HEARING EXAMINER COMMITTEE
FINDINGS OF FACT, CONCLUSIONS AND ORDER
INTRODUCTION
This matter has come before the Heanng Examiner Commttee on March 21, 1996
The members of the Committee present are Brenda Bodenstein, Chair, Donald
Moore and 1V1ichael Schrader.
PI20POSAL
The sponsor, Cameron Ball, requests approval of a Zone Reclassification ZE-2-96,
from Urban Residential-3 5(UR-3 5) to Urban Residenaal-12 (UR-12) for
developnlent of 11 multiple family residences and those uses allowed in the Urban
Residential-12 (UR-12) zone
FINDINGS OF FACT AND CONCLUSIONS
1 The property is generally located north of and adjacent to 8th Avenue,
approximately 300 feet west of Felts Road in the NE 1/4 of Section 20, Township
25 North, Range 44 EWM, Spokane County, Washington
2 The Committee adopts the Planning Department Report as a part of this record
3 The exisang land uses in the area include single farmly residences, an apartment
complex and a hnuted number of duplexes
4 The proposed use is not compatible with existing uses m the area
5 The Comprehensive Plan designates this site as Urban Residennal net densities in
the Urban category should have an approximate density of one umt per acre to 17
uruts per acre The proposed Urban Residential-12 (UR-12) zone allows a
maacunum density of 12 uruts per acre which is consistent with the density range
suggested by the Urban category The proposal lies within the Pnonty Sewer
Service Area (PSSA) and is served by pubhc faclhties and services Lncluchng water,
samtary stonn sewer lines, pohce and fire protecnon
6 The proposed zoning does not unplement and conform to the Comprehensive Plan
7 The Artenal Road Plan designates Eighth Avenue is as a Mulor Artenal with a
future nght of way width of 80 feet
8 The existing zoiung of the property described m the applicarion is Urban
Residential-3 5(UR-3 5) prevlously established as Agncultural (A) zomng in 1942
and redesignated to Urban Residential-3 5(UR-3 5) on January 1, 1991 pursuant
to the Program to Implement the Spokane County Zoning Code
w
/
9 The provisions of RCW 43.21C ('The State Environmental Policy Act) have been
comphed with and a Determmation of Nonsignificance (DNS) was issued
10 The legal requirements for pubhc notice have been fulfilled.
11 T'he owners of adjacent lands expressed disapproval of the proposed use
Concems lncluded increased traffic, incompatibility with adjacent uses, and
incompatible densities
12. The apphcant has not demonstrated that cond.itions have substantially changed
since the onguial zoiurig of this area and accorcimgly, the proposed zone
reclassificanon is not jusafied.
13 The proposed use may be detnmental to the pubhc health, safety, morals or
welfare
HEC Order for ZE-2-96 Page 2
~
I
ORDER
The Heanng Examiner Committee, pursuant to the above Findings of Fact and
Conclusion, DENIES the application of Cameron Ball for the Zone Reclassificanon
from Urban Residential-3 5(UR-3 5) to Urban Residential-12 (UR-12) for
development of 11 multiple family residences and those uses allowed in the Urban
Residential-12 (UR-12) zone as descnbed in the apphcation ZE-2-96
MotLon by Michael Schrader Seconded by Donald Moore
Vote• (3-0) UNANIlVIOUS TO DENY THE ZONE RECLASSIFICATION
HEARING EXAMNER CO E
HEREBY ATTEST TO THE ABOVE FINDINGS ORDER AND VOTE
CHAIR
AT'TEST:
For JOHN MERCER
Acring Assistant Planning Dixector
By OHN W PEI)ERSON
Senior Planner
'3 /"22/0p~o
DATE
Pursuant to Spokane County regulations, any aggneved party has the nght to appeal thls
wntten decision to the Hearing Body within ten (10) calendar days of the signulg of this
order Upon receipt of an appeal, a public heanng wffl be scheduled. If you desue to file
such an appeal, you must submlt a wntten appeal, preferably on forms designed for such
purpose along with a$225 processing fee payable to the Spokane County Treasurer
Please contact the Division of Build.ing and Planning to file an appeal
If you have any questions, please call the Division of Buildulg and Planning at 456-2205
HEC Order for ZE-2-96 Page 3
,
r ~
ENGINEER' S REVIEW SHEET
AS BEtILT PL.A'VS Ri:CL1VED
REZONE FILE # ZE-002-96
Related File # ~ )
AARD # ( DiZlr- I64-96
~
Date to Review 03/21/1996 # 1
Date to AA & DR 41/10/1996 Time 1:15
Date Received 01/0211996
Project Name UR-3.5 TO UR-12 3-FOUR PLEXES No. Lots 0 No. Acres 43,2SF
Range - Township - Section
SITE ADDRESS N 8TH/W FELTS RD/W UNIVERSITY PARCEL yV01. /q4~~ I
Appiicant's Name CAMERON W BALL- Phone # 91-2-9076
Address BELL TELI.C IyC Qh"'n` 2J
PO BOX 85
GREEN.4CRFS N'y'A 99016
FLOOD ZONE No W S School 356 Ua[e Conditions Mailc:d i tBilling Name Owner BELLE TERRE INC Engineer
Address Address PO BOX SS Company
GREENACRES WA 99016 Address I
Signcd Phone 922-9076
Phone Phoae/FAX •
Date
Building Contact Person: Phone fl 456-3675
Date Submitted Description Initials
DATE FEES RECEIVED '
DATE PRIORITY FEES RECEIVED COPY TO ACC4UNTING
FINAL PLAT FEES COMPLETED & COPY TO ACCOUNTIIv
1v'OTICE TO PUBLIC # t 3 4 6 COMPLETED - OR NEEDS TO BE SI(;,\L-U
DESIGN DEVIATION SUBMITTED/DATE COMPLE"tED - MA]LED
ALTERATION TO PLAT - BI-OCKS & LOTS
BOND QUANTITIES FOR DRAINAGE ITEM CALCULATED
DATE BOND RECEIVED - BOND AMOUNT RECEIVED
DATE BOND RELEASED - DATE AS BUILT RD PLANS
HEARING EXAlbt APPROVED V/)ENTED 'PEALED BCC r
~
APPEALED PROJECT APPROYFD ENTED
STAMPED MYLARS TO PERMIT TECHNICIAN (SYLlSUZANNE)
~
STAMPED 208 LOT PLANS TO ADMINISTRATIVE ASSISTANT (SANDY)
~
r'
♦ r
ENGINEER' S REVIEW SHEET
AS BtrILT PLANS RECEIVED
DR REZONE FILE # -
Related File # ( )
AARD t! ( DRZE-164-96)
Date to Review #
Date to AA & DR 01/ 10/199b Time 1:15
Date Reccived 01 /02/1996
Projec;t Name UR-3.5 1'U UR-12 3-4 PLEXES No. l.ocs o No. Acres 43,2SF
Range - Township - Scction
A5201. l 4M
SIT'E ADDRESS N 8TH/W FELTS RD/W LRVIVERSITY P.ARCEL
Applicant's Name CAMERON W BALL- Phone # 922-9076
Address BELL TELLE iNC Phone 2#
PO BOX 85
GREENACRES W A 99016
FLOOD ZONE No W S School 356 Date Cond.itions Mailed
Billing Name Owner BELLE TERRE 1NC Engineer CHARLES SIMPSON
Address Address PO BOX 85 Company SIMPSOH ENGINEERS INC.
GREENACRES WA 99016 Address 909 N ARGONNE RD
Signed Phone 922-9076 SPOKANE WA 99212
Phone PhonelFAX 926-1322 FAX 926-1323
Date
Buildiag Concact Person: Jeff Forry Ext 103 I LOREN LAKSHAS Phone # 456-3675
Daie Submitted Description Iciitials
I / DATE FEES RECEIVED
DATE PRIORITY FEES RECEIYED COPY TO ACCOUNTING
FTNAL PLAT FEES COMPLETED & COPY TO ACCOUNTIN
NOTICE TO PUBLIC # 13 4 6 COMPLETED - OR NEEDS TO BE SIGNED
DESIGN DEVIATION SUBMITTED/DATE COMPLETED - MAILED
ALTERATIOIY TO PLAT - BLOCKS & LOTS
I J BOND QUANTITIES FOR DRAINAGE 1TEM CALCULATED
DATE BOND RECEIVED - BOND AMOUNT RECEIVED
DATE BOND RELEASED - DATE AS BUILT RD PLANS
/ j HEARI,IG EXAM APPROVED )F1NIED 'PEALED BCC
APPEALED PROlECT 4PPROVED ENIED
J / STAMPED MYLARS TO PERMIT TECHNICIAN (SYL/SUZANNE)
STAMPED 208 LOT PLANS TO ADM[NISTRATIVE ASSISTANT (SANDY)
. t -1o -U
Ga
I
~
~
ZE=2=96
/ ~1
C'IVALLEYI AY
N N f. NI ON ~
E.
. ~
~ J J
; 4 • Q R~vERStO a
.
u Z u Ftre ~~1 Ft. /9B ' N
- Z totian
► . ~~j A COU N T Y ROA=3 N0 2?
I +
o?
~ ~ a .St P~ pc~o,~oCQ~►vs . M/LWAUKEE RA/ LRDA1
, * 3 rej /1V 6 £
+ : .
~ • g
FO V R T H AV o
~ AV E a at
. ; d' ~ u`~ , Z ~ ~ H+ z • < W
t. ' S
_ Y. ♦ F1 . . y
Fit a > 7Th SEv
~
~
E l G A1/E
20 '
T H 9 rr{
. , L'/lE/P~' . ~ . • • -
9rA '
102, 10 T
.
. o ADIA AYE
• • Z
.
.
;N •
~
t Y~a•
= y~~ ~ J t~~{ • •~'S
t ~ :
vil
~;Y~•r ;r• J
.
. • ,
►
,
• ~ 0 T
• o r r~~ d
. `
• , , y,. ~
L. 1991 a T F
.
co ~ ~
H 3
o . .
i ,
9 TN ~ ~
, •
>
1
3i~ 10
. r
3/96 HEC Staff Report for ZE-2-96 PaQe 1
1
, R.
10J
ZIE 6 ~ V
. ~
~irt
m ON v
N ~
. uR r fe-a
w uR
URV
. ~ ~
X!ts►vi a Z` V~
TA0
? N ~ 3
r ~ ,oc UR2
Z •
2 VR~Zp ~ ~ . a4 G,71~NT ~ 11 . -
- 4 " ~A1 LRp;
~ • - r-
„s Y Mic.wA_~ _ ~ it
! ~ 5 t 0~a vC~ I
02 ~ St ~ t p f~ R .
~22
. -
r. uR_22 _ N 3 g,
• s
FoQaT
a t 5~~
~ , Y ~ th ~ Tr
` URP33 7 7
~ r► ~ •
• '
T 1~
1 *n ~ 9 T~+
'-Z, a Q j =f gTH ` .
a 3 T N
~ „ A ~ ~ 3
~
V • ~ Z Q
,
uR Z . - 10
.
'3 ACHER~Vf s;- C~ ~m~0~
~ _ ,
. ' _ ► 2
AVE • ~
A 5cv;1w ~
St ~ ~ '~•r.t~'~-.~-f ~
s t~
,
° ; o. ~
' c~` ~ ' ~ ,
' 4- !
. . ,
UR
uz L `99~
vft-7
' OR_ 2 ~
, r
o ,
4 loo Y
Z 2
.
p,age
re !'9►ff~' - ~ ZE_2-96
EC Staff RePort f ot
3/gb ~
,
~
,
w/ 1"~~_ 1
~ ~ ' ~ ~ ~ -1 1 ► ~ ~ ~ ~ ; ; ~ r ~ t, _ ,_t,., _ _ ~ _ l~ ~ , n
,
o~ , ~~)1
s',ao~r Ia. I 1l I~j I ii ROAO~ ~
~~1~~~ ,~b , r S
~
{Q~ ~ 0 1i ~ 'C I b y A ~
r
~ `
~iJ,~„~1 ~ ~ ~ - e
~ 1\ I ~ ~ I J'~ f.r.. 1 0 ~O ~ t I
0f=~
, 0
~ v
~ L-~ ~ ~ n ~ ~ V~ ~ e ~
CD ~ . / i . ~ ~ ~ _ ~ s ~ -.h-
b
91 ~ ~ z•_- -
e:Ey
O ~ Q`• .s~~. ~~~i~~~ ~ ~ _ ~ LoCUS/ OAQ
~ ~
' 1l Oir: i ~
ooze / i ~ ~S • ~ j ` ~
^~o019 ~ ~ c ~ ~ ~ r ~b G~' II i~ / a~ ~ n
' ~ ^1 ~ l'~~ ~ ~ ~ ~~l}• J~~ ~
J ,
wno ~OOd ►4ooeau~F RoAD. )
b\
4' - - r / ° •~1 Q ~ •---~1~. ~ ~ f"'
t ~ 1 I V ~
AL ROAO
~ D x ; ~ ~l~., ao~lO 1
A ie.12 ° v _
. - (
1 . , .r ; i ~ ~ ~ (
tI Y , x ~1 I
lj'~S . i- a ~ s~ 1 tl~i;4 ~ k- r J N l
`p~`/1 ~r ~ r ~ ~ Z • ~ t~ ~ ) 1 ~ ~
I I NIV[ UNIV TY ~ i ~ ~ • ~
~ ~ ~~.c~ ~i• ( 1 ~~r~r lis':~. ~C`~~` a_i.•-yr~._~_.4,~~,:_~~~._ ~l~s l6 ~ ..R+O~ ' I ~s~1~
r
1 ~I ~ ( ~ ~ /`~'I~~, v ~ ` ~ ,'i ~ ~ _ v J~ ~ f ~ rl gr.. • .
lz
y
h PiF~cc~~
~L ~ ~ R( A~'RCE RQAO~ , ~
~
+r ,t
W ~ni I}~ L - 4 ~ } ~ A • t t ~^st _ i ' ~ ` I ~ I I a ~
~ ~ JI
~ ; ~ p
9owo,sN_ poAC
i t ~`:rxp ►r « ~ - s. _
w
~ II I i ~y ~ V~
O . )0
ai
~I ya/ r~ . i f~I; 1} •9- i ~`1 - ~i ~ i~~„~ ~ ~
1_0
40
8,12 (I II r ~ ~ ~ } ' , + f • 0
~ ~ ~ ~ 1 ~ ~s:~Ji ~ ! ► ~ j ~ ~ ~
~'C, z t, ~
II 1 ~ I~ k r 7 ! I ~I~ay ~ I Y i I►~ ~ ~4
V ~ti i ~ A I I f{ II ~ t ~ ~ A~ I~f ~ "
Jf
ro t1 ~ 1~• I nl_ r t r ,I , r
II I~ I I {N t
W M~~ p
i
~ ; ~ p ~ ` a ' i~ x? i ;1t►,~ '~I ~ I ~
\ I ~ ~ I ~ ' ~ ' A 1
i /
a ~oda~. 3~~'5 961~
ti
96-Z"4Z ~ ~ ~
t tZrd , o
° Vi . /
_ J - w e kc,
0
~ ~ ` n
O~ + ~ n t - 1t~ ~ . e
~ 1 ~;.-e fr v. F s 4 r
/Ot
y. ~ ~ ,q ~
r
ror
Et $ + ~ t
$Z~k~
r ■
~ 1~~ G)►r.a ~u~R~~ ~ 5 ~s, ~ `t~~ 'R ~ `p~' 'c
~ ~ 1 ~ ~ . ~ t ♦ ~ U
i a if t 1 r
,y ` ' ~ t- _ : b3 . n~ 0 ~
~~y`~~~i r ~ _ ~ ti +_,,,,r ` 5 O _
1 ' ~j3✓ ~ ~ ,{lr . t ~ ~
~rqa
~~~'i ~ ~8~ • ~ al ~ ! ` ~~~i 1
,
41~
rstK r ~ _ ~ ~i i •a : = ~ ~ U ~ •
~
t1aN► ~ ~ `t_ Nlai ~ ~ D ~ o
~ _ ~ ~ " •
. .
r+ii~ _ ~i ~ ' ~ , • dw
► : oz • .
oeoz ~ - - 11
~
~ iIS aA
~ldS t
' tQaaa
~ ~~7lVA ~ , i 1 t
~
/ ~ ~s-_ ^ ti '~t`t • _
, v t~ • ~
1L3k008 ~ • ~ vw
, V 3AV ~ 1 y ! ~ ~ ~ +7 ♦ '
~ N , tt ~ ' • ~ ~p l~1aM f
ilk- ,
pp,pr . .
~
L~
~
96
,
~ ~ N 1
cn us
~ ` °c
: ~ ~ ~
y
.
fm
o ~ ~ v ~ = °
Z ~N8. z i t~ o
-z~j4t is~
Ct,
~
y %,;I.Z W Wt.~G ~ .
4 "C
M
F.. q : "`~Z y 0 '
`V ►~•1~~.~ ~ ~'iRK~~ ~ .
0 0
~n ~ 1~ ty 1r ~ V 1~ ` ~ ~ • ~
~ ~ ~ ~ ~ ~ ~ ~ ►Z. 1~ Z ~i O ~.a ~1 ti
-
W ~ _ R
R ~O z v N ~ ~ v yti
V J ~ i
Q~:3Jl ~
r ~
~ .
