2010, 04-14 Permit App: 10001001 PatioProject Number: 10001001 Inv: 1
Application
Date: 4/14/2010 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 210 SQFT ATT COVERED PATIO
Setbacks: Front
Site Information:
zr
Contact: DURA -SIDE INC
Address: 4808 N STARR RD
C - S - Z: SPOKANE VALLEY WA 99027
Left: Right: Rear: Phone: (509) 226-0048
Group Name:
Project Name:
Plat Key: 000000 Name: Range
District: Nort
Parcel Number: 45174.1109
Block: Lot:
SiteAddress: 622 N DARTMOUTH RD
Location:: CSV
Zoning: R-3 SF Res District
Water District: 011 MODERN
Area: 12,803 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:.: ,,, :y
Owner: Name: KITTREDGE, P E/R S/H B/R M
Address: 622 N DARTMOUTH RD
SPOKANE, WA 99206-3821
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
ReleasedBy
Originally Released: 4/14/2010 By: tmelbourn
Landuse/Zoning/HE Conditions
Permits:
.;Released
Originally Released: 4/13/2010 By: tschmidt
Operator: JD Printed By: jmm Print Date: 4/14/2010
Project Number: 10001001 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/14/2010 Page 2 of 2
Building Permit
Contractor: DURA -SIDE Firm: DURA -SIDE
Address: 9514 E MONTGOMERY DR #27 Phone: (509) 922-9250
SPOKANE VALLEY WA 99206
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
COV DECK R-3 VB 210 SQFT 0 $6,599.82 0 $6,599.82
COV PATIO
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Notes:
Payment Summary: =7-- 2r -
Permit
Permit Type
Building Permit
Totals: 0 $6,599.82 0 $6,599.82
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Fee Amount
$139.25
$4.50
$55.70
$199.45
Fee Amount Invoice Amount Amount Paid Amount Owing
$199.45 $199.45 $55.70 $143.75
$199.45 $199.45 $55.70 $143.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD
Printed By: jmm
Print Date: 4/14/2010
Spokane
_ Valley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER:
PERMIT FEE:
New Construction
Addition/Remodel
Other: yu
Accessory Bldg
Deck
SITE ADDRESS: 6.12 V - 0%4 1 MOvIt" ` a
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Budding Owner :,
Name. r ICI.0 to (�
Address: 6Z_ n . c`Ir �t-� 1 �c
City Vol AI �vState:/;, t/ Zip:9q
Phone: -C 2!0
77f4 1 J Fax: �J L
Contact Person;>
Name:
Phone: Ce -I ( 31-16 -c%
Describe the scope o
Contractor:
Name: Duke --Si
Address: /7
Skc Pc -
City: vf> t c -d s State (.4 4
Zip: 91y0�7
Phone:_ l c)/ - >ig, Fax: _5-0(/_/2.26._ 1 ? o
Contractor Lic No: Du viI 2A d i a0 t !
City Business Lic. No: /w4
work in detail: , Cost of Project: $ ec7Sa , s2-.
Proposed Use:(...c)ieTlikeil-1�t
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
l/ -F+
DIMENSIONS:
ii-
# OF STORI S::/
y; 4
TOTAL //�HABITABLE SPACE:
, /4
MAIN FLOOR TO SQ.
FTG:
f A
N
2 FLOOR SQ. FTG:
6/A
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
,
FINISHED BASEMENT
SQ. FTG: VA-
GARAGE SQ FTG:
/
DE K%COV. PATIO FTG:
(c2lD- _. UK
30% SLOPES ONIA
PROPERTY: fj
# OF BEDROOMS:
CONSTRUCTION TYPE:
HE)\T C :
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
DATE: z_ 13, 6
❑ Mastercard
Expires:
❑ VISA
VIN#:
Sijokane
al
•
11703 E Sprague;Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax 509.688 0037 4 permitcenter@spokanevaltey or
. As part of 'our on-going commitment` to customer, service during the review process.:of ,your project'
application:. we are. ,rovidin 3
pp p g you with a` TARGET DATEfor the initial technical: application review If fora:
any reason we cannot meet;thisdate, we;will `contactyou,with a revs
ied target'date ":
Your application review TARGET DATE
The TARGET; DATE is 'the .date we estimate your<.project :application will have had its'. initial` technical=.
review.It is riot the date for approval or=permit issuance "`
Tips for: a Smoother' Project Application -Review..
•
Submit complete; accurate plans and documents:
-Extra time ina be i egrnr ed for r`e'-subihittals as•pr oject application 'r evtewers work on inultiple applications and "it
may be sei;ei'al days: befot e-they;cah look at )our• new or r evis'ed inforiinatibn:
➢ : Designatea.specific contact.person`to communicate•with the'City
While the peison designated as the applicant's contactpetson With .the City can be changed one individual with the
expertise for dealing With i•e.vieweit"conlnients would be the best choice for the entn e revreiv pr ocess
CaI•I staff regarding the status of your project only after the target date shown at the top of the page
Although youshould be cointacted on or,.bythetarget date,•please.feel free, /o.eontaet us if you haven't heaidffoni us
•by yore tai date.' Staff may contact you before. the target date if the initial review rs. complete. ;By following this
•pi ocedure, you will:save tithe and allow the reViewers.to complete"the wol k'rnor e expeditiously
1. Counter Complete.' Your; application:, has •.been accepted as counter complete - This means :hall of the required'*
documents;-as.indicated on your- Pre Application Checklist: have been submitted or have been approved. ;for deferred':
submittal. This does not pieventtechnical staff from; requesting additional information as a result of�their tecl nical ieview.,
2: Quality Check. The next step in the:: process is a:; quality: check .to make: sure -that the ,application is':reviewable and free
• trona substantive: flaws that: would prevent teehnicar staff -from completing the technical review once it is started ,,When
this step .is complete;_ your application -;.will be routed to the: appropriate ;staffand remain in their review queue
comes up for review
3. Technical Compliance Once an application is,.administratively:complete itSis routed to technical staff.for compliance.''.
review. Depending on the type 'of project,`technieal staff.` may include'multiple..reviewers You should be.contacted :by
phone, fax, ernail, or mail by your TARGET,DATE, once uutial `technical compliance review is complete,:?`
4. Permit Issuance: When the technical compliance review of the application rs complete, including any subsequent :re-
submittals,each reviewer, will approve.:.their section of the application -and route:it to, the Permit Center When all: sections
of the: application are received, a Permit Specialist will. processthe application;and'contact the person specified on your',
application foru
permit pickp: Information regarding fees and pren m
='constructioeeting's (ifrewill
quired) be provided by
the Permit Specialist at that tirne.
WHITE -APPLICANT PINK -'BUILDING FILE
REV 9/07
0
PLANNING DEPT. APPROVED
(A)
--'' ...t
BY. •
DATE:±ilL511--_
1;
1.S"'\-1.eLl' IlovtSC
ne.N.NJ
ALADoi2j
t- 02s'
q
/6'