2011, 02-04 Permit App: 11000242 Basement RemodelProject Number: 11000242 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 2/4/2011 Page 1 of 2
Project Information:
Permit Use: BASEMENT REMODEL Contact: WORTHINGTON, ROBERT P & BRONW
Address: 903 N DORN CRT
C - S - Z: SPOKANE VALLEY, WA 99212-3703
Setbacks: Front Left: Right: Rear: Phone: (509) 928-0176
Group Name:
Site Information: Project Name:
Plat Key: 999999 Name: Range
District: Nort
Parcel Number: 45182.9042
SiteAddress: 903 N DORN CT
Location:: CSV
Block: Lot:
Owner: Name: WORTHINGTON, ROBERT P & BR
Address: 903 N DORN CRT
SPOKANE VALLEY, WA 99212-370
Zoning: R-3 SF Res District
Water District: 098 SPO CO WATER DIST#1
Hold: ❑
Area: .22 Acres Width: 75 Depth: 125 Right Of Way (ft): 40
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Permits •
Released By: -_
Originally Released: 2/1/2011 By: tmelbourn
Contractor: OWNER
Building Permit
Firm: OWNER
Phone• (000) 000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
BASEMENT F R-3 VB PLAN 0 $9.500.00 0 $9,500.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS R V W < 7999 SQ FT
Totals: 0 $9,500.00 0 $9.500.00
Units Unit Desc Fee Amount
1 SELECT $181.25
1 SELECT $4.50
1 SELECT $72.50
Operator: jmm Printed By: jmm
Permit Total Fees: $258.25
Print Date: 2/4/2011
Project Number: 11000242
Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 2/4/2011
Contractor: OWNER
Item Description
VENTILATING FANS 1 DUCT
Contractor: OWNER
Item Description
TOILETS/BIDETS
SINKS
SHOWERS
WATER HEATER - ELECTRIC
Notes: - : -
Mechanical Permit
Page 2 of 2
Firm: OWNER
Phone: (000) 000-0000
Units Unit Desc
2 NUMBER OF
Permit Total Fees:
Plumbing Permit
Firm: OWNER
Phone:
Units Unit Desc
1 NUMBER OF
.1 NUMBER OF
1 NUMBER OF
1 NUMBER OF
Permit Total Fees:
Fee Amount
$22.00
$22.00
(000) 000-0000
Fee Amount
$6.00
$6.00
$6.00
$6.00
$24.00
MECHANICAL PERMIT REQUIRED FOR FANS
Payment Summary:
Permit Type
Building Permit
Mechanical Permit
Plumbing Permit
Fee Amount
$258.25
$22.00
$24.00
Invoice Amount
$258.25
$22.00
$24.00
$304.25 $304.25
Amount Paid
$72.50
$0.00
$0.00
Amount Owing
$185 75
$22.00
$24.00
$72.50 $231 75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to he true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not he construed to he a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 2/4/2011
Spokane
Walley
Comm u n itT-Developmer Department-- n
Permit Center
epartment—
PermitCenter t.iV t --tat
t�
11703 East Sprague Avenue, Suite B-3:NTEF
Spokane Valley, WA:49206=Nm'ni t v`
(Staff Use Only)
PERMIT NUMBER:
Tel: (509) 688-0036 �1 (�� PERMIT FEE:
Fax: (509)'688-0037 JAN
permitcent4resookanevallev aicr
Project #
'Name
RESIDENTIAL CONSTRU-CTIO °PERMI rA PLICATION
0 NEW CONSTRUCTION 0 ADDITION/REMODEL 0 ACCESSORY BUILDING
❑ DECK ■❑ OTHER
SITE ADDRESS: 903 N. Dorn Court, Spokane Valley, WA 99212
ASSESSORS PARCEL NO.: 45182.9042 LEGAL DESCRIPTION:
BUILDING OWNER NAME: Robert P and Bronwyn L Worthington
NAME: Robert P Worthington
ADDRESS: 903 N. Dorn Court
Cm: Spokane Valley
STATE: WA zip: 99212
PHONE: (509) 928-0176
FAX:
CELL: (509) 768-8908
CONTACT NAME: Robert P and Bronwyn L Worthington
PHONE: (509) 928-0176
Fax:
CELL: (509) 768-8908
CONTRACTOR NAME: Robert P and Bronwyn L Worthington
MAILING ADDRESS: 903 N. Dorn Court, Spokane Valley, WA 99212
cm: Spokane Valley
STATE: WA
zip: 99212
PHONE: (509) 928-0176
FAX:
CELL: (509) 768-8908
CONTRACTOR LICENSE No.:
EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
Replacing: panelling, carpet, light fixture, ceiling tiles, water heater. Adding cabinets. toilet, shower, sink, outlets.