` • ` ~
41 °
< ,W s ov ~
I ffi _ ~ - - ` a.e._•r2 ~ ~el - - , { S ` R + £ •
na`►~-- ~.r ~v~"= ~~.~~-li- _ / `c' ~~~~~~T~....- ."j~ II + i ~ ~
+ N ' M1
tl LF <
t-
`
Y ~
• ~ ' ~ 1 ~'~1~7~ Y1r 1
~
_ W ~ ~ t ~ y . ~ l • ~'~,r~-=-- _ s. _ s~-~'~ ~
` ~ ~ ( ~ • .u+nivo a~~ ~
3NOZ zZ • a" ~ { p
~ ~ : , Olld 1~/1a~ .~bnXll7 ~
( 4
I ~
1 , ' } L ^ ~
i
`c -2`3Z
i - P a e ~
. ZE`2~~6
, . _
t for
3/96 HEC Staff R~or
:
1 ~
DIVISION OF BUILDING AND PLANNING REPORT
TO: SPOKANE COUNTY HEARING EXAMINER COMMITTEE
FROM: CURRENT PLANNING SECTION
DATE: MARCH 21, 1996
SUBJECT: ZE-2-96, ZONE RECLASSIFICATION FROM URBAN
RESIDENTIAL-3.5 (UR-3.5) TO URBAN RESIDENTIAL-12
(UR-12)
1. GENERAL INFORMATION
Applicant: Belle Terre Inc.
% Cameron Ball
P.O. Box 85
Greenacres, WA 99016
(509) 922-9076
Contact Planner: Lorne Lakshas
Location: Generally located north of and adjacent to 8th Avenue,
approximately 300 feet west of Felts Road in the NE 1/4 of Section 20, Township
25 North, Range 44 EWM, Spokane County, Washington.
Proposal: Zone Reclassif'icanon from Urban Residenaal-3.5 (UR-3 5) to
Urban Residential-12 (UR-12) for development of 11 mulnple fanuly residences
and those uses allowed u1 the Urban Residential-12 (UR-12) zone
II. SITE INFORMATION
A. Site Size: Approximately 43,200 square feet
Gross Density Approximately 11 dwelling uruts per acre
B. Comprehensive Plan
1. Land Use Plan• The property is located within the Urban category of the
Spokane County Comprehensive Plan. Residential net densities ui the
Urban category should have an approxunate density of one urut per acre to
17 uruts per acre. The proposed Urban Residential-12 (UR-12) zone allows
a maxunum density of 12 units per acre which is consistent with the density
rang suggested by the Urban category. The proposal lies withm the Pnonry
Sewer Sernce Area (PSSA) and is served by pubhc facihtxes and services
including water, sarutary storm sewer luies, police and fire protection
2. Arterial Road Plan Access to the project will be provided by a
dnveway from 8th Avenue. Eighth Avenue is designated as a Minor
3/'96 HEC Staff Report for ZE-2-96 Page 6
A
~
Arterial with a future right of way width of 80 feet, The existing nght of
way width is 30 feet. To implement the arterial road plan, County
Engineering has required that a strip of properry 10 feet in width along 8th
Avenue be set aside as a Future Acquisition Area (FAA).
3. County Parks Plan: The Spokane County Parks and Recreation Plan
idenrifies Dishman Hills as the nearest county parks facility Facihties
include picnic and play areas, ball fields, a lodge, rescrooms and fireplaces.
C. Site C6aracteristics: The site is level, undeveloped and has recently been
logged.
D. Neighborhood Characteristics. The neighborhood in the vicinity of the
project is made up of single fanuly residences, an apartment complex and a
hmited number of duplexes.
E. Zoning Analysis: The subject property and adjoining areas to the north,
south, east and a pornon of the west area, are all zoned Urban Residential-3.5
(UR-3.5). A portion of the west boundary of the parcel lies adjacent to Urban
Residential-22 (UR-22) zonuig. Pnor to implementation of the Spokane County
Zorung Code on January 1, 1991, the subject property and adjacent propernes
were zoned Agncultural (A) and Agncultural Suburban (AS)
Proposal: Urban Residential-3 5(UR-3.5) estabhshed in 1991, previously
established as Agncultural in 1942 (ZE-203-42)
North. Urban Residential-3.5 (UR-3.5) estabhshed in 1991, previously
established as Agncultural in 1942 (ZE-203-42)
South Urban Residential-3.5 (UR-3.5) estabhshed in 1991, previously
established as Agncultural Suburban (AS) in 1965 (ZE-17-65)
EasL Urban Residential-3.5 (UR-3.5) established in 1991, previously
estabhshed as Agncultural in 1942 (ZE-203-42)
West: Urban Residential-3.5 (UR-3.5) estabhshed in 1991, and Urban
Residenaal-22 (UR-22) established in 1991 previously
established as Multiple Family Suburban (MFS) (ZE-191-79)
F. Land Use Analysis: The zone reclassification proposal is bordered by
single family dwelhngs, undeveloped/vacant land and one duplex (LTrban
Residential-3.5 (UR-3.5) zone). A portion of the adjacent west boundary of the
proposal consists of mula-family dwellings (Urban Residential-22 (UR-22)
zone) which was zoned in 1979 as Multiple Family Suburban (1V1FS) and
crossed over dunng the "Program to Implement" the 1991 Zoning Code. The
MFS zomng occurred pnor to implementaaon of the Comprehensive Land Use
Plan (1981). The proposed zone reclassification from Urban Residential-3 5
(UR-3.5) to Urban Residential-12 (UR-12) is, therefore, not consistent with the
surrounding single family uses and zoning executed after unplementation of the
Comprehensive Land Use Plan.
Site• Vacant and undeveloped
North: Vacant and undeveloped
South• Single family structures
East: Vacant land, single family structures, and a duplex
3/96 HEC Staff Report for ZE-2-96 Page 7
r
1 OL
West• Multi family dwellings
G. Circulation: The property will be accessed from Sth Avenue by a 150 foot
dnveway from 8th Avenue into the site.
H. Design: A specific site plan was subnutted for review by the Hearing
Exanuner Committee. The proposed site plan includes three muln family
buildings mcluding one m-plex and two four-plexes for a total of eleven units.
Each structure will have a buildmg footprint area of 2,400 square feet and a
height of 22 feet. The proposed site plan illustrates general comphance with the
requirements of the Urban Residenaal-12 (UR-12) zone.
1. Site Plan Data
Use: 11 multi family dwellings
Proposed Buildings: 3
Building(s) Footpnnt Area: 7,200
Site Coverage: 17%
Maximum Structure Height: 22 feet
Total Floor Area: 7,200
Build.ulg Setbacks: Pro,t)osed E4uired
Front yard (S) 53 feet 25 feet
Side yard (R) 15 feet 10 feet
Side yard (L) 45 feet 10 feet
Rear yard (N) 15 feet 15 feet
Parlong 18 spaces 16 5 spaces
Proposed Buffering/Landscaping Techniques Five (5) feet of
Type III landscaping is required adjacent all Urban Residential-3.5 (UR-3 5)
zoning as well as a 6 foot high site-obscuruig fence, solid landscaping or
wall as requued by Secaon 14.620 365-2 of the Zomng Code. The required
landscaping and fencing is correctly indicated on the site plan on the north,
south, east and west boundanes of the property.
Other Site Plan Considerations: The site plan subnutted for review
by the Hearing Examiner Committee is general ul nature. Detailed review to
deterinine compliance vvith all Code regulations and conditions of approval
is recommended to be administrative and to occur at the Btulding Pernut
stage.
I. Density: The proposed density of approximately eleven dwelling units per acre
is consistent with the density range of the Urban category, but may not be
compatible with adjacent densines
J. Drainage: A dramage plan is required.. This plan must be reviewed and
approved by the County Engineer's Department pnor to development.
K. Power Transmission Lines/Other Known Easements• None known
3/96 HEC Staff Report for ZE-2-96 Page 8
~ t
L. Water Supply: The proposal is vvithm the Modern Electric Water Dismct.
Provisions for water service vvill by met pnor to issuance of building pernuts
M. Sewage Disposal: The proposal is required to connect to public sewer. Plans
and specifications for this connection are to be reviewed and approved by the
Spokane County Division of Urihaes.
N. School: The proposal is in the Central Valley School District No. 356. The
Central Valley School District has responded to the proposal and has indicated
that existing facilities are inadequate to accommodate additional students generated
by new residential developments and requests the apphcant be required to reach a
voluntary agreement to mitigate the impact of the project on the school district.
0. Fire Protection• The proposal is wnthin Fue Distnct No. 1. The Fire Distnct
and the Drvision of Builduigs Department (Fue Marshall) are reqwred to approve
fire protecaon provisions pnor to finalizuig the preluYUnary plat
P. Culturat Resource.s: None have been identlf'ied.
Q. Parks and Recreation: No comments have been received from the
Department of Parks, Recreaaon and Fw.
R. Special Information An Administranve Exception (AEE-6-96) for lack of
pubhc street frontage and an Administraave Interpretation (AIE-6-96) for an
"ulnocent purchaser" were approved for the subject property on February 21,
1996
S. Transit: The proposal is located withul the Public Transit Benefit Area (PTBA)
boundary. Route 18, serving the Pence Cole Valley Transit Center is located
approximately 5 blocks from the site
III. ENVIRONMENTAL REVIEW.
An Environmental Checklist was subnutted by the sponsor and was reviewed by the
Counry Division of Budding and Planning The review considered the specifics of
the proposal, other available information, County ordinances, other regulations and
laws, possible standard Conditions of Approval, the Generalized Comprehensrve
Plan, and other County policies and guidehnes The Division of Build.ing and
Planning has deterrmned that "No probable signif'icant adverse unpacts" would result
from the proposal being developed and has issued a Deternunanon of
Nonsignificance ("DNS").
The "DNS" was circulated to 15 other agencies of junschction and other
agencies/deparanents affected by the future development for review and comment.
The "DNS" comment penod ends March 19, 1996 and was advertised 15 calendar
days before said date in the newspaper, by letter to adjacent property owners within
400 feet of the proposal, and by notice on a sign posted on the proposal site. The
Heanrig Examiner may consider additional envunnmental related testimony at the
public heanng
3/96 HEC Staff Report for ZE-2-96 Page 9
t ~
I V. DIVISION OF BUILDING AND PLANNING SUMMARY AND
RECOMMENDATION
The Urban category encompasses a vanery of land uses and activities as well as a mix
of mula-family and single family uses. However, when mula-family dwelluigs are to
be located adjacent to single fa.nuly aneas, as the proposal uidicates, careful
consideration must be given to the density and design of the multi-family units so as to
ensure the protecaon of the amenities of the single family area. While landscaping and
fencing can be used in the design of the proposal to screen multi-fa.mily from suigle
family dwellings, the proposed Urban Residential-12 (UR-12) zonmg may be
considered too dense for the surrounding (85%) Urban Residential-3.5 (UR-3.5)
zoning. Even though a limited portion of the proposed Urban Residential-12 (UR-12)
zonuig is bordered by Urban Residential-22 (UR-22) zoning on the west boundary, the
Urban Residenhal-22 (UR-22) zorung was established in 1979, prior to unplementation
of the Comprehensive Land Use Plan (1981). Since the remainder of the adjacent
property is zoned exclusively Urban Residential-3.5 (UR-3.5), the Division of
Buflding and Planning recommends DENLAL of the zone reclassif'ication because the
proposed Urban Residential-12 (UR-12) zoning is not consistent wnth adjacent zonuig
and land uses.
V . CONDITIONS OF APPROVAL
i. All conditions imposed by the Hearing Examiner Committee shall
be binding on the "Applicant", which terms shall include the
owner or owners of the property, heirs, assigns and successors.
i i. The zone reclassification applies to the following real property:
The south 150 feet of the west 30 feet, and the north 300 feet of the south 450
feet of Block 233 of Opporturuty as per plat thereof recorded in Volume K of
Plats, Page 20; EXCEPT that portlon descnbed as follows: Beguz at the
southeast corner of said Block 233, thence north along the east luie of Block
233 a distance of 150 feet, thence west parallel with the south lule of Block
233, a d~stance of 197.4 feet, thence north a distance of 300 feet, thence east a
distance of 197.4 feet to the east hne of Block 233, thence south 300 feet to the
point of beginning.
SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING
1. All conditions imposed by the Hearing Examiner Comrnittee shall be binchng on the
"Apphcant", which term shall include the owner or owners of the property, heus,
assigns and successors.
2. The proposal shall comply with the Urban Residential-12 (LJR-12) zone(s) as
amended.
3. The applicant shall develop subject properry generally ui accordance within the
concept presented to the Heanng Body. Vanations, when approved by the
Planning Duector/designee, may be pernutted, including, but not limited to building
location, landscape plans and general allowable uses of the pernutted zone. All
3/°96 HEC Staff Report for ZE-2-96 Page 10
. r
vanations must conform to regulations set forth in the Spokane County Zorung
Caie, and the original intent of the development plans shall be maintained.
4. Approval is required by the Planning Dimctor/designee of a specific lighting and
signmg plan for the descnbed property prior to the release of any building permits.
5. A specific landscape plan, planting schedule and provisions for maintenance
acceptable to the Planning Director/designee shall be submitted wnth a performance
bond for the project pnor to release of building pernuts. Landscaping shall be
installed and mauitamed so that sight dhstance at access goints is not obscured or
impaired.
6. Duect hght from any extenor area lighting fixture shall not extend over the property
boundary.
7. The Division of Building and Plannmg shall prepare and record with the Spokane
County Audhtor a Tide Notice noting that the property ui quesaon is subject to a
vanety of special condhtions imposed as a result of approval of a land use action.
This Tide Notice shall serve as public notice of the conditions of approval affecting
the property in quesaon. The Title Notice should be recorded within the same time
frame as allowed for an appeal and shall only be released, in full or in part, by the
Division of Building and Planrung. The Tide Notice shall generally provide as
follows•
The parcel of property legally described as [ ] is the subject
of a land use action by a Spokane County Hearing Body or
Administrative Official on [ imposing a variety of
special development conditions. File No. [ ] is available for
inspection and copying in the Spokane County Division of Building
and Planning.
8. The Spokane County Division of Builduig and Planrung shall prepare and record
with the County Audhtor a Tide Notice specifying a future land acquisition area for
road nght-of-way and utdities. The reserved~ future acquisition area Tide Notice
shall be released, in full or in part, by the Division of Buildmg and Planning. The
notice should be recorded withm the same time frame as an appeal and shall provide
the following;
a. At least 5 feet of reserved future acquisition area for road nght-of-way and
ualiaes, in add.ition to the existing and/or newly dedicated nght-of-way along
8th Avenue.
b. Future bwldhng and other setbacks required by the Spokane County Zorung
Code shall be measured from the reserved future acquisiaon area
c. No requued landscaping, parlang, '208' areas, drainfield or allowed signs
should be located within the future acquisiaon area for road right-of-way and
utilities If any of the above improvements are made within this azea, they
shall be relocated at the applicant's expense when roadway improvements are
made
d The future acquisitlon area, until acquired, shall be private property and may
be used as allowed in the zone, except that any unprovements (such as
3/96 HEC Staff Report for ZE-2-96 Page 11
.
.
1 `
landscaping, pazlang, surface drainage, drainfield, signs or others) shall be
considered intenm uses.
e The property owner shall be responsible for relocating such "intenm"
unprovements at the time Spokane County makes roadway unprovements
after acquu7ng said future acquisinon area
9. The appucant shall contact the Division of Builcling and Planrung at the earhest possible
stage in order to be infoimed of code requuements admirustered/enforced as authonzed
by the State Bwldmg Code Act Design/development concerns uiclude: Addressmg,
fire apparatus access roads, fire hydrantJflow, approved water systems, buildulg
accessibility, construcnon type, occupancy classificanon, exiting, exterior wall
protection, and energy code regulations. (Note: The Division of Building and
Planning reserves the right to confirm the actual address at the time of buildmg pernut )
SPOKANE C4UNTY DIVISION OF ENGINEERING AND ROADS
Pnor to issuance of a builciinLy nemut or at the reauest of the Countv Engineer in comunction
-
with a Countv Road ProiecVRoad Imnrovement Distnct. whichever comes first•
1. Apphcant shall dedicate 5 feet on 8th Avenue for nght-of-way
Pnor to issuance of a bqlldingaernut or u,e of h ro~ez~tv as nro~os~
1. Access permits for approaches to the county road system shall be obtained from the
Spokane County Engineer
2. The aPPhcant shall subrrut for aPProval bY the SPokane CountY EngiL ~
neer oad
~ Jv drainage and access plans.
'QOv 3. The appl~cant shall subnut for approval by the Spokane County Enguieer and the
Spokane County Health Dismct a detailed combined on-site sewage system plan
and surface water dlsposal plan for the entire project, or pomon thereof, if the
development is to be phased.
4. A parking plan and traffic cu-culation plan shall be subnutted and approved by the
Spokane County Englneer. The design, location and arrangement of parkmg stalls
shall be ul accordance with standard traffic engineering practices. Pavnng or
surfacing as approved by the County Engineer, will be requued for any pornon of
the project which is to be occupied or traveled by vehicles.
5. To construct the roadway improvements stated herein, the apphcant may, with the
approval of the County Engineer, join in and be wllhng to pamcipate ui any
petition or resolution which purpose is the fonnaaon of a Road Improvement
District (RID) for saud unprovement, pursuant to RCW 36.88, as a.mended.
Spokane County vvlll not parncipate in the cost of these improvements. This is
applicable to 8th Avenue.
6 As an alternative method of constructing the road unprovements stated herein, the
applicant may, wnth the approval of the County Engineer, accomplish the road
improvements stated herein by joinmg and pamcipaang in a County Road Project
3/°96 HEC Staff Report for ZE-2-96 Page 12
~
r
I
~ (CR.P) to the exteat of the required improvemenL Spakane County vvdl not
parncipate in the cost of these improvements. Thxs is apphra'ble to $th Avenue
7. The construction of the road mmpranvements stated herein sha1i be accamp]sshed as
approved by the Spakane County Engnneer.
