2015, 02-24 Permit: SW-15000118 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000118 Permit Issued Date: 02/24/2015
Expiration Date: 02/24/2016
Project Description: SEWER
Project Name: SIPPLE
Primary Contact: NORM'S EXCAVATING INC
Phone: 509-928-0580
Applicant: NORM'S EXCAVATING INC
Address: PO BOX 30873
SPOKANE, WA 99223
Phone: 509-928-0580
Email. tina@normsexcavating.com
SITE INFORMATION:
Site Address:
Parcel Number:
3118 N DORA RD
35121.0901
Assessor's Description: ORCHARD AVE ADD N129.5 FT B138
Inspection Area: : (509)477-3675
Owner: YOUMANS, KENNETH D
Address: 3118 N DORA RD
SPOKANE, WA 99212-1519
Phone:
Email:
Water District: Orchard Avenue Irrigation Fire District: Spokane Valley Fire
District #6
Zoning: Land Area: 19166 Square Feet
CONTRACTOR INFORMATION:
NORMSEI972BM, Exp. 02/06/2017
NORM'S EXCAVATING INC
PO BOX 30873 SPOKANE, WA 99223
509-928-0580
tina@normsexcavating.com
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$27.12
$125.00
$152.12
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed: 02/24/2015 07.37:29 Project Coordinator: Susan Clark
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000118 Permit Issued Date: 02/24/2015
Expiration Date: 02/24/2016
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 02/24/2015 07:37:29 Project Coordinator: Susan Clark