Replacing: panelling, carpet, light fixture, ceiling tiles, water heater. Adding: cabinets, toilet, shower, sink, outlets.
****YOU MUST COMPLETE THE FOLLOWING****
E
Height to Peak: n/a
Dimensions: 40X25
No. of Stories: 1
Total Habitable 1437
Space:
Main Floor SQ FT:
957
Upper Floor SQ FT:
Na
Unfinished Basement SQ
FT: 4OU
Finished Basement SQ
F x:480
Garage SQ FT:���
Deck/Covered Patio SQ
FT:
nia
Impervious Surface
Area:
30% Slopes on O
Property:
No. of Bedrooms:2
Construction Type:
Heat Source: Gas Furnace
Sewer or Septic: Sewer
TOTAL COST OF PROJECT: $ 9, SDO OIC
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Effective October 28, 2007 Page 1 of 2
P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
Signature
Method of payment: ❑ Cash
Bankcard #:
0 Check
❑ Visa
EXP:
Date: `/
0 Mastercard
VIN#:
Authorized Signature:
Effective October 28, 2007Page 2 of 2
P:\Community Oevelopment\02 Administration\03 Forms - Official Versions\Permit Center\ftesidential Construction Permit
App 10.28.07.doc
Permit Cads
11703 E Sprague Ave, Suite B-3
j�ayssaa" Spokane Valley, WA 99206
(509)688-0336 FAX (509)688-0037
pennitcenterfaspokanevallev ore
Community Development
Plumbing Permit Application
SITE ADDRESS: 903 N Dom Ct, Spokane Valley, WA 99212
PERMIT NUMBER:
PERMIT FEE:
❑ Commercial 0 Residential
Building Owner Robert P and Bronwyn L Worthington
Name: Robert P Worthington Phoma 509-928-0176 Fax:
Address: m314 Dom Ct Cib' Spokane Valley State: WA Zip: 99212
Contractor Robert P and Bronwyn L Worthington
Name: 509-928-0176 Phone: 509-928-0176 Far
Address: 803 N Dom cr citySpokane Valley State
WA Zip: 99212
License No: City Baseness Lic:
ContactiPrgeet Manager. Robert P Worthington
Name: Robert P Worthington Phare: 509-928-0176
0 OF UNITS
PLUMBING FIXTURE ON A TRAP
--
TOILETS
1
URINALS
TUBS
SHOWERS (per trap)
1
SINKS
Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food
Prey Meat
1
DISHWASHER
CLOTHES WASHER
GARBAGE DISPOSAL
WATER SOFTNER
FLOOR DRAIN
Area, Case, Cot Trench, Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN, DRINKING
WATER PIPING/DRAIN-IN WASTE
Installation, Alterations, Repair, Reuasats
WATER USING DEVICE
Ice and/or Coffee maker, hose bib, steamer Woofer, cabonmtor, swamp cooler
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER
If Gas, See Mechanical
1
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS
Including baps. vents except kitchen type grease interceptors functioning as Mute baps
REPAIR OR ALTERATION
Water piping, drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE
Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
DCASH ❑ CHECK ❑ VISA 0 MC
Cards
SIGNATURE:
EXPIRES:
VIN:
P.'Community Devclopment102 Administration \03 Forms- Official Versions \Permit CentrrkPlmnbing Permit Application 04-03-09 dgdoc
T7'_�,,� Permit Center
S Oi She 11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
4200:001/2Her (509)688-0036 FAX. (509)688-0037
Community Development pertnrtcenter(a)sookanevallev0re
Mechanical Permit Application
PERMIT NUMBER:
PERMIT FEE:
n Commercial Residential
SITE ADDRESS: ()a3 /V. i20C'�-
Building Owner '
Name: R0 Ser i- P r tl:.,,
Address: 103 4/ Oorn C.
Phone: q2 f_ 0,-, L Fax:
Contractor'
City: Sa ko»_ van. -7
State: WA Zip: q1
Name: Ro)rc, d P. ldat-ILl I -o.
Address: 90 3 At lir✓.. C t .
