Loading...
2010, 02-02 Permit App: 10000231 GarageProject Number: 10000231 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/2/2010 Page 1 of 2 Project Information: Permit Use: 30 X 50 GARAGE Contact: MACKAY, CHADD P Address: 2423 N CENTER RD C - S - Z: SPOKANE VALLEY, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 499-8504 Group Name: Site Information: Project Name: Plat Key: 000000 Name: Range District: Nort Parcel Number: 45072.1607 Block: SiteAddress: 2423 N CENTER RD Location:: CSV Lot: Owner: Name: MACKAY, CHADD P Address: 2423 N CENTER RD SPOKANE VALLEY, WA 99212 Zoning: R-2 SF Res Suburban District Water District: 002 ORCHARD AVENUE Area: 24,000 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Information: , Review Building Plan Review Released By: Originally Released: Septic Sys Review 2/2/2010 By: tmelbourn Released By: Originally Released: 1/29/2010 By: LHALSEY Landuse/Zoning/HE Conditions Released By: See Conditions Permits: Originally Released: 1/28/2010 By: mbasinger Operator: JD Printed By: jmm Print Date: 2/2/2010 Project Number: 10000231 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/2/2010 Page 2 of 2 Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation GAR WOOD U-1 VB 1,500 $28,500.00 1,500 $28,500.00 Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Totals: 1,500 $28,500.00 1,500 $28,500.00 Units Unit Desc 1 SELECT I SELECT 1 SELECT Permit Total Fees: Notes: Fee Amount $431.65 $107.91 $4.50 $544.06 This permit is granted based on the structure not being used for storage of on -street vehicles. Should the use of the structure be used for that purpose, the driveway will need to be paved and approved by the City of Spokane Valley. Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $544.06 $544.06 $107.91 $436.15 $544.06 $544.06 $107.91 $436.15 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 2/2/2010 �pokanG ems' $valleyt PERMIT NUMBER: PERMIT FEE: (Staff Use Only) CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokanevallev.orq RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ❑ NEW CONSTRUCTION ❑ DECK ❑ ADDITION/REMODEL 4 ACCESSORY BUILDING ❑ OTHER SITE ADDRESS: 3-4 a-3 N Cenftr Rd SinMope 1 al frj Ws 942.13- ASSESSORS PARCEL NO.: 4 SO7j-1 607 LEGAL DESCRIPTION: ELEC icy SVB Nome 8OF+ of E 3oo F7 Bi6 BUILDING OWNER NAME: NAME: ChQla/ MaCil1Q.N ADDRESS: a.L'I .)-; N e-tnfer RD CITY: Spokane V'all� PHONE: 509-Lj 99+ Q504 CONTACT NAME: Chad/ M a -C t4) U.\ PHONE: S'0y_ L99- $SOLj J CONTRACTOR NAME: STATE: UAL FAX: (12a g30$ ZIP: FAX: ct y.P' 8303 CELL: CELL: MAILING ADDRESS: '4" -M 0 n ei CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: ConsfrvCA 30 'to %, 5011- x la' 14 Wali Sf or432 '%4ids'i St; c k Cr .mt co as-flvc f on O(1 Conc,th Co* ✓nd cif op PROPOSED USE: 940011f, Effective October 28, 2007 Page 1 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.l.doc /o._ z3/ ****YOU MUST COMPLETE THE FOLLOWING**** A IF NOT APPLICABLE Height to Peak: 17' Dimensions: 30twxso'L No. of Stories: I Total Habitable Space: /V4 Main Floor SQ Upper Floor SQ FT: /v4 Unfinished Basement SQ FT: /tf4 Finished Basement SQ FT: NA FT: 1500 ^- Garage SQ FTy/ /V.A D K Deck/Covered Patio SQ FT: AM Impervious Surface Area: NA 30% Slopes on Property: 14/4 No. of Bedrooms: i9 Construction Type: S+irk frame Heat Source: /V 4 Sewer or Septic: M4 TOTAL COST OF PROJECT: $ 440) 000 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature Method of payment: 0 Cash 0 Check Bankcard #: Date: 1 Lab 20/0 ❑ Visa ❑ Mastercard EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.l.doc Spokane Valley . For City Use Only PLUS 'ProjectNumber iih- Project Address S(-17' Fs K Cta . • 11703 E Sprague Ave Suite B-3‘•.Spokane Valley WA 99206 , 509.688.00364 Fax: 509:688:0037 •'.permitcenterc spokaneValley.org As part of our on-going commitment to customer service during the 'review. process 'ot your project application, we are providing you with a TARGET DATE. for the initial, technical -application review. If for any reason we cannot meet this date; we will contact you witha revisedfaargeet (date. ' •' - •review • TARGETis \ •••1 \ 1 ) Your application • DATE The TARGET; DATE is thedate we estimate your project application, will .have had its initial ,technical review. "It is not the date for approval'or permit issuance. , •- Tips fora' Smoother Project Application Review i Submit complete, accurate plans and documents. - Ertra time may be required for re -.submittals cis project, application reviewers•tvork on initltiple,applications-and it; ntav he several days before they can"look at your new or reviseclanformatiori: , Ir Designate a specific contact person to communicate with the City. , . {While the person designcited as the applicant's contact person, with the City can he clianged,:one individital with the. c.rpei1ise for dealing With reviewer comments would be,the hest choice for: }he Gdtire review process. - I . • • r Call staff regarding the status of your project only afterthe target date shown at the top of thepage-. Although you should be contacted on,or-hv the target date, please feel free'to'contact us if vou'lraven •t heard from us by your target elate: Staff mai contact you belore the target date if Inc initial.ievien is complete: By Jollowing this procedure, you will save time and allow; the reviewers to complete the, work mare expeditiously.. - • Steps in the Permit Process 1. Counter Complete.. Your application' has been accepted as counter .complete. This means all .of 'the required documents, as Indicated on your Pre -Application Checklist have been' submitted: or' have iben approved for deterred submittal. This does not prevent technical staff from requesting additional informaiion as a'result of iheir technical review. 2, Quality' Check. The next step in the process is a"quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from: completing the1technical review once it is started. When this step is complete; your application will be routed to the; appropriate, staff and remain in their review'queue, until 'it comes up for review.; ' 3. Technical Compliance. Once an application is administratively complete, it is_ routed to'technical staff for' compliance • review. Depending on. the type of project; technical' staff bay, include multiple reviewers.' Yob should. be contacted•by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete . ' . 4. Permit Issuance. When the'technical compliance review of the application. is, complete, including `any subsequent re- subniittals, each reviewer will approve their section of-the'application and rbute it to the Permit Center. When ail'seciions of the application are received, a Permit Specialist will process the ,applicatibb and contact the•person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be, provided by the Permit Specialist at that time. WHITE -APPLICANT PINK- BUILDING FILE REV 9/07 Heather Morris From: Halsey, Lance [LHalsey@spokanecounty.orgj Sent: Friday, January 29, 2010 1:49 PM To: Permit Center Subject: 2423 N Center Rd Project # 10000231. Signe off in PLUS. Thanks, Lance. I' PLANNING DEPT. t. BY: •, DATE: t /za to CHADD MACKAY SPOKANE VALLEY PARCEL #: 45072-1607 LEGAL DESCRIPTI❑N: ELEC RY SUB H❑ME 80 FT ❑F E 300 FT B16 () 80' CI I 3vn a31Vn 30' COVERED PATI❑ SEPTIC PR❑P❑SED SHOP 30' X 50' T 45' —20'— H❑USE 12'— V/13AI21Q 3C0' NORTH CENTER R❑AD ()