8, The County Engineer ha.s designated a 5 Lane NIUnor Artenal Roadway Section
starYdard for the improvement of 8th Avenue, wtuch is adjacent to the proposed
developmernt This wffl reqwne the ad,dition of approximatel y]. 6- 18 feet of aspnalt
alang the frvntage of the developmenr. The construction of curbing and sidewalk is
a.lso required.
9. All required imgrovements shall conform to the current State of Washingtvn
Standard Specificaavns for R.aad and Bndge Consrruction and other apphcable
C+aunty startdards andlor adopted resolutivns pertaming to Raad Standards and
Stoxmwater Management ir~ effect at the date of constni.ctian, unless vtherwise
apgroved by the County EngYneer.
10. Roadway standards, typical raadway secaons and dramage plan requ_i_rements are
found in Spokane Bvard vf Caunty Commissioners Resolution No 95-0498 as
amended and are applicable to tlus proposal.
11. Na construction work sha.U be performed within the exssnng or proposed public
nght-of way until a perrtut has. been issued b}r the County Engtneer. All work
wlthin the public road nght-of-way is subject tv inspecaon and appraval by the
County Enguteer.
12. Apphcant shall sign and recard 5pakane Coutnty hTatice to the Public Na. 6 which
spec-ifies the follvwing.
The owner(s) or successor(s) in interest agree that rn consideration of lw►riutual
Benefits now or to be hereafter denve.d, do for thernselves, their, heirs{, grantees,
assigns and successor(s) in interest hereby request and authonze Spokane County
to inelude the abave descrYbed properry in a Road' impravement Ihstnct (RID) and
srappnrt the farmarion of a RTD pursuant to RCW 36.88 050, or by requesting and
authorizing Spakane County to cast their ballot in favor of a RID heing formed
under the resolutian method pursuant ta RCW 36 $8 030, andlor by not filxng a
protest against t.he formation of a RID belng formed under the altemative resolutian
method pravided for m R,CW 36.8$ 065 and Chapter 35 43RCW.
If a RID is proposed far inpravement vf the road(s) descnbed belvw, sa.id
owner(s) and successar(s) further agree:
(a) that the impmvement or construction contemplated within the proposed RID is
feasible;
(b) that the benefits to be denved from the forrnativn af the RID by the properky
includedi therein, together with the amvunt af any Cvunty partLcrpatiQn,
exceeds the cast and expense af fornation of the RID, and
(c) that the property within the prvposed RID rs sufficlently developed.
3/96 HEC Staff Report for ZE-2-96 Page 13
~
ti
r '
Provided further that the awner(s) or successor(s) shall remn t.he nght, as
authori.zed under RCW 36-88 09(}, to abject to any assessment on the property as a
result of the improvernents ea.Ued far m conjunction with the formtion of the RID
by either petidon or resoiution method under Chapter 36.88 RCW and to appea] to
t.he 5upenor Court the deeisian of the Bpard of County Comniissivners confirnnxng
the finall assessment roll; providad ftuther, it is re.cognized that actual assessments
may vary from assessment estimate so long as they do not exceed a ~"igure equal to
the uicreased trxe and fair value improvement(s) add(s) to the property.
It is further acknawledged and agrc.ed that at such tvme as a RID is created or any
County Road Impravement project is authorized by Spokane County, the
xmprovements required sha11 be at the sole expense af the owner(s) of proPertY
vvithrY the RID ar served by ihe inaprovements without any monetary participatton
by Spokane County.
'Ihe RID waiver contamed Ln this agreement sha11 expze after ten (10) years frorn
the date af execution belaw. This requirment applies to 8th Avenue.
13 The County Arterial Road Pian identifies 8th Avenue as a 80 faot Mmor arterial
The exi.sting right-af-way wrdth of 30 feet is nvt eansistent with that spe.cifiad in the
Plan. Yn orier to irnplement the Arterial Road P1an, in addYtion to the required
right-of-way de.dication, a stnp af property 5 feet in vvidth along the Sth Avenue
frontage shall be set aside in reserve. Thas prvperty may be acquired by Spokane
County at the nme when artenal improvements are made to 8th Avenue
14 There may exlst utilitres, either undergound or averhea,d,, affecting the subject
property, includin,g prvperty tv be dedhcated ar set aside for future ac,quisition.
Spokane Cvunty assumes nv financial obligation for adjustments or relocation
regarding these utilities. Apphcant(s) should check vcith the applicable utihty
purveyor and the Spokane Caunty Engineer ta deternnine whether applicant(s) or
the utility is responsible for adjustnaent or relocativa cvsts and to make
a.rrangements far any necessary wark.
15. 'I'he applicant shall grant apphcab1e horder easements adaacent to Spokane County
nght of way per Spokane County standards
~ 64
The propvsed pnvate road whieh serves the du-ee multi-family lots shall be
constructed to Spokane Caunty standards far a pnvate road strving three lots. -
~
SPOKAIwIE CDUNTY DIVISION OF UTII.rITIES
1. A wet (live) sewer cannection to the areawide Public Sevver 5ystern is to be
eonstructed. Sewer connecuon permit is mqu.ired
2. AppEcant shall subrr,ut expressly ta Spokane County TJtihhes Department "under
separate cover" only those plan sheets shvwing sewer pans and specifcatians for
pnvate sewer cannecaon for re-view and approval by th~ Uti1ities Department pnvr to
issuance of pernrut to cvnnect
3. Secunty shall be deposxte.d with the Utlrties Depamnent for constructLon of the pubhc
facihties connections
3,{96 IIEC S t aff Regart for ZE-2-9E Page 14
J ~
4. Amangements for payments of additional sewer charges must be made for pnor to
issuance of sewer connection pemut.
5. Any water service for this project shall be provided in accordance with the Coordmated
Water System Plan for Spokane County, as amended.
SPOKANE COUNTY HEALTH DISTRICT
1. Sewage d.isposal method shall be as authonzed by the Director of Utilities, Spokane
County.
2. Water service shall be coordinated through the Director of Utilities, Spokane
County.
3. Water service shall be by an existing pubhc water supply when approved by the
Regional engineer (Spokane), State Department of Health.
4. A public sewer system will be made available for the project, and individual service
will be provided to each building.
5. Use of pnvate wells and water systems is prohibited
SPOKANE COUNTY AIR POLLUTION CONTROL AUTHORITY
1. All air pollution regulaaons must be met
2. Air pollurion regulations requue that dust emissions during demohtion, construction
and excavadon projects be controlled. This may requue use of water sprays, tarps,
sprinklers or suspension of activity dw-ing certain weather conditions. Haul roads
should be treated, and enussions from the transfer of earthen matenal must be
controlled, as well as emissions from all other construcaon-related acavities.
3 SCAPCA strongly recommends that all traveled surfaces (i e, ingress, egress,
parking areas, access roads) be paved and kept clean to minunize dust enussions
4. Measures must be taken to avoid the deposition of du-t and mud from unpaved
surfaces onto paved surfaces. If trackulg or spllls occur on paved surfaces,
measures must be taken immediately to clean these surfaces
5. Debns generated as a result of this project must be disposed of by means other than
burning (i e, vegetative matenal, slash, construction waste, etc.). ~
;
6. All solid fuel burning devices (wood stoves, pellet stoves, etc...) must comply with ~
local, state, and federal rules and regulations
7. Some objecaonable odors may result from this project (asphalt fumes). SCAPCA's
regulations state that effecnve control apparatus and measures must be used to
reduce odors to a mirumum
I
3/'96 HEC Staff Report for ZE-2-96 Page 15 '
c •
SPOKANE COUNTY FIRE PROTECTION DISTRICT NO. 1
1. A water plan is required showing locations of new fire hydrant(s) to meet the fire flow
of the new buildings.
2. An approved apparatus turnaround for the dnveway is also required.
CENTRAL VALLEY SCHOOL DISTRICT
1. The owner shall negotiate with Central Valley School District and subnut a recorded
copy of a voluntary agreement making provisions for public schools prior to
issuance of building permit. The agreement shall provide a wntten description of
the subject property to which the agreement apphes and also state the dollar amount
and any other agreed to nutigating measures.
The owner shall also notify any potential purchasers who have made an agreement
to purchase property within said plat pursuant to the Revised Code of Washington
(RCVV) 58.17.205, that adequate provisions for school facilities must be made
conditioned on a future agreement between the plattor and school d.istnct.
Voluntary agreements between the owner and school distnct shall conform to the
requuements of RCW Chapter 82 02.
3/96 HEC Staff Report for ZE-2-96 Page 16
,
• j
OFFICE OF THE SPOKANE COUNTY ENGINEER
1026 W Broadway Ave, Spokane, WA 99260-0170 (509)456-3600 Fax 324-3478
- ZONE CHANGE -
TO: Spokane County Planning Department, Lorne Lakshas
FROM: Division of Engineering & Roads, Scott Engelhard;f-
DATE: March 7, 1996
SUBJECT: ZONE CHANGE CONDITIONS # ZE-002-96 / BALL, CAMERON
The following "Conditions of Approval" for the above referenced zone change
are submitted to the Spokane County Hearing Examiner Committee for inclusion
in the "Planning Report" and "Findings and Order" of the public hearing
scheduled March 21, 1996.
E36A Prior to issuance of a building permit or at the request of the County Engineer in
conjunction with a County Road Project/Road Improvement District, whichever comes
f irst
E36 Applicant shall dedicate 5 feet on 8th Avenue for right of way
Prior to release of a building permit or use of property as proposed:
E40 Access permits for approaches to the County Road System shall be obtained from the
County Engineer
E43 Applicant shall submit for approval by the Spokane County Engineer drainage and access
plans
E45 A parking plan and traffic circulation plan shall be submitted and approved by the
Spokane County Engineer The design, location and arrangement of parking stalls shall
be in accordance with standard engineering practices Paving or surfacing as approved
by the County Engineer will be required for any portion of the project which is to be
occupied or traveled by vehicles
E46 To construct the roadway improvements stated herein, the applicant may, with the
approval of the County Engineer, Join in and be willing to participate in any petition
or resolution which purpose is the formation of a Road Improvement District (RID) for
said improvement pursuant to RCW 36 88, as amended Spokane County will not participate
in the cost of these improvements This provision is applicable to 8th Avenue
.
E47 As an alternative method of constructing the road improvements stated herein, the
applicant may, with the approval of the County Engineer, accomplish the road
improvements stated herein by 3oining and participating in a County Road Project (CRP)
to the extent of the required improvement Spokane County will not participate in the
cost of these improvements This provision is applicable to eth Avenue
E48 The construction of the roadway improvements stated herein shall be accomplished as
approved by the Spokane County Engineer
E50 The County Engineer has designated a 5 Lane Minor Arterial Roadway Section for the
improvement of 8th Avenue which is adjacent to the proposed development This will
require the addition of approximately 16-18 feet of asphalt along the f rontage of the
development Curbing and sidewalk must also be constructed
E51 All required improvements shall conform to the current State of Washington Standard
Specifications for Road and Bridge construction and other applicable county standards
and/or adopted resolutions pertaining to Road Standards and Stormwater Management in
effect at the date of construction, unless otherwise approved by the County Engineer
E55 Roadway standards, typical roadway sections and drainage plan requirements are found
in Spokane Board of County Commissioners resolution 95-0498 as amended and are
applicable to this proposal
E58 No construction work is to be performed within the existing or proposed right of way
until a permit has been issued by the County Engineer All work within the public road
right of way is subject to inspection and approval by the County Engineer
A • .
ZONE CHANGE: # ZE-002-96 / BALL, CAMERON 2
E60 Applicant shall sign "Spokane County Notice to the Public Number 6" which specifies the
following
The owner(s) or successor(s) in interest agree that in consideration of Mutual Benefits
now or to be hereafter derived, do for themselves, their heirs, grantees, assigns and
successor(s) in interest hereby request and authorize Spokane County to include the
above described property in a Road Improvement District (RID) and to support the
fonnation of a Road Improvement District for improvement of the road(s) described below
by requesting and authorizing Spokane County to place their name(s) on a petition for
the formation of a Road Improvement District pursuant to RCw 36 88 050, or by
requesting and authorizing Spokane County to cast their ballot in favor of a RID being
formed under the resolution method pursuant to RCW 36 88 030, and/or by not filing a
protest against the formation of a RID being formed under the alternative resolution
method provided for in RCW 36.88 065 and Chapter 35 43 RCW
If a RID is proposed for improvement of the road(s) described below, said owner(s) and
successor (s) further agree (1) that the improvements or construction contemplated
within the proposed RID are feasible and (2) that the benefits to be derived from the
formation of the RID by the property included therein, together with the amount of any
County participation, exceeds the cost and expense of formation of the RID, and (3)
that the property within the proposed RID is sufficiently developed, provided,
themselves, their heirs, grantees, assigns and successor(s) shall retain the right, as
authorized under RCW 36 88 090, to object to any assessment(s) on the property as a
result of the improvements called for in conjunction with the formation of a RID by
either the petition or resolution method under Chapter 36 88 RCW and to appeal to the
Superior Court the decision of the Board of County Commissioners confirming the final
assessmerit roll; provided further, it is recognized that actual assessments may vary
from assessment estimate so long as they do not exceed a figure equal to the increased
true and fair value improvement(s) add(s) to the property
It is £urther acknowledged and agreed that at such time as a RID is created or any
County Road Improvement project is authorized by Spokane County, the improvements
required shall be at the sole expense of the owner(s) of property within the RID or
served by the improvements without any monetary participation by Spokane County
The RID waiver contained in this agreement shall expire after ten (10) years from the
date of execution below This provision is applicable to 8th Avenue
E61 The County Arterial Road plan identifies 8th Avenue as a 80 foot Minor Arterial The
existing right of way width of 30 feet is not consistent with that specified in The
Plan In order to implement the Arterial Road Plan it is recommended that in addition
to the required right of way dedication, a strip of property 5 feet in width along the
Sth Avenue frontage be set aside in reserve This property may be acquired by Spokane
County at the time when Arterial Improvements are made to 8th Avenue
E90 The applicant should be advised that there may exist utilities either underground or ~overhead affecting the applicants property, including property to be dedicated or set
aside future acquisition Spokane County will assume no financial obligation for
adjustments or relocation regarding these utilities The applicant should check with
the applicable utilities and Spokane County Engineer to determine whether the applicant
or utility is responsible for adjustment or relocation costs and to make arrangements
for any necessary work
SPECIAL CONDITION The applicant shall grant applicable border easements adjacent to Spokane
County Right of Way per Spokane County Standards
SPECIAL CONDITION The site plan submitted by the applicant indicates that the property may
be subdivided in the future If more than three lots will be served by a driveway than
private road standards shall apply
,
.
.
