2005, 01-27 Permit: 05000200 DuplexSpokan �
®,valley
BUILDING DIVISION
11707 E Sprague Avenue Suite 106
Spokane Valley, WA 99206
Site Information
Project Information
Site Address: 1712 N DRUMMOND ST
Parcel Number: 55083 6101
Subdivision:
Block: Lot:
Zoning: UR -3 Urban Residential 3.5
Owner: DIAMOND ROCK CONSTRUCTION
Address: 15321 E MISSION AVE,
SPOKANE VALLEY, WA 99037
Building inspector. NIK BENTLEY
Water Dist:
Project Number: 05000200 Inv: 1 Issue Date: 0127/2005
Permit Use: NEW DUPLEX W/ATTACHF,D GARAGES - GAS
Applicant: DIAMOND ROCK CONSTRUCTION
15321 E MISSION AVE.
SPOKANE VALLEY, WA 99037. Phone: (509) 924-8964
Contact: DIAMOND ROCK CONSTRUCTION •
15321 E MISSION AVE.
SPOKANE. VALLEY, WA 99037 Phone: (509) 924-8964
Setbacks -Front: 55 Left: 5 Right: 5 Rear: 37
Group Name:
Project Name:
Permits
Approach
Contractor: DIAMOND ROCK CONSTRUCTION
License#: DIAMORC0320Q
APPROACH INSPECTION
FOR RIGHT OF WAY INSPECTIONS CALL (509) 869-5373 ENGINEERING
S25.00 CONST IN ROW - APPROACH
Total Permit Fee:
1 525 00
550.00
Building Permit
Group: R-3
Contractor: DIAMOND ROCK CONSTRUCTION
License #: DIAMORC0320Q
Type: VB
Total Area 1400
Building Height 20
Stories 1
GARAGE
PER COST OF
PROJECT
Total Value:
FOR BUILDING INSPECTIONS CALI, (509) 688-0054
11-1 VB 960 RESIDENTIAL PERMIT FEE
R-3 VB 0 STATE SURCHARGE,
RESIDF,NTIAL PLAN REVIEW
5130,000.00
$1,161.75
$4.50
5464.70
Total Permit Fee: $1,630.95
Mechanical Permit
Contractor: COMFORT CENTRAL HEATING & AIR License #: COMFOCH990G
GAS WATER HEATER
GAS PIPING
CLOTHES DRYER
GAS LOG OR GAS INSERT
FOR MECHANICAL INSPECTIONS CALL (509) 688-0054.
2 520.00
6 $6.00
2 520.00
2 $20 00
GAS APPLIANCE'=100,000BTU
VENTILATING FANS
RANGE
HOOD -TYPE II
Total Pennit Fee:
2 524.00
6 560 00
2 $20 00
2 $20 00
$190.00
Processed By: DOMPIER, DAWN
Printed By: MIKE TURBAK
Page 1 of 2
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code.
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE This inspection includes review of the structure's setback from property lines Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final
FRAMING — after all framing. bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing
FINAL — when complete and prior to occupancy and/or use. All permits require final inspection
NOTE. In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete. stairs, handrails, skirting, etc. installed, and prior to occupancy,
completed inspection record card must be available on site
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc must
be inspected prior to cover Check with the Building department for "special inspections' in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and inspections for eiectncal vnnng, Slate Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Diesion
And Industries 3242640 477-3604
Permis and Inspections ler on-site septic systems, Spokane Regional Fire spnnkler and alarm systems and private access road inspections. Spokane valley
Health District 324-1560 Fire Department 892-4122
State law RCW 19122 requires that pnor 10 any excavation the -CALL BEFORE YOU DIG- censer must be notified Gall before you dig at least 2 working days in advance, 456-8000
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance. regardless of whether the work is
finished If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent
Date
Staff Approval Date
//2-7A
Spokane
.0,0051svalley
BUILDING DIVISION
, 11707 E Sprague Avenue Suite 106
Spokane Valley, WA 99206
Site Information Project Information
Site Address: 1712 N DRUMMOND ST
SPOKANE. VALLEY, WA 99016
Parcel Number: 55083.6101
Project Number: 05000200
Inv: 1 issue Date: 01/27/2005
Permit Use: NEW DUPLEX W/ATTACHED GARAGES - GAS
Permits
Plumbing Permit
Contractor: MIKE & SONS PLUMBING License 4: MIKESP'999KJ
TOILETS/BIDETS 4 524.00 SINKS 6 536.00
SHO\VERS 4 524.00 DISH WASHERS 2 $12.00
CLOTHES WASHER 2 S12 00 WATER USING DEVICES 4 $2400
Total Permit Fee: $132.00
FOR PLUMBING INSPECTIONS CALL (509) 688-0054.
Payment Summary
Total Fees AmountPaid AmountOwing
$2,002.95 $2,002.95
$0.00
Tran Date Receipt # Pavment Amt
01/262005 181 $1,630.95 '
01/27/2005 192 "'".$372.00
Processed By: DOMPIER, DAWN
Printed By: MIKE TURBAK Page 2 of 2
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following Inspections ARE
REQUIRED by City Code:
FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes
NOTE. This inspection includes review of the structure's setback from property lines Minimum setbacks are established by City of Spokane
Valley Ordinance Curb lines and fence tines are not necessarily indicative of property lines The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete
PLUMBING - after rough -in, before covering, and final
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL - when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access,
on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Penis and inspections for eiectncal wrong, State Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division
And Industries 324-2640 477-3604
Permits and mspecllons for on-site septic systems. Spokane Regional
Health D,sIncl 3241560
Fire spnnkler and alarm systems and pnvate access road inspections. Spokane valley
Fire Department 892.4122
Stale law RCW 19 122 requires that pnor to any excavation the -CALL BEFORE YOU DIG"centermust be notified Cali before you dig al least 2 working days in advance. 456-6000
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent
Date //2-- 7/0 5 -
Staff Approval Date