2008, 04-21 Permit App: 08001374 Pole BuildingProject Number: 08001374 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 30 X 36 POLE BLDG Contact: SPOKANE STRUCTURES
Address: 510 N MULLAN ST
C - S - Z: SPOKANE, WA 99206
Setbacks: Front Left: Right: Rear: Phone: (509) 927-0655
Group Name:
Site Information: Project Name:
Date: 4/21/2008 Page 1 of 2
Plat Key: Name: VERADALE PARK ADD District: Nort
Parcel Number: 45141.0413
Block: Lot:
SiteAddress: 15301 E CATALDO AVE
Location:: CSV
Owner: Name: PETERSON, KEVIN
Address: 15301 E CATALDO AVE
SPOKANE VALLEY, WA 99037
Zoning: UR -7 Urban Residential -7
Water District: . Hold: ❑
Area: 10,800 Sq Ft Width: 0 Depth: 0 " Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 4/14/2008 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By: `
Originally Released: 4/18/2008 By: tschmidt
Permits•
Operator: JD Printed By: JD
Print Date: 4/21/2008
Project Number: 08001374
Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/21/2008 Page 2 of 2
Contractor: SPOKANE STRUCTURES INC
Address: 510 N MULLAN RD
SPOKANE, WA 99206
Building Height 16
Building. Permit
Firm: SPOKANE STRUCTURES INC
Phone: (509) 927-0655
Building Characteristics
Description Grp Type Notes
POLE BDLG U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBC SURCHARGE
This Application: Total Project:
Sq Ft Valuation Sq Ft Valuation
1,080 $20,520.00 1,080 $20,520.00
Totals: 1,080 $20,520.00 1,080 $20,520.00
Units Unit Desc Fee Amount
1 SELECT $335.25
1 SELECT $83.81
1 SELECT $4.50
Permit Total Fees:
$423.56
Notes:
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$423.56 $423.56
$423.56 $423.56
$0.00 $423.56
$0.00 $423.56
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 4/21/2008
boOF
kane
40,0 �
Valley.
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
tvww. spokanevallev. orc'
PERMIT N NIBER:
PERMIT FEE:
New Construction
ff Addition/Remodel
PJ Other:
❑ Accessory Bldg
❑ Deck
sITEADDRESS: /5301 E. Ca7ALDo� 5poC4wc (fAILSy h -'M- `yon
''
ASSESSORS PARCEL NO: Y 5/ 411 . O `f 13 LEGAL DESCRIPTION: I
Building Owner:
Name: /CE u ?As. re/Z sow
Address" 5 30, E. CATA L Do
Contractor:
Name:
CPOK:ANE ETiUCTUREB,
Address:
510 N. MULLAN ROAD
INC .
Ciry✓eny4X/Gr U/4LLt y State/a4 Zipgi^fan
Phone: /7 S1 _ S r 5 e Fax:
Contact Person
Name:MA-AJC VCLic/ t9t-71y Cave/
Phone: 509_ 4.7- O(o Sr
Describe the scope of work in detail:
City: State: Zip:
Pr]KANF VAT,TFY WA 9Q? 0,
Phone: Fax:
500-427-0655 509-977-406,7
Contractor Lic No: Exp Date:
1/1/03
GP YACI12C0C
City Business Lic. No:
Cost of Project: $ /-, 7,0
Pos' C ste►3 u t LD/N4
Proposed Use: G A-24 C -E
************
The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
/6'
DIMENSIONS:
3o K34.* /I
# OF STORIES:
/
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:/08D
2"" FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
NC4RAGE SQ. FTG:
OK
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done •
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
l/L„
Method of Payment: (J
❑ Cash
Bankcard #:
Authorized Signature:
PEASED 7l1 ST,
❑ Check
DATE: gt1701
❑ Mastercard 0 VISA
Expires: VIN#:
Valley
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project
Previous pre -app meeting El
Plan revisions
Transmittal Date:
Monday, April 14, 2008
Site Address: 15301 E CATALDO AVE
Parcel Number: 45141.0413
Zoning: UR -7
Fire District:
Water District:
Project Number: 08001374
Applicant:
e-mail:
Contact:
e-mail:
Contractor:
SPOKANE STRUCTURES
510 N MULLAN ST
SPOKANE, WA 99206
(509) 927-0655
SPOKANE STRUCTURES
510 N MULLAN ST
SPOKANE, WA 99206
(509) 927-0655
SPOKANE STRUCTURES INC
510 N MULLAN RD
SPOKANE, WA 99206
(509) 927-0655
Owner: PETERSON, KEVIN
15301 E CATALDO AVE
SPOKANE VALLEY, WA 99037
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
ptECELIVED
Project 30 X 36 POLE BLDG
Description:
Building
Landuse
Engineer
Utilities Health
Fire Dist
Assessor
APPLICATION
SITE PLAN
PLANS
Please send all plan review and project comments via e-mail to the
highlighted individuals.
tit W:::.l :,:i �+*'Ir: tr.7 i r'`✓,. •0 ;�, .
"T"okane
Dalley°
..♦ .T. Ae.Y` r.�ri i; ue-c. ti.1..Pr.-�I� �• -
For City Use Only
PLUS Project Number tMTi (-2j7'4
Project Address
(CIL H D 'D
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 1 permitcenter@spokanevaltey.org
As part of our on-going commitment to customer service during the review process of your' project
application, we are providing you with a TARGET DATE for the initial technical application 'review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is i/ n /V�
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work' on multiple applications and it
may he several days before they can look at your new or revised information.
i Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City cnn be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process;•
i Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us.
by your target dale. Stat' may contact you before the large/ date if the initial review is complete. By following this
procedure. you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
I. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and, remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE - APPLICANT PINK -BUILDING FILE
REV 9/07
PLANNING DEPT. APPROVED
BY:
DATE
5-
i
• E%,057"/A16.-
hov5
LA`t-aiDo
k''/"\ eft/50 ✓'
15-3o) E. C nr4A 1b c
5?o t ijt r (4)4
r6 -r(5_-.1( • 09/ 3