Loading...
2015, 04-20 Permit: SW-15000349 SewerSPOKANE COUNTY UTILITIES Application Number: SW -15000349 Project Description: SEWER Project Name: E SPRAGUE AVE Primary Contact: OCTOBER HOLDINGS COMPANY, LLC Phone: SITE INFORMATION: Site Address: 122 N CONKLIN RD Parcel Number: 45134.1350 Assessor's Description: VERA REPL B13 EXC N5FT L6 B2 Inspection Area: :(509)-477-3675 Zoning CONTRACTOR INFORMATION: OWNER, Exp. 12/31/2015 OWNER PERFORMING THE WORK SAME AS SITE ADDRESS SAME, WA 00000 ------------------------------------------- DETAILS: Permit Issued Date: 04/20/2015 Expiration Date: 04/20/2016 Applicant: OCTOBER HOLDINGS COMPANY, LLC Address: PO BOX 1810 SPOKANE, WA 99210-1810 Phone: Email: Owner: Address: Phone: Email: Water District: Vera Irrigation District #15 OCTOBER HOLDINGS COMPANY, LLC PO BOX 1810 SPOKANE, WA 99210-1810 Fire District: Spokane Valley Fire Land Area: 13728 Square Feet Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit CONDITIONS: $27.12 $125.00 Total Fee: $152.12 Inside Public Transit Benefit Area ---------------------------------------------------- SVRP Aquifer Boundary: Water Purveyor ability to serve statement required. If unable to serve, ?mitigation certificate? (use of private well) from DOE prior to permit issuance. ---------------————————————————————————————————————— Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. ---------------------------------------------------- Public Transit Benefit Area ---------------------------------------------------- Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire ---------------------------------------------------- CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR 8 INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. ---------------------------------------------------- SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. ------------------------------------------ — — — — — — — — — — Date Printed: 04/20/2015 11:29:29 Project Coordinator: Susan Clark SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -15000349 Permit Issued Date: 04/20/2015 Expiration Date: 04/20/2016 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. ---------------------------------------------------- SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. ---------------------------------------------------- THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. —-------------———————————————————————————————— — — — — — — Date Printed: 04/20/2015 11:29:29 Project Coordinator: Susan Clark