2013, 03-18 Permit: SW-13000234 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000234
Permit Issued Date: 03/18/2013
Project Description:
SEWER CONNECTION
Project Name:
WEST FARMS
Primary Contact:
H & R COMPLETE
Applicant:
H & R COMPLETE
Phone:
509-218-8336
Address:
PO BOX 749
NEWMAN LAKE-, WA 99025
Phone:
509-218-8336
Email:
SITE INFORMATION:
Site Address: 5320 N DAVIS RD
Parcel Number: 46344.1204
Assessor's Description: SANSON EAST LT 4 BLK 3
Inspection Area: :(509)-477-3675
Owner: PEDERSEN, GLENNA MARIE
Address: 5320 N DAVIS RD
SPOKANE, WA 99216-3011
Phone:
Email:
Water District: Trentwood Irrigation District Fire District: Spokane Valley Fire
#3
Zoning: Land Area: 12474 Square Feet
CONTRACTOR INFORMATION:
HRCOMI*972DD, Exp. 03/04/2015
H & R COMPLETE
PO BOX 749
NEWMAN LAKE-, WA 99025
509-218-8336
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
CONDITIONS:
$26.32
$125.00
Total Fee: $151.32
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY. -
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed: 03/18/2013 08:50:01 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000234
Permit Issued Date: 03/18/2013
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 03/18/2013 08:50:01 Project Coordinator: Dawn Dompier