Loading...
1996, 09-24 InsulTech Correspondence/OBEY AMOW ®NS11L INCH! AN, • insulation, inc. if Attn: Joseph Jarvis SubmatedTo. Trinity Homes 10804 E. 19th 11303 East Montgomery, #4 • Spokane, WA 99206 509-891-4070 • Fax: 509-891-4992 • 800-646-7822 Contractors Lic. # INSULT1052Q7 Phone: 928-0223 Job Name: Fax. Date. 9-24-96 Spokane, WA 99206 Job Location: 2308 S. Dusk Lane (Morning Side) INSUL-TECH Insulation, Inc. hereafter designated as INSUL-TECH, proposes to furnish all materials for the application of: ' 6 p 6" R-19 fiberglass batt insulation in exterior wood frame house walls 3?" R-13 fiberglass batt insulation in.:upper frame 2X4 wall 6" R-19 fiberglass batt insulation at exterior concrete furred walls 6" R-19 fiberglass insulation at exterior floor rim & end joists 10" R-30 fiberglass insulation; in floor cantilevers/overhangs 10" R-30 fiberglass batt insulation over "bay window(s)" "10" R-30 fiberyiass•batt insulation at vaulted/cathedral ceiling 12" R-38 fiberglass batt insulation at entry ceiling 4 mil poly vapor barrier over all exterior frame wall insulation Flame Spread poly vapor barrier, over all exterior furred wail insulation 4 mil poly vapor barrier over ceiling•batt insulation .Insulation air baffles installed at attic/roof eaves as required Sealant Package: Foam seal all- plumb.irig/wire penetrations at top & bottom wall plates., foam seal outlet boxes: at exterior walls, foam seal all windows/door jambs, caulk exterio,r.;wall plates. R-38 blown over attic area of house $1,938.00 Tax Included 4:) NOTE: Joseph, can you cut access through sheathing at front girder truss to allow access to small upper front attic? TERMS OF PAYMENT: Payment in full due upon receipt of invoice. Contracts which state a draw cut off date and payment release date are the only exceptions and must be signed by the representatives of both parties. FINANCE CHARGE: A finance charge in amount of the lesser of 1.5% per month (18% per annum), or the maximum allowed by law will be added to all invoices that are 30 days past due as of the 10th of the following month. 3 0 ACCEPTANCE: This proposal is subject to change and may be withdrawn if.not accepted within days after above date and is submitted to the terms and conditions listed hereof. APPROVAL: This contract shell not be binding on INSUL-TECH unt l it shall he approved by an authorized representative of INSUL-TECH. No alterations or additional work sha!I be performed unless agreed to oy INSUL=TECH, beforehand in writing. • APPR V D Date' 9-24-96 ACCEPTED De' R aim;� • i Company Name [ By By L d L rx aerie ael'dgaard Mar --11-97 08:08A Insu 1 Tc.ch ' -sulation _NSIuL ZECH i114U?. darer, .i 1991 Trinity riomes Attn: Josepn „arv�s RE: s. 23C6 `v'.. -A Lan- • 509-891-4992 44 • Spokane, WA 99206 • -4992 • 800.646-7822 t_ is Lic. # INSULTI052Q7 1 P.01 Q7 This letter i5 to verity the fact that-Iiisu1-Tech Insulation did in fact insulate the none at S. 23Po Uusk Lane as per bid dated 9-24-96. The insuiation ,job was completed as re4uired to :feet Spokane County Buildiny Coaes , ana "rror tr:west Energy Code,, . " Larr; 1.'N ti! 0J Vice r'res!,'cTi',