2009, 06-10 Permit App: 09001562 DeckProjegt Number: 09001562 Inv: I Application Date: 6/10/2009 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Proiect Information:
Permit Use: REPLACE EXISTING DECK DUE TO SNOW
DAMAGE
Setbacks: Front Left: Right: Rear:
Site Information:
Plat Key: CONV Name: Range
Contact: SCHJODT, STEVEN J (GUARDIAN)
Address: 1720 N DARTMOUTH RD
C - S - Z: SPOKANE VALLEY, WA 99206-4103
Phone: (509) 385-1794
Group Name:
Project Name:
District: Nort
Parcel Number: 45084.0377 Block: Lot:
SiteAddress: 1720 N DARTMOUTH RD Owner: Name: SCHJODT, STEVEN J (GUARDIAN
Address: 1720 N DARTMOUTH RD
Location:: CSV SPOKANE VALLEY, WA 99206-41
Zoning: R-3 SF Res District
Water District: 011 MODERN Hold: ❑
Area: 9,534 Sq Ft Width: 70 Depth: 125 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information: — . _y:3
Review
Building Plan Review
.,.r
Released By
Originally Released: 6/10/2009 By: tmelbourn
Septic Sys Review ReleasedBy m
Originally Released: 6/2/2009 By: LHALSEY
Landuse/Zonin /HE Conditions
g Released'By _
Originally Released: 6/4/2009 By: tschmidt
Permits:
Operator: jmm Printed By: JD Print Date: 6/10/2009
�^ Project Number: 09001562 Inv: 1 Application Date: 6/10/2009 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: OWNER
Building Permit
Firm: OWNER
Phone: (000) 000-0000
This Application:
Description Grp Type Notes Sq Ft Valuation
DECK OPEN R-3 VB REPLACE 0 $4,000.00
DECK
Totals: 0 $4,000.00
Item Description Units Unit Desc
RESIDENTIAL PERMIT FEE 1 SELECT
WSBCC SURCHARGE 1 SELECT
SF PLNS RVW < 7999 SQ FT I SELECT
Notes:
Total Project:
Scl Ft Valuation
0 $4,000.00
0 $4,000.00
Fee Amount
$97.25
$4.50
$38.90
Permit Total Fees: $140.65
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $140.65 $140.65 $38.90 $101.75
$140.65 $140.65 $38.90 $101.75
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD Print Date: 6/10/2009
Permit Center
crrroe 11703 E Sprao e Ave, Suite B-3 PERMIT NUMBER: n, ��p�
W ne Spokane Valley, WA 99206
Valley, (509)688-0036 FAX: (509)688-OOFIE IVED BY PERMIT FEE:
w�v�v.spokanevalley.or•>; CIV OF Community Development t-'VyoCn'tT
zoos
Residential Construction ❑onuction ❑ Accessory Bldg
t=n
Permit Application ❑ AemodehDeck
SITE ADDRESS: N 1720 O cL,17 YMo Kti�
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
-
Name: 6
Phone: S
t.
Name:
# OF STORIES:
Address:
City:
State: Zip:
Phone:
Fax:
Contractor Lic No:
Exp Date:
City Business Lic. No:
FTG:
Describe the scope of work in detail: Cost of Project: $ d , OC)
e,y / s �-r cm ow c,.e 73,3 s m o L d. GK a G.t
Proposed Use:
**************ThP fnllnwina MTTCT he emmnlete- (write N/A if not
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
/&0:Sq r -T
MAIN FLOOR TO SQ.
2 FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
FTG:
AREA:
c�
FINISHED BASEMENT
GARAGE SQ. FTG:
IJEMCOV. SQ. FTG:
30% SLOPES ON
SQ. FTG:
F -
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
T SOU
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on'a dwelling, the
dwelling is/will'be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE: 'X�_ DATE: �� l
Method of Payment:
F-1 Cash ❑ Check ❑ Mastercard ❑ VISA
Bankcard #: Expires: VIN#:
Authorized Signature:
REVISED 2/15/07
As part' of `our `orngoing: commitment to'.customer service ;during the review process': of your project'
application, `we, are' -providing you with a TARGET. DATE for the initial.Iechn cal application review If for
any reason we cannof meet this date, we'.will contact you -with a revised target, date
Your application review TARGET DATE is
The TARGET DATE is tfiet. date we. estimate 'your'.proiect application, will have _had its initial: technical:
review. It is not the date,for approval or permit issuance.
Tips fora `Smoother` Proiect Application Review
➢ Submit complete, accurate plans and documents.
'Extra time` may be :required, for 're -submittals as, project..applicaiion reviewers work on;. multiple applications 'and'it
may be several days before they can look at'your-new or revised information
➢ Designate a specific contact.person to communicate with the City.
While the,person designated as: theapplicant's, contact person with the: City *can be -changed one. individual ,with the:
expertisefordealing with reviewer, comments would be the best_choicefor.'the entire -review process
➢ ' Call.staregarding the status of your project only after the -target date.shown-at the 'top of the page
ff
Although you:,should be contacted'on or by the 'targetdate, please feel free to contact us fyou,:haven it°heard from us
by your target, Staff,may contact. you�-before the target date the initial review is complete By.following this -; ,
procedure, you will save time and allow the reviewers -to complete the: work more expeditiously = ,
Steps in the ,Permit Process
` r
1. Counter Complete. Your;,application has been accepted as counter' complete: '.This means. all of the .required.
documents; as indicated on your Pre=Application Checklist have been submitted' or .:have :been approved; for : deferred
submittal. This does not prevent technical staff from requesting additional inform'ation.as a',resultbf:tleir technical. review.
2. Quality Check. .The next step in the process is a quality.check :to make sure that the application is reviewable and free -
from substantive flaws that would prevent technical staff from. completing the technical review once' it is started ; When
this step is -complete; your. application. will be routed to the appropriate staff and reiiiain in'their review queue _until `it
comes up for review.
3. Technical Compliance: Once an application is administratively compl'ete,it is routed to technicahstaff for compliancel..
review. Depending ori the type- of project,°techni(cal staff may: include multiple reviewers :You .should ;be contacted by
phone, fax; email, or mail byyour TARGET;DATE. once the inrtfal technical compliance review is complete;
4. Permit I"ssuance. When'* technical` compliance review of the application is,complete, including any` subsequent re:
submittals; each reviewer will `approveaheir section of the.application.and route it to the Permit Center When a.11 sections
of the application are received, a, Permit Specialist will process the application and contact the person specified"on your
application for. permit pick-up: Information regarding fees and pre-constructiop meetings (if;required) will be provided by
the Permit Specialist•at that time.
WHITE—APPLICANT PINK — BUILDING FILE REV 9/07
51TP/ /l)
PLANNING DEPT.
PPROVED
BY.
DATE. Nf �x+
‹- Al
X15
r
b4 -0,,V1
rfrt-
sept ( Artie
E— 12.—+, Proposed sTruc4-14. n
•I• I c1eQ"
rt FX 1st' Q . /Z' 0
Ce Rt P ►s p�c� oa 5
Jr r. ..
Exp sTIN
RestLev%c-e_
17 2, 0 N 0 ckf4- AI L44 -1•N
50
oAf
70
DAR -Pinot -WI J f
j
4(7u574 R.0 gr