2002, 05-23 Permit: 02004023 Sewer SPOKANE COUNTY DIVISION OF BUILDING
AND C ODE ENFORCEMENT
lit 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
#,,.. SIo C(XJI*TY
Site Information Project Information
Site Address: 1425 S DAVIS LN Project Number: 02004023 Inv: 1 Issue Date: 5/23/02
SPOKANE,WA 99216 Permit Use: SEWER CONNECTION-DHAENENS SQUARE PHASE II
Parcel Number: 45224.4405
Subdivision: DHAENENS SQUARE PHASE II Applicant: CURRY,GORDON
Block: 5 Lot: 5 14313E TRENT
Zoning: UR-7 Urban Residential-7 SPOKANE,WA 99216 Phone: (509)928-0600
Owner: CURRY,GORDON Contact: CURRY,GORDON
14313 E TRENT
Address: 14313 E TRENT SPOKANE,WA 99216 Phone: (509)928-0600
SPOKANE,WA 99216
Setbacks-Front: Left: Right: Rear:
Building Inspector: DAN HOWARD
Water Dist:
Group Name:
Project Name:
Permits
Sewer Connection Permit Contractor: OWNER License#: OWNER
SEWER CONNECTION 1 $85.00 PROCESSING FEE $15.00
Total Permit Fee: $100.00
FOR SEWER INSPECTIONS CALL(509)477-3604 UTILITIES 8:30-5:00 PM MONDAY THRU FRIDAY
Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED.
Contractor or applicant is to field locate and confirm the elevation and position of sewer stub prior to any other excavation.
Sewer stubs are to be checked prior to connection to ensure that they have acceptable grade and are clear and unobstructed to the main
sewer. Sewer lines should be constructed to allow for gravity flow from the lowest level of the structure.
This permit must be presented to the job site inspector for verification. To locate buried cables,gas piping,water lines,etc.
CALL BEFORE YOU DIG,(509)456-8000.
STATE LAW RCW 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE"CALL BEFORE YOU DIG"CENTER BE
NOTIFIED.CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE,(509)456-8000.
Payment Summary
Total Fees AmountPaid AmountOwing Tran Date Receipt# Payment Amt
$100.00 $100.00 $0.00 5/23/02 3660 $100.00
Processed By: FRAZIER,CAROL PERMIT ,
Printed By: WENDEL,GLORIA Page 1 of 1