2010, 12-08 Permit App: 10003960 GarageProject Number: 10003960 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 12/8/2010 Page 1 of 2
Project Information:
Permit Use: NEW 24 X 36 GARAGE/STORAGE BUILDING Contact: SPOKANE POST FRAME
Address: 7001 E 2ND
C - S - Z: SPOKANE, WA 99212
Setbacks: Front Left: Right: Rear: Phone: (509) 926-0865
Group Name:
Site Information: Project Name:
Plat Key: 000646 Name: DONWOOD EAST District: East
Parcel Number: 55064.0203
Block: Lot:
SiteAddress: 3516 N DONWOOD ST
Location:: CSV
Zoning: R-4 SF Res Urban District
Water District: 134 CONSOLIDATED ID #19 Hold: ❑
Area: .00 Acres Width: 68 Depth: 134 Right Of Way (ft): 50
Nbr of Bldgs: 1 Nbr of Dwellings: I
Owner: Name: POWELL, NELS S & TANA L
Address: 3516 N DONWOOD ST
SPOKANE VALLEY, WA 99216-170
Review Information:
Review
Building Plan Review
Released By:
Septic Sys Review
Originally Released: 12/7/2010 By: tmelbourn
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
12/6/2010 By: LHALSEY
Released By:
Originally Released: 12/8/2010 By: tschmidt
Permits•
Operator: jmm Printed By: jmm
Print Date: 12/8/2010
Project Number: 10003960 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 12/8/2010 Page 2 of 2
Building Permit
Contractor: SPOKANE POST FRAME Firm: SPOKANE POST FRAME
Address: 7001 E 2ND AVE Phone: (509) 926-0865
SPOKANE, WA 99212
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
POLE BDLG U-1 VB PLAN 864 $16,416.00 864 $16,416.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Totals: 864 $16,416.00 864 $16,416.00
Units Unit Desc Fee Amount
I SELECT $279.25
1 SELECT $69.81
I SELECT $4.50
Permit Total Fees: $353.56
Notes:
One of the exisitng accessory structures MUST be removed prior to final inspection. Exceeds the 10%
allowable sq ft for accessory structures.
As per SVMC 19.40.020 (b) all residential driveways must be paved with asphalt...or other approved
hard surface material.
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $353.56 $353.56 $69.81 $283.75
$353.56 $353.56
$69.81 $283.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 12/8/2010
Community Development
Residential Constructio"ri r'- 2 �� L Ne Consfruction
Permit Application DEL 9� ❑ Addition/Remodel
, pNtect #
Permit Center
11707 E Sprague Ave, Suite 106
Spokane Valley, WA 99206
(509)688-0036 _FArX,:t(5509)688-0037
www.spokanevalleey:orgs
1.11
1
1 cEt1�E
PERMIT NUMBER:
PERMIT FEE:
�C1 othe4:
[f Accessory Bldg
❑ Deck
SITE ADDRESS: 35 1 1 ! t,mst'LU i1:9 Gc� . JJ , "'Oki V oR ( ' ,9 a
ASSESSORS PARCEL NO: 0 61-1— ozo 1- LEGAL DESCRIPTION:
Building Owner:
Contractor�.
SPo% z 1-14-:,_�c.m_i_(�L
Name: ts- r.
Name: J -..i...5 tT * —pow LLL
Address: 35-1 b M, OAf/:Jet,/
. Address: Ito t 2p pi..
City Z v 44&A State: wt Zip:1,216
City: .1ii:veCi - tittLey State: W7 Zip: 42_
Phone: c/Lc_ CdYS ( Fax: y2 -Y -_5.l41
Phone: ?2z— 322.- Fax:
IMPERVIOUS SURFACE
AREA:
-Comae rrcL<N'k. 9cv Fbtu) Exp Date:
Contact Person
GARS.esso:-F G: fL
( 869 Ip
City Business Lie. No: ;
r12 W�11
# OF BEDROOMS:
-er --
f1CON�SfTR�,U�eCTI(((»ONT"YPE:
PO'i Inaba tWK{rt rq
Name: -etre—
SEWER 0 SEPTIC
Phone: 22.4 -mgt s
Describe the scope of work in detail::. Cost of -Project: $ 3 ,smb
Z -t, 36' x )v' 6-4-21-61- / STD 12-1 3QL Odic?
Proposed Use: L�3y-[� S_ / $73rL1-6--4- 31c,a_uy
**************The following MUST be complete: (write N/A 'if hot applicable)**********************
HEIGHT TO PEAK: e
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2N° FLOOR SQ. FTG:
,�
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
.
FINISHED BASEI,E
SQ. FTG:
GARS.esso:-F G: fL
( 869 Ip
DECK/COV. PATIO SQ. FTG:
- .-e--
30% SLOPES ON
:PROPERTY'
# OF BEDROOMS:
-er --
f1CON�SfTR�,U�eCTI(((»ONT"YPE:
PO'i Inaba tWK{rt rq
HEAT SOURCE:%
SEWER 0 SEPTIC
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit Is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this -City of Spokane Valley Permit inure to theproperty owner. 3) The
signatory is the property owner or has permission to represent the property owner in thIs transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for. any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature::
REVISED 711507
['Check
DATE:
❑ Mastercard 0 VISA
Expires: VIN#:
(A
Spokane
valley
J.J-•'��^�'3 res.—��v v�
. For City Use Only
PLUS Project Nunilier�� ���p7'
Project Address S 1 (o'•� ;\?)