. I
OFFICE OF THE SPOI{ANE COUNTY ENGINEER
1026 W Broadway Ave, Spokane, WA 99260-0170 (509)456-3600 Fax 324-3478
-SLTBDTVTSTON _nNDTTTONS-
J
TO: Spokane County Planning Department, Plats Administrator
FROM: Division of Engineering & Roads, Scott Engelhard
DATE: January 10, 1996
SUBJECT: ZONE CHANGE CONDITIONS # DRZE-164-96 / BALL, CAMERON
The following "Conditions of Approval" for the above referenced zone change
are submitted to the Spokane County Planning Department for inclusion in the
Design Review Meeting scheduled January 10, 1996
E36A Prior to issuance of a building permit or at the request of the County Engineer in
conjunction with a County Road Pro3ect/Road Improvement District, whichever comes
first
E36 Applicant shall dedicate S feet on 8th Avenue for right of way
Prior to release of a building permit or use of property as proposed:
E40 Access permits for approaches to the County Road System shall be obtained from the
County Engineer
43 Applicant shall submit for approval by the Spokane County Engineer road, drainage and
access plans
-94A, The applicant shall submit for approval by the Spokane County Engineer and the Spokane
County Health District a detailed combined on-site sewage system plan and surface water
disposal plan for the entire project or portion thereof if the development is phased
-°-°-E45 A parking plan and traffic circulation plan shall be submitted and approved by the
Spokane County Engineer The design, location and arrangement of parking stalls shall
be in accordance with standard engineering practices Paving or surfacing as approved
by the County Engineer will be required for any porta.on of the project which is to be
occupied or traveled by vehicles
E46 To construct the roadway improvements stated herein, the applicant may, with the
approval of the County Engineer, Join in and be willing to participate in any petition
or resolution which purpose is the formation of a Road Improvement District (RID) for
said improvement pursuant to RCW 36 88, as amended Spokane County will not participate
in the cost of these improvements This provision is applicable to 8th Avenue
E47 As an alternative method of constructing the road improvements stated herein, the
applicant may, with the approval of the County Engineer, accomplish the road
improvements stated herein by joining and participating in a County Road Project (CRP)
to the extent of the required improvement Spokane County will not participate in the
cost of these improvements This provision is applicable to 8th Avenue
E48 The construction of the roadway improvements stated herein shall be accomplished as
approved by the Spokane County Engineer
E50 The County Engineer has designated a 5 Lane Minor Arterial Roadway Section for the
improvement of 8th Avenue which is ad3acent to the proposed development This will
require the addition of approximately 16-18 feet of asphalt along the frontage of the
development Curbing and sidewalk must also be constructed
E51 All required improvements shall conform to the current State of Washington Standard
Specifications for Road and Bridge construction and other applicable county standards
and/or adopted resolutions pertaining to Road Standards and Stormwater Management in
effect at the date of construction, unless otherwise approved by the County Engineer
E55 Roadway standards, typical roadway sections and drainage plan requirements are found
in Spokane Board of County Commissioners resolution 95-0498 as amended and are
applicable to this proposal
E58 No construction work is to be performed within the existing or proposed right of way
until a permit has been issued by the County Engineer All work within the public road
right of way is subject to inspection and approval by the County Engineer
_ . ~
SUBDIVISION CONDITIONS: # DRZE-164-96 / BALI.,. CAMERON 2
E60 Applicant shall sign "Spokane County Notice to the Public Number 6" which specifies the
, following
The owner(s) or successor(s) in interest agree that in consideration of Mutual Benefits
now or to be hereafter derived, do for themselves, their heirs, grantees, assigns and
successor(s) in interest hereby request and authorize Spokane County to include the
above described property in a Road Improvement District (RID) and to support the
formation of a Road Improvement District for improvement of the road(s) described below
by requesting and authorizing Spokane County to place their name(s) on a petition for
the formation of a Road Improvement District pursuant to RCW 36 88 050, or by
requesting and authorizing Spokane County to cast their ballot in favor of a RID being
formed under the resolution method pursuant to RCW 36 88 030, and/or by not filing a
protest against the formation of a RID being formed under the alternative resolution
method provided for in RCW 36 88 065 and Chapter 35 43 RCW
If a RID is proposed for improvement of the road(s) described below, said owner(s) and
successor (s) further agree• (1) that the improvements or construction contemplated
within the proposed RID are feasible and (2) that the benefits to be derived from the
formation of the RID by the property included therein, together with the amount of any
County participation, exceeds the cost and expense of formation of the RID, and (3)
that the property within the proposed RID is sufficiently developed, provided,
themselves, their heirs, grantees, assigns and successor(s) shall retain the right, as
authorized under RCW 36 88 090, to ob3ect to any assessment(s) on the property as a
result of the improvements called for in con3unction with the formation of a RID by
either the petition or resolution method under Chapter 36 88 RCW and to appeal to the
Superior Court the decision of the Board of County Commissioners confirming the final
assessment roll, provided further, it is recognized that actual assessments may vary
from assessment estimate so long as they do not exceed a figure equal to the increased
true and fair value improvement(s) add(s) to the property
It is further acknowledged and agreed that at such time as a,RID is created or any
County Road Improvement project is authorized by Spokane County, the improvements
required shall be at the sole expense of the owner(s) of property within the RID or
served by the improvements without any monetary participation by Spokane County
The RID waiver contained in this agreement shall expire after ten (10) years from the
date of execution below This provision is applicable to 8th Avenue
E61 The County Arterial Road plan identifies 8th Avenue as a 80 foot Minor Arterial The
existing right of way width of 30 feet is not consistent with that specified in The
Plan In order to implement the Arterial Road Plan it is recommended that in addition
to the required right of way dedication, a strip of property 5 feet in width along the
8th Avenue frontage be set aside in reserve This property may be acquired by Spokane
County at the time when Arterial Improvements are made to 8th Avenue
E90 The applicant should be advised that there may exist utilities either underground or
overhead affecting the applicants property, including property to be dedicated or set
aside future acquisition Spokane County will assume no financial obligation for
adjustments or relocation regarding these utilities The applicant should check with
the applicable utilities and Spokane County Engineer to determine whether the applicant
or utility is responsible for adjustment or relocation costs and to make arrangements
for any necessary work
SPECIAL CONDITION The applicant shall grant applicable border easements adjacent to Spokane
County Right of Way per Spokane County Standards
SPECIAL CONDITION The proposed private road which serves the three multi-family lots shall
be constructed to Spokane County Standards for a private road serving three lots
PAGE 1 11:10:12 03 JAN 1996
Road# Road Names.. MPost. ReferencefDescriptio Road Log Info....
05865 8TH AV (START) 00 000 HAVANA ST (START) & U 16 PAVED 20
8TH AV 00.120 DEARBORN RD (START) U 16 PAVED 20
00.240 CUSTER RD (START) U 16 PAVED 20
00.343 WILLAMETTE U 16 PAVED 20
00.370 CHRONICLE RD (END) U 16 PAVED 20
00 510 CARNAHAN RD U 16 PAVED 20
00 690 MCKINNON RD (START) U 16 PAVED 20
00 870 VJOODLAWN DR ( START ) U 16 PAVED 20
00 990 FANCHER RD (START) U 16 PAVED 20
01.080 6TH AV (START) U 16 PAVED 22
01.120 DICKEY ST (END) U 16 PAVED 22
Ol 240 EASTERN RD U 16 PAVED 20
01.370 DOLLAR RD (END) U 16 PAVED 20
01.510 THIERMAN ST U 16 PAVED 20
01.550 ELIZABETH RD (END) U 16 PAVED 20
01.630 BR.ADLEY RD U 16 PAVED 20
01 740 COLEMAN RD (END) U 16 PAVED 20
01.760 COLEMAN RD (START) U 16 PAVED 20
01.860 GIRARD RD (END) U 16 PAVED 20
01.870 GIRARD RD (START) U 16 PAVED 20
02.000 PARK RD U 19 PAVED 32
02.050 EDGERTON RD (END) U 19 PAVED 32
8TH AV (END) 02.080 EAST END OF ROAD
05866 8TH AV (START) 00.000 DISHMAN-MICA RD & DI U 16 PAVED 44
8TH AV 00.140 FARR RD U 16 PAVED 44
00.210 SUNDERLAND RD (START U 16 PAVED 36
00.270 WOODRUFF RD U 16 PAVED 36
00.34 T RD (END) U 16 PAVED ~4
00 410 HER.ALD RD (EN"D) U 16 PAVED 24
. 5?,,..0 PP.T.TG.--RD U 16 PAVE D 2 4
00 640 R.AYMOND RD ( END ) PAVED 2
8TH AVE 00 660 HARMONY RD U 16 PAVED 24
STH AV 00.710 OBERLIN RD (END) U 16 PAVED 24
00.770 UNIVERSITY RD U 16 PAVED 24
00.920 GLENN RD (START) U 16 PAVED 22
01.040 PIERCE RD U 16 PAVED 22
01.280 BOWDISH RD U 16 PAVED 20
01 530 UNION RD (END) U 16 PAVED 20
01.660 ROBIE RD (END) U 16 PAVED 20
01 780 SR 27 (PINES) U 16 PAVED 20
01 920 HOUK RD (END) U 16 PAVED 20
01.960 HOUK RD (START) U 16 PAVED 20
01.980 COLLINS RD (END) U 16 PAVED 20
02.020 VERCLER RD (START) U 16 PAVED 20
02.050 VERCLER RD (END) U 16 PAVED 22
02 130 VIRGINIA ST (START) U 16 PAVED 22
02.180 WOODLAWN RD (END) U 16 PAVED 22
02.220 MORROW RD (START) U 16 PAVED 22
02.310 MCDONALD RD U 16 PAVED 22
02.430 CL I IVTON RD ( END ) U 16 PAVED 22
02 560 BLAKE RD (START) U 16 PAVED 30
02.590 BLAKE RD (END) U 16 PAVED 30
02.720 MAMER RD U 16 PAVED 22
02.810 EVERGREEN RD U 16 PAVED 22
02.970 BANNEN RD (END) U 16 PAVED 22
03.030 BEST RD (END) U 16 PAVED 22
PAGE 2 11:10:16 03 JAN 1996
Road# Road Names.. . . MPost. RefeYenceDescriptio Road Log Info..........
03.090 REES RD (START) U 16 PAVED 22
8TH AVE 03.160 CALVIN ST U 16 PAVED 22
8TH AV 03.220 WARREN RD (END) U 16 PAVED 32
03.320 ADAMS RD U 16 PAVED 22
03.350 MARCUS RD (END) U 16 PAVED 22
03.410 MARIGOLD RD (END) U 16 PAVED 22
03.470 BURNS RD (END) U 16 PAVED 22
03.570 PROGRESS RD U 16 PAVED 22
8TH AV (END) 03.820 SULLIVAN RD
05868 8TH AV (START) 00.000 LONG RD (START) U 19 GR.AVEL 14
8TH AV 00.500 BARKER RD U 17 LIGHT BITUM. 18
01.010 HODGES RD (START) U 17 LIGHT BITUM 18
01.210 COLONIAL DR (START) U 17 LIGHT BITUM 18
01.330 GLENBROOK ST (START) U 17 LIGHT BITUM. 18
8 TH AV ( END ) 01.510 HENRY RD
05867 STH AV (START) 00.000 WEST END OF ROAD U 19 LIGHT BITUM 20
STH AV (END) 00.160 TSCHIRLEY RD (START) U 19 LIGHT BITUM. 20
05869 8TH AV (LIBERTY LAKE 00.000 WEST END TO MCKINZIE R 09 GRAVEL 12
00.020 MCKINZIE RD (LIBERTY R 09 GR.AVEL 12
00.150 GARRY RD (LIBERTY LA R 09 GRAVEL 18
5 Records Processed
Traffic Counts
Road Name . Location...'. Leg Count. .
8TH AV at CARNAHAN RD E 6060
8TH AV at CARNAHAN RD W 4486
8TH AV at EASTERN RD E 7692
8TH AV at EASTERN RD W 7605
STH AV at PARK RD W 5831
8TH AV at UNIVERSITY RD E 2175
8TH AV at UNIVERSITY RD W 4104
8TH AV at BOWDISH RD E 02192
8TH AV at BOWDISH RD W 02531
STH AV at SR 27 (PINES) E 03456
8TH AV at SR 27 (PINES) W 1732
8TH AV at MCDONALD RD E 1952
8TH AV at MCDONALD RD W 01742
8TH AV at EVERGREEN RD E 02414
STH AV at EVERGREEN RD W 01927
STH AV at ADAMS RD E 01912
8TH AV at ADAMS RD W 01675
8TH AV at BARKER RD E 00934
8TH AV (END) at SULLIVAN RD W 1773
8TH AV (END) at HENRY RD W 00316
8TH AV (START) at DISHMAN-MICA RD E 03032
8TH AV (START) at DISHMAN-MICA RD W 04054
Traf f ic Counts
Road Name . . Location. . Leg Count...
UNIVERSITY RD at 32ND AV N 08573
UNIVERSITY RD at 32ND AV S 08170
UNIVERSITY RD at 24TH AV (START) N 6488
UNIVERSITY RD at 24TH AV (START) S 5175
UNIVERSITY RD at 16TH AV N 5240
UNIVERSITY RD at 16TH AV S 6826
UNIVERSITY RD 105 ft S of 8TH AV N 11455
UNIVERSITY RD 105 ft S of 8TH AV S 8409
UNIVERSITY RD at SPRAGUE AV N 05081
UNIVERSITY RD at SPRAGUE AV S 12526
UNIVERSITY RD at BROADWAY AV N 03050
UNIVERSITY RD at BROADWAY AV S 07811
UNIVERSITY RD at MISSION AV N 1342
UNIVERSITY RD at MISSION AV S 4492
UNIVERSITY RD at MONTGOMERY DR N 2982
UNIVERSITY RD at SR 290 S 4923
~ UNIVERSITY RD (START) at DISHMAN-MICA RD N 02901
~
~
. ,
DETERMINATION OF
NONSIGNIFICANCE • "DNS"
SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING
RESPONSIBLE OFFICIAL, JAMES L. MANSON, DIRECTOR
WAC 197-11-970 and Section 11 10 230(3)
SPOKANE ENVIlZONMENTAL ORDINANCE
FILE NUMBER(S) ZE-2-96
DESCRIPTION OF PROPOSAL Zone Reclasslfication from Urban Resldential-3 5
(UR-3 5) to Urban Residential-12 (UR-12) for development of 11 multiple family residences
and those uses allowed in the Urban Residential-12 (UR-12) zone
APPLICANT: Belle Terre Inc
c/o Cameron Ball
P O Box 85
Greenacres, WA 99016
(509) 922-9076
LOCATION OF PROPOSAL Generally located north of and adjacent to 8th Avenue,
approximately 300 feet west of Felts Road in the NE 1/4 of Section 20, Township 25 North,
Range 44 EWM, Spokane County, Washington
LEAD AGENCY SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING
f---
DETERMINATION The lead agency for this proposal has deternuned that it does not have
a probable slgruficant adverse impact on the environment An Environmental Impact Statement
(EIS) is not required under RCW 43 21C 030(2)(c) This decision was made after review of
a completed environmental checkllst and other information on file with the lead agency This
information is available to the public on request
Thls DNS is issued under WAC 197-11-340(2), the lead agency will not act on this proposal
for at least 15 days from the date issued (below) Comments regarding this DNS must
be submitted no later than 4:00 p.m., March 19, 1996, if they are intended to
alter the DNS. All comments should be sent to the contact person listed
below.
By Lorne Lakshas Title Planner II
Phone (509) 456-2205
Address Spokane County Division of Building and Planning (MS-P)
West 1026 Broadway
Spokane, WA 99260
DATE ISSUED 1996 SIGNATURE
;THE COI~'~►~QN'IS REGARDING INVIROI~fMET~I7'AL CONCFRNS ARE OME AT HEARING
APPEAL OF THIS DETERMINATION, after it becomes final, may be made to the
SPOKANE COUNTY DNISION OF BUILDING AND PLANNING, (MS-P), 2nd Floor,
West 1026 Broadway, Spokane, WA 99260 The appeal deadline is the same as the above
project's appeal deadline, being ten (10) calendar days after the signing of the decision to
approve or disapprove the project This appeal must be wntten and the appellant should be
prepared to make specific factual objections Contact the Division of Building and Planrung to
assist you with the specifics for a SEPA appeal
Ttus DNS was mailed to
1 WA State Department of Ecology (Olympia)
2 WA State Department of Health
3 Spokane County Health District
4 Spokane County Division of Engineenng
5 Spokane County Alr Pollution Control Authonty
6 Spokane County Parks Department
7 Spokane Counry Boundary Review Board
8 Spokane Regional Transportation Council
9 WA State Deparcment of Transportation
10 Spokane Transit Authonty
11 Central Valley School Distnct
12 Modern Electnc Water Company
13 Fire District No 1
14 WA State Department of Natural Resources (Colville)
15 WA State Department of Fish and Wildlife (Spokane)
.
t
► ~ ~
~
~
SPOKANE ENVIRONMENTAL ORDINANCE
SECTION 11.10.230 -1-
7__~-2 - ~1.,
t
~ SP01(ANE EtNiRO1aSENTAI ORDINIUiGE
(YAL 197-11-960) Settion 11 10 230(1) • ►
Envlrorx~ental Chetkllst
Purpose of Check115t Flle No
The State Enviromental Poltcy Act (SEPA) chapter 43 21C RCW. requtres ail governsental agencies to consiCer the envirorcaental inpacts of a proposal
befon Rnking Aecisions An Environmental lmpact Statement (EI5) must be prepared for ail proposals wlth probable siqnlficant adverse impacts on
tAe quality of the environment The purpose of this checklist is to provide infortoation to help you and the agency identlfy impacts frocn your
proposal (and to reduce or avoid laqacts froa tAe proposai. if 1t can De done) an0 to help the agency decide Mhether an E1S is required
instwctions for Applicants
This environwntal cheekiSSt asks you to eescribe saae baslc lnfonaatlon eba t your proposal Governaental agencies use tA1s checklist to Getermine
rhetAer the enrironarntal iapacts of ywir proposal are signiflcant. requtrtng preperation of an EIS Ansrer the questSons brSefiy, r1tA the most
precise inforeation knwn, or give the best descriptlon you can
You wust ansver each Qvestlon atturately and Carefully. to the best of your keowledge In most cases, you should be able to answer the questions
from your own observattons or project plans wtthout the need to hire experts If you really do not knar the artsMer. or 1t a questlon Gces not aDp1y
to your proposal, vrite 'do not know• or 'does not apply ' Coaplete ansMers to the questlons now aiay avotd unnecessary delays later
Soaie qvestions ask abaut governwental regulations, such as zoring. shoreline. and landmark designations Artswer these questions if you can lf you
have probless. the goverraental agerscies can assist you
The chectlist Questlons apply to all parts of your proposal, even tf you plsn to do theu over e perloE of tSme or on dSffennt parcels of tand
Attach any additSonat infonytton thet v111 CescrlDe your prcposal or 1ts environeental ettects The agency to rhich yov submlt this checklist may
ask you to explain your ansMers or pravide additional 1nfoRnatlon reasonably related to deterafning 1f tAen may be stgniflcant adverse impact
Use of cheeklist for nonproject proposals
Coaiplete this checklist for nonproject proposals. even though Questions may be •nswered 'dxs not ooply'
IM ADDITION, complete the SUPPLEMENTAL SHEET fOR NOKPROJECT ACTIQ115(Part 0)
For nonproject actlons, the refennces 1n tl+e chetklist to tAe wrds 'Droject.' 'applltant.' and 'property or site' should be reaE as 'proposal."
