Loading...
HomeMy WebLinkAbout2011, 09 Air Leakage Test Results09/28/2011 08:30 5095330329 COMPLETE HEATING PAGE 02 S 1l p WASHINGTON STATE UNIVEFLSITY. EXTENSION ENERGY PROGRAM U r Permit #: Residential Buillding Air Leakage Test (Blower Door Test) Results House address or lot number: City: _Xr\1Z_ Zip: GM DI 0 Cond. Floor Area (ft2): Source (circle one): res Estimated Measured Results shall be reported as Specific Leakage Area (SLA) and shall be calculated as follows: SLA (CFM50 x 0.055)/(CFA x 144) Where; CFM50 = Blower door fan flow at 50 Pascal pressuredlfference CFA = Conditioned Floor Area of the housing unit Blower Door Test Result:SLA )-..c> CFM@50Pa --- Ring (circle one if applicable): Open B Blower Door Fan Location:6'h t- Aacrc— Weather Conditions: V1►'1,) I certify that these blower door results are accurate and determined using standard industry protocol. Company Name: L4_ c- Technician: Ty/.r Technician Signature: f` ::: Date: q- ~ ) ( Phone Number: TelYi' �3��t ?--S" 2009 Washington State Energy Code reference: 502.4.5 Building Air Leakage Testing: Building envelope air leakage control shall be considered acceptable when tested to have an alr leakage less than 0.00030 Specific Leakage Area (SLA) when tested with a blower door at a press of 50 Pascals (0.2 inch w.g.). Testing shall occur et any time after rough In and after Installation of penetrations of the building envelope, Including penetrations for utilities, plumbing, electrical, ventilation, and combustion appliances and sealing thereof. When 'required by the building official, the test shall be conducted in the presence of department staff, The blower door test results shall be recorded on the certificate required in Section 105.4. EXCEPTIONS: 1. Additions less than 750 square feet. 2. Once visual inspection has confirmed the presence of a gasket (see Section 502.4), operable windows and doors manufactured by small business shall be permitted to be sealed off at the frame prior to the test. Complete Heating and Sheetmetal, Inca 3604 E TRENT AVE • SPOKANE, WA 99220 • TEL: (509) 533.9528 • FAX: (509) 533.0329 Washington State: Energy Code Duct Testing Calculator (New Construction) House Addressor Lot #: I. Cll 4 C Ce.i-L(t Conditoned Floor Area: 5 1 Duct Tester Locaton: 2,0 Kbtff-ttr"-- Pressure Tap Location: f,. LV'5 C St Ring .(it applicable):Open 0 1 0 2 0 3 X • At Rough -In (Total. Leakage) `Calculated Test Method Standard' Target Testi CFM25 Air Handler Present 5 6 CFM2s. per 100 sf of CFA SE i) Air Handler NOT Present 5 4 CFM2s per 100 sf of CFA Air Handler NOT Present Post Construction Test Method Standard' Calculated Target Test CFM25 Air Handler Present (Total Leakage) 5 8 CFM2s per 100 sf of CFA Air Handler Present (Leakage to Exterior) 5 6 CFM2s per 100 sf of CFA Air Handler NOT Present 54 CFM2s per 100 sf of CFA 1. Test results must comply with one of the Standards options. 2. Test CFM25 must be equal to or less than the calculated target. Air Leakage Testing Calculator (Blower Door Test) Standard Tested CFMso Test Result (SLA) 0.00030 SLA ((CFMso X 0.055) / (CFA X 144))