Loading...
2010, 12-08 Permit App: 10003960 GarageProject Number: 10003960 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/8/2010 Page 1 of 2 Project Information: Permit Use: NEW 24 X 36 GARAGE/STORAGE BUILDING Contact: SPOKANE POST FRAME Address: 7001 E 2ND C - S - Z: SPOKANE, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 926-0865 Group Name: Site Information: Project Name: Plat Key: 000646 Name: DONWOOD EAST District: East Parcel Number: 55064.0203 Block: Lot: SiteAddress: 3516 N DONWOOD ST Location:: CSV Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: .00 Acres Width: 68 Depth: 134 Right Of Way (ft): 50 Nbr of Bldgs: 1 Nbr of Dwellings: I Owner: Name: POWELL, NELS S & TANA L Address: 3516 N DONWOOD ST SPOKANE VALLEY, WA 99216-170 Review Information: Review Building Plan Review Released By: Septic Sys Review Originally Released: 12/7/2010 By: tmelbourn Released By: Originally Released: Landuse/Zoning/HE Conditions 12/6/2010 By: LHALSEY Released By: Originally Released: 12/8/2010 By: tschmidt Permits• Operator: jmm Printed By: jmm Print Date: 12/8/2010 Project Number: 10003960 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/8/2010 Page 2 of 2 Building Permit Contractor: SPOKANE POST FRAME Firm: SPOKANE POST FRAME Address: 7001 E 2ND AVE Phone: (509) 926-0865 SPOKANE, WA 99212 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB PLAN 864 $16,416.00 864 $16,416.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Totals: 864 $16,416.00 864 $16,416.00 Units Unit Desc Fee Amount I SELECT $279.25 1 SELECT $69.81 I SELECT $4.50 Permit Total Fees: $353.56 Notes: One of the exisitng accessory structures MUST be removed prior to final inspection. Exceeds the 10% allowable sq ft for accessory structures. As per SVMC 19.40.020 (b) all residential driveways must be paved with asphalt...or other approved hard surface material. Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $353.56 $353.56 $69.81 $283.75 $353.56 $353.56 $69.81 $283.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 12/8/2010 Community Development Residential Constructio"ri r'- 2 �� L Ne Consfruction Permit Application DEL 9� ❑ Addition/Remodel , pNtect # Permit Center 11707 E Sprague Ave, Suite 106 Spokane Valley, WA 99206 (509)688-0036 _FArX,:t(5509)688-0037 www.spokanevalleey:orgs 1.11 1 1 cEt1�E PERMIT NUMBER: PERMIT FEE: �C1 othe4: [f Accessory Bldg ❑ Deck SITE ADDRESS: 35 1 1 ! t,mst'LU i1:9 Gc� . JJ , "'Oki V oR ( ' ,9 a ASSESSORS PARCEL NO: 0 61-1— ozo 1- LEGAL DESCRIPTION: Building Owner: Contractor�. SPo% z 1-14-:,_�c.m_i_(�L Name: ts- r. Name: J -..i...5 tT * —pow LLL Address: 35-1 b M, OAf/:Jet,/ . Address: Ito t 2p pi.. City Z v 44&A State: wt Zip:1,216 City: .1ii:veCi - tittLey State: W7 Zip: 42_ Phone: c/Lc_ CdYS ( Fax: y2 -Y -_5.l41 Phone: ?2z— 322.- Fax: IMPERVIOUS SURFACE AREA: -Comae rrcL<N'k. 9cv Fbtu) Exp Date: Contact Person GARS.esso:-F G: fL ( 869 Ip City Business Lie. No: ; r12 W�11 # OF BEDROOMS: -er -- f1CON�SfTR�,U�eCTI(((»ONT"YPE: PO'i Inaba tWK{rt rq Name: -etre— SEWER 0 SEPTIC Phone: 22.4 -mgt s Describe the scope of work in detail::. Cost of -Project: $ 3 ,smb Z -t, 36' x )v' 6-4-21-61- / STD 12-1 3QL Odic? Proposed Use: L�3y-[� S_ / $73rL1-6--4- 31c,a_uy **************The following MUST be complete: (write N/A 'if hot applicable)********************** HEIGHT TO PEAK: e DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2N° FLOOR SQ. FTG: ,� UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: . FINISHED BASEI,E SQ. FTG: GARS.esso:-F G: fL ( 869 Ip DECK/COV. PATIO SQ. FTG: - .-e-- 30% SLOPES ON :PROPERTY' # OF BEDROOMS: -er -- f1CON�SfTR�,U�eCTI(((»ONT"YPE: PO'i Inaba tWK{rt rq HEAT SOURCE:% SEWER 0 SEPTIC The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit Is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this -City of Spokane Valley Permit inure to theproperty owner. 3) The signatory is the property owner or has permission to represent the property owner in thIs transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for. any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature:: REVISED 711507 ['Check DATE: ❑ Mastercard 0 VISA Expires: VIN#: (A Spokane valley J.J-•'��^�'3 res.—��v v� . For City Use Only PLUS Project Nunilier�� ���p7' Project Address S 1 (o'•� ;\?) 11703 E Sprague'Ave Suite B=3' •, Spokane Valley WA 99206. • 509.688.0036 ♦ Fax: 509.68&0037'$ permitcenter@spokanevatley.org As part of our, on-going. commitment to customer. service during the.' review., process of your. project application, we are providing' you witha TARGET DATE for the initial technical:application review; If for any reason we cannot meet this `date, we will contact you with a'revised target date; -. Your application review TARGET DATE is 4%7/, C) The TARGET DATE is the date; we estimate your project application' will have had its -initial technical review. It is not the date for approval,or permit issuance. Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. • ' •Extra time /7/Cly be required for re-suhnnttals as project application reviewersit oiL on inn/tip/c applicatio5is and it may he several clans before they can look at trout ticw o, revised i formation. •• . i Designate d specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be:changed, one individual With the expertise for dealing With reviewer coma -tents would be the best choice for the entire review process: r Call staff regarding the status of your. project only after the target date shown at the`itop'ofthe page:: . Althoughvoushould be contacted on or by the tat get date, please feelRecto contact uv if ion hat en'theatdfrom us by your target date. Stat! may contact roti before the target date if the initial i°eview is complete.' By folowing this procechu-e. you will save time and allow the reviewers to complete the Work more expeditiously:.: '' Steps in the Permit Process ; • 1. Counter Complete. Your application has been accepted as' counter complete. This ' means :all' of the required , documents, as indicated on your Pre -Application' Checklist have been submitted or' have been approved for deferred. submittal. This does not prevent technical stafRfrom requesting, additional, information,as a result of their technical review." . 2. Quality Check. Theuext step in the process is a quality checkto make' sure that the -application is reviewable and free, from substantive Claws that would'prevent technical staff from 'completing ,the technical.review-once-it is; started:' When • this step is complete, your application :Will be routed to the appropriate; staff and remain, in. their; review. queue until it • • comes up for review. • 3. Technical Compliance. Once an,application is administratively complete, it -is routed to technical staff for compliance • review. Depending on .the type of project, technical staff may include multiple reviewers.'You should.be contacted; by phone, tax; email, or mail by your TARGET DATE once, the initial technical compliance' review is complete: 4. Permit Issuance. When the technical compliance review of the application; is complete;. including any subsequent re- submittals, each reviewer,will approve their section of the application and route it to,the Permit; Center.' When all sections of the application are. received, a Permit Specialist will process the application and'contact the- person; specified on your application for permit pick-up. Information regarding fees and pre,construction meeting's (if required).will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9/07 SPOKANE POST FRAME, INC. Engineered Pole Buildings shops garages storage buildings cabins kits -cost plus 7001 E. 2nd Ave Spokane, WA 99212 ROLFE WILL Sales Manager - Owner 509-926-0865 • Fax 509-924-5161 or 1-866-926-0865 Visit us at www.spokanepostframe.com PLANNING DEPT. APPROVED Site . Ian BY:�j DATE: /*//c Nor t h Show streets/alley Show septic/sewer/dratnfleld Show existing buildings Show proposed building Show setbacks - front, rear, sir Show lot size ZONING CRITERIA - Sh '0 O•) CU U E' ) E.= 0- 0 (1) 7) Q - a) O pCCS L_ O _c U c r- oco�o � u)3 A a) (')�n 2 c ca a) -> cri o — at - TO o cu to 0_ < co `no JOB UNIE N 1.71-` ,JA- TO w (UL PHOtJE " % Z2-- 32Z- ADDRESS 3,5-1 6 PI t c olooi 5� e 1Jr tit t i l` 2t 6 LEGAL DESCRI PT ION l e&rc.../L- 53 o 2 Q z (#Y4/2_, -44 �Gp cay If closer than 5' to property Ilne - need firewall and parapet Out of rear 30' and closer than 5' - need waiver from neighbor Can't cover more than 50% of rear 25' Corner lot - building must be 20' from property line 50' minimum setback from front property line Less than 8' from residence - need firewall Maximum square footage - 10% of lot area (Must be less than 3.000 sq ft.) flay not subdivide lot so that building Is more than IOP. of residual lot area bounty If closer than 5' to Property Ilne - need firewall 10' from septic/dratnfleld Less than 6' from residence - need f irewal l GEtiERAL SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE BOOK AILD KNOW WHAT ZONING YOU'RE IN TO BE SURE. I-IAXII1UM BUILDING SIZE ALSO CHANGES WITH DIFFERENT ZONING. 5' minimum side yard setback 5' minimum rear yard setback Minimum front and side street setback - 25' from property line or 55' from center of road - whichever Is greater o� 0V - Aug. jn •>�n , X(Q..PdS IO% S+ oc- ,pr 410 Reid ropo e - RECEIVED CSV PERMIT CENTER l DEC 0 5 22,0,1,0 Profit ;t #____1111.:3--Z-- --1-� 1 "`r -c - Name `r--`- Submittal At_ _-._ ---