Loading...
2012, 07-31 Permit: SW-12001876 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001876 $4' Permit Issued Date: pp 07/31/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: LARRY MILLER EXCAVATING Project Name: ORCHARD AVE Applicant: LARRY MILLER EXCAVATING Permit Type: SEWER Address: 7117 E RUTTER AVE SPOKANE, WA 99212 Phone: 509-218-3335 Email: SITE INFORMATION: Site Address: 3515 N CENTER RD Parcel Number: 45063.3518 Subdivision: ORCHARD AVENUE Assessor's Description: ORCHARD AVE ADD N95FT OF S225FT OF B52 Inspection Area: Water District: Orchard Avenue Irrigation District #6 Zoning CONTRACTOR INFORMATION: General Contractor LARRYME918DR LARRY MILLER EXCAVATING 7,117 E RUTTER AVE SPOKANE, WA 99212 509-218-3335 DETAILS: Class SEWER Type SEWER CONNECTION Owner: ALBRECHT, PATSY L Address: 3515 N CENTER RD SPOKANE, WA 99212-1974 Phone: Email: Fire District: Spokane Valley Fire Land Area: 13407 Square Feet Quantity 1 FEE DETAIL: Processing - Utilities Utilities Permit Unit Charge Value $125.00 $125.00 $125.00 $25.94 $ 125.00 Total Fee: $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR &INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 07/31/2012 09:29:36 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001876 07/31/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/31/2012 09:29:36 Printed by: IIS APPPOOL\ASP.NET v4.0