ZE-002-96 w SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS OF FACT, CONCLUSIONS AND ORDER INTRODUCTION This matter has come before the Heanng Examiner Commttee on March 21, 1996 The members of the Committee present are Brenda Bodenstein, Chair, Donald Moore and 1V1ichael Schrader. PI20POSAL The sponsor, Cameron Ball, requests approval of a Zone Reclassification ZE-2-96, from Urban Residential-3 5(UR-3 5) to Urban Residenaal-12 (UR-12) for developnlent of 11 multiple family residences and those uses allowed in the Urban Residential-12 (UR-12) zone FINDINGS OF FACT AND CONCLUSIONS 1 The property is generally located north of and adjacent to 8th Avenue, approximately 300 feet west of Felts Road in the NE 1/4 of Section 20, Township 25 North, Range 44 EWM, Spokane County, Washington 2 The Committee adopts the Planning Department Report as a part of this record 3 The exisang land uses in the area include single farmly residences, an apartment complex and a hnuted number of duplexes 4 The proposed use is not compatible with existing uses m the area 5 The Comprehensive Plan designates this site as Urban Residennal net densities in the Urban category should have an approximate density of one umt per acre to 17 uruts per acre The proposed Urban Residential-12 (UR-12) zone allows a maacunum density of 12 uruts per acre which is consistent with the density range suggested by the Urban category The proposal lies within the Pnonty Sewer Service Area (PSSA) and is served by pubhc faclhties and services Lncluchng water, samtary stonn sewer lines, pohce and fire protecnon 6 The proposed zoning does not unplement and conform to the Comprehensive Plan 7 The Artenal Road Plan designates Eighth Avenue is as a Mulor Artenal with a future nght of way width of 80 feet 8 The existing zoiung of the property described m the applicarion is Urban Residential-3 5(UR-3 5) prevlously established as Agncultural (A) zomng in 1942 and redesignated to Urban Residential-3 5(UR-3 5) on January 1, 1991 pursuant to the Program to Implement the Spokane County Zoning Code w / 9 The provisions of RCW 43.21C ('The State Environmental Policy Act) have been comphed with and a Determmation of Nonsignificance (DNS) was issued 10 The legal requirements for pubhc notice have been fulfilled. 11 T'he owners of adjacent lands expressed disapproval of the proposed use Concems lncluded increased traffic, incompatibility with adjacent uses, and incompatible densities 12. The apphcant has not demonstrated that cond.itions have substantially changed since the onguial zoiurig of this area and accorcimgly, the proposed zone reclassificanon is not jusafied. 13 The proposed use may be detnmental to the pubhc health, safety, morals or welfare HEC Order for ZE-2-96 Page 2 ~ I ORDER The Heanng Examiner Committee, pursuant to the above Findings of Fact and Conclusion, DENIES the application of Cameron Ball for the Zone Reclassificanon from Urban Residential-3 5(UR-3 5) to Urban Residential-12 (UR-12) for development of 11 multiple family residences and those uses allowed in the Urban Residential-12 (UR-12) zone as descnbed in the apphcation ZE-2-96 MotLon by Michael Schrader Seconded by Donald Moore Vote• (3-0) UNANIlVIOUS TO DENY THE ZONE RECLASSIFICATION HEARING EXAMNER CO E HEREBY ATTEST TO THE ABOVE FINDINGS ORDER AND VOTE CHAIR AT'TEST: For JOHN MERCER Acring Assistant Planning Dixector By OHN W PEI)ERSON Senior Planner '3 /"22/0p~o DATE Pursuant to Spokane County regulations, any aggneved party has the nght to appeal thls wntten decision to the Hearing Body within ten (10) calendar days of the signulg of this order Upon receipt of an appeal, a public heanng wffl be scheduled. If you desue to file such an appeal, you must submlt a wntten appeal, preferably on forms designed for such purpose along with a$225 processing fee payable to the Spokane County Treasurer Please contact the Division of Build.ing and Planning to file an appeal If you have any questions, please call the Division of Buildulg and Planning at 456-2205 HEC Order for ZE-2-96 Page 3 , r ~ ENGINEER' S REVIEW SHEET AS BEtILT PL.A'VS Ri:CL1VED REZONE FILE # ZE-002-96 Related File # ~ ) AARD # ( DiZlr- I64-96 ~ Date to Review 03/21/1996 # 1 Date to AA & DR 41/10/1996 Time 1:15 Date Received 01/0211996 Project Name UR-3.5 TO UR-12 3-FOUR PLEXES No. Lots 0 No. Acres 43,2SF Range - Township - Section SITE ADDRESS N 8TH/W FELTS RD/W UNIVERSITY PARCEL yV01. /q4~~ I Appiicant's Name CAMERON W BALL- Phone # 91-2-9076 Address BELL TELI.C IyC Qh"'n` 2J PO BOX 85 GREEN.4CRFS N'y'A 99016 FLOOD ZONE No W S School 356 Ua[e Conditions Mailc:d i tBilling Name Owner BELLE TERRE INC Engineer Address Address PO BOX SS Company GREENACRES WA 99016 Address I Signcd Phone 922-9076 Phone Phoae/FAX • Date Building Contact Person: Phone fl 456-3675 Date Submitted Description Initials DATE FEES RECEIVED ' DATE PRIORITY FEES RECEIVED COPY TO ACC4UNTING FINAL PLAT FEES COMPLETED & COPY TO ACCOUNTIIv 1v'OTICE TO PUBLIC # t 3 4 6 COMPLETED - OR NEEDS TO BE SI(;,\L-U DESIGN DEVIATION SUBMITTED/DATE COMPLE"tED - MA]LED ALTERATION TO PLAT - BI-OCKS & LOTS BOND QUANTITIES FOR DRAINAGE ITEM CALCULATED DATE BOND RECEIVED - BOND AMOUNT RECEIVED DATE BOND RELEASED - DATE AS BUILT RD PLANS HEARING EXAlbt APPROVED V/)ENTED 'PEALED BCC r ~ APPEALED PROJECT APPROYFD ENTED STAMPED MYLARS TO PERMIT TECHNICIAN (SYLlSUZANNE) ~ STAMPED 208 LOT PLANS TO ADMINISTRATIVE ASSISTANT (SANDY) ~ r' ♦ r ENGINEER' S REVIEW SHEET AS BtrILT PLANS RECEIVED DR REZONE FILE # - Related File # ( ) AARD t! ( DRZE-164-96) Date to Review # Date to AA & DR 01/ 10/199b Time 1:15 Date Reccived 01 /02/1996 Projec;t Name UR-3.5 1'U UR-12 3-4 PLEXES No. l.ocs o No. Acres 43,2SF Range - Township - Scction A5201. l 4M SIT'E ADDRESS N 8TH/W FELTS RD/W LRVIVERSITY P.ARCEL Applicant's Name CAMERON W BALL- Phone # 922-9076 Address BELL TELLE iNC Phone 2# PO BOX 85 GREENACRES W A 99016 FLOOD ZONE No W S School 356 Date Cond.itions Mailed Billing Name Owner BELLE TERRE 1NC Engineer CHARLES SIMPSON Address Address PO BOX 85 Company SIMPSOH ENGINEERS INC. GREENACRES WA 99016 Address 909 N ARGONNE RD Signed Phone 922-9076 SPOKANE WA 99212 Phone PhonelFAX 926-1322 FAX 926-1323 Date Buildiag Concact Person: Jeff Forry Ext 103 I LOREN LAKSHAS Phone # 456-3675 Daie Submitted Description Iciitials I / DATE FEES RECEIVED DATE PRIORITY FEES RECEIYED COPY TO ACCOUNTING FTNAL PLAT FEES COMPLETED & COPY TO ACCOUNTIN NOTICE TO PUBLIC # 13 4 6 COMPLETED - OR NEEDS TO BE SIGNED DESIGN DEVIATION SUBMITTED/DATE COMPLETED - MAILED ALTERATIOIY TO PLAT - BLOCKS & LOTS I J BOND QUANTITIES FOR DRAINAGE 1TEM CALCULATED DATE BOND RECEIVED - BOND AMOUNT RECEIVED DATE BOND RELEASED - DATE AS BUILT RD PLANS / j HEARI,IG EXAM APPROVED )F1NIED 'PEALED BCC APPEALED PROlECT 4PPROVED ENIED J / STAMPED MYLARS TO PERMIT TECHNICIAN (SYL/SUZANNE) STAMPED 208 LOT PLANS TO ADM[NISTRATIVE ASSISTANT (SANDY) . t -1o -U Ga I ~ ~ ZE=2=96 / ~1 C'IVALLEYI AY N N f. NI ON ~ E. . ~ ~ J J ; 4 • Q R~vERStO a . u Z u Ftre ~~1 Ft. /9B ' N - Z totian ► . ~~j A COU N T Y ROA=3 N0 2? I + o? ~ ~ a .St P~ pc~o,~oCQ~►vs . M/LWAUKEE RA/ LRDA1 , * 3 rej /1V 6 £ + : . ~ • g FO V R T H AV o ~ AV E a at . ; d' ~ u`~ , Z ~ ~ H+ z • < W t. ' S _ Y. ♦ F1 . . y Fit a > 7Th SEv ~ ~ E l G A1/E 20 ' T H 9 rr{ . , L'/lE/P~' . ~ . • • - 9rA ' 102, 10 T . . o ADIA AYE • • Z . . ;N • ~ t Y~a• = y~~ ~ J t~~{ • •~'S t ~ : vil ~;Y~•r ;r• J . . • , ► , • ~ 0 T • o r r~~ d . ` • , , y,. ~ L. 1991 a T F . co ~ ~ H 3 o . . i , 9 TN ~ ~ , • > 1 3i~ 10 . r 3/96 HEC Staff Report for ZE-2-96 PaQe 1 1 , R. 10J ZIE 6 ~ V . ~ ~irt m ON v N ~ . uR r fe-a w uR URV . ~ ~ X!ts►vi a Z` V~ TA0 ? N ~ 3 r ~ ,oc UR2 Z • 2 VR~Zp ~ ~ . a4 G,71~NT ~ 11 . - - 4 " ~A1 LRp; ~ • - r- „s Y Mic.wA_~ _ ~ it ! ~ 5 t 0~a vC~ I 02 ~ St ~ t p f~ R . ~22 . - r. uR_22 _ N 3 g, • s FoQaT a t 5~~ ~ , Y ~ th ~ Tr ` URP33 7 7 ~ r► ~ • • ' T 1~ 1 *n ~ 9 T~+ '-Z, a Q j =f gTH ` . a 3 T N ~ „ A ~ ~ 3 ~ V • ~ Z Q , uR Z . - 10 . '3 ACHER~Vf s;- C~ ~m~0~ ~ _ , . ' _ ► 2 AVE • ~ A 5cv;1w ~ St ~ ~ '~•r.t~'~-.~-f ~ s t~ , ° ; o. ~ ' c~` ~ ' ~ , ' 4- ! . . , UR uz L `99~ vft-7 ' OR_ 2 ~ , r o , 4 loo Y Z 2 . p,age re !'9►ff~' - ~ ZE_2-96 EC Staff RePort f ot 3/gb ~ , ~ , w/ 1"~~_ 1 ~ ~ ' ~ ~ ~ -1 1 ► ~ ~ ~ ~ ; ; ~ r ~ t, _ ,_t,., _ _ ~ _ l~ ~ , n , o~ , ~~)1 s',ao~r Ia. I 1l I~j I ii ROAO~ ~ ~~1~~~ ,~b , r S ~ {Q~ ~ 0 1i ~ 'C I b y A ~ r ~ ` ~iJ,~„~1 ~ ~ ~ - e ~ 1\ I ~ ~ I J'~ f.r.. 1 0 ~O ~ t I 0f=~ , 0 ~ v ~ L-~ ~ ~ n ~ ~ V~ ~ e ~ CD ~ . / i . ~ ~ ~ _ ~ s ~ -.h- b 91 ~ ~ z•_- - e:Ey O ~ Q`• .s~~. ~~~i~~~ ~ ~ _ ~ LoCUS/ OAQ ~ ~ ' 1l Oir: i ~ ooze / i ~ ~S • ~ j ` ~ ^~o019 ~ ~ c ~ ~ ~ r ~b G~' II i~ / a~ ~ n ' ~ ^1 ~ l'~~ ~ ~ ~ ~~l}• J~~ ~ J , wno ~OOd ►4ooeau~F RoAD. ) b\ 4' - - r / ° •~1 Q ~ •---~1~. ~ ~ f"' t ~ 1 I V ~ AL ROAO ~ D x ; ~ ~l~., ao~lO 1 A ie.12 ° v _ . - ( 1 . , .r ; i ~ ~ ~ ( tI Y , x ~1 I lj'~S . i- a ~ s~ 1 tl~i;4 ~ k- r J N l `p~`/1 ~r ~ r ~ ~ Z • ~ t~ ~ ) 1 ~ ~ I I NIV[ UNIV TY ~ i ~ ~ • ~ ~ ~ ~~.c~ ~i• ( 1 ~~r~r lis':~. ~C`~~` a_i.