11703 E Sprague'Ave Suite B=3' •, Spokane Valley WA 99206.
• 509.688.0036 ♦ Fax: 509.68&0037'$ permitcenter@spokanevatley.org
As part of our, on-going. commitment to customer. service during the.' review., process of your. project
application, we are providing' you witha TARGET DATE for the initial technical:application review; If for
any reason we cannot meet this `date, we will contact you with a'revised target date; -.
Your application review TARGET DATE is 4%7/, C)
The TARGET DATE is the date; we estimate your project application' will have had its -initial technical
review. It is not the date for approval,or permit issuance.
Tips for a Smoother Project Application Review
Submit complete, accurate plans and documents. • '
•Extra time /7/Cly be required for re-suhnnttals as project application reviewersit oiL on inn/tip/c applicatio5is and it
may he several clans before they can look at trout ticw o, revised i formation. •• .
i Designate d specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be:changed, one individual With the
expertise for dealing With reviewer coma -tents would be the best choice for the entire review process:
r Call staff regarding the status of your. project only after the target date shown at the`itop'ofthe page:: .
Althoughvoushould be contacted on or by the tat get date, please feelRecto contact uv if ion hat en'theatdfrom us
by your target date. Stat! may contact roti before the target date if the initial i°eview is complete.' By folowing this
procechu-e. you will save time and allow the reviewers to complete the Work more expeditiously:.: ''
Steps in the Permit Process ;
• 1. Counter Complete. Your application has been accepted as' counter complete. This ' means :all' of the required ,
documents, as indicated on your Pre -Application' Checklist have been submitted or' have been approved for deferred.
submittal. This does not prevent technical stafRfrom requesting, additional, information,as a result of their technical review."
.
2. Quality Check. Theuext step in the process is a quality checkto make' sure that the -application is reviewable and free,
from substantive Claws that would'prevent technical staff from 'completing ,the technical.review-once-it is; started:' When •
this step is complete, your application :Will be routed to the appropriate; staff and remain, in. their; review. queue until it •
•
comes up for review.
•
3. Technical Compliance. Once an,application is administratively complete, it -is routed to technical staff for compliance •
review. Depending on .the type of project, technical staff may include multiple reviewers.'You should.be contacted; by
phone, tax; email, or mail by your TARGET DATE once, the initial technical compliance' review is complete:
4. Permit Issuance. When the technical compliance review of the application; is complete;. including any subsequent re-
submittals, each reviewer,will approve their section of the application and route it to,the Permit; Center.' When all sections
of the application are. received, a Permit Specialist will process the application and'contact the- person; specified on your
application for permit pick-up. Information regarding fees and pre,construction meeting's (if required).will be provided by
the Permit Specialist at that time.
WHITE—APPLICANT PINK—BUILDING FILE
REV 9/07
SPOKANE POST FRAME, INC.
Engineered Pole Buildings
shops
garages
storage buildings
cabins
kits -cost plus
7001 E. 2nd Ave
Spokane, WA 99212
ROLFE WILL
Sales Manager - Owner
509-926-0865 • Fax 509-924-5161
or 1-866-926-0865
Visit us at
www.spokanepostframe.com
PLANNING DEPT. APPROVED
Site . Ian
BY:�j
DATE: /*//c
Nor t h
Show streets/alley
Show septic/sewer/dratnfleld
Show existing buildings
Show proposed building
Show setbacks - front, rear, sir
Show lot size
ZONING CRITERIA - Sh
'0
O•) CU
U E'
) E.= 0-
0 (1)
7) Q
- a)
O pCCS
L_
O _c U
c r-
oco�o
� u)3
A
a)
(')�n
2
c ca a)
->
cri
o — at -
TO
o
cu to
0_ < co `no
JOB UNIE N 1.71-` ,JA- TO w (UL
PHOtJE " % Z2-- 32Z-
ADDRESS 3,5-1 6 PI t c olooi
5� e 1Jr tit t i l` 2t 6
LEGAL DESCRI PT ION l
e&rc.../L- 53 o 2 Q z
(#Y4/2_,
-44
�Gp
cay
If closer than 5' to property Ilne - need firewall and parapet
Out of rear 30' and closer than 5' - need waiver from neighbor
Can't cover more than 50% of rear 25'
Corner lot - building must be 20' from property line
50' minimum setback from front property line
Less than 8' from residence - need firewall
Maximum square footage - 10% of lot area (Must be less than 3.000 sq ft.)
flay not subdivide lot so that building Is more than IOP. of residual lot area
bounty
If closer than 5' to Property Ilne - need firewall
10' from septic/dratnfleld
Less than 6' from residence - need f irewal l
GEtiERAL SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE BOOK
AILD KNOW WHAT ZONING YOU'RE IN TO BE SURE. I-IAXII1UM BUILDING SIZE
ALSO CHANGES WITH DIFFERENT ZONING.
5' minimum side yard setback
5' minimum rear yard setback
Minimum front and side street setback - 25' from property line or 55' from
center of road - whichever Is greater
o� 0V - Aug.
jn •>�n , X(Q..PdS IO%
S+ oc-
,pr 410 Reid
ropo
e -
RECEIVED
CSV PERMIT CENTER l
DEC 0 5 22,0,1,0
Profit ;t #____1111.:3--Z--
--1-� 1 "`r -c -
Name `r--`-
Submittal At_ _-._ ---