'OroRoser,• and 'affecteE geographlc area.' res9ecttvely
A. BACKGtOUl1D
1 4me of proposed profect. 1f appliceble _UQriP
2. Mame of App i icant C-- ~t pEt,t, t 7 C"11QI2.C: biC
3 Address and phone number ot app 1 funt or tontact person _p,Q ,B ej m & J:; S Dp a.y~ e- VIA "I 4 4n 1G
422-40'7(, 991-0935
4 Date checklist prepared 2
S Agency reQuesting checklist PI cx- vi lr~ p~S
6 Proposed ttaing or schedule (includinq phasing. if applicable) -~r ( YG a 1~'
1. a. Do you have any plans f future additions, e~cpanslon or further act vity relateE to or comected rith this O~Posal? Iain
~ ~
~ a44., h~ ~3 9~
b Do you orn or have options on land nearby or adjacent to this proposal? It yes. explaln ~
S. List any enviromental inforwetion you knor aDout that has been prepare0. or Kill be prepared, dfrectty related to thfs proaosat
Rtv.2/1/88 I
~A
1 T~
gPOKAfiE EMQO~. " DRDI~MCE
(VAC 197-11-960) Section I1 10 230(1)
♦ E,ALKCYDQBD (coatinued)
4 Do yw Imw vhetAer applicatiooa ara peodiag for go.ercmencal approvals of other proposals direeely affeeting the property covered by yout
proposal' If yes, eiplsio
IV V
10 List any governnent approvals or perait• that vill be needed for your proposal, if Icnovn
Q>dckt n a pcr m14S 11 Give a brief, camplete deseription of your proposal. ineluding che pcoposed uses and che •ise of the project an8 site 'here ace oeveral
quescions Lcer ie thi• cheeklist that ask you co deseribe certaln upect• of rour proposal Y w do not need to repeat those acuvere on thts
page
-T]a e_ r,'), 1r~Pn.S Aj 1 S e... I A['_ Y L' ps.T GC..1 i Y1 Q. 3. S Z ch YL P -t-Irt G`T we L_ud U Ld I1 P
4- Q 2 _ ~ Y► ea 12 M.r.A Q Q4 3 4- P( e.x Nrza_-4tnn c'Irt+S o vr
1: locacioo of the proposal Give suf[icisnt inforsatloo tor a person to understand the preeioo Location of pour proposed proSecc, LncludlnE e
street addreee, if any, and seeilon, tovnmhlp and range. it knam It • proposal vould occur over s range of area, provide the range or
Doundariee of the eite(s) Provide a legal descciption, slte plao. vicioi q tip, and topo4raphic sap, if reaaonably sva! L ble 1Jhile you
ehould subuit aay p Lns reQuired try che asency, pau ate aot cequired to dupliute map• or de[ailed plans sulatcced vich any permic apflllcatton
rc Lted to this checklisc .
Av P~ 14 -7 Fr- c-~- W c s~- o47 F~e. (4 S. Rnc~l o n44%
t.
' S r_c-_. 7 n i 25M.. R-L}-4- E -~_l.M,
13 Does the proposed accion lie wlthio che ~uifec Sensitive AT4 (ASA)' (:hs Ceaeral Sever Service Areal) (:he Prloricy Sevcr Service Aree) 'he
City of Spokane+ (See Spokaae County's ASA Ow r L y Zone %cl.&• for boundaries)
'^0 6E COMPLE':'LD DY APPLICANt
B QIS/ZROR`IEN"'JL Q.DO'NLS
EvalwtLon For
Agency Use Only
1 EAP"it
a General description of the slte (eircle one) t L t rolling, hilly, C_ p •lope$ ~ wuacainous.
other
0
b 'ihac is the ots*pert •lope on che sice (approxiaace psreanc •lope)9
c `fiat general types of soila aTe found on the slte (for eunple, elay. ~a gtavel, peat, nuek)'
If you inov [!u elaasifiution of agrieultural soiL, specifq thea a note any priee famlaad
d kre there •urface lodications or his[ory of unscable so11e in the Lsmediate vicinlty' If go,
dercribe
_u^
2
. ~
"-N
(WAC 197-11-960) Section 11 10.230(1) SPQIUINE ENYIROMKENTAI ORDINAlICE
B EIIVIR0IMENTAL EtEMENTS(continued)
Evaluatlon For
Agency Use Only
e Describe the purpose, type. and approximate puanttties of any f1111ng or gradSng proposed
Indgcate source of fill
C,rd.dtng 1.i ill b~ AonP ;:'nr Drl vetvaY f ;
~Q 4:7 11 GL. Yl GC4 ,
f Could erosion o aur as a result of clearing, construttlon, or use7 If so. generally destribe
N e-%
g About what percent of the site Mill be covered with lmpervious surfaces after project construc-
tion (for ezample, asphalt or Ouildings)'
L1..4 °fa
h Proposed weasures to reduce or control eroston. or other impacts to the earth. if •ny
MO cr
2 AIR
a Mhat type of eAissions to the atr Moula rESUIt from the proposal (i e. dust. auta+roblle. odors
SnCustrlel. wooE seoke) during tonstructlon artd when tAe profeCt is Coapleted' If any.
generally describe and give approzimate quantites if known
Ao'}' n1M o[? 11 f. InwL t S S 1 o h egaG Y" q1? t. Q_tr G6U l 1 1r
D Are there eny off-stte sources of dmtssiorts or oEor that Aay affect your proposs17 lf so.
generally descrlDe
t Proposed measures to rtduce or tontrol emisslons or other inpetts to air, it any
hkQ tn P
3 WATER
a Surfece
(l) is there any surface water body on or in the laaedtate vlclnity of the slte 1nc1u01nq year-
round and seasonal streaRS. saltw ter. lakes. ponds, wetlands)' If yes. describe type and
provide nnmes If approprlate, state rhat strean or river 1t flors into
(2) Wtll the pro3ect reQuire any wrlc over. 1n, or adjacent to (within 200 feet) the desCrlbeE
waters7 If yes. please descrlbe and attach available plans _
.hkQ
3
SPOXAiM LRVIR02R92TLL ORDIRARCE ,
~ ('JAC 197-11-960) Section 11 10 230(1)
D LNNIROiilMNTAL CI.IIKdR;$ (continued) ~
~ Evaluatior For
(3) Estiaate the aswnt of fill aad dredge material ttvt vould be plseed la or removed from the Agency Use Only
surface vater or vetl.ands and indiute the area of the site tlvt would De atfeeted Indicace
the eouree of fill eaterial
LLo u F
(6) Vill the proposal reduire surlue yter vithdravals or diverslons' Ciae a geoeral deserip-
tion, purpose. and appTO:laace quantities, !i kaovo
~nt~IF
(5) Does the proposal lie vitAln a lOQ-pear flood plain' If so, oote loutLon on the sice p Ln
(5) Does the propoaal lavolve any disedarQe• of vaste eatetial• to surface vateW If so
deecriDe the crpe of vaste and aaticipated volum oI diseharge
~n
0 Graund
(1) W111 groundvater be vithdravo. or vill vacer be d1scAarsed to 6roundvacer' Clve genaral
description, purpose, and appro:laate Quantities, if Imovn
(Z) DescriDe vu te saterial that vill be dlseha[atd lnto the arouod trom •eptic tanks or otir r
wnitary vaste crutaent Laeility De"ribt the general •ise of the epet m. the numDer oE
houses to be •erved (if •pp1lcsDle) or clr aiaDer of psrsoas the rystee(s) are ezpecced to
serve
PI"o .1 L°c t L,31 A Pt1[JI 1 S .1 P.Y"'
(3) Describe anr syacems. other cAan those designed for the dispo"l ot saaitary vu ce.
installed for the purpose of diecAaTgics tluids belov the gtouod surfaea (inelude• syscs• such
as those for the disposal of storm vatar or draloaae frm floor drains) Deserl0e the cype o[
systea, the asount of na[erial [o be dleposed of [Rrau6A the srstq aad the type• ot saterlals
likely co De disposed ot (includiaa aatatial• tit►ich aay enter the qstem loadverteatlr throu6h
•pill• or •s a rasulc of tirefishtiai activlties)
1,
r~~ ~cY ~ S L~il 1 1
~c n._ ~ ( 6 c YL S-~~ I I e tl 1~ 1-t- k
OrVwc.l~S
C^ cV" S+e rm tA-J, C'.-~ C-- r . N o C o.~ _c I I 4- 1 n v. S Ao 1n
~ 0 1r ~ i S n v^~ G G~
(4) Y111 any ehmicals (espeelallq oraanic solvant• or pecroleum fw 1s) De •toreA in above-
ground or undergrouad •toraae tadu' If so, vhat type• and anaacit Ls of materials vill be
stored'P
4
SlOTAHL ENOT80M4.'N= 04DI4ARC6 ~ -
(WAC 197-11-960) Seccion 11 10 230(1)
B CRVIR02iMMAI. LI.EMEtTI'S (con[lnued) ~
' Svaluation Por
Ageney ttse Only
(5) What proceetive m asures vill De taken to Lesure that lealu or •plll• of •ay ehemlcnl•
otored or used on aice vill noc be •lloved to percolate to groundvater (chie ineludes eeaeuree
to keep clumlcals wt of dlsposal systeas desetibed in 3b(2) and 7b(7)'
c Vater Runoff (lncluding •toro vater)
(1) DescrlDe che source of nmoif (laeluding •cors water) and metbd of eollectioe aad dispoaal
if any (inelude Quaaticies, if kaove) Where vill chis water flov+ Will tAi• water flov Lnco
other vatere' If so. desccibe
r o u r, d m n. 3 Pa c. e- e~.
J
(2) .1111 anr ehealeal• be •toreE, handled or uied oo t!►e si[e ir a loa tion vha[e a•pill or
leak vill drain eo surface or groundvater oc to a•coro water dlepopl syst m discharaing co
surfaee or groundwcer'
~
(3) Could vasce soterial• eater grwnd or surfacs v ters2 If •o, aensrally deseriDe
~Q
d Proaosed measures to reduce or coatrol surface. `rwnd. aad cvnoif water lapacta, tf •n7
t the proposed action lie• vithin che Aquifer Seniitive Aru pe •speeially claar on axplaoatioos
r relating to facilitie• cooeernio= Seetlone 3D(4). 3D(5), and 3c(2) of thi• cheeklist)
G PLA.v'i'S
a f'heck or clrcle type of veaetatioa found oa tha •ite
deciduow tree alder, maple. aspen, o[her
~ evergreen tree tir. ceder, pine, other
.hrub. 2 23 q~o
A--gTe..
puture v _ ~
crop or 6rain
vet wil pLats, eat[all. bu[tercup. Cullrwh. skumk upbase, other i~ .
M cer ylanc• rater lillr. eelgrass, allfoil, other
other types ot vegetation
D Vhet Iclad and asouet of vegetacion vill De rmoved oT altered!
~nx
7'rGGt~ 6 a.v%A .ee_d s
c List threacened or endangered speeies Imown to De oa or near the site
t,l o n
d Propooed landseaplag. use of ostive pLecs, or otlrsr muuns [o prssesve or eahaace Nsetatioa
0o the sice, if any I
~
T~2 Ltx -v.4cC4-o i v, a aMr1 a rn_.s sw i l 1 b e c, s ee~
5
) SPOKANE ENYIRONMEIRAL OROINAJICE
(YAC 197-11-960) Section il 10 230(1)
B ENVIROtd4EttTA1 EL01E1(T5 (continued) .
' Evaluation For
Agency Use Only
5 ANIMALS
a Circle any birds anC animals which have been oDServed on or neer the slte or are known to be on
or near the 51te
birds hawk. heron, eagle. songbirds, other
meamals deer. bear. elk, beaver. other
fish bass, salnan. trout, herring. shellfish, other
other
b List any threnteneE or endangered species knarn to De on or near tAe site
hl o Y% P
c Is the site part of a migratlon routel' If so. explaln
JA r-%
d Propose0 oeasuns to preserve or enhance wildlife. if any
m eN 1=
5 ENERGI' ANO YATURAL RESOURCES
a What kinds of energy ectrlc natural gas. Meod stove. solarl will be used~aiert the
the completed profect'i"'energy needz7 Descrlbe wAether 1t will be used fo<heetlnq). nanufac-
turing, ett
b YoulE your project affect the potentlal use of solar energy Dy aqjacent properties' Ii so,
generaliy descriDe
N n
c What kinEs of enerqy conservatlon features are 1nc1u6eE in the plans of this proposal' List
other proposed oeasures to reGuce or control energy inpacts. if any
110 N p
1 ENYIROHMENTIIL HEALTH
a Are there any enviromental health Aazardi, including exposure to toxic cAemlcals, rtsk ot tire
and exploston. spitl, or hazardous weste. that could oaur as a rtsult ot this proposal7 If so.
destribe
UO-hLF
(l) Describe spectal ewrgency services that mlght be requtred
~
6
~ SPOKAIiE EHPI4'7[9FL" OIIDIiiA14CL ~
(YAC 197-11-960) Section 11 10 230(1) ~
D EWIROMC1RAL ELMat7T5 (eonclnued)
Evalwiioa Por
EtNIROtdE21TAL REAL:B (continued) Ageacy Ose Only
(2) Proposcd Qeasures to reduee or concrol eavironsental health hasards, if any
JV.S~C
b Noise
(1) lrhat types of noise e:ist in the area vAieh wy a[fnet yout psoject (for esasple craffic,
equlpwnt. oyaration, other'
~LY.6.i.~l F
(2) What type• aad levels oE noise vould be ereated by or aaoelated vith the ptoject on a
ehort-cero or • lons-tere Dasi• (for euaple traffie, eoustruetion. opera[loo, otter)'? Iodicate
vhac hwr• noise would cow from the •ita
-rv1 c-r e.a s c d ' lTirrL.-~~i~ c o v~. S T µ
(3) Proposed enasure to reduee or eontrol noise lopatts, iE aa~
,~Ln nt F_
e u•ro Arro sKORei.itre usE
s Hhat 1• the current we of the site and sdjacent prope[ties'
YG..GD,..Y\T- 0. vLd Ao O.r4Yv.C.'r,+ C.crn pi Ut +b wG4-.4--
b [las the sice Deea used Eor agrieulture" If •o. deseribe
JY.-0
c Describe any •trvetures on the site
un11;=
d Vill any •cructures be desolished' If so, vhieh'
hv
e Whac 1• the curtent saeiag classlfltation oi the siCet V R- 3,~j
f Vhac io the eunenc emprehoonive pLn desigaation of the •ite' U2CiAN
g If applicable, vhac i• the eurrent •Aoreliae aaacer pcoaras deslaoation of the •ice'
h1fd►
h Na• ao7 pert of the •ite Deen elaaified as aa 'eoviraunienully wwitiva' •reat If so.
•pecify
~v ~ •
i Approzimately hov aany people vould ramide or vort ln the compla[ed project•
-25
7
• ^ ~ ~ertu. o~nixexae
(HAC 197-11-960) Section 11 10 230(1) sroxuRa aXvtso
E ENVIROnKnrm Llmmlrf5 (tontlnued) • ~
~ Evaluatlon For
Agency Use Oal'
j Apprnaleately hov maoy people vould the toapleted projett di*plsceP ~
k Proposed eeasure• to avoid or reduee d1spLeoent inpsets, if aay ~ Q
1 Proposed measure• to eeuure the proposal !s eofpaciDle vich existing aod projeeted Lnd usas and
plans. !f anq
u! , l I Fin- I I n w I k e_ -M►rl i vt Q S oEa.l I C~, ial%_FLecau fa-~ tL r~ S
9 ROUSING
a Appro:iaately hw aan7 uaits vould be provided. if anyt Iodieat• v6scM r high-, aiddlr . or
loriocooe howing
12 bEhL, NA 16 0 t.Z
D Ap➢ msimtely hov saar uaits. if aop, vould be •lid otcsdf Indiute vhether high-, aiddls-. or
lowincone housing
M.5~[2
c ProposeA oY sUT!• to redute or eoetrol housing imyacts, if anr
t4ny% p
10 ACSTIIETICS
a Vhet in the callest helghc of any proposed •ttueture(e). not loeludint antemasf VAat i• the
prfacipal e:Carlor Duildiag "terial(s) proposed•
2z F«-~- h i4ti ~...~eLs2ctrl
b Uhat vievs in the imediate +iclaity vould be alcend or obstruecedf
U Q~ P
c Proposed wasuree to reduce or coetrol aesthstic lapaets. if aay
11 LICHT AND G1.AAL
a 'tAat type of llghi ot gLre vlll the pro9ow 1 produee! tfiat ciae of day vould it uainly oeeur'
V\
b Could li;ht or aLre fevn the finished projset be a wiet7r daurd or interiare vitA •lewt
lYD
c What e:iacing off-s1te ewrees oi 11`hc or g Lre aay, aitact your proposalT
S) ~4"Qu_)XN
d Proposed wsuce• to reduea or control light and 61are Lputs. if any
8
' ~
~ SPQfAPL L111TfROtiM'YAL ORDl1iAIiCE
~ (WAC 197-11-960) Section 11 10 230(1)
.
E EPPIAMUMAL T.i.IDCR7i5 (tontiaved) •
~ evaluation For
Ageacy Uee Onlq
12 RFCRtASION
a VAat deslgnated and Snformal recceational opporcunities •Le in the iaaediste vicini[y'
(,1 v, ~ v c r S i-~- 51L~ ti
D Vouid the propossd project disp Lce aay exiicing recreaciooal we@! If so, descriDe
J"' r~
c Proposed seasun s to reduee or eontrol la9uc• oe reereation, loeludinQ secru tional opportuoi-
ties to be yrovided br the ptoject or appliucc, !t aay
Mo p-
13 NIS:'ORIC AND CV[.TU1tAL PRLSBRVATION
a Are there any place• or object• listed on or proposed for oational. stat• or local pre prva-
tion resiscer• luwvn to Da on or nest to the site1 Ii so. aeoesally deseribe
,U
b Geeerally deseribe aa7 laadoark• or evidence ot htstoric arehaeolosieal, seientific ot culcural
inporcance lmovn to be on or ae:t to the •ite
L" c-
c Proposed aasure• to rsduce or cootrol lopacts, if sny
Ij ntJ ir
16 T1U11SPORTASION
• Identify public •treet@ aad RiaMrt7• sstvina t4s sit• aa8 describe proponed acee q to the
e:iotiog •trsec sysce Shoron site pLtu. if an7
Tbe-,~,
b Is site currently served Sy pu011e traoalt+ It aot, vtut 1s the spp[o:faste dlstance co the
nsarest translt •tap!
__Y2_ C__
c Itov aao7 parklos spaees vould the eoaplsted project lavet 9ov saay rould the projeet elidnate'
~.n
.
d Yill the propo ul nauire any atv raad@ or stteata, oc laprovasac• to esisting rard• or stsMt•
not includiag driw+myst It •o. reaesally deocr1De (ladiute vdtMr public or private)
han
e 1ii11 the projeet wa (ur occur lo the losdiate vieinity oi) water. rail. ot alr tsaasportation•
If so, generally desctibe
J=g>Ga..l uQ S, FcdcraL xTresS E~-c..
