Loading...
2012, 07-25 Permit: SW-12001836 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001836 Permit Issued Date: 07/25/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION ELECTRIC RAILROAD SEWER Primary Contac Applicant: Address: Phone: Email: OVERLAND EXCAVATION INC OVERLAND EXCAVATION INC P.O. BOX 277 NEWMAN LAKE, WA 99025 (509)939-7984 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description Inspection Area: Zoning: 2526 N CENTER RD 45072.1703 O'CONNOR'S SUBDIVISION OF LOTS 14 & 17 ELEC RY SUB HM OCONNOR N1/2 EXC S25FT B 13 Owner: Address: Phone: Email: MARON, ROBERT/MARON LIVING TRUST 14812 N CUBA ST MEAD, WA 99021 Water District: Orchard Fire District: Spokane Valley Fire Avenue Irrigation District #6 Land Area: 41881 Square Feet CONTRACTOR INFORMATION• General Contractor OVERLEI951LE OVERLAND EXCAVATION INC 5918 E TRENT AVE SPOKANE, WA 99212 509-939-7984 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL - Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area Date Printed: 07/25/2012 11:07:53 Printed by- 115 APPPOOL'ASP.NET v4 0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001836 07/25/2012 Expiration Date: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/25/2012 11 07:53 Printed by. 113 APPPOOL\ASP.NET v4.0