N/A City Business Lic. No: HEAT SOUR E: WA SEWER OR SEPTIC? —HI— Name: 5 TBf l 50 (0 Phone: (Soq) Z S I • 3 SI 2 - Describe the scope of work in detail: Cost of Project: $ 3 6 9 0, 3 7 REPL-ACE axi�lCt 8' x 17-1 Deck wi'nf Ili' X 12' Deck - Proposed Use: **************The followine MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: IJ /A DIMENSIONS: • N/A # OF STORIES: NI /4. TOTAL HABITABLE SPACE: N /A MAIN FLOOR TO SQ. FTG: Ki /A 2"D FLOOR SQ. FTG: N/4 UNFIN BASEMENT SQ. FTG: N AAREA: IMPERVIOUS SURFACE NA FINISHED BASEMENT SQ. FTG: 1.4/4 GARAGE SQ. FTG: N/A DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: 4/PP 011-1. q 2- sial -T7 # OF BEDROOMS: N/A CONSTRUCTION TYPE: w o op HEAT SOUR E: WA SEWER OR SEPTIC? —HI— The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or addit al information may be required to be submitted, and subsequently approved before this application can be process SIGNATURE: �_ DATE: I O/2 (3/Zo 1 0 Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2)15107 ❑ Check ❑ Mastercard Expires: ❑ VISA VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines ❑ Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: O Foundation Plan (crawlspace;.basement or slab on grade): o Footing sizes and locations ❑ Supporting wood cripple walls or beams o Perimeter concrete foundation wall sizes o Thickened concrete pads supporting o Crawlspace ventilation . beams or girder trusses . O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing ❑ Window and door location and sizes ❑ Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations O Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: - ❑ Engineered truss direction and spacing o Rafter and over frame direction, size and•spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall ❑ Height/ top plate/ stud size and spacing/ sole plate ❑ Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width ❑ Earth to wood separation distance Footing ❑ Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details 0 Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing 0 Stairway tread rise & run and nosing o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations ❑ Fire Wall construction ❑ Ridge, eave and valley lines ❑ Beath and girder size and location • o Truss or rafter size, spacing & connection ❑ Attic insulation/ air space baffle/ ventilation O Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth ❑ Horizontal & vertical reinforcement if any o Reinforcement if any ❑ Active system with 6 mil vapor barrier O Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Spokane Valley®..: • For City Use Only, PLUS Project Number nnk52-Mc� Project Address • I L -{Co I: , V: CcA)-citidC 11703 ESprague Ave Suite.B 3 + Spokane Valley WA 99206. • 509.688,0036 • Fax 509.688.0037.1* permitcenter@spokanevalteyorg• As part of our on-going commitment- to customer -service' durmg the. review process'ofi your projeef application, we are providing you:with a TARGET DATE for the initial technical:: application; review<'If-for 'any reason we cannot meet this date, we will contact'you with'a revised::target date i Rion review TARGET, DATE is 1I ' '�' 7 11: '1 - The TARGET DATE „is the date.;we estimate' your project application' will have -had its initial'technieal review. It is not the date for approval or permit issuance lips for a Smoother Project Application Review:; ➢ '.Submit complete, iceuratc plans atid.documents: ;t. Extra tithe MOT he regi'iired /o; ie -submittals as pioject:apphcation /£Vieweli' work an'inteltgile applications• and i 171(11, be several days before thev can look at voter n°ew or revised infoi matzoh.`, - - i .Designate a specific contact person to communicatewith the City: • While the person designated as the applicant's contact.peison with the Citt1'can be„.changed'' (pieiiidividual Willi the expertise jar dealing with tvviewer comments would-be the hest choice /oi the encu c i evieiv pl ocesS. , AA e' • Call staff regarding thestatus of your project only after thetarget date shown.atthe top of the page., ..; • Although you sliould,be conmcted00 or by the target:date, please feel free to contact ``us 1f you haven't heard Ji-om its by your target date. Staff /nql+ contact you before the:target date if the initial 1eviur is.;coinplete. By following this procedure, you gill sere time and alloWthe renewers to complete the work 1176.1•C erpeditiousli Steps in the Permit Process • I. Counter Complete, Your application has 'been accepted as counter complete This' means` all or thc';rcquired documents, as indicated on your Pie -Application Checklist have been -submitted or .have been approved for ;deferred. submittal. This does not prevent technical staff from requesting additionalinformation is a result their technical review:`• 2. Quality Check. The next step in the 'process is a quality cheek' td njake sure thafthe application is"reviewable- and' free from substantive flaws that wouId prevent technical staff:fromicompleting the technicdl'review onceiit:.is'started" When this step is complete, your application will' be-routed'to the 'appropriate stilt and. remain'in:their review:queue until it, cones up thrreview. • 3. Technical Compliance, Once an application' is administratively complete, it is.routedto technical staffafot:compliance review. Depending on the type of project, technical staff may include multiple reviewers` You should'becontacted by phone, fax„entail, Or mail by your TARGET' DATE once the initial.technic il'compliancc review, is:complete 4. Permit Issuance,, When the technical compliance review'of the application'is complete including any subsequent: re-. submittals, each revicwcr wiIl approve their section,of the application -and route it to the Permit,Centcr: When 'all sections of the application tire received; a Permit Specialist will: process the application;an'd contact' the person'specitied on your application fbi. permit pick-up. lnformation'regarding fees:and pre -construction meetings (i f requrrcd)<wi11 Ibe provided by , the Permit Specialist at that time. • WHITE -APPLICANT PINK'- BUILDING FILE REV 9/07 Drive way E- E. Cataldo Ave. eo Boyd residence 14613 E. Cataldo Ave Spok. Val. Wa. 99216 Deck construction Scope of work; demo old deck and replace with new to`a► o' HOUSE zal I 61 z