9
. . ~
SYORAHL EPVTSOtilEIUAL OBDI11A8CL ~
(MAC 197-I1-960) Seetlon 11 10 230(1) ~
B EBVIxOt!ffilLAI, B,II4.1R'g (continusd) a ~
Lvaluation For
Agency Use Only
f Aov aany vehicuL r crlp• per dey vould be genarated b7 the emyle[ed project' Lf Imovn,
indicate vlnn peak vould occur
U Y► ~Y101,~
g Proposed, oeasure• to teduee or concrol transportatioa impacts. !f any
15 PUBLIC SERVICBS
a ttould the proleet result in an laerueed esad for public •eniea• (for exalopla. fire protsctioo.
poliee proteetion. health care. schooL. other)? If •o. Qnnerally deseribe
b Proposad veasures to redues or contsol direet iapaet• on puplie eervices. 10 any
16 U'ILITIES
a Circle vtlllties turren[1y avai L ble at the sice leecrlcit_.reatural vater)
(refu~~
(7ervice~ ~ephonaaoitary uw ~ septie systes. otM r
b Descrilbe the utilitie• that are propossd for the projeet, the ut111t7 provldina the •eniet and
the gene al co~tcuctioo actlvitie• oo the ait• oc ia the iaa~diate +ici~icr vhich alaht be
needed ~ Srr S .~SeW G lr ~
PLL6
C SIGNAT9RL
1. the undersigned. waar under the penalt-y oi petjury tlut the above nspowe• •re tide truthfullr aad to the Msc of sy kawledge I also
underscand that. •hould there be aoy villiul siaTepromentacion or villtul luk of Eull disclosure on ey part. the a en sar vitM rav any
deterninacion of nonsignifleaace that lc dsht issue in reliaace upon thi• checklist
Oa te Ptoponent S C~ ~ E n +ie j~ P G 1[~,S
Plesso Print ot iy6e)
Proponent C2 AedreN
(SiaoaCUre)
Phone ~ Z. 1 3 Z. Z_ WA.
Person cospleting focm Dtfo,lry -P 1-4PM- Date
-t r---
Phone -7'~ Z. 6 ^L3 Z L
POR STATT OSE ONLT
Staff nAbec(a) sevieviag cAnclclist l-opA
Dased on chis staff reviev of the envirooaeaLal eheeklist aad otdst partiuent infoesatlan, the staff
~
AConcludes that tFu re ara no probable mignifi uat adverse iapact• and rec4ssads a deteesination of eonoige►itieaoce
s Conclude• that probable •16ttificaat advoerae anvironmntal iapaet• do eslst for the current proyoul and ncosnds a aitigated dnter-
siaatlon of nonsi;nificanee vith cooditions
C Concludes tAac there are probable slaailiunt adverse nnvironmnntal imput• and recomeods a datenioatioa of •ignifiunce
fILZ11C lS - =75 00
10
Z E ' 2'qC.
, .
~ ~ t f•• .
: SPOKANE COUNTY PLANNING
ZONE RECLASSIFICATION APPLICATION
PART Z
A. GENERAL _INFORMATION:
,
NAME OF A.PPLICANT/REPRESENTATIVE
MAILING A.DDRESS P-0 - ~3DX 9:5r
CITY G 2c'i.-~/A c2cS STATE a,,-, ZIp 5'~v( 6 .
PHONE 9 Z L - 5 U 7 (work) q2,2 - 7016 (home
)
IF APPLICANT IS NOT OWNER, INCLUDE WRITTEN OWNER AUTHORIZATION
FOR APPLICANT TO SERVE AS REPRESENTATIVE.
LEGAL OWNER'S NAME &;giF-~- SA M -1 PHONE
MATLING A.DDRESS
CITY STATE ZIP
PROJECT/PROFOSAL SITE AREA (acres or sq ft) ~ t
A.DJACENT AREA OWNED OR CONTROLLED (acres or sq ft ) N~A
ASSESSOR PARCEL #S OF PROJECT/PROPOSAL U 5 Zol
ASSESSOR PARCEL #'S OF ADJACENT AREA OWNED OR CONTROLLED w14
STREET ADDRESS OF PROPOSAL
EXISTING ZONE CLASSIFTCATTON(S) (DATE ESTABLISHED) U 2 3. S
EXISTING USE OF PROPERTY 12A~W G!tj,'IJNd
PROPOSED ZONING J 2- ~ 2
COMPREHENSIVE PLAN CATEGORY U2.&~
SCHOOL DISTRICT G~
FIRE DISTRICT
WATER PURVEYOR
PROPOSED USE OF PROPERTY •
Single family dwellings Duplexes Multifamily dwellings (o~j
Manufactured homes ( ) Business ( ) Industnal ( ) Mixed Use ( )
Other ( ) - Descnbe
LIST PREVIOUS PLANNING DEPARTMENT ACTIONS INVOLVING THIS PROPERTY N/,4
B. LEGAL/ZONE RECLA,,SSZFZCA,TZON INk'ORMATInN
LOCATION OF PROPOSAL
SECTION 1JE 4 0~ LO TOWNSHIP L 51S RANGE 44 & Wti.
NAME OF PUBLIC ROAD(S) PROVIDING ACCESS FTN !Vt
WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD 30"
ZOIVE, RECLASSIFICATION Arrt,ICATTON • . Page 2 of 4
;
DOES THE PROPOSAL HAVE ACCESS TO AN ARTERIAL OR PLANNED ARTERIAL YES NO
NAME(S) OF ARTERIAL ROADS gr%( ~4~-
LEGAL DESCRIPTION OF PROPERTY FOR EACH ZONE RECLASSIFICATION PROPOSED
S CE A m4 TcNi,-~,> 62 S rTc P t.qj
EXISTING ZONE(S) 0A2, ~.S TO PROPOSED ZONE(S) V,
FOR THE FOLLOWING DESCRIBED
PROPERTY (ATTACH LEGAL DESCRIPTION STAMPED BY LAND SURVEYOR OR PROVIDE
BELOW 315E s 'l-€ ALAo.l
IF YOU DO NOT HOLD TITLE TO THE PROPERTY, WHAT IS YOUR INTEREST IN IT? AM
A-ss I s;A-rJr 51-c.i2 rTRA-Y ):~>2 Q E LL6 r#Jc , w► u A-t-SJ KE IN-6 6 &CA4-L
C,zNC9ACiUk FOK• T~f-i C4T3Sr"CTlorJ QF Ttfc BVILD lIJGs.
WHAT ARE T'HE CHANGED CONDITIONS OF THE AREA WHICH YOU FEEL MAKE THIS
PROPOSAL WARRANTED? i NF c.vHpk6 N&Js(uC Pc,Ad ENw09AG4FS /I vAR (ErY oF NCOS, N6
TOC-46 fh2E A w(D6; 4(-kjGt O~ Di PA5e&r Z cMrF3 td TritF Ae.64 IN Cc ubtArG U 2, 3, S, uIt 7
- ~
~ b cl Q ZZ. D iRSLR.Y ivc`5,7 of rMC Sc TC , 8TN AJ&JvE tKS 12E t&+ryY 8E54 w(46w6b &A
Gwt41`Y Scw6Q- IS 5rL$66 r Nro -IH£ s erLc_
WHAT IMPACT WILL T'HE PROFOSED ZONE RECLASSIFICATION HAVE ON THE ADJACENT
PROPERTMS? MIO'M,+L i+iC-2E-45a iN iJQAFFrt, oeJ $'cW 4•rt;.►u6
WHAT FACTORS SUPPORT'THE ZONE RECLASSIFICATION? A~~ttj j?jtE C0HPVH6vsiv6 ~rJ
&JCoUgAGcS A c1oViE7+( J-P axjS«JL Wc Cvocb 60 FvrC. ilft;' VtQ 1.1 M4404vM, dut wb
Fc'eL OR(t wouc.A 3E R C0MFdQt$c.e. v5C FD2 7"C Si2C oP 'ttIC e2oPCelr R'3 wEu-
43 G c vC, 1k02 E 4lA;0,tG; y oP r+D%)StA- 7D 7W4F AIW-A
WHAT MEASURES DO YOU PROPOSE TO MITIGATE YOUR PROPOSAL'S IMPACT ON
SURROUNDING LAND USE? bakucw*1 lnvm strE wcc.` abr ORvE-d SI DfwqLK Lyc/ 8774 ,qvepivc
Wiu. 81F C*-&4Q0 64Sr ro PA-06?trY uPtw cpMPc.ETianl oF 324 ;avi c.d19G t S irE IvJC C
B€CvM PLC TC-c,y CATJD SCAPC-~ ibJb PR.o fESsc on►A t.c.Y M,++out-4,r*6, A S~ G#+7 ag S MU «W P&.+%
B r WNPtPTQ AU~" P/LORcAr1 uAZS, Gc3DC 4t-WwS 4v la'n► GS io 6E kc) Aci-~T
iAt.t. , oUK 6u(c61N&S wovc.A Bc twi) STURY LcsS 77tft LS Fc'-t ~ 74-c.c.
.
• '70NE RECLASSIFICATTUN ti.. . LICATION . , Page 3 of 4
PART II
THIS SECTION OF THE APPLICATTON WII.,L PROVIDE THE PLANNING DEPARTMENT STAFF WITH
WRITTEN VERIFICATION THAT THE APPLICANT HAS HA.D PRELIMINARY CONSULTATION WITH THE
AGENCIES IDENTIFIED RESULTS OF THE PRELIMINARY CONSULTATION SHALL BE INCORPORATED
IN THE PROPOSAL BEFORE FINAL SUBMITTAL TO THE PLANTIING DEPARTMENT
FIRE MARSHALL/FIRE DISTRICT ~
A THIS PROPOSAL IS WITHIN FIRE PROTECTIO T NO `
B ADEQUATE ARRANGEMENTS (HAVE) ( AVE N BEEN MADE TO MEET OUR NEEDS
IN PROVIDING FOR AN ADEQUATE WATER SYSTEM AND FACILI'ITES FOR FIRE
PROTECTION PURPOSES
C RECOMMENDED FLRE FLOW OR UNABLE TO CALCULATE NOW
BECAUSE USE IS NOT DEFIlVITIVE, AND W1LL BE DETERMINED AT BUIIrDING PERMIT
APPLICATION TIME
D REQUIREMENTS INCLUDE , . ll
~ V*urr L~ ~ / 2 -J8• ~ 5
FIRE DISTRICT U rSIGNATURE/TITLE DATE WATER PURVEYOR
A. SATISFACTORY ARRANGEMENTS FOR DQMESTIC WATER AND FIRE FLOW
REQLJIREMENTS MM4W~ (HAVE NOT) BEEN MADE
B REQUIREMENTS/COMMENTS CA.U...A 04sI`{-c. VJFAW ~t%a
vv" cAQ.cQ,ssox :F-0 kAle-l- AzC.
WATER DISTRICT GNATURE/I'ITLE DATE
COUNTY ENGINEER
A PRELIMIIVARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR ROADS
AND DRAINAGE HAVE BEEN DISCUSSED WITH THE APPLICANT
A COMMENTS ~ bc" ~.A"/ CG
X✓ ~
S IGNATUREfI'ITLE DATE
COUNTY UTILITIES '
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR
SUBMITTAL OF THIS PROPOSAL (HAVE) (HAVE NOT) BEEN S~ PTISFIE THE DESIGNATED
WATER PURVEYOR FOR THIS SITE IS ~Pc~KA~36' C a~Or'Y ~AT~2 ~is-'2c er :W-3
A COMMENTS -Ct~ 0 P- b lJU A`v-E 12
.
a ~ Z ` s
v SIGNATUREfI'ITLE ATE
HEALTH DISTRICT '
A PRELIMINARY DISCUSSION HAS TAKEN PL E AND GE RAL REQUIREMENTS FOR
SUBMITTAL OF THIS PROPOSAL (HAVE) CHAVE NOT BEEN SATISFTED.
A COMMENTS PV41~ C -fc'Lvl /
~L
45kt~~~
SIGNA E/TI E ~ A
SEWER PURVEYOR
A PRELIMIIVARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR THE
PROVISION OF PUBLIC SEWER A.RE UNDERSTOOD BY THE APPLICANT
A COMMENTS CD00JEQ-r TO ~~1S1-I C- :51El,JE/2-
~ 12 g `
SIGNATURE/TITLE bAllE
- 1 . -
• GONE :ZECLASSIFICAT'ION APPLICATION ' Page 4 of 4
{
PART III
~S E` ,S•~~ j SURVEYOR VERIFICATION
wA c D, A LICENSED LAND SURVEYOR, HAVE COMPLETED THE INFORMATTON
ZONING MAP AND WRITTEN LEGAL DESCRIPTION
V y ~o
t
DATE I Z. l I 9,S"
1 f
D S S (V • 9~ 9 j~.. PHONE: 97- ~ 13 L Z
a~ Ut,zO F .
EXPIRES 7117~ 9 ? -S f:~A lcGi,z~ W At ZIP / 92-1) -
tl~
PART IV
(SIGNATURE OF PROPERTY OWNERS OR LETTER OF AUTHORLZATTON)
I, THE UNDERSIGNED, SWEAR OR AFFIRM UNDER PENALTY OF PERJIIRY THAT T'HE ABOVE
RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE
I FURTHER SWEAR OR AFFIRM THAT I AM THE OWNER OF RECORD OF THE AREA PROPOSED
FOR THE PREVIOUSLY IDENTMZED LAND USE ACTION, OR,1F NOT THE OWNER, ATTACHED
HEREWITH IS WRITTEN PERMISSION FROM THE OWNER AUTHORIZING MY ACTTONS ON HIS/HER
BEHALF
NAME 6ELL"6 l~-~t.2a li~ C. DATE
ADDRES S P-6 - &X PHONE
G2eo PIC95 ZE? g1or6
SIGNATURE OF APPLICANT OR REPRESENTATIVE DATE
STATE OF WASHIIVGTON )
) ss
COUNTY OF SPOKANE )
SIGNED AND SWORN OR A,fFTRMED BEFORE ME ON THIS L$T 14 DAY OF
p~~ e_,•~~ r, 199q, B Y
p.l1E M. y
N ••~ae~• ~i -
'~?1 . ~~~a~~, ~ ~I;0 NOTAAY NotarY Public in and for the State of Washington
v •
• : ~
.
~ s Residing a[ -p- VA•
: cl~1 ; PUBLIC
'•~'9 '•ti y~~ My appointment expues T~- t 4_9 S
O~'i• ~
PART V
(TO BE COMPLETED BY THE PLANNING DEPART'MENT)
DATE SUBMITTED FILE #
DATE ACCEPTED BY
TOTAL FEES • RECEIPT #
a
•
~
- a~
S P O K A N E , ~ C O U N T Y
DEPARTMENT OF BUILDING AND PLANNING • A DIVISION OF THE PUBLIC WORKS DEPARTMENT
JAMES L MANSON, C B O, DIRECTOR DENNIS M SCOTT, P E, DIRECTOR
MEMORANDUM
TO: ,
Jim Red, Spokane County Utilities Department
Steve Holderby, Spokane County Health District
Wyn Birkenthal, Spokane County Parks & Recreation Department
Bill Hemmings, Stormwater Utility
Greg Figg, Department of Transportation
Glen Niiles, Spokane Regional Transportation Council
Chnstuie Fueston, Spokane Transit Authority
Susan Winchell, Boundary Review Board
Central Valley School Distnct
Spokane County Water District No 3
Fire District No 1
FROM: John Pederson, Senior Plannerq
DATE: December 29, 1995
~
RE: Zone Reclassification from Urban Residential-3 5(UR-3 5) to Urban
Residential-12 (UR-12)
APPLICATION ACCEPTANCE AND DESIGN REVIEW MEETING
rTANUARY 10. 1996 AT 1:15
COUNTY PLANNING CONFERENCE ROOM. 2ND FLOOR
Please review the above application and use the attached APPLICATION ACCEPTANCE AND
DESIGN REVIEW MEETING FORM for your comments The Planrung Department
encourages your presence at tlus meeting The sponsor and representative have been
invited to also attend if you can not attend, please forward your review comments on the
attached form to Lorne Lakshas for the meeting The attached APPLICATION
ACCEPTANCE AND DESIGN REVIEW FORMS will be given to the sponsor at the meeting and
included in the Planning Department file (so bring three copies to the meeting) Thanks
for your cooperation If you have any questions about the application, please contact
Lorne Lakshas of the Planning Department at 456-2205
c Belle Terre Inc, c/o Cameron Ball, P O Box 85, Greenacres, WA 99016
Attachments Application Acceptance and Design Review Form, Project Desi;n, Slte Plan
1026 WEST BROADWAY AVENUE • SPOKANE, WASHINGTON 99260
BUt1.DwG PHONE (509) 456-3675 • FAx (509) 456-4703
PLANNING PHONE (509) 456-2205 • FAx (509) 456-2243
TDD (509) 324-3166
Design Review for January 10, 1996 at 1 15
Belle Terre Inc. Zone Reclassification
Generally located north of and adjacent to 8th Avenue, approximately 300
feet west of Felts Road in the NE 1/4 of Section 20, Township 25 North,
Range 44 EWM, Spokane Counry, Washington
COMPREHENSNE PLAN Urban and within the Priority Sewer Service
Area (PSSA)
PROJECT DESCRIPTION Zone reclassification from Urban Residential-3 5
(UR-3 5) to Urban Residentral-12 (UR-12) for devleopment of 12 multiple
farruly residences and those uses allowed in the Urban Residential-12 (UR-12)
zone
PARCEL NUMBER 45201 1448
SITE SIZE Approxlmately 43,200 square feet
APPLICANT Belle Terre Inc
c% Cameron Bail
POBox85
Greenacres, WA 99016
(509) 922-9076
ASSIGNED PLANNER Lorne Lakshas
- ,
r 1 SPOKANE COUNTY PLANNING
ZONE RECLASSIFICATION APPLICATI4N
PART I
A. GENERAL INFQRMATION:
~
NAME OF APPLICANT/REPRESENTATIVE 9EI'l- TcI.(ZE )OL. .cl~)"tL~otj 611-~L
MAILING ADDRESS PD ~3DX ~
CITY 69-6~'V AC&C-S STATE O'l, ZIP 01 6
PHOIVE 92-Z - qO7 G (work) q Z Z- .7U ?C (home)
IF APPLICANT IS NOT OWNER, IIVCLUDE WRITTEN OWNER AUTHORIZATION
FOR APPLICANT TO SERVE AS REPRESENTATIVE.
