2009, 10-6 Permit App: 09002922 Garage, Project Number: 09002922 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/6/2009 Page 1 of 2
Project Information:
Permit Use: RES DET GAR
Contact: L & M ENTERPRISES
Address: 20814 W MCFARLANE RD
C - S - Z: MEDICAL LAKE, WA 99022
Setbacks: Front Left: Right: Rear: Phone: (509) 299-4144
Group Name:
Site Information: Project Name:
Plat Key: 001865 Name: ORCHARD AVE ADD TR 1-228
District: Nort
Parcel Number: 45063.3406
SiteAddress: 3424 N CENTER RD
Location:: CSV
Block: Lot:
Owner: Name: SHEPARD, TINA A
Address: 3424 N CENTER RD
SPOKANE, WA 99212-1917
Zoning: R-2 SF Res Suburban District
Water District: 002 ORCHARD AVENUE
Area: 15,524 Sq Ft
Nbr of Bldgs: 1
Review Information:
Width: 0
Nbr of Dwellings: 1
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Blease;
Septic Sys Review
Originally Released: 10/5/2009 By: tmelbourn
eleased
Originally Released: 9/17/2009 By: Lhalsey
Landuse/Zoning/HE Conditions
Release
See Conditions
Originally Released: 9/18/2009 By: mbasinger
Permits: =raw=
Operator: JD Printed By: jmm Print Date: 10/6/2009
Project Number: 09002922 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/6/2009 Page 2 of 2
Contractor: L & M ENTERPRISES
Address: 20814 W MCFARLANE RD Phone: (509) 299-4144
MEDICAL LAKE, WA 99022
Building Permit
Firm: L & M ENTERPRISES
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sn Ft Valuation
GARAGE U-1 VB GARAGE 704 $13,376.00 704 $13,376.00
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Notes: Ezzi=mommEr=2=mir
Totals: 704
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
$13,376.00
Permit Total Fees:
704 $13,376.00
Fee Amount
$237.25
$59.31
$4.50
$301.06
This permit is granted based on the structure not being used for storage of on -street vehicles. Should
the use of the structure be used for that purpose, the driveway will need to be paved and approved by
the City of Spokane Valley.
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$301.06 $301.06 $62.81 $238.25
$301.06
$301.06
$62.81 $238.25
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 10/6/2009
Spokane
Valley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER:
Z
PERMIT FEE:
New Construction
Addition/Remodel
Other:
Accessory Bldg
Deck
SITE ADDRESS: 3 `'I `/
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner
Name:
7---/A-k.4
)
-rol.„ 3
Address:
3 / 2y
Ai
DECK/COV. PATIO SQ. FTG:
/V / A-
City:
`�
,i. p
�'
State: _ ,,,3 ..1Zip:
Phone:
"i `-.
L/ l i/
Fax:
ontact ,ersc
Name: /V1 0,4"),1""\ -
Phone: 9. ,qo O F 3
Describe the scope of work indetails
kr' Id. 2_2)4:3_ n X a
`z" o v,e r'
Contrajcto
.4.,.,21t,-,-,-,'
Name: LA,,./v) h j, Z --�1'1
Address: 08/ 0 0 /") ,LF ckr.),
5-..Q
City:nn saA.v( L State: IA) 0.
Zip: c 7
Phonnel4O 073 % Fax: ,z3 .3
/
" 1
Contractor Lic No:z/vrm xp Date:
DECK/COV. PATIO SQ. FTG:
/V / A-
City Business Lic. No:
# OF BEDROOMS:
4/ / 11-47
Cost of Project: $
Proposed Use:
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
/ Z /
DIMENSIONS:
2- 2_?. 3 2_70?
# OF STORIES:
/
/' TOTAL HABITABLE SPACE:
°if o
MAIN FLOOR TO SQ.
FTG: n(j/
2"1"
NFLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
/V/
IMPERVIOUS SURFACE
AREA: A1D
FINISHED BASWENT
SQ. FTG: k/ 4-
GARAGE SQ. FTG:
7 o ( r9i --
DECK/COV. PATIO SQ. FTG:
/V / A-
30% SLOPES ON
PROPERTY: ki-0
# OF BEDROOMS:
4/ / 11-47
CONSTRUCTION TYPE:
- i= F
HEAT SOURC :
/V/ .
SEWERR SEPTIC?
A/%
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE. -
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
tfl
u `I
❑ Check
DATE: / K
❑ Mastercard ❑ VISA
Expires: VIN#:
721 RECEIVED
CSV PERMIT CENTER
SEP 1 20092
Project #
Name
Submittal #
i`� V
11703 E Sprague Ave Suite' B-3 ♦ Spokane Valley WA 99206
509.688.0036 Fax:: 509.688:0037;•: permitcenter@spokanevalley.org
For City Use Only
PLUS Project Number. (->Cj(�C z_92Z
Project Address
As part of our on-going : commitment to customer service duringthe.- review process :of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for.
any reason we cannot meet this date, we will contact you with a revised target .date.
Your application review TARGET DATE is ' (0
...rz l
•
The : TARGET DATE is the date we estimate your project application will have : had its initial technical:
review: It is not the date for approval or: permit issuance:
•
Tips for a Smoother. Project Application Review
➢ Submit complete, accurate plans'and.documents.
Extra'tittme May be required for re -submittals as project application reviewers work on multiple applications and it..
may be several days: before,they can look at your new or.revised information. '
• Designate a specific contact person'tocommunicate with the City:
While the, person designated as the applicant's contact person with the City' can be changed one individual, withthe
expertise for dealing ,with reviewer comments would be the best choice for the entire review process.
> . Call staff regarding the status of your project only after `the target date shown' at_:the 'top of the page.
Although you should be.contacted on or by the„ target. date, .please feel free to contact us f you haven 't heard from us
by your target date. Staff may contact you before the _target date if the initial. review, is complete.. By followingthis
procedure, you will save tithe and allow the reviewers to complete the work more expeditiously
Steps in the Permit Process
1. Counter Complete. Your application has been . accepted `as counter complete. This means :all ` of the required
documents, as indicated on your Pre -Application Checklist have been subinitted or have : been approved for deferred
submittal. This does not prevent technical staff from requesting.additional information as a resultof their technical review.
2. Quality Check. The next step in the process is a'quality check to make sure:that the application is -reviewable and free
from, substantive flaws that would prevent technical staff; from completing the' technical. review once' it is started. When
this step is complete; your application :will be routed to the appropriate 'staff and remain in their review queue until it
comes up.for'review. .
' 3. Technical Compliance. Once an application is administrativelycomplete, it` is routed to technical staff for• compliance'
review. Depending on the type of project, technical staff may include multiple reviewers You should be contacted by
phone, fax, email, or mail by. your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review: of the applicationis 'complete, including any subsequent re-
submittals, each.reviewer will approve their section of the application and route it to the Permit Center. When all .sections •
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre' -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
Sep 17 2009 3:25PM
SPOKANE#COUNTY4UTILITIES 4777178
p.1