Phone: 121- 0 1-1 !� Fax:
License No:
City S;,A'a..� \t)la7 State. �.yA
City Business Lic I
Zip: 99 nl z
Contact/Project Manager:
Name: Rej,
fi e. v/or
Phone:
9
tf-07-740
❑CASH 0 CHECK 0 VISA ❑ MC
CARD#:
EXPIRES:
SIGNATURE
VIN:
http.//www spokanevalley.org/uploads/Commumly_DevelopmemMocuments/Forms/Building/McchamcalPermitApphcation040309 doc
#UNITS
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Up to & including 100,000 BTU
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP/AIR CONDITIONER
0-3 TON
AIR CONDITIONER
Over 3-15 TON
AIR CONDITIONER
Over 15-30 TON
AIR CONDITIONER
Over 30-50 TON
AIR CONDITIONER
Over 50 TON
GAS WATER HEATER
GAS PIPING SYSTEM (each outlet)
GAS LOG, FIREPLACE, & GAS INSERT
APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT
REPAIRS OR ADDITIONS
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
0 to 3 hp -100,000 BTU or less
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 3 - 15 hp - 100,001 to 500,000 BTU
BOILER COMPRESSORS, ABSORPTIONS SYSTEM
Over 15 - 30 hp - 500,001 to 1,000,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 30 hp - 1,000,001 to 1,750,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 50 hp - over 1,750,000 BTU
AIR HANDLER (DOES NOT include ducting)
Each unit up to 10,000 cfm, including ducts
•
AIR HANDLER (DOES NOT include ducting)
Each unit over 10,000 cfm
EVAPORATIVE COOLERS(other than portables)
VENTILATION AND EXHAUST
Each fan connected to a singe duct
2 -
VENTILATION AND EXHAUST
Each ventilation system
VENTILATION AND EXHAUST
Each hood served by mechanical exhaust
INCINERATORS
Installation or relocation of residential
INCINERATORS
Installation or relocation of commercial
APPLIANCES
Range Clothes Washer
UNLISTED APPLIANCES
Under 400,000 BTU
UNLISTED APPLIANCES
Over 400,000 BTU
HOOD
Type I
HOOD
Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM - FREE STANDING
❑CASH 0 CHECK 0 VISA ❑ MC
CARD#:
EXPIRES:
SIGNATURE
VIN:
http.//www spokanevalley.org/uploads/Commumly_DevelopmemMocuments/Forms/Building/McchamcalPermitApphcation040309 doc
Spokane
#Ya1ktr
For City Use Only •
PLUS Project Number —
Project Address Uj 0 [7 •J
11703 E Sprague Ave Suite B-3,♦ Spokane Vattey WA 99206
• 509.688.0036 • Fax: 509.688.0037 ♦ permitcetiter@spokanyatley,org:
As part .of our on-going commitment' to customer -, service during the review process;of'yotir'project
application, we are providing you with a TARGET DATE for the initial technical application review'If,
for
any reason we cannot meet this date; we will contact,you with a revised target. date: •
Your application review TARGET DATE is
•
The TARGET DATE is the date' we estimate your project application wilt have,had its:.initial technical
review. It is not the date for appi'oval'or permit issuance.
[•
-Tipsfor a -Smoother Project Application -Review
Submit complete, accurate,plans'and'documents.
Ea lime maybe regidred toy re-suhinitlals cis protect application. *70//0 o
Extra n iiurlliple applicutiats,nnd,it
nun' he ,credal day* be/hrc.lhe r can look at your new or revised arfornnitioh...
Designate a specific contact person to communicate with the City.
IVhrle the person designated as the applicant's contact person' with the City can be'changed, one indii'rrirahwilh the -
cvpertise for dealing with reviewer continents world be the best choice Jor the entire rerteir process. •
Call staff regarding the status of your project only after the target dateshown at the top of, the page. '
Although you should be contactedon.or by the target date, please feel free 10 contact us.'if:Voir haven't en'/ heart/from us
by your target date. Staff may contact you before the target date if the initial review; is complete. 81 /O/1owing this
procedure, you will Saye time and allow the 1 eyietrers to complete ihe.n'ark imire.erpeditioltcly. • `
Steps in the Permit Process':
I. Counter Complete. Your application' has. been accepted as counter complete. • This , means all .• of `the 'required.;
documents, as indicated on your Pre -Application Checklist have been submitted"oi ' haye;.becli approved for, 'deferred
submittal. This does not prevent technical staff from requesting additional information. as a result of their technical:res;ie-w.
2. Quality Check. The next step in the process is a quality check to make sure. that theapplication is reviewable and free,'
from substantive tlaws that would prevent technical staff from completing the technical'review once itis started.' When;
this step is complete, your application will be routed to the appropriate staff and'rentain in,iheir'review,queue until it •
comes up for review. .,
3. Technical Compliance. Once an application is administratively complete, it-is.robted to technical staff for compliance ,
review. Depending 011 the type of project}technical staff may include -multiple reviewers. You should be„contacted by
phone; fax, email, or mail by your' I' ARG ET. DATE once the initialtechhical compliance revicd` is complete.
4. Permit Issuance. When the. technical, compliance review of the application,is complcta.including any,stibsegtient're-
submilttils, each reviewer will approve their section of the application and route it to the' Perrnit Center When all: sections •
of the application are received, a Perntit,Specialist,tvill process the' application and contact theperson'speci1ied.011 your
application for•permit pick-up. In!orntation regarding fees and pre-construction'm ectings-(if required)' will'be provided by '
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE
REV 9/07