•-yr~._~_.4,~~,:_~~~._ ~l~s l6 ~ ..R+O~ ' I ~s~1~ r 1 ~I ~ ( ~ ~ /`~'I~~, v ~ ` ~ ,'i ~ ~ _ v J~ ~ f ~ rl gr.. • . lz y h PiF~cc~~ ~L ~ ~ R( A~'RCE RQAO~ , ~ ~ +r ,t W ~ni I}~ L - 4 ~ } ~ A • t t ~^st _ i ' ~ ` I ~ I I a ~ ~ ~ JI ~ ; ~ p 9owo,sN_ poAC i t ~`:rxp ►r « ~ - s. _ w ~ II I i ~y ~ V~ O . )0 ai ~I ya/ r~ . i f~I; 1} •9- i ~`1 - ~i ~ i~~„~ ~ ~ 1_0 40 8,12 (I II r ~ ~ ~ } ' , + f • 0 ~ ~ ~ ~ 1 ~ ~s:~Ji ~ ! ► ~ j ~ ~ ~ ~'C, z t, ~ II 1 ~ I~ k r 7 ! I ~I~ay ~ I Y i I►~ ~ ~4 V ~ti i ~ A I I f{ II ~ t ~ ~ A~ I~f ~ " Jf ro t1 ~ 1~• I nl_ r t r ,I , r II I~ I I {N t W M~~ p i ~ ; ~ p ~ ` a ' i~ x? i ;1t►,~ '~I ~ I ~ \ I ~ ~ I ~ ' ~ ' A 1 i / a ~oda~. 3~~'5 961~ ti 96-Z"4Z ~ ~ ~ t tZrd , o ° Vi . / _ J - w e kc, 0 ~ ~ ` n O~ + ~ n t - 1t~ ~ . e ~ 1 ~;.-e fr v. F s 4 r /Ot y. ~ ~ ,q ~ r ror Et $ + ~ t $Z~k~ r ■ ~ 1~~ G)►r.a ~u~R~~ ~ 5 ~s, ~ `t~~ 'R ~ `p~' 'c ~ ~ 1 ~ ~ . ~ t ♦ ~ U i a if t 1 r ,y ` ' ~ t- _ : b3 . n~ 0 ~ ~~y`~~~i r ~ _ ~ ti +_,,,,r ` 5 O _ 1 ' ~j3✓ ~ ~ ,{lr . t ~ ~ ~rqa ~~~'i ~ ~8~ • ~ al ~ ! ` ~~~i 1 , 41~ rstK r ~ _ ~ ~i i •a : = ~ ~ U ~ • ~ t1aN► ~ ~ `t_ Nlai ~ ~ D ~ o ~ _ ~ ~ " • . . r+ii~ _ ~i ~ ' ~ , • dw ► : oz • . oeoz ~ - - 11 ~ ~ iIS aA ~ldS t ' tQaaa ~ ~~7lVA ~ , i 1 t ~ / ~ ~s-_ ^ ti '~t`t • _ , v t~ • ~ 1L3k008 ~ • ~ vw , V 3AV ~ 1 y ! ~ ~ ~ +7 ♦ ' ~ N , tt ~ ' • ~ ~p l~1aM f ilk- , pp,pr . . ~ L~ ~ 96 , ~ ~ N 1 cn us ~ ` °c : ~ ~ ~ y . fm o ~ ~ v ~ = ° Z ~N8. z i t~ o -z~j4t is~ Ct, ~ y %,;I.Z W Wt.~G ~ . 4 "C M F.. q : "`~Z y 0 ' `V ►~•1~~.~ ~ ~'iRK~~ ~ . 0 0 ~n ~ 1~ ty 1r ~ V 1~ ` ~ ~ • ~ ~ ~ ~ ~ ~ ~ ~ ~ ►Z. 1~ Z ~i O ~.a ~1 ti - W ~ _ R R ~O z v N ~ ~ v yti V J ~ i Q~:3Jl ~ r ~ ~ . ` • ` ~ 41 ° < ,W s ov ~ I ffi _ ~ - - ` a.e._•r2 ~ ~el - - , { S ` R + £ • na`►~-- ~.r ~v~"= ~~.~~-li- _ / `c' ~~~~~~T~....- ."j~ II + i ~ ~ + N ' M1 tl LF < t- ` Y ~ • ~ ' ~ 1 ~'~1~7~ Y1r 1 ~ _ W ~ ~ t ~ y . ~ l • ~'~,r~-=-- _ s. _ s~-~'~ ~ ` ~ ~ ( ~ • .u+nivo a~~ ~ 3NOZ zZ • a" ~ { p ~ ~ : , Olld 1~/1a~ .~bnXll7 ~ ( 4 I ~ 1 , ' } L ^ ~ i `c -2`3Z i - P a e ~ . ZE`2~~6 , . _ t for 3/96 HEC Staff R~or : 1 ~ DIVISION OF BUILDING AND PLANNING REPORT TO: SPOKANE COUNTY HEARING EXAMINER COMMITTEE FROM: CURRENT PLANNING SECTION DATE: MARCH 21, 1996 SUBJECT: ZE-2-96, ZONE RECLASSIFICATION FROM URBAN RESIDENTIAL-3.5 (UR-3.5) TO URBAN RESIDENTIAL-12 (UR-12) 1. GENERAL INFORMATION Applicant: Belle Terre Inc. % Cameron Ball P.O. Box 85 Greenacres, WA 99016 (509) 922-9076 Contact Planner: Lorne Lakshas Location: Generally located north of and adjacent to 8th Avenue, approximately 300 feet west of Felts Road in the NE 1/4 of Section 20, Township 25 North, Range 44 EWM, Spokane County, Washington. Proposal: Zone Reclassif'icanon from Urban Residenaal-3.5 (UR-3 5) to Urban Residential-12 (UR-12) for development of 11 mulnple fanuly residences and those uses allowed u1 the Urban Residential-12 (UR-12) zone II. SITE INFORMATION A. Site Size: Approximately 43,200 square feet Gross Density Approximately 11 dwelling uruts per acre B. Comprehensive Plan 1. Land Use Plan• The property is located within the Urban category of the Spokane County Comprehensive Plan. Residential net densities ui the Urban category should have an approxunate density of one urut per acre to 17 uruts per acre. The proposed Urban Residential-12 (UR-12) zone allows a maxunum density of 12 units per acre which is consistent with the density rang suggested by the Urban category. The proposal lies withm the Pnonry Sewer Sernce Area (PSSA) and is served by pubhc facihtxes and services including water, sarutary storm sewer luies, police and fire protection 2. Arterial Road Plan Access to the project will be provided by a dnveway from 8th Avenue. Eighth Avenue is designated as a Minor 3/'96 HEC Staff Report for ZE-2-96 Page 6 A ~ Arterial with a future right of way width of 80 feet, The existing nght of way width is 30 feet. To implement the arterial road plan, County Engineering has required that a strip of properry 10 feet in width along 8th Avenue be set aside as a Future Acquisition Area (FAA). 3. County Parks Plan: The Spokane County Parks and Recreation Plan idenrifies Dishman Hills as the nearest county parks facility Facihties include picnic and play areas, ball fields, a lodge, rescrooms and fireplaces. C. Site C6aracteristics: The site is level, undeveloped and has recently been logged. D. Neighborhood Characteristics. The neighborhood in the vicinity of the project is made up of single fanuly residences, an apartment complex and a hmited number of duplexes. E. Zoning Analysis: The subject property and adjoining areas to the north, south, east and a pornon of the west area, are all zoned Urban Residential-3.5 (UR-3.5). A portion of the west boundary of the parcel lies adjacent to Urban Residential-22 (UR-22) zonuig. Pnor to implementation of the Spokane County Zorung Code on January 1, 1991, the subject property and adjacent propernes were zoned Agncultural (A) and Agncultural Suburban (AS) Proposal: Urban Residential-3 5(UR-3.5) estabhshed in 1991, previously established as Agncultural in 1942 (ZE-203-42) North. Urban Residential-3.5 (UR-3.5) estabhshed in 1991, previously established as Agncultural in 1942 (ZE-203-42) South Urban Residential-3.5 (UR-3.5) estabhshed in 1991, previously established as Agncultural Suburban (AS) in 1965 (ZE-17-65) EasL Urban Residential-3.5 (UR-3.5) established in 1991, previously estabhshed as Agncultural in 1942 (ZE-203-42) West: Urban Residential-3.5 (UR-3.5) estabhshed in 1991, and Urban Residenaal-22 (UR-22) established in 1991 previously established as Multiple Family Suburban (MFS) (ZE-191-79) F. Land Use Analysis: The zone reclassification proposal is bordered by single family dwelhngs, undeveloped/vacant land and one duplex (LTrban Residential-3.5 (UR-3.5) zone). A portion of the adjacent west boundary of the proposal consists of mula-family dwellings (Urban Residential-22 (UR-22) zone) which was zoned in 1979 as Multiple Family Suburban (1V1FS) and crossed over dunng the "Program to Implement" the 1991 Zoning Code. The MFS zomng occurred pnor to implementaaon of the Comprehensive Land Use Plan (1981). The proposed zone reclassification from Urban Residential-3 5 (UR-3.5) to Urban Residential-12 (UR-12) is, therefore, not consistent with the surrounding single family uses and zoning executed after unplementation of the Comprehensive Land Use Plan. Site• Vacant and undeveloped North: Vacant and undeveloped South• Single family structures East: Vacant land, single family structures, and a duplex 3/96 HEC Staff Report for ZE-2-96 Page 7 r 1 OL West• Multi family dwellings G. Circulation: The property will be accessed from Sth Avenue by a 150 foot dnveway from 8th Avenue into the site. H. Design: A specific site plan was subnutted for review by the Hearing Exanuner Committee. The proposed site plan includes three muln family buildings mcluding one m-plex and two four-plexes for a total of eleven units. Each structure will have a buildmg footprint area of 2,400 square feet and a height of 22 feet. The proposed site plan illustrates general comphance with the requirements of the Urban Residenaal-12 (UR-12) zone. 1. Site Plan Data Use: 11 multi family dwellings Proposed Buildings: 3 Building(s) Footpnnt Area: 7,200 Site Coverage: 17% Maximum Structure Height: 22 feet Total Floor Area: 7,200 Build.ulg Setbacks: Pro,t)osed E4uired Front yard (S) 53 feet 25 feet Side yard (R) 15 feet 10 feet Side yard (L) 45 feet 10 feet Rear yard (N) 15 feet 15 feet Parlong 18 spaces 16 5 spaces Proposed Buffering/Landscaping Techniques Five (5) feet of Type III landscaping is required adjacent all Urban Residential-3.5 (UR-3 5) zoning as well as a 6 foot high site-obscuruig fence, solid landscaping or wall as requued by Secaon 14.620 365-2 of the Zomng Code. The required landscaping and fencing is correctly indicated on the site plan on the north, south, east and west boundanes of the property. Other Site Plan Considerations: The site plan subnutted for review by the Hearing Examiner Committee is general ul nature. Detailed review to deterinine compliance vvith all Code regulations and conditions of approval is recommended to be administrative and to occur at the Btulding Pernut stage. I. Density: The proposed density of approximately eleven dwelling units per acre is consistent with the density range of the Urban category, but may not be compatible with adjacent densines J. Drainage: A dramage plan is required.. This plan must be reviewed and approved by the County Engineer's Department pnor to development. K. Power Transmission Lines/Other Known Easements• None known 3/96 HEC Staff Report for ZE-2-96 Page 8 ~ t L. Water Supply: The proposal is vvithm the Modern Electric Water Dismct. Provisions for water service vvill by met pnor to issuance of building pernuts M. Sewage Disposal: The proposal is required to connect to public sewer. Plans and specifications for this connection are to be reviewed and approved by the Spokane County Division of Urihaes. N. School: The proposal is in the Central Valley School District No. 356. The Central Valley School District has responded to the proposal and has indicated that existing facilities are inadequate to accommodate additional students generated by new residential developments and requests the apphcant be required to reach a voluntary agreement to mitigate the impact of the project on the school district. 