Loading...
2012, 11-29 Permit: SW-12002581 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002581 Permit Issued Date: 11/29/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION SOUTH GREENACRES SEWER Primary Contact Applicant: Address: Phone: Email: H & S CONSTRUCTION 11 & S CONSTRUCTION 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 509-926-8964 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 17213 E CATALDO 55182.2443 BACON'S ADDITION TO GREENACRES BACONS ADD TO GREENACRES E1/2 OF E1/2 OF W1/2 OF BLK 23 LYG SLY OF RR ROW & W1/2 OF E1/2 OF W1/2 OF BLK 23 LYG SLY OF RR ROW EXC S246FT OF E1/2 OF W1/2 Water District: Consolidated Irrigation District #19 Owner: Address: Phone: Email: CANTOR, VASILE PO BOX 562 SPOKANE, WA 99016 Fire District: Spokane Valley Fire Land Area: 26517 Square Feet CONTRACTOR INFORMATION: General Contractor HSCON**123KF H & S CONSTRUCTION 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 509-926-8964 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area Date Printed: 11/29/2012 10:25:04 Printed by: 115 APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12002581 11/29/2012 Expiration Date: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 11/29/2012 10:25:04 Printed by: 115 APPPOOL\SmarlGovProdApp