Loading...
2012, 07-10 Permit: SW-12001720 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001720 07/10/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: COURCHAINE CONSTRUCTION Project Name: ORCHARD AVE Applicant: COURCHAINE CONSTRUCTION Permit Type: SEWER Address: 19818 E SPRAGUE GREENACRES, WA 99216 Phone: 509-924-5485 Email: SITE INFORMATION: Site Address: 3611 N CENTER RD Parcel Number: 45063.2415 Subdivision: ORCHARD AVENUE Assessor's Description: ORCHARD AVE ADD PT OF B31 N77.25FT OF S167.25FT OF E84 .13FT Inspection Area: Zoning CONTRACTOR INFORMATION: General Contractor COURCC*181 R7 COURCHAINE EXCAVATION 19818 E SPRAGUE GREENACRES, WA 99016 509-928-0846 DETAILS: Class Type Owner: THOMAS, RENEE E Address: 2408 W BOONE AVE SPOKANE, WA 99201-2907 Phone: Email: Water District: Orchard Fire District: Spokane Valley Fire Avenue Irrigation District . #6 Land Area: 6499 Square Feet Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing - Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Inside Public Transit Benefit Area -------------------------------------------------- CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 07/10/2012 14:56:46 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001720 07/10/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT.AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. ---------------————————————————————————————————————— INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. ----------------------------—————————— -------------- THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. —-------------————————————————————————--—————— — — — — — — Date Printed: 07/10/2012 14:56:46 Printed by: IIS APPPOOL\ASP.NET v4.0