LEGAL OWNER'S NAME ~ s4AI€ PHONE
MAII.ING ADDRESS
CITY STATE ZIP
PROJECT/PROPOSAL SITE AREA (acres or sq ft) -
ADJACENT AREA OWNED OR CONTROLLED (acres or sq ft ) N/A
ASSESSOR PARCEL #S OF PROJECT/PROPOSAL U 5 ZoJ -/U1l9
ASSESSOR PARCEL #'S OF ADJACENT AREA OWNED OR CONTROLLED AJ 14
STREET ADDRESS OF PROPOSAL
EXISTING ZONE CLASSIFTCATION(S) (DATE ESTABLISHED) U 2 3, S
EXISTING USE OF PROPERTY 2" 6,te,)N'3
PROPOSED ZONING J 12. / Z
COMPREHENSIVE PLAN CATEGORY U
SCHOOL DISTRICT Cv
FIRE DISTRICT -i-P (
WATER PURVEYOR ~ ~DC-P-l-)
PROPOSED USE OF PROPERTY •
Single family dwellings Duplexes Mulafamily dwellings (4
Manufactured homes ( ) Business ( ) Industnal ( ) Mixed Use ( )
Other ( ) - Descnbe
LIST PREVIOUS PLANNING DEPARTMENT ACTIONS IlVVOLVING THIS PROPERTY
.
B. LECAL/ZONE REC't,ASSIFIC,ATInNIN,FnR ViATiDNI
LOCATION OF PROPOSAL
SECTTON NF-4 L-)~- LO TOWNSHIP 2 5~ RANGE 44 ~ Wtt
NAME OF PUBLIC ROAD(S) PROVIDING ACCESS FTW #VC
WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD 30"
ZOIVE, RECLASSIFICA7'TnN APPLICATTON Page 2 of 4
, ~
~
DOES THE PROPOSAL HAVE ACCESS TO AN ARTERIAL OR PLANNED ARTERIAL ¢-1 YES NO
NAME(S) OF ARTERIAL ROADS gr4 A-JI4---
LEGAL DESCRIPTION OF PROPERTY FOR EACH ZONE RECLASSIFICATION PROPOSED
L;.~ r5v, S cE A rrA 7-cNi,~ 02 S rrc P c-AJ
,
EXISTING ZONE(S) l) .k, 3.5 TO PROPOSED ZONE(S) v~.
FOR THE FOLLOWING DESCRIBED
PROPERTY (ATTACH LEGAL DESCRIPTION STAMPED BY LAND SURVEYOR OR PROVIDE
BELOW 5 ~T€ A`AW
IF YOU DO NOT HOLD TITLE TO THE PROPERTY, WHAT IS YOUR IlVTEREST IN I77 AM
A-ss i s 7A-rJr 51-(At7AA-Y 1:.7 fL 96L~LC i~:-fL.2. ~114, 1 w IL.L I; €10t G &C-Aq-L
FOK. 7Hi C4435 t"t-Tlor~ oF TOE BUILD 1465.
WHAT ARE THE CHANGED CONDITTONS OF THE AREA WHICH YOU FEEL MAKE THIS
PROPOSAL WA.RRANTED? ?NF 00MpQ6ltaJsWC pcAd &JwRJd-AGcS dq vOt2 'ErY of HwSf N(-
T Hi0 AlzE A w c 05 R f-W GE O~ PA5t& r Z c~t& cd ntc /fi2.fr4 N C.t. uD cjuG U!L , 3,57. cs2 7
AriD cl Q ZZ p '/ZEc.tzY tvc`5Y c~ rMC ScTt-' R Sra ,q06~JvC 04s At c&+my Bc'aJ w(664co &4
Gwtit`f SC.j4e- iS 5rz)S3EA !N m iw S e mc_
WHAT IMPACT WII.L THE PROPOSED ZONE RECLASSIFICATION HAVE ON THE ADJACENT
PROPERTIES? M iN'~~4L. r N c.2E4sr IN 72AFFtG aJ 8~+ /~•~r'~-►~ ~
WHAT FACTORS SUPPORT THE ZONE RECLASSIFICATION? 46AI"; n-ftE CUhPlUIki'JSlve
bjGuWgAGcS A cllQP-iE-Ty Jf f*-JStNG Wc 60 FvR. j1' Qo2 LZ M4l4mvM, du7' we
l-EeL 0 R (2 wouc.A BE R CoMAd&Wc.b . u'SC FoR TW 5i7Z dF 7Ttr: o°2oPCIZTr /4S wFLc
A5 Gtv(F &u2E vkRssrY ot OD05cK4 7n 7)4C ARZA
WHAT MEASURES DO YOU PROPOSE TO MITIGATE YOUR PROPOSAL'S IMPACT ON
SURROUNDING LAND USE) D(ZkuEw1H /+un' Scrc wcu- 66 O&C-A. SiD6wj4iK cc/ 87W A,rc;Utlc
.
1,il" 8c C-ici Q0 64Sr 7n plLoPErZ?7 UPoM Cpt-cPc.67IU1 OF 3R6 j3uj c.dr KG r S tM ~vJt L
3E CvMPLC-TC-Ly CA-NOSCAP~~ bJD PR.O~CSS(c+JA t.LY Mkiti7-4wO,A Sj6 FfT 06SMOcric4 ffau%
wvLu br wMAcpTE~l ,~;~nrd p2opUh uAZs, Gt;Oc" 4j-wwt (3wLD(N GS to &E 4c)~Fr
,
`14U. , ovf- 4utc.DlN4S w0vt.6 B,~ 7wO S1URY I.ess 77tft LS ~-c 7*-U.
_ ~
=70NE RECLASSIFICAT7r'-T A.PPLICATION Page 3 of 4
.
.
PART II
THIS SECT'ION OF THE APPLICATION WII.L PROVIDE THE PLANNIING DEPARTMENT STAFF WITH
WRITTEN VERIFICATION THAT THE APPLICANT HAS HAD PRELIMINARY CONSULTATION WITH TFiE
AGENCIES IDENTLFiED RESULTS OF THE PRELIMINARY CONSULTATION SHALL BE TNCORPORATED
IN THE PROPOSAL BEFORE FINAL SUBMITTAL TO THE PLANNTNG DEPA.RTMENT
FZIZE MARSHALL/FYRE DTSTRICT
A THIS PROPOSAL IS WITHIlN FIRE PROTECTIO T NO ~
B ADEQUATE ARRANGEMENTS (HAVE) ( AVE N BEEN MADE TO MEET OUR NEEDS
IN PROVIDING FOR AN ADEQUATE WATER SYSTEM AND FACII.IT'IES FOR FIRE
PROTECTION PURPOSES
C RECOMMENDED FIRE FLOW OR UNABLE TO CALCULATE NOW
BECAUSE USE IS NOT DEFINITIVE, AND WILL BE DETERMINED AT BUII,DTNG PERMIT
APPLICATION TIME
D REQUIREMENTS INCLUDE . . /1 .
v*u`l
FTRE DISTRICT SIGNATURE/I'ITLE DATE
WATER PURVEYOR
A. SATISFACTORY ARRANGEMENTS FOR DOMESTIC WATER AND FIRE FLOW
REQUIREMENTS (NA"" (HAVE NOT) BEEN MADE
B REQUIREMENTS/COMMENTS QYsl+,q- t,r.s~-'~ NbLcJ%a
t-~.bi o~...s .nn r,{t ~,.Q, c~Q.c4,ss~c :-o We-i' A(ze- -~6A1
S C.~J ~ ''~,3 ~ ~ - I ~ ~ `9 ~
WATER DISTRICT I GNATURE/I'ITLE DATE
U
COUNTY ENGINEER
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIR.EMENTS FOR ROADS
AND DRAINAGE HAVE BEEN DISCUSSED WITH THE APPLICANT
A COMMENTS 75c°' x //,411 c- ~ w
~ S
SIGNATURE/TTTLE DATE ,
COUNTY UTILITIES
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUII2,EMENTS FOR
SUBMITTAL OF THIS PROPOSAL (HAVE) (HAVE NOT) BEEN ~S PTISFIE THE DESIGNATED
WATER PURVEYOR FOR THIS SITE IS ~OvKAx3~' C'. D~~'Y ~ATF-2 ~3
A COMMENTS C-D 0~~► rJ AT'e C>`I lJU A`T"~' I~ rvl f~-v'
ti ~
~
L
~
SIGNATURElTITLE ATE
HEALTH DISTRICT
A PRELIMINARY DISCUSSION HAS TAKEN PL E AND GE RAL REQUIREMENTS FOR
SUBMITTAL OF THIS PROPOSAL (HAVE) AVE NOT BEEN SATISFIED
A COMMENTS C -fe
!:Z~7 ~SIGNA&7 - ~
E A ,
SEWER PURVEYOR
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUiREMENTS FOR THE
PROVISION OF PUBLTC SEWER ARE UNDERSTOOD BY THE APPLICANT
MENTS
A COM
- ~ 2 I ~i F \5
~ A
rE ~
S IGNATUREITITL
w.
- - C
'r
w r
` ♦
• ZONE :ZECLASSIFICATF kPPLICATION Page 4 of 4
~ • ,t .
PART IIZ
E, SURVEYOR VERIFICATION
WAV. '
~ D, A LICENSED LAND SURVEYOR, HAVE COMPLETED THE INFORMATTON
ZONING MAP AND WRIT'T'EN LEGAL DESCRIP'tION
a
1 DATE 9 S"
~s
D s s N• 909 F, R d_ PHONE• _,9 Z. . 13 Z2-
t,
a ur~
EXPIRES 711719 7 ~ple, k 'A t1~ w~ZIP 9 9 Z' 1 1- '
PART IV
(SIGNATURE OF PROPERTY OWNERS OR LETTER OF AUTHORIZATION)
I, THE UNDERSIGNED, SWEAR OR AFFIRM UNDER PENALTY OF PERTURY THAT THE ABOVE
RESPONSES ARE MADE TRUTHFUI.LY AND TO TI-E BEST OF MY KNOWLEDGE
I FURTHER SWEAR OR AFFIRM THAT I AM THE OWNER OF RECORD OF THE AREA PROPOSED
FOR THE PREVIOUSLY IDENTIFTED LAND USE ACTION, OR,1F NOT THE OWNER, ATTACHED
HEREWITH IS WRITTEN PERMISSION FROM THE OWNER AUTHORIZING MY ACTIONS ON HIS/HER
BEHALF
NAME 6EL~6 !&(I.a /rJ(.. 'DATE
ADDRESS P-v •k1( 9' PHONE
Gr~~ plws WA. ZIP 9 jo (6
~
~fis s r. 5 iLl4e /-*tr ( Z'
S IGNATURE OF APPLICANT OR REPRESENTATIVE DATE
STATE OF WASHINGTON )
) ss
COUNTY OF SPOK;.A.NE )
SIGNED AND S WORN OR AFFIRMED BEFORE ME ON THIS LZ T14 DAY OF
D G 19ABY Co, P r,ow [&r„11
p,~E M•
♦
NJP
. : ~1 ~ •
: Jv Notary Public in and for the State of Washmgton
w Residing at
.
!~7 '~`~y~ 1~ yiy appointment expLres TK t~4 $
•y ~
i
PART V
0 BE M,91LETEB 3Y THE. PLA1ti"``TING DEPARTMEN-0
Dr.?Z t ~-1.91 dFII.E #
D rsT E A C Et . B Y
TOrI'AL FM: RECEIPT #
~
t
.
L SPOKANE COUNTY PLANNING
ZONE RECLASSIFICATION APPLICATION
PART I
A. GENERAL INFnRMATION:
NAME OF APPLICANT/REPRESENTATIVE
MAILING ADDRESS
CITY STATE ZIP
PHONE (work) (home)
IF APPLICANT IS NOT OWNER, INCLUDE WRITTEN OWNER AUTHORIZATION
FOR APPLICANT TO SERVE AS REPRESENTATIVE.
LEGAL OWNER'S NAME PHONE
MAILING ADDRESS
CITY STATE ZIP
PROJECT/PROPOSAL SITE AREA (acres or sq ft)
ADJACENT AREA OWNED OR CONTROLLED (acres or sq ft )
ASSESSOR PARCEL #S OF PROJECT/PROPOSAL
ASSESSOR PARCEL #'S OF ADJACENT AREA OWNED OR CONTROLLED
STREET ADDRESS OF PROPOSAL
EXISTIIVG ZONE CLASSIFTCATION(S) (DATE ESTABLISHED)
EXISTING USE OF PROPERTY
PROPOSED ZONING
COMPREHENSIVE PLAN CATEGORY
SCHOOL DISTRICT
FIRE DISTRICT
WATER PURVEYOR
PROPOSED USE OF PROPERTY
Single family dwellings O Duplexes O Multifamily dwellings O
Manufactured homes ( ) Business ( ) Industnal ( ) Mixed Use ( )
Other ( ) - Descnbe
LIST PREVIOUS PLANNIIVG DEPARTMENT ACTIONS INVOLVING THIS PROPERTY
B LEGAL/ZONE RECLA,SSIFICATInt4 INFnR V~„i,ATInNI
LOCATION OF PROPOSAL
SECTION TOWNSHIP RANGE
NAME OF PUBLIC ROAD(S) PROVIDING ACCESS
WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD
J
• J
»1
ZONL' RECLASSIFICATION APPLICATION Page 2 of 4
DOES THE PROPOSAL HAVE ACCESS TO AN ARTERIAL OR PLANNED ARTERIAL O YES O NO
NAME(S) OF ARTERIAL ROADS
I
LEGAL DESCRIPTION OF PROPERTY FOR EACH ZONE RECLASSIFICATION PROPOSED
EXISTING ZONE(S) TO PROPOSED ZONE(S)_
FOR THE FOLLOWING DESCRIBED
PROPERTY (ATTACH LEGAL DESCRIPTION STAMPED BY LAND SURVEYOR OR PROVIDE
BELOW ,
IF YOU DO NOT HOLD TITLE TO THE PROPERTY, WHAT IS YOUR INTEREST IN IT?
WHAT ARE Tf-E CHANGED CONDITTONS OF THE AREA WHICH YOU FEEL MAKE THIS
PROPOSAL WARRANTED?
WHAT IMPACT WILL THE PROPOSED ZONE RECLASSIFICATION HAVE ON TI-E ADJACENT
PROPER'TIES?
WHAT FACTORS SUPPORT THE ZONE RECLASSIFICATION?
.
WHAT MEASURES DO YOU PROPOSE TO MITIGATE YOLIR PROPOSAL'S IMPACT ON
SURROUNDING LAND USE?
.
ZONE RECLAA55EFTCATION APPLICATION Fage 3 0f 4
PART 11
THIS SECU(]N OF THE AFPLICATIQN WILL P~~VIDE THE PLANNLlNG DEFARTMF-N'i` STA.FF° WI'rH
WRITTEN VF,RTFICATIQN THAT T'IM APPLFCANT HAS HAD PRF-LIMINARY C4NSLJI.TA1'ION WITH THE
A.CENC]ES IDF-NT=D, fiESULTS OF THE PRELIMIINARY ~ONSULTATION 5HALL BE IlNCORPORA.TEn
IN THE PROPOSAL BEFQRE FINAL SUBMMAL TO THE PLANN7NG DEPA,R7MENT
FIRE MARSHALLIFIRE I3ISTRIC7` A THiS PRC3POSAL IS W[THIlY F"IR~ ~~OTECTTON DISTRIC7 ND
B ADF-QLTA'I'E ARRANGEMENTS (HAVE) (HA'VIE IYD'F) BEEN 1V,(ADE 'Z'O NEET OUR NEEIDS
IIN PR(]VIDIlNfi FOR AN ADEQLTATE WATER SYSTEM AND FACILiTFES FOR. FIRE
PROTF-CTION FURPOSES
~ ~~OMNfENDED ~M-E FLUW , OR UNABLE TO CALCULATE NOW
13ECALTS£ LFSE IS NDT DEFWMVE, AND WILL BE DE'TERNiII~ED AT BUII.DINC,~ ~ERMIT
AFPLICATION 'FIhM.
D REQ=MENI'S INCLTJDE
FIRE DISTRICT SIO~ATUREtnTLE DA'I'F,
WA,TER PL1RVE,YOR i
A. SATISFACTORY A.RRANGEI~NTS FOR DONIESTIC WATER AND FIRE FL.OW
REQUEREMENT'~ (HAVE} (HAVE NOT) BEEN MADE
B REQLTIREMENI'S/COMMENTS
WATER DIS'IRICT SIGNATURE/TITLE ~ DA'I"E
CDUIYT~ ENGINEER
A pRELrMINARY nIScusSrorv HAs rAKEN PLA~E Aivn GEnrERAr.. REQuIREMF-NTS FaR ROAns
AN'D I7RAIVAGE H~~E -BREN DISCUSSED VVITH THE APFLICANT
A COMA}iENTS 1w'41
~
J~C-4yt4-
SrGN~~/TITT.~ ~ATE
CoUNTY UTzz.,ITzEs '
A PRELIMINARY DISCUSSIOIV HAS 7'AKEN PLACE AhTD GEIr[ERAL REQUfIREhEN'TS FOR
SUBMITTAL OF THIS PROPOSAL (HAVE) (HAVE IYOT) BEEN SATISFIED THE DESIGNATED
WATER FLTRVEYC7R FOR THIS SITE IS
A COMMENTS _
, S IGNAT[JRE/I'ITLF, DA'I'E
HEALTH DISTRICT .
