2013, 10-17 Permit: SW-13001842 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13001842
Permit Issued Date: 10/17/2013
Expiration Date: 10/17/2014
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
ELECTRIC RR
LARRY MILLER EXCAVATING
509-218-3335
Applicant: LARRY MILLER EXCAVATING
Address:
Phone:
Email:
7117 E RUTTER AVE
SPOKANE, WA 99212
509-218-3335
SITE INFORMATION:
Site Address:
Parcel Number:
2510 N CENTER RD
45072.1730
Assessor's Description: ELEC RY SUBURBAN HOME OCONNOR SUBD
N1/2 TR C EXC PTN OF N1/2 OF TR C DAF, BEG
AT NW COR OF TR C, TH ELY ALG NLY LN
THEREOF, TH SELY TO A PT ON N LN OF S 11 FT
OF N1/2 OF TR C, 125FT E OF WLY LN OF TR C
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
Water District: Orchard Avenue Irrigation
District #6
WINFREY, LINDA A & GARY
2510 1/2 N CENTER RD
SPOKANE, WA 99212-2263
Fire District: Spokane Valley Fire
Land Area: 0.35 Acre(s)
CONTRACTOR INFORMATION:
LARRYME918DR, Exp. 03/19/2015
LARRY MILLER EXCAVATING
7117 E RUTTER AVE SPOKANE, WA 99212
509-218-3335
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.32
$125.00
$151.32
1
$125.00 $125.00
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 830-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Pnnted: 10/17/2013 10:19:52 Project Coordinator: Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13001842 Permit Issued Date: 10/17/2013
Expiration Date: 10/17/2014
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 10/17/2013 10 19 52 Project Coordinator Kathy Cummings