0. Fire Protection• The proposal is wnthin Fue Distnct No. 1. The Fire Distnct and the Drvision of Builduigs Department (Fue Marshall) are reqwred to approve fire protecaon provisions pnor to finalizuig the preluYUnary plat P. Culturat Resource.s: None have been identlf'ied. Q. Parks and Recreation: No comments have been received from the Department of Parks, Recreaaon and Fw. R. Special Information An Administranve Exception (AEE-6-96) for lack of pubhc street frontage and an Administraave Interpretation (AIE-6-96) for an "ulnocent purchaser" were approved for the subject property on February 21, 1996 S. Transit: The proposal is located withul the Public Transit Benefit Area (PTBA) boundary. Route 18, serving the Pence Cole Valley Transit Center is located approximately 5 blocks from the site III. ENVIRONMENTAL REVIEW. An Environmental Checklist was subnutted by the sponsor and was reviewed by the Counry Division of Budding and Planning The review considered the specifics of the proposal, other available information, County ordinances, other regulations and laws, possible standard Conditions of Approval, the Generalized Comprehensrve Plan, and other County policies and guidehnes The Division of Build.ing and Planning has deterrmned that "No probable signif'icant adverse unpacts" would result from the proposal being developed and has issued a Deternunanon of Nonsignificance ("DNS"). The "DNS" was circulated to 15 other agencies of junschction and other agencies/deparanents affected by the future development for review and comment. The "DNS" comment penod ends March 19, 1996 and was advertised 15 calendar days before said date in the newspaper, by letter to adjacent property owners within 400 feet of the proposal, and by notice on a sign posted on the proposal site. The Heanrig Examiner may consider additional envunnmental related testimony at the public heanng 3/96 HEC Staff Report for ZE-2-96 Page 9 t ~ I V. DIVISION OF BUILDING AND PLANNING SUMMARY AND RECOMMENDATION The Urban category encompasses a vanery of land uses and activities as well as a mix of mula-family and single family uses. However, when mula-family dwelluigs are to be located adjacent to single fa.nuly aneas, as the proposal uidicates, careful consideration must be given to the density and design of the multi-family units so as to ensure the protecaon of the amenities of the single family area. While landscaping and fencing can be used in the design of the proposal to screen multi-fa.mily from suigle family dwellings, the proposed Urban Residential-12 (UR-12) zonmg may be considered too dense for the surrounding (85%) Urban Residential-3.5 (UR-3.5) zoning. Even though a limited portion of the proposed Urban Residential-12 (UR-12) zonuig is bordered by Urban Residential-22 (UR-22) zoning on the west boundary, the Urban Residenhal-22 (UR-22) zorung was established in 1979, prior to unplementation of the Comprehensive Land Use Plan (1981). Since the remainder of the adjacent property is zoned exclusively Urban Residential-3.5 (UR-3.5), the Division of Buflding and Planning recommends DENLAL of the zone reclassif'ication because the proposed Urban Residential-12 (UR-12) zoning is not consistent wnth adjacent zonuig and land uses. V . CONDITIONS OF APPROVAL i. All conditions imposed by the Hearing Examiner Committee shall be binding on the "Applicant", which terms shall include the owner or owners of the property, heirs, assigns and successors. i i. The zone reclassification applies to the following real property: The south 150 feet of the west 30 feet, and the north 300 feet of the south 450 feet of Block 233 of Opporturuty as per plat thereof recorded in Volume K of Plats, Page 20; EXCEPT that portlon descnbed as follows: Beguz at the southeast corner of said Block 233, thence north along the east luie of Block 233 a distance of 150 feet, thence west parallel with the south lule of Block 233, a d~stance of 197.4 feet, thence north a distance of 300 feet, thence east a distance of 197.4 feet to the east hne of Block 233, thence south 300 feet to the point of beginning. SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING 1. All conditions imposed by the Hearing Examiner Comrnittee shall be binchng on the "Apphcant", which term shall include the owner or owners of the property, heus, assigns and successors. 2. The proposal shall comply with the Urban Residential-12 (LJR-12) zone(s) as amended. 3. The applicant shall develop subject properry generally ui accordance within the concept presented to the Heanng Body. Vanations, when approved by the Planning Duector/designee, may be pernutted, including, but not limited to building location, landscape plans and general allowable uses of the pernutted zone. All 3/°96 HEC Staff Report for ZE-2-96 Page 10 . r vanations must conform to regulations set forth in the Spokane County Zorung Caie, and the original intent of the development plans shall be maintained. 4. Approval is required by the Planning Dimctor/designee of a specific lighting and signmg plan for the descnbed property prior to the release of any building permits. 5. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Planning Director/designee shall be submitted wnth a performance bond for the project pnor to release of building pernuts. Landscaping shall be installed and mauitamed so that sight dhstance at access goints is not obscured or impaired. 6. Duect hght from any extenor area lighting fixture shall not extend over the property boundary. 7. The Division of Building and Plannmg shall prepare and record with the Spokane County Audhtor a Tide Notice noting that the property ui quesaon is subject to a vanety of special condhtions imposed as a result of approval of a land use action. This Tide Notice shall serve as public notice of the conditions of approval affecting the property in quesaon. The Title Notice should be recorded within the same time frame as allowed for an appeal and shall only be released, in full or in part, by the Division of Building and Planrung. The Tide Notice shall generally provide as follows• The parcel of property legally described as [ ] is the subject of a land use action by a Spokane County Hearing Body or Administrative Official on [ imposing a variety of special development conditions. File No. [ ] is available for inspection and copying in the Spokane County Division of Building and Planning. 8. The Spokane County Division of Builduig and Planrung shall prepare and record with the County Audhtor a Tide Notice specifying a future land acquisition area for road nght-of-way and utdities. The reserved~ future acquisition area Tide Notice shall be released, in full or in part, by the Division of Buildmg and Planning. The notice should be recorded withm the same time frame as an appeal and shall provide the following; a. At least 5 feet of reserved future acquisition area for road nght-of-way and ualiaes, in add.ition to the existing and/or newly dedicated nght-of-way along 8th Avenue. b. Future bwldhng and other setbacks required by the Spokane County Zorung Code shall be measured from the reserved future acquisiaon area c. No requued landscaping, parlang, '208' areas, drainfield or allowed signs should be located within the future acquisiaon area for road right-of-way and utilities If any of the above improvements are made within this azea, they shall be relocated at the applicant's expense when roadway improvements are made d The future acquisitlon area, until acquired, shall be private property and may be used as allowed in the zone, except that any unprovements (such as 3/96 HEC Staff Report for ZE-2-96 Page 11 . . 