Loading...
2013, 10-17 Permit: SW-13001842 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001842 Permit Issued Date: 10/17/2013 Expiration Date: 10/17/2014 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION ELECTRIC RR LARRY MILLER EXCAVATING 509-218-3335 Applicant: LARRY MILLER EXCAVATING Address: Phone: Email: 7117 E RUTTER AVE SPOKANE, WA 99212 509-218-3335 SITE INFORMATION: Site Address: Parcel Number: 2510 N CENTER RD 45072.1730 Assessor's Description: ELEC RY SUBURBAN HOME OCONNOR SUBD N1/2 TR C EXC PTN OF N1/2 OF TR C DAF, BEG AT NW COR OF TR C, TH ELY ALG NLY LN THEREOF, TH SELY TO A PT ON N LN OF S 11 FT OF N1/2 OF TR C, 125FT E OF WLY LN OF TR C Inspection Area: : (509)-477-3675 Zoning: Owner: Address: Phone: Email: Water District: Orchard Avenue Irrigation District #6 WINFREY, LINDA A & GARY 2510 1/2 N CENTER RD SPOKANE, WA 99212-2263 Fire District: Spokane Valley Fire Land Area: 0.35 Acre(s) CONTRACTOR INFORMATION: LARRYME918DR, Exp. 03/19/2015 LARRY MILLER EXCAVATING 7117 E RUTTER AVE SPOKANE, WA 99212 509-218-3335 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 830-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Pnnted: 10/17/2013 10:19:52 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001842 Permit Issued Date: 10/17/2013 Expiration Date: 10/17/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 10/17/2013 10 19 52 Project Coordinator Kathy Cummings