A PR£LIMINARY DISCUSS~ON HAS TAKEN 1'LACF, AND GENERAL REQUIREIVENT'S FOR
SLTBMITTAL OF THTS PFtQPOSAL (HAVE) {HAVE NOT} BE,EN SA`I'lSFIED
A COMMENTS ~
S IGNA7'UREMTLE DATE R
SEV4'ER PLIRVEI'OR ,
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AiVD GENERA1, REQUIREhENTS FC}R TffE
PROVXSXON OF PL7BLIC SEWER ARE UNDERSTDOD BY THE APPLICAhIT
A COMMEN°TS SICANAT[JR.EfI'ITLE I7ATE
. • w ! 't
2,0iNq1~,1'ZECLASSIFTCATI0N APPLICAT'ION Page 4 of 4
PART III
SURVEYOR VERIFTCATION
I, THE UNDERSIGNED, A,LICENSED LAND SURVEYOR, HAVE COMPLETED T'HE INFORMATION
REQUESTED FOR THE ZONING MAP AND WRITTEN LEGAL DESCRIP"I'ION
SIGNED DATE
ADDRESS PHONE.
ZIP
PART IV
(SIGNATURE OF PROPERTY OWNERS OR LETTER OF AUTfiORIZAT10N)
I, THE UNDERSIGNED, SWEAR OR AFFIRM UNDER PENALTY OF PERNRY THAT THE ABOVE
RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE
I FURTHER SWEAR OR AFFIRM THAT I AM THE OWNER OF RECORD OF 1'HE AREA PROPOSED
FOR THE PREVIOUSLY IDENTIFIED LAND USE ACTTON, OR, IF NOT THE OWNER, ATTACHED
HEREWITH IS WRITTEN PERMISSION FROM THE OWNER AUTHORIZING MY ACTIONS ON HIS/f-iER
BEHALF
NAME DATE
ADDRESS PHONE
ZIP
SIGNATURE OF APPLICANT OR REPRESENTATIVE DATE
STATE OF WASHINGTON )
) ss
COUNTY OF SPOKANE )
SIGNED AND SWORN OR AFFTRMED BEFORE ME ON THIS DAY OF
, 1994, BY
NOTARY SEAL
Notary Public in and for the State of Washington
Residing at -
My appointment expires
PART V
(TO BE COMPLETED BY THE PLANNING DEPARTMENT)
DATE SUBMITfED FILE #
DATE ACCEPTED BY
TOTAL FEES RECEIPT #
- 9MIT CENTER PASSPORT
Date Number
~
Name C Phone
Address
Comments
CUSTOMER ROUTING
r1 s cx
~BUILDING Department ~ PCANNING Department-r, t~&GINEER'S department ry}
L Addressmg i Admin Exception _ Approach Permit
, Building Permit _ Artenal Rd Plan Info = F7ood Plam Permit
i Code Information ~ Binding Site Plan Info _ Public/Pnvate Roads
i Commercial Review _ CerL of Fxemption i Res Bldg Petrnit Rev.
_ Conference i Comprehensive Plan _ Site Drainage Info
s Energy Code Info ~ Cond Use Permit i Subdivision Review
i Fire Safety Review i Nonconforming Use ~ UtiLty Percnit
s Manufactured Homc i Permit Review *-OnneangeR view
Mechanical Perniits Shorelines Info
Other Pemiits Short Plat Info NO -•E RFQUIRED
! ! 11pviewer Time out
_ Plumbing Pem»ts i Subdivision Info ~ J S U `
Pnvate Road Info i Temp Use Perrnit ~UTIUTIES D~e-piartmt-nt
i Residential Review i Vanance Appl i APA Payment
~ Sewer Permits i Zone C7ieck ~ Cert of Exemption
Zone Info Subdrvision Review
ULID/Sewer Info
_ Zone Change Review
NO • •E REQUIRED NO • •E RTQUIIZED
Reviewer Time out Reviewer Tirne out Reviewer Time out
~ I
4AS'iLR1Fi1SSPORI CiR 211&'93
PERMIT CENTER rCE S(,.,> _)ULE ~ ZLCCIP'1'INF,0RMA770N
'[.ANN[NG DP.PAItTMP.NT 77ZANSAC j-1 UN # 793
S(?Q I# UNITS ICOST I DGSCRIPT[ON QF WORK
frtiti
POl $54 1 Administratrve Exccption ~ Any One Foot Uimension rP02 5110l ~ AllOthers RECU1'1'?'i# '•,.>ti ,P03 $54 1 CertiCcate of Euemption ~ Pre-1978 ' p04 ~ 1 $811 ~ f3ctwcen S& 10 Acres
N POS $811 1 Minor Lot lane Adiustment r"A { { w
P06 ~ 1 $711 ~ All Others
p07 ~ 1 2981 Conditional Use Pcrmits ~ Dependent Rclatrve
ppg ~ 1 $3401 ~ Prrvate DoR Kennel DEPARTAl.Ts1VT COMMEN7S
P09 $625 1 ~ All Others = or < 10 Ac
P10 $1651 ~ Ea Add'I 10 Ac. PLANNING
P11 $33IConditional Use Permits - Renewal ~ Dependent Relatrve °
P12 ~ 1 $541 ~ AllOthers
P13 I S75 IEnvironmental ChecklLst ~
P14 ~ S61 ~Home Profcssion Permit ~
P32 $215 ~ Interpretations ~ Wntten/Adrtunistratrve
P15 $65 ~ NonvonforrtiunA Status ~ LarstelSmall Animals
P16 ~ 1 $3801 ~All Others = or < lOAc.
P17 ~ 1 $811 ~ Ea. Add'I 10 Ac.
P18 ~ 1 $331 Pre -Conference Fee ~ Admin F_xcxption
P19 ~ 1 $331 ~ Conditional Use
P20 ~ 1 $331 ~ Nonconforcrung StaWs
P21 ~ 1 $331 ~ Temporary Use Permit
P22 ~ 1 $331 I Variance
P24 ~ 1 $245 1 Temporarv Use Permit ~
P25 ~ I S870IVariance - Afcer Construcaon ~ SO - $100,000
P26 ~ 1 $1,3001 ~ Over $100,000
P27 $545 I Vanance - Before Constniction ~
P28 $325~Zone Review I Mining
p29 ~ ( =325 1 ~ Industnal
P30 ~ 1 $2701 ~ Business
P31 I I 5215 + 1 I Multi-family +
~ I S11 l I Each Apartment Unit
ENaiNEP.R'SDEPAR'TMP.NT : . ,~t' ^<y ENGINHERS
~
E01 ~ 1 $30 lAdmintsiratrve Vaziance
E02 ~ 1 $50 IAppcals ~
`kE03 ' + $20 JADproach inspection
E04 Permit r
EOS $SO ~ChanRe of Canditions ~ Plat
E06 $50 Zone
E07 $SO ~ Conditional Use ~
E26 $30 ~ Design Deviation I
E24 $75 lEnvirocunental Checl.list ~
COS . 1:,'~` . =20 1 F1ood Plas n k ~ ~ • ~ In„~spccUon. _ _ . . .
E09 ~ .f~ S10 ~ ~M x ~ r ;,Permir ,818 N $1.000 ~ Perfornfancc Btynd ' 208 ti
, ~ Cltlven
819 ~ %,sI00
. 920 ~ 1"~3250 Q1fbCtli
f ' r _3\J~/~/J ~ '
~ r 1 fJ J
1 < 1 f
1~~1 i I% IBonds On1Y Arht). ~ . ,
B10 ~ $200 1 Prel►minarv BindinA Site Plan ~
E11 ~ $200 IPreliminary Plats ~ LonR
L~12 5100 Short
E23 5100 Final
Q13 , 11 1,% S10 ISpecialPccmit
E14 ~ 1 $SO 12 Lot Admin Drvtsioci ~
E15 ~ 1 $SO IVariance ~ U77IJTIns
E16 $100 Work in Right-of-Way
~ . _ . asp [e Without Permil r
E17 1 $200 IZoninR Permit I
L725 1 $10 INSF CharRe ~
tIT[1.1T1P.S DIIPARTMI:NT
U01 ~ 1 $20 I C.erUficate of Exemption Rcvicw ~
UQZ $20 1 Land Usc Action Review ~
AIASTER/YASS POR I.DQC ( U4"
Belle Terre Inc.
or ¢ ¢ ~
~ WAY
N N
f- N i ON v
J ~ r • . ac
~ • o j < w
MAIN
tiu1 ~ ~ w+ t N o vE
r J
~ Q RivERStDE ~ a
3
; • ~
U ~
~ Z w Fire ^
- Z totion ~ ~1 FL. /9B ' N
A COUNTY • ROAD Ns 22
Q j
Q I
.S't P~ Ae~o~o ~Q,4,va ~ h//LWAUKEE RA/ L RDA,
"r-r..ftr"` - ' - - - _ _ _ . . - _ . - -
' ` • ~ rcl Av 6 i
• • • w.•.....
t
~ ~ • '
FOV RTN AVE
T AV E - ~ -
a Q,
U
< w
S
- 16 ih • '
. N
~ T1n SEv
` ~ ~ f~,_ F• ~ ~
J ,
W
E1 G M H 2p AvE 8 T H TH
•
- 9 T H 9 Ttl
RCNEW
N.~ a 9tA A Vf .
~ 10
~ IbIA AYZ • •f'- ~
Q
~ ' i~C• Z
2 ~ .
~
~ t ♦f; ~ . :
1'S1~• .
~ ~ J :T.. i2 H
.
• ~ ~ J
~ C. •
• C = V `
J ~
.
dT r rs~ a
.
^ L. /99! '
a ~
i 'T
.
W~ ~ . .
.
a ~ • -f ~ . . N,..~
a•
N
STH
~9 Thr Lq/ ~
L TM
7 • ~ Or
1 ~ Cb, ~
r' f OO ~ ` V ' 4
3j!
-
\ %
aas niEAa 940irooni N
t29 E ~1►
r ' ,~1,~
, reue v+au7 - - I
~ a vLEx I FAllt[L A
I
~ _.j ~ p uut I» rttr
a r1~■
•jtrltff i i 30 a # fo
I
KkE f 37
1 I
~
L
/ 129
I
1
~ ~
u I:~ i I a ;
~ I ~ I Or1h
I ~S 0
• 9 PLE%
PROPERTY DESCR/PT/ON
~ ~ k 77/C f0[~rll lID/!!70! TNL NFJT M!!L7 7.Ya TN! MN7A' lA0
~ I a rt[rarrxttwra.ror[rroieioc,rt»orcapparruwrr
129 a AJ Pfi9 PLFT rIICTfO! RlMAO[0 iN INlNVr r N P4ITI KGf
0\ n ' i ° ~ z°
~1 P I r tu id ry! ~~.et1~ CYCfPl7NAr/WiT/ON OCICR/8f0 Af /bICONl
~I ~ P/RCfL B OCL/NATTNCJlCGtNEAA'JA/DOlOC.IlJI THLMflMOR/p
\
L I ~ ALONL 7W6lF1T[/N[0lELOfK1J1 A0/lr4*fCOFKO/f!T
I 1 I TNfNCf MfJT PpA,V[[f[ l//rN TNC JWTM LlNf 0lQ10lA' 123
~ ~ I ACIlIAAYf OF ~/fCT TNfNCf MO~tTiY AOlJf/AY( KJ00
J ~ ~ /Yfl TNCNflf.4JT,00IJTANfCO!/976Fff1I0TMClOjI
I I 4 FLEM I $ G/Nf OrR[OCR IJJ, rm:A'CC SOf/7M100/CL770 TNLPo/Nt0!
O I I 2 I ~ JfC/MN/HG
g
I
~ I I i I
J L f-ewie y s~_w~K~J
J „0
v i 90
I i ~ ,y \1 .w,r
w
~ 1 1 V
I 3 1 ~y
M Q \ ~~71M1p~ . `1~ ~ 1
I ' I f~ tN.`J 1 ~ I I wr~ ~
~ 1 I VECINITY MdP
E%iSTINC ZO iE I PROPOSED ZONE I aCREB n SOFT I
vA2s I uR-n I .x.ooson I
CAMERON BALL
~ I F I 04VA(0/NL 10pAM.1T/OM SQ fT 1400 JJ/7 _
a a a ~ I v. arevua.+c coscr,vc[ +i% PRELIMINARY RE2QNE MQP
L(_ evrtw,rc uftt FI/RTMCNT!
:"r ~ T a ~ LYNOJCpifO BRLO n, loo ra /r NE V4 Of SEC 20T 25N„R 44 E W M
:
~ I 7YPf WlANA7C9P1NG 7rpr d
- - - - - - - ~ I m ' M1 0lP.ORRIMG JNK[J,tlOW.flO I %I OCR LWLLL/AY. -
i acvr.vJa,areVnwot.aortos,xv_ra
' ~ -----I----- Ilw~aveure~i-.~r~. ~ re e ..i, sro
A ~
~ IdUlldN6 Nl1LNfM ttrT qNl ENCINEERS k UND SURVEYORS
N 909-ARGONNE ROAO TPOKANE VA, 99212-2789
WbNE t4091 926'1722 FAX (369) 926-1721
8iH AvE
pq~µ eT 1 OMM IOAI[ NU/lSIDROLCT xOI~RAWlClIQ
OIFQI(0 BYI I0A1I I I)29/ !
~ s
, i * ~ + . • '
" ` f v
~ ~~~~1~2 I 1■ '
}.&b.,►.
4 PLEX FqncEL °A ~
~ b4Iry~.ra I ~
q i
j + Yj} 0 xi SD
' a ~ f i ~~J , I I ~ ~ ,~"'~•r•~° ~
i
~ ~ d,did,n~ ~49+4.~K~ rJ 9
r~1~'~ ' 41 +x ~
A
A FLEx
< PROPFRrr OESCRrprtanr
W nvc savrN 1san-Zr a~ rHO ,vrsrscreCr', pMC rW4r nWrN aoa
f( , PW rrcr ar r,vr sovrH dISa rerr af Xacx ?J3 aF aP~WrrfxfrY
' 4~, ~ 1r t~ AS P£R P[~CT T7VE+l~G~ R£~OCa I,k xf(nME' A''tYR"Fd-NGE .
Erea.or nrqrfw+rlajv arsutlBta 0t ",Ezora `
~
~ ~ ~"•~-qa~dir.~ 6r1~+A1~ I~j PIRCfL ~ @~6/NrIT7Nr $C[A~IRdd fAr lW QLOGfd]]iTNCNF~A@NT~i' ~
x a,vc nvr "sruxecrAWOxuJ aasrd,4rraF40 1727;
. ~ rg ' f w' _ rWArt ,&rar ~~ae~er A?rk rKr sdr►rvAMe oreraex 0a~ -
- c a ~i AVsfAN[£ a►~nr4 r!!fi, TN~Cf ,vMTW ROrfr~+er6 LV'~
~ ►~CT, TAr.Wr dpJTp j=TaRr£arl4xa MET FO W CAf r
w t ~PL" uNC Q~rel4Cjr oi, AV~A'cd SAIIrN~Aaf£fr rA rxd PeYNyN
" • ~ J ~ , • ,
, 5., ~ , .
f /uildf S~+hasli~ ~
%4 • i ~ so ~ f p
~ + n
e1 ~ i~ I 4 y Y
r ~ ~ Iwri rrt ~
SITE PLAN
OF REC4RD ' . . ~
y ~ ~~I ~ ~ ` E]fIBTIR~ 20~fE iW4PO5~0 ZOkE [AtIREB or~ 50.F?
, + r ~ ~ ~ ~ y ~ b ~ r.a•s.s ~ u~-~: nx~osarr CAMERON $At,L . ,
o ~ oc sai7 ,
, - • ~ ' Bp~e,plNa ►NJ~R►a+T~ $Q rr 4~ . ~
a rrea~n~ccs~act ' ~ nPRELIMINAFt~( REIONE MAR • ,
~ runa,vs ~r~~ fMWrwrxn
s ` • ' ' _ ~ , ~ ~ - ' ianca,+61ZAca OAW ; r~ ine ~ rr !V E Il4 OF 3E1C.2@T 25N. ft 44 F-Yf #1 . a
0, rn9ta-cOarcaNws ~ ria~r, d ~
~ yy ~ n ' ~ S d l
;n.crfsvAtnva r►~vca'rdrow~r~o ' ►vs Flovya~~lt~+u ~c~te t~
} + r 1 y~A~~wrT~rr~ra~~ n N ~ j ' II7Y ` ^ ^ ~ r 4~
1NAft SETZWR57f1~1,~SAW(f~l1/f7lV
* ~ ~r,.4 a~r;~.m~.rd.~vi~ ' ~n~ a VtNp ~k`VEYpkS p
: ~ • y~~~~
~ re~ ~ H, +J49~G~E 5PIWAM,V~► 9921~27, •
PIOw ~
OR~1WI R'~ GMN 1! i~/!f tIMAC{ ~ 9 MEl i
hti ~ BTH kVE
• 'i ' ' '~t. , . n ' , nsv~ r ►
er~5r Wr ~ R~ l T~ ~ ~ -7
~ ~ ~
.~*I