1 ` landscaping, pazlang, surface drainage, drainfield, signs or others) shall be considered intenm uses. e The property owner shall be responsible for relocating such "intenm" unprovements at the time Spokane County makes roadway unprovements after acquu7ng said future acquisinon area 9. The appucant shall contact the Division of Builcling and Planrung at the earhest possible stage in order to be infoimed of code requuements admirustered/enforced as authonzed by the State Bwldmg Code Act Design/development concerns uiclude: Addressmg, fire apparatus access roads, fire hydrantJflow, approved water systems, buildulg accessibility, construcnon type, occupancy classificanon, exiting, exterior wall protection, and energy code regulations. (Note: The Division of Building and Planning reserves the right to confirm the actual address at the time of buildmg pernut ) SPOKANE C4UNTY DIVISION OF ENGINEERING AND ROADS Pnor to issuance of a builciinLy nemut or at the reauest of the Countv Engineer in comunction - with a Countv Road ProiecVRoad Imnrovement Distnct. whichever comes first• 1. Apphcant shall dedicate 5 feet on 8th Avenue for nght-of-way Pnor to issuance of a bqlldingaernut or u,e of h ro~ez~tv as nro~os~ 1. Access permits for approaches to the county road system shall be obtained from the Spokane County Engineer 2. The aPPhcant shall subrrut for aPProval bY the SPokane CountY EngiL ~ neer oad ~ Jv drainage and access plans. 'QOv 3. The appl~cant shall subnut for approval by the Spokane County Enguieer and the Spokane County Health Dismct a detailed combined on-site sewage system plan and surface water dlsposal plan for the entire project, or pomon thereof, if the development is to be phased. 4. A parking plan and traffic cu-culation plan shall be subnutted and approved by the Spokane County Englneer. The design, location and arrangement of parkmg stalls shall be ul accordance with standard traffic engineering practices. Pavnng or surfacing as approved by the County Engineer, will be requued for any pornon of the project which is to be occupied or traveled by vehicles. 5. To construct the roadway improvements stated herein, the apphcant may, with the approval of the County Engineer, join in and be wllhng to pamcipate ui any petition or resolution which purpose is the fonnaaon of a Road Improvement District (RID) for saud unprovement, pursuant to RCW 36.88, as a.mended. Spokane County vvlll not parncipate in the cost of these improvements. This is applicable to 8th Avenue. 6 As an alternative method of constructing the road unprovements stated herein, the applicant may, wnth the approval of the County Engineer, accomplish the road improvements stated herein by joinmg and pamcipaang in a County Road Project 3/°96 HEC Staff Report for ZE-2-96 Page 12 ~ r I ~ (CR.P) to the exteat of the required improvemenL Spakane County vvdl not parncipate in the cost of these improvements. Thxs is apphra'ble to $th Avenue 7. The construction of the road mmpranvements stated herein sha1i be accamp]sshed as approved by the Spakane County Engnneer. 8, The County Engineer ha.s designated a 5 Lane NIUnor Artenal Roadway Section starYdard for the improvement of 8th Avenue, wtuch is adjacent to the proposed developmernt This wffl reqwne the ad,dition of approximatel y]. 6- 18 feet of aspnalt alang the frvntage of the developmenr. The construction of curbing and sidewalk is a.lso required. 9. All required imgrovements shall conform to the current State of Washingtvn Standard Specificaavns for R.aad and Bndge Consrruction and other apphcable C+aunty startdards andlor adopted resolutivns pertaming to Raad Standards and Stoxmwater Management ir~ effect at the date of constni.ctian, unless vtherwise apgroved by the County EngYneer. 10. Roadway standards, typical raadway secaons and dramage plan requ_i_rements are found in Spokane Bvard vf Caunty Commissioners Resolution No 95-0498 as amended and are applicable to tlus proposal. 11. Na construction work sha.U be performed within the exssnng or proposed public nght-of way until a perrtut has. been issued b}r the County Engtneer. All work wlthin the public road nght-of-way is subject tv inspecaon and appraval by the County Enguteer. 12. Apphcant shall sign and recard 5pakane Coutnty hTatice to the Public Na. 6 which spec-ifies the follvwing. The owner(s) or successor(s) in interest agree that rn consideration of lw►riutual Benefits now or to be hereafter denve.d, do for thernselves, their, heirs{, grantees, assigns and successor(s) in interest hereby request and authonze Spokane County to inelude the abave descrYbed properry in a Road' impravement Ihstnct (RID) and srappnrt the farmarion of a RTD pursuant to RCW 36.88 050, or by requesting and authorizing Spakane County to cast their ballot in favor of a RID heing formed under the resolutian method pursuant ta RCW 36 $8 030, andlor by not filxng a protest against t.he formation of a RID belng formed under the altemative resolutian method pravided for m R,CW 36.8$ 065 and Chapter 35 43RCW. If a RID is proposed far inpravement vf the road(s) descnbed belvw, sa.id owner(s) and successar(s) further agree: (a) that the impmvement or construction contemplated within the proposed RID is feasible; (b) that the benefits to be denved from the forrnativn af the RID by the properky includedi therein, together with the amvunt af any Cvunty partLcrpatiQn, exceeds the cast and expense af fornation of the RID, and (c) that the property within the prvposed RID rs sufficlently developed. 3/96 HEC Staff Report for ZE-2-96 Page 13 ~ ti r ' Provided further that the awner(s) or successor(s) shall remn t.he nght, as authori.zed under RCW 36-88 09(}, to abject to any assessment on the property as a result of the improvernents ea.Ued far m conjunction with the formtion of the RID by either petidon or resoiution method under Chapter 36.88 RCW and to appea] to t.he 5upenor Court the deeisian of the Bpard of County Comniissivners confirnnxng the finall assessment roll; providad ftuther, it is re.cognized that actual assessments may vary from assessment estimate so long as they do not exceed a ~"igure equal to the uicreased trxe and fair value improvement(s) add(s) to the property. It is further acknawledged and agrc.ed that at such tvme as a RID is created or any County Road Impravement project is authorized by Spokane County, the xmprovements required sha11 be at the sole expense af the owner(s) of proPertY vvithrY the RID ar served by ihe inaprovements without any monetary participatton by Spokane County. 'Ihe RID waiver contamed Ln this agreement sha11 expze after ten (10) years frorn the date af execution belaw. This requirment applies to 8th Avenue. 13 The County Arterial Road Pian identifies 8th Avenue as a 80 faot Mmor arterial The exi.sting right-af-way wrdth of 30 feet is nvt eansistent with that spe.cifiad in the Plan. Yn orier to irnplement the Arterial Road P1an, in addYtion to the required right-of-way de.dication, a stnp af property 5 feet in vvidth along the Sth Avenue frontage shall be set aside in reserve. Thas prvperty may be acquired by Spokane County at the nme when artenal improvements are made to 8th Avenue 14 There may exlst utilitres, either undergound or averhea,d,, affecting the subject property, includin,g prvperty tv be dedhcated ar set aside for future ac,quisition. Spokane Cvunty assumes nv financial obligation for adjustments or relocation regarding these utilities. Apphcant(s) should check vcith the applicable utihty purveyor and the Spokane Caunty Engineer ta deternnine whether applicant(s) or the utility is responsible for adjustnaent or relocativa cvsts and to make a.rrangements far any necessary wark. 15. 'I'he applicant shall grant apphcab1e horder easements adaacent to Spokane County nght of way per Spokane County standards ~ 64 The propvsed pnvate road whieh serves the du-ee multi-family lots shall be constructed to Spokane Caunty standards far a pnvate road strving three lots. - ~ SPOKAIwIE CDUNTY DIVISION OF UTII.rITIES 1. A wet (live) sewer cannection to the areawide Public Sevver 5ystern is to be eonstructed. Sewer connecuon permit is mqu.ired 2. AppEcant shall subrr,ut expressly ta Spokane County TJtihhes Department "under separate cover" only those plan sheets shvwing sewer pans and specifcatians for pnvate sewer cannecaon for re-view and approval by th~ Uti1ities Department pnvr to issuance of pernrut to cvnnect 3. Secunty shall be deposxte.d with the Utlrties Depamnent for constructLon of the pubhc facihties connections 3,{96 IIEC S t aff Regart for ZE-2-9E Page 14 J ~ 4. Amangements for payments of additional sewer charges must be made for pnor to issuance of sewer connection pemut. 5. Any water service for this project shall be provided in accordance with the Coordmated Water System Plan for Spokane County, as amended. SPOKANE COUNTY HEALTH DISTRICT 1. Sewage d.isposal method shall be as authonzed by the Director of Utilities, Spokane County. 2. Water service shall be coordinated through the Director of Utilities, Spokane County. 3. Water service shall be by an existing pubhc water supply when approved by the Regional engineer (Spokane), State Department of Health. 4. A public sewer system will be made available for the project, and individual service will be provided to each building. 5. Use of pnvate wells and water systems is prohibited SPOKANE COUNTY AIR POLLUTION CONTROL AUTHORITY 1. All air pollution regulaaons must be met 2. Air pollurion regulations requue that dust emissions during demohtion, construction and excavadon projects be controlled. This may requue use of water sprays, tarps, sprinklers or suspension of activity dw-ing certain weather conditions. Haul roads should be treated, and enussions from the transfer of earthen matenal must be controlled, as well as emissions from all other construcaon-related acavities. 3 SCAPCA strongly recommends that all traveled surfaces (i e, ingress, egress, parking areas, access roads) be paved and kept clean to minunize dust enussions 4. Measures must be taken to avoid the deposition of du-t and mud from unpaved surfaces onto paved surfaces. If trackulg or spllls occur on paved surfaces, measures must be taken immediately to clean these surfaces 5. Debns generated as a result of this project must be disposed of by means other than burning (i e, vegetative matenal, slash, construction waste, etc.). ~ ; 6. All solid fuel burning devices (wood stoves, pellet stoves, etc...) must comply with ~ local, state, and federal rules and regulations 7. Some objecaonable odors may result from this project (asphalt fumes). SCAPCA's regulations state that effecnve control apparatus and measures must be used to reduce odors to a mirumum I 3/'96 HEC Staff Report for ZE-2-96 Page 15 ' c • SPOKANE COUNTY FIRE PROTECTION DISTRICT NO. 1 1. A water plan is required showing locations of new fire hydrant(s) to meet the fire flow of the new buildings. 2. An approved apparatus turnaround for the dnveway is also required. CENTRAL VALLEY SCHOOL DISTRICT 1. The owner shall negotiate with Central Valley School District and subnut a recorded copy of a voluntary agreement making provisions for public schools prior to issuance of building permit. The agreement shall provide a wntten description of the subject property to which the agreement apphes and also state the dollar amount and any other agreed to nutigating measures. The owner shall also notify any potential purchasers who have made an agreement to purchase property within said plat pursuant to the Revised Code of Washington (RCVV) 58.17.205, that adequate provisions for school facilities must be made conditioned on a future agreement between the plattor and school d.istnct. Voluntary agreements between the owner and school distnct shall conform to the requuements of RCW Chapter 82 02. 3/96 HEC Staff Report for ZE-2-96 Page 16 , • j OFFICE OF THE SPOKANE COUNTY ENGINEER 1026 W Broadway Ave, Spokane, WA 99260-0170 (509)456-3600 Fax 324-3478 - ZONE CHANGE - TO: Spokane County Planning Department, Lorne Lakshas FROM: Division of Engineering & Roads, Scott Engelhard;f- DATE: March 7, 1996 SUBJECT: ZONE CHANGE CONDITIONS # ZE-002-96 / BALL, CAMERON The following "Conditions of Approval" for the above referenced zone change are submitted to the Spokane County Hearing Examiner Committee for inclusion in the "Planning Report" and "Findings and Order" of the public hearing scheduled March 21, 1996. E36A Prior to issuance of a building permit or at the request of the County Engineer in conjunction with a County Road Project/Road Improvement District, whichever comes f irst E36 Applicant shall dedicate 5 feet on 8th Avenue for right of way Prior to release of a building permit or use of property as proposed: E40 Access permits for approaches to the County Road System shall be obtained from the County Engineer E43 Applicant shall submit for approval by the Spokane County Engineer drainage and access plans E45 A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer The design, location and arrangement of parking stalls shall be in accordance with standard engineering practices Paving or surfacing as approved by the County Engineer will be required for any portion of the project which is to be occupied or traveled by vehicles E46 To construct the roadway improvements stated herein, the applicant may, with the approval of the County Engineer, Join in and be willing to participate in any petition or resolution which purpose is the formation of a Road Improvement District (RID) for said improvement pursuant to RCW 36 88, as amended Spokane County will not participate in the cost of these improvements This provision is applicable to 8th Avenue . E47 As an alternative method of constructing the road improvements stated herein, the applicant may, with the approval of the County Engineer, accomplish the road improvements stated herein by 3oining and participating in a County Road Project (CRP) to the extent of the required improvement Spokane County will not participate in the cost of these improvements This provision is applicable to eth Avenue E48 The construction of the roadway improvements stated herein shall be accomplished as approved by the Spokane County Engineer E50 The County Engineer has designated a 5 Lane Minor Arterial Roadway Section for the improvement of 8th Avenue which is adjacent to the proposed development This will require the addition of approximately 16-18 feet of asphalt along the f rontage of the development Curbing and sidewalk must also be constructed E51 All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge construction and other applicable county standards and/or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer E55 Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners resolution 95-0498 as amended and are applicable to this proposal E58 No construction work is to be performed within the existing or proposed right of way until a permit has been issued by the County Engineer All work within the public road right of way is subject to inspection and approval by the County Engineer A • . ZONE CHANGE: # ZE-002-96 / BALL, CAMERON 2 E60 Applicant shall sign "Spokane County Notice to the Public Number 6" which specifies the following The owner(s) or successor(s) in interest agree that in consideration of Mutual Benefits now or to be hereafter derived, do for themselves, their heirs, grantees, assigns and successor(s) in interest hereby request and authorize Spokane County to include the above described property in a Road Improvement District (RID) and to support the fonnation of a Road Improvement District for improvement of the road(s) described below by requesting and authorizing Spokane County to place their name(s) on a petition for the formation of a Road Improvement District pursuant to RCw 36 88 050, or by requesting and authorizing Spokane County to cast their ballot in favor of a RID being formed under the resolution method pursuant to RCW 36 88 030, and/or by not filing a protest against the formation of a RID being formed under the alternative resolution method provided for in RCW 36.88 065 and Chapter 35 43 RCW If a RID is proposed for improvement of the road(s) described below, said owner(s) and successor (s) further agree (1) that the improvements or construction contemplated within the proposed RID are feasible and (2) that the benefits to be derived from the formation of the RID by the property included therein, together with the amount of any County participation, exceeds the cost and expense of formation of the RID, and (3) that the property within the proposed RID is sufficiently developed, provided, themselves, their heirs, grantees, assigns and successor(s) shall retain the right, as authorized under RCW 36 88 090, to object to any assessment(s) on the property as a result of the improvements called for in conjunction with the formation of a RID by either the petition or resolution method under Chapter 36 88 RCW and to appeal to the Superior Court the decision of the Board of County Commissioners confirming the final assessmerit roll; provided further, it is recognized that actual assessments may vary from assessment estimate so long as they do not exceed a figure equal to the increased true and fair value improvement(s) add(s) to the property It is £urther acknowledged and agreed that at such time as a RID is created or any County Road Improvement project is authorized by Spokane County, the improvements required shall be at the sole expense of the owner(s) of property within the RID or served by the improvements without any monetary participation by Spokane County The RID waiver contained in this agreement shall expire after ten (10) years from the date of execution below This provision is applicable to 8th Avenue E61 The County Arterial Road plan identifies 8th Avenue as a 80 foot Minor Arterial The existing right of way width of 30 feet is not consistent with that specified in The Plan In order to implement the Arterial Road Plan it is recommended that in addition to the required right of way dedication, a strip of property 5 feet in width along the Sth Avenue frontage be set aside in reserve This property may be acquired by Spokane County at the time when Arterial Improvements are made to 8th Avenue E90 The applicant should be advised that there may exist utilities either underground or ~overhead affecting the applicants property, including property to be dedicated or set aside future acquisition Spokane County will assume no financial obligation for adjustments or relocation regarding these utilities The applicant should check with the applicable utilities and Spokane County Engineer to determine whether the applicant or utility is responsible for adjustment or relocation costs and to make arrangements for any necessary work SPECIAL CONDITION The applicant shall grant applicable border easements adjacent to Spokane County Right of Way per Spokane County Standards SPECIAL CONDITION The site plan submitted by the applicant indicates that the property may be subdivided in the future If more than three lots will be served by a driveway than private road standards shall apply , . . . I OFFICE OF THE SPOI{ANE COUNTY ENGINEER 1026 W Broadway Ave, Spokane, WA 99260-0170 (509)456-3600 Fax 324-3478 -SLTBDTVTSTON _nNDTTTONS- J TO: Spokane County Planning Department, Plats Administrator FROM: Division of Engineering & Roads, Scott Engelhard DATE: January 10, 1996 SUBJECT: ZONE CHANGE CONDITIONS # DRZE-164-96 / BALL, CAMERON The following "Conditions of Approval" for the above referenced zone change are submitted to the Spokane County Planning Department for inclusion in the Design Review Meeting scheduled January 10, 1996 E36A Prior to issuance of a building permit or at the request of the County Engineer in conjunction with a County Road Pro3ect/Road Improvement District, whichever comes first E36 Applicant shall dedicate S feet on 8th Avenue for right of way Prior to release of a building permit or use of property as proposed: E40 Access permits for approaches to the County Road System shall be obtained from the County Engineer 43 Applicant shall submit for approval by the Spokane County Engineer road, drainage and access plans -94A, The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on-site sewage system plan and surface water disposal plan for the entire project or portion thereof if the development is phased -°-°-E45 A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer The design, location and arrangement of parking stalls shall be in accordance with standard engineering practices Paving or surfacing as approved by the County Engineer will be required for any porta.on of the project which is to be occupied or traveled by vehicles E46 To construct the roadway improvements stated herein, the applicant may, with the approval of the County Engineer, Join in and be willing to participate in any petition or resolution which purpose is the formation of a Road Improvement District (RID) for said improvement pursuant to RCW 36 88, as amended Spokane County will not participate in the cost of these improvements This provision is applicable to 8th Avenue E47 As an alternative method of constructing the road improvements stated herein, the applicant may, with the approval of the County Engineer, accomplish the road improvements stated herein by joining and participating in a County Road Project (CRP) to the extent of the required improvement Spokane County will not participate in the cost of these improvements This provision is applicable to 8th Avenue E48 The construction of the roadway improvements stated herein shall be accomplished as approved by the Spokane County Engineer E50 The County Engineer has designated a 5 Lane Minor Arterial Roadway Section for the improvement of 8th Avenue which is ad3acent to the proposed development This will require the addition of approximately 16-18 feet of asphalt along the frontage of the development Curbing and sidewalk must also be constructed E51 All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge construction and other applicable county standards and/or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer E55 Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners resolution 95-0498 as amended and are applicable to this proposal E58 No construction work is to be performed within the existing or proposed right of way until a permit has been issued by the County Engineer All work within the public road right of way is subject to inspection and approval by the County Engineer _ . ~ SUBDIVISION CONDITIONS: # DRZE-164-96 / BALI.,. CAMERON 2 E60 Applicant shall sign "Spokane County Notice to the Public Number 6" which specifies the , following The owner(s) or successor(s) in interest agree that in consideration of Mutual Benefits now or to be hereafter derived, do for themselves, their heirs, grantees, assigns and successor(s) in interest hereby request and authorize Spokane County to include the above described property in a Road Improvement District (RID) and to support the formation of a Road Improvement District for improvement of the road(s) described below by requesting and authorizing Spokane County to place their name(s) on a petition for the formation of a Road Improvement District pursuant to RCW 36 88 050, or by requesting and authorizing Spokane County to cast their ballot in favor of a RID being formed under the resolution method pursuant to RCW 36 88 030, and/or by not filing a protest against the formation of a RID being formed under the alternative resolution method provided for in RCW 36 88 065 and Chapter 35 43 RCW If a RID is proposed for improvement of the road(s) described below, said owner(s) and successor (s) further agree• (1) that the improvements or construction contemplated within the proposed RID are feasible and (2) that the benefits to be derived from the formation of the RID by the property included therein, together with the amount of any County participation, exceeds the cost and expense of formation of the RID, and (3) that the property within the proposed RID is sufficiently developed, provided, themselves, their heirs, grantees, assigns and successor(s) shall retain the right, as authorized under RCW 36 88 090, to ob3ect to any assessment(s) on the property as a result of the improvements called for in con3unction with the formation of a RID by either the petition or resolution method under Chapter 36 88 RCW and to appeal to the Superior Court the decision of the Board of County Commissioners confirming the final assessment roll, provided further, it is recognized that actual assessments may vary from assessment estimate so long as they do not exceed a figure equal to the increased true and fair value improvement(s) add(s) to the property It is further acknowledged and agreed that at such time as a,RID is created or any County Road Improvement project is authorized by Spokane County, the improvements required shall be at the sole expense of the owner(s) of property within the RID or served by the improvements without any monetary participation by Spokane County The RID waiver contained in this agreement shall expire after ten (10) years from the date of execution below This provision is applicable to 8th Avenue E61 The County Arterial Road plan identifies 8th Avenue as a 80 foot Minor Arterial The existing right of way width of 30 feet is not consistent with that specified in The Plan In order to implement the Arterial Road Plan it is recommended that in addition to the required right of way dedication, a strip of property 5 feet in width along the 8th Avenue frontage be set aside in reserve This property may be acquired by Spokane County at the time when Arterial Improvements are made to 8th Avenue E90 The applicant should be advised that there may exist utilities either underground or overhead affecting the applicants property, including property to be dedicated or set aside future acquisition Spokane County will assume no financial obligation for adjustments or relocation regarding these utilities The applicant should check with the applicable utilities and Spokane County Engineer to determine whether the applicant or utility is responsible for adjustment or relocation costs and to make arrangements for any necessary work SPECIAL CONDITION The applicant shall grant applicable border easements adjacent to Spokane County Right of Way per Spokane County Standards SPECIAL CONDITION The proposed private road which serves the three multi-family lots shall be constructed to Spokane County Standards for a private road serving three lots PAGE 1 11:10:12 03 JAN 1996 Road# Road Names.. MPost. ReferencefDescriptio Road Log Info.... 05865 8TH AV (START) 00 000 HAVANA ST (START) & U 16 PAVED 20 8TH AV 00.120 DEARBORN RD (START) U 16 PAVED 20 00.240 CUSTER RD (START) U 16 PAVED 20 00.343 WILLAMETTE U 16 PAVED 20 00.370 CHRONICLE RD (END) U 16 PAVED 20 00 510 CARNAHAN RD U 16 PAVED 20 00 690 MCKINNON RD (START) U 16 PAVED 20 00 870 VJOODLAWN DR ( START ) U 16 PAVED 20 00 990 FANCHER RD (START) U 16 PAVED 20 01.080 6TH AV (START) U 16 PAVED 22 01.120 DICKEY ST (END) U 16 PAVED 22 Ol 240 EASTERN RD U 16 PAVED 20 01.370 DOLLAR RD (END) U 16 PAVED 20 01.510 THIERMAN ST U 16 PAVED 20 01.550 ELIZABETH RD (END) U 16 PAVED 20 01.630 BR.ADLEY RD U 16 PAVED 20 01 740 COLEMAN RD (END) U 16 PAVED 20 01.760 COLEMAN RD (START) U 16 PAVED 20 01.860 GIRARD RD (END) U 16 PAVED 20 01.870 GIRARD RD (START) U 16 PAVED 20 02.000 PARK RD U 19 PAVED 32 02.050 EDGERTON RD (END) U 19 PAVED 32 8TH AV (END) 02.080 EAST END OF ROAD 05866 8TH AV (START) 00.000 DISHMAN-MICA RD & DI U 16 PAVED 44 8TH AV 00.140 FARR RD U 16 PAVED 44 00.210 SUNDERLAND RD (START U 16 PAVED 36 00.270 WOODRUFF RD U 16 PAVED 36 00.34 T RD (END) U 16 PAVED ~4 00 410 HER.ALD RD (EN"D) U 16 PAVED 24 . 5?,,..0 PP.T.TG.--RD U 16 PAVE D 2 4 00 640 R.AYMOND RD ( END ) PAVED 2 8TH AVE 00 660 HARMONY RD U 16 PAVED 24 STH AV 00.710 OBERLIN RD (END) U 16 PAVED 24 00.770 UNIVERSITY RD U 16 PAVED 24 00.920 GLENN RD (START) U 16 PAVED 22 01.040 PIERCE RD U 16 PAVED 22 01.280 BOWDISH RD U 16 PAVED 20 01 530 UNION RD (END) U 16 PAVED 20 01.660 ROBIE RD (END) U 16 PAVED 20 01 780 SR 27 (PINES) U 16 PAVED 20 01 920 HOUK RD (END) U 16 PAVED 20 01.960 HOUK RD (START) U 16 PAVED 20 01.980 COLLINS RD (END) U 16 PAVED 20 02.020 VERCLER RD (START) U 16 PAVED 20 02.050 VERCLER RD (END) U 16 PAVED 22 02 130 VIRGINIA ST (START) U 16 PAVED 22 02.180 WOODLAWN RD (END) U 16 PAVED 22 02.220 MORROW RD (START) U 16 PAVED 22 02.310 MCDONALD RD U 16 PAVED 22 02.430 CL I IVTON RD ( END ) U 16 PAVED 22 02 560 BLAKE RD (START) U 16 PAVED 30 02.590 BLAKE RD (END) U 16 PAVED 30 02.720 MAMER RD U 16 PAVED 22 02.810 EVERGREEN RD U 16 PAVED 22 02.970 BANNEN RD (END) U 16 PAVED 22 03.030 BEST RD (END) U 16 PAVED 22 PAGE 2 11:10:16 03 JAN 1996 Road# Road Names.. . . MPost. RefeYenceDescriptio Road Log Info.......... 03.090 REES RD (START) U 16 PAVED 22 8TH AVE 03.160 CALVIN ST U 16 PAVED 22 8TH AV 03.220 WARREN RD (END) U 16 PAVED 32 03.320 ADAMS RD U 16 PAVED 22 03.350 MARCUS RD (END) U 16 PAVED 22 03.410 MARIGOLD RD (END) U 16 PAVED 22 03.470 BURNS RD (END) U 16 PAVED 22 03.570 PROGRESS RD U 16 PAVED 22 8TH AV (END) 03.820 SULLIVAN RD 05868 8TH AV (START) 00.000 LONG RD (START) U 19 GR.AVEL 14 8TH AV 00.500 BARKER RD U 17 LIGHT BITUM. 18 01.010 HODGES RD (START) U 17 LIGHT BITUM 18 01.210 COLONIAL DR (START) U 17 LIGHT BITUM 18 01.330 GLENBROOK ST (START) U 17 LIGHT BITUM. 18 8 TH AV ( END ) 01.510 HENRY RD 05867 STH AV (START) 00.000 WEST END OF ROAD U 19 LIGHT BITUM 20 STH AV (END) 00.160 TSCHIRLEY RD (START) U 19 LIGHT BITUM. 20 05869 8TH AV (LIBERTY LAKE 00.000 WEST END TO MCKINZIE R 09 GRAVEL 12 00.020 MCKINZIE RD (LIBERTY R 09 GR.AVEL 12 00.150 GARRY RD (LIBERTY LA R 09 GRAVEL 18 5 Records Processed Traffic Counts Road Name . Location...'. Leg Count. . 8TH AV at CARNAHAN RD E 6060 8TH AV at CARNAHAN RD W 4486 8TH AV at EASTERN RD E 7692 8TH AV at EASTERN RD W 7605 STH AV at PARK RD W 5831 8TH AV at UNIVERSITY RD E 2175 8TH AV at UNIVERSITY RD W 4104 8TH AV at BOWDISH RD E 02192 8TH AV at BOWDISH RD W 02531 STH AV at SR 27 (PINES) E 03456 8TH AV at SR 27 (PINES) W 1732 8TH AV at MCDONALD RD E 1952 8TH AV at MCDONALD RD W 01742 8TH AV at EVERGREEN RD E 02414 STH AV at EVERGREEN RD W 01927 STH AV at ADAMS RD E 01912 8TH AV at ADAMS RD W 01675 8TH AV at BARKER RD E 00934 8TH AV (END) at SULLIVAN RD W 1773 8TH AV (END) at HENRY RD W 00316 8TH AV (START) at DISHMAN-MICA RD E 03032 8TH AV (START) at DISHMAN-MICA RD W 04054 Traf f ic Counts Road Name . . Location. . Leg Count... UNIVERSITY RD at 32ND AV N 08573 UNIVERSITY RD at 32ND AV S 08170 UNIVERSITY RD at 24TH AV (START) N 6488 UNIVERSITY RD at 24TH AV (START) S 5175 UNIVERSITY RD at 16TH AV N 5240 UNIVERSITY RD at 16TH AV S 6826 UNIVERSITY RD 105 ft S of 8TH AV N 11455 UNIVERSITY RD 105 ft S of 8TH AV S 8409 UNIVERSITY RD at SPRAGUE AV N 05081 UNIVERSITY RD at SPRAGUE AV S 12526 UNIVERSITY RD at BROADWAY AV N 03050 UNIVERSITY RD at BROADWAY AV S 07811 UNIVERSITY RD at MISSION AV N 1342 UNIVERSITY RD at MISSION AV S 4492 UNIVERSITY RD at MONTGOMERY DR N 2982 UNIVERSITY RD at SR 290 S 4923 ~ UNIVERSITY RD (START) at DISHMAN-MICA RD N 02901 ~ ~ . , DETERMINATION OF NONSIGNIFICANCE • "DNS" SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING RESPONSIBLE OFFICIAL, JAMES L. MANSON, DIRECTOR WAC 197-11-970 and Section 11 10 230(3) SPOKANE ENVIlZONMENTAL ORDINANCE FILE NUMBER(S) ZE-2-96 DESCRIPTION OF PROPOSAL Zone Reclasslfication from Urban Resldential-3 5 (UR-3 5) to Urban Residential-12 (UR-12) for development of 11 multiple family residences and those uses allowed in the Urban Residential-12 (UR-12) zone APPLICANT: Belle Terre Inc c/o Cameron Ball P O Box 85 Greenacres, WA 99016 (509) 922-9076 LOCATION OF PROPOSAL Generally located north of and adjacent to 8th Avenue, approximately 300 feet west of Felts Road in the NE 1/4 of Section 20, Township 25 North, Range 44 EWM, Spokane County, Washington LEAD AGENCY SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING f--- DETERMINATION The lead agency for this proposal has deternuned that it does not have a probable slgruficant adverse impact on the environment An Environmental Impact Statement (EIS) is not required under RCW 43 21C 030(2)(c) This decision was made after review of a completed environmental checkllst and other information on file with the lead agency This information is available to the public on request Thls DNS is issued under WAC 197-11-340(2), the lead agency will not act on this proposal for at least 15 days from the date issued (below) Comments regarding this DNS must be submitted no later than 4:00 p.m., March 19, 1996, if they are intended to alter the DNS. All comments should be sent to the contact person listed below. By Lorne Lakshas Title Planner II Phone (509) 456-2205 Address Spokane County Division of Building and Planning (MS-P) West 1026 Broadway Spokane, WA 99260 DATE ISSUED 1996 SIGNATURE ;THE COI~'~►~QN'IS REGARDING INVIROI~fMET~I7'AL CONCFRNS ARE OME AT HEARING APPEAL OF THIS DETERMINATION, after it becomes final, may be made to the SPOKANE COUNTY DNISION OF BUILDING AND PLANNING, (MS-P), 2nd Floor, West 1026 Broadway, Spokane, WA 99260 The appeal deadline is the same as the above project's appeal deadline, being ten (10) calendar days after the signing of the decision to approve or disapprove the project This appeal must be wntten and the appellant should be prepared to make specific factual objections Contact the Division of Building and Planrung to assist you with the specifics for a SEPA appeal Ttus DNS was mailed to 1 WA State Department of Ecology (Olympia) 2 WA State Department of Health 3 Spokane County Health District 4 Spokane County Division of Engineenng 5 Spokane County Alr Pollution Control Authonty 6 Spokane County Parks Department 7 Spokane Counry Boundary Review Board 8 Spokane Regional Transportation Council 9 WA State Deparcment of Transportation 10 Spokane Transit Authonty 11 Central Valley School Distnct 12 Modern Electnc Water Company 13 Fire District No 1 14 WA State Department of Natural Resources (Colville) 15 WA State Department of Fish and Wildlife (Spokane) . t ► ~ ~ ~ ~ SPOKANE ENVIRONMENTAL ORDINANCE SECTION 11.10.230 -1- 7__~-2 - ~1., t ~ SP01(ANE EtNiRO1aSENTAI ORDINIUiGE (YAL 197-11-960) Settion 11 10 230(1) • ► Envlrorx~ental Chetkllst Purpose of Check115t Flle No The State Enviromental Poltcy Act (SEPA) chapter 43 21C RCW. requtres ail governsental agencies to consiCer the envirorcaental inpacts of a proposal befon Rnking Aecisions An Environmental lmpact Statement (EI5) must be prepared for ail proposals wlth probable siqnlficant adverse impacts on tAe quality of the environment The purpose of this checklist is to provide infortoation to help you and the agency identlfy impacts frocn your proposal (and to reduce or avoid laqacts froa tAe proposai. if 1t can De done) an0 to help the agency decide Mhether an E1S is required instwctions for Applicants This environwntal cheekiSSt asks you to eescribe saae baslc lnfonaatlon eba t your proposal Governaental agencies use tA1s checklist to Getermine rhetAer the enrironarntal iapacts of ywir proposal are signiflcant. requtrtng preperation of an EIS Ansrer the questSons brSefiy, r1tA the most precise inforeation knwn, or give the best descriptlon you can You wust ansver each Qvestlon atturately and Carefully. to the best of your keowledge In most cases, you should be able to answer the questions from your own observattons or project plans wtthout the need to hire experts If you really do not knar the artsMer. or 1t a questlon Gces not aDp1y to your proposal, vrite 'do not know• or 'does not apply ' Coaplete ansMers to the questlons now aiay avotd unnecessary delays later Soaie qvestions ask abaut governwental regulations, such as zoring. shoreline. and landmark designations Artswer these questions if you can lf you have probless. the goverraental agerscies can assist you The chectlist Questlons apply to all parts of your proposal, even tf you plsn to do theu over e perloE of tSme or on dSffennt parcels of tand Attach any additSonat infonytton thet v111 CescrlDe your prcposal or 1ts environeental ettects The agency to rhich yov submlt this checklist may ask you to explain your ansMers or pravide additional 1nfoRnatlon reasonably related to deterafning 1f tAen may be stgniflcant adverse impact Use of cheeklist for nonproject proposals Coaiplete this checklist for nonproject proposals. even though Questions may be •nswered 'dxs not ooply' IM ADDITION, complete the SUPPLEMENTAL SHEET fOR NOKPROJECT ACTIQ115(Part 0) For nonproject actlons, the refennces 1n tl+e chetklist to tAe wrds 'Droject.' 'applltant.' and 'property or site' should be reaE as 'proposal." 'OroRoser,• and 'affecteE geographlc area.' res9ecttvely A. BACKGtOUl1D 1 4me of proposed profect. 1f appliceble _UQriP 2. Mame of App i icant C-- ~t pEt,t, t 7 C"11QI2.C: biC 3 Address and phone number ot app 1 funt or tontact person _p,Q ,B ej m & J:; S Dp a.y~ e- VIA "I 4 4n 1G 422-40'7(, 991-0935 4 Date checklist prepared 2 S Agency reQuesting checklist PI cx- vi lr~ p~S 6 Proposed ttaing or schedule (includinq phasing. if applicable) -~r ( YG a 1~' 1. a. Do you have any plans f future additions, e~cpanslon or further act vity relateE to or comected rith this O~Posal? Iain ~ ~ ~ a44., h~ ~3 9~ b Do you orn or have options on land nearby or adjacent to this proposal? It yes. explaln ~ S. List any enviromental inforwetion you knor aDout that has been prepare0. or Kill be prepared, dfrectty related to thfs proaosat Rtv.2/1/88 I ~A 1 T~ gPOKAfiE EMQO~. " DRDI~MCE (VAC 197-11-960) Section I1 10 230(1) ♦ E,ALKCYDQBD (coatinued) 4 Do yw Imw vhetAer applicatiooa ara peodiag for go.ercmencal approvals of other proposals direeely affeeting the property covered by yout proposal' If yes, eiplsio IV V 10 List any governnent approvals or perait• that vill be needed for your proposal, if Icnovn Q>dckt n a pcr m14S 11 Give a brief, camplete deseription of your proposal. ineluding che pcoposed uses and che •ise of the project an8 site 'here ace oeveral quescions Lcer ie thi• cheeklist that ask you co deseribe certaln upect• of rour proposal Y w do not need to repeat those acuvere on thts page -T]a e_ r,'), 1r~Pn.S Aj 1 S e... I A['_ Y L' ps.T GC..1 i Y1 Q. 3. S Z ch YL P -t-Irt G`T we L_ud U Ld I1 P 4- Q 2 _ ~ Y► ea 12 M.r.A Q Q4 3 4- P( e.x Nrza_-4tnn c'Irt+S o vr 1: locacioo of the proposal Give suf[icisnt inforsatloo tor a person to understand the preeioo Location of pour proposed proSecc, LncludlnE e street addreee, if any, and seeilon, tovnmhlp and range. it knam It • proposal vould occur over s range of area, provide the range or Doundariee of the eite(s) Provide a legal descciption, slte plao. vicioi q tip, and topo4raphic sap, if reaaonably sva! L ble 1Jhile you ehould subuit aay p Lns reQuired try che asency, pau ate aot cequired to dupliute map• or de[ailed plans sulatcced vich any permic apflllcatton rc Lted to this checklisc . Av P~ 14 -7 Fr- c-~- W c s~- o47 F~e. (4 S. Rnc~l o n44% t. ' S r_c-_. 7 n i 25M.. R-L}-4- E -~_l.M, 13 Does the proposed accion lie wlthio che ~uifec Sensitive AT4 (ASA)' (:hs Ceaeral Sever Service Areal) (:he Prloricy Sevcr Service Aree) 'he City of Spokane+ (See Spokaae County's ASA Ow r L y Zone %cl.&• for boundaries) '^0 6E COMPLE':'LD DY APPLICANt B QIS/ZROR`IEN"'JL Q.DO'NLS EvalwtLon For Agency Use Only 1 EAP"it a General description of the slte (eircle one) t L t rolling, hilly, C_ p •lope$ ~ wuacainous. other 0 b 'ihac is the ots*pert •lope on che sice (approxiaace psreanc •lope)9 c `fiat general types of soila aTe found on the slte (for eunple, elay. ~a gtavel, peat, nuek)' If you inov [!u elaasifiution of agrieultural soiL, specifq thea a note any priee famlaad d kre there •urface lodications or his[ory of unscable so11e in the Lsmediate vicinlty' If go, dercribe _u^ 2 . ~ "-N (WAC 197-11-960) Section 11 10.230(1) SPQIUINE ENYIROMKENTAI ORDINAlICE B EIIVIR0IMENTAL EtEMENTS(continued) Evaluatlon For Agency Use Only e Describe the purpose, type. and approximate puanttties of any f1111ng or gradSng proposed Indgcate source of fill C,rd.dtng 1.i ill b~ AonP ;:'nr Drl vetvaY f ; ~Q 4:7 11 GL. Yl GC4 , f Could erosion o aur as a result of clearing, construttlon, or use7 If so. generally destribe N e-% g About what percent of the site Mill be covered with lmpervious surfaces after project construc- tion (for ezample, asphalt or Ouildings)' L1..4 °fa h Proposed weasures to reduce or control eroston. or other impacts to the earth. if •ny MO cr 2 AIR a Mhat type of eAissions to the atr Moula rESUIt from the proposal (i e. dust. auta+roblle. odors SnCustrlel. wooE seoke) during tonstructlon artd when tAe profeCt is Coapleted' If any. generally describe and give approzimate quantites if known Ao'}' n1M o[? 11 f. InwL t S S 1 o h egaG Y" q1? t. Q_tr G6U l 1 1r D Are there eny off-stte sources of dmtssiorts or oEor that Aay affect your proposs17 lf so. generally descrlDe t Proposed measures to rtduce or tontrol emisslons or other inpetts to air, it any hkQ tn P 3 WATER a Surfece (l) is there any surface water body on or in the laaedtate vlclnity of the slte 1nc1u01nq year- round and seasonal streaRS. saltw ter. lakes. ponds, wetlands)' If yes. describe type and provide nnmes If approprlate, state rhat strean or river 1t flors into (2) Wtll the pro3ect reQuire any wrlc over. 1n, or adjacent to (within 200 feet) the desCrlbeE waters7 If yes. please descrlbe and attach available plans _ .hkQ 3 SPOXAiM LRVIR02R92TLL ORDIRARCE , ~ ('JAC 197-11-960) Section 11 10 230(1) D LNNIROiilMNTAL CI.IIKdR;$ (continued) ~ ~ Evaluatior For (3) Estiaate the aswnt of fill aad dredge material ttvt vould be plseed la or removed from the Agency Use Only surface vater or vetl.ands and indiute the area of the site tlvt would De atfeeted Indicace the eouree of fill eaterial LLo u F (6) Vill the proposal reduire surlue yter vithdravals or diverslons' Ciae a geoeral deserip- tion, purpose. and appTO:laace quantities, !i kaovo ~nt~IF (5) Does the proposal lie vitAln a lOQ-pear flood plain' If so, oote loutLon on the sice p Ln (5) Does the propoaal lavolve any disedarQe• of vaste eatetial• to surface vateW If so deecriDe the crpe of vaste and aaticipated volum oI diseharge ~n 0 Graund (1) W111 groundvater be vithdravo. or vill vacer be d1scAarsed to 6roundvacer' Clve genaral description, purpose, and appro:laate Quantities, if Imovn (Z) DescriDe vu te saterial that vill be dlseha[atd lnto the arouod trom •eptic tanks or otir r wnitary vaste crutaent Laeility De"ribt the general •ise of the epet m. the numDer oE houses to be •erved (if •pp1lcsDle) or clr aiaDer of psrsoas the rystee(s) are ezpecced to serve PI"o .1 L°c t L,31 A Pt1[JI 1 S .1 P.Y"' (3) Describe anr syacems. other cAan those designed for the dispo"l ot saaitary vu ce. installed for the purpose of diecAaTgics tluids belov the gtouod surfaea (inelude• syscs• such as those for the disposal of storm vatar or draloaae frm floor drains) Deserl0e the cype o[ systea, the asount of na[erial [o be dleposed of [Rrau6A the srstq aad the type• ot saterlals likely co De disposed ot (includiaa aatatial• tit►ich aay enter the qstem loadverteatlr throu6h •pill• or •s a rasulc of tirefishtiai activlties) 1, r~~ ~cY ~ S L~il 1 1 ~c n._ ~ ( 6 c YL S-~~ I I e tl 1~ 1-t- k OrVwc.l~S C^ cV" S+e rm tA-J, C'.-~ C-- r . N o C o.~ _c I I 4- 1 n v. S Ao 1n ~ 0 1r ~ i S n v^~ G G~ (4) Y111 any ehmicals (espeelallq oraanic solvant• or pecroleum fw 1s) De •toreA in above- ground or undergrouad •toraae tadu' If so, vhat type• and anaacit Ls of materials vill be stored'P 4 SlOTAHL ENOT80M4.'N= 04DI4ARC6 ~ - (WAC 197-11-960) Seccion 11 10 230(1) B CRVIR02iMMAI. LI.EMEtTI'S (con[lnued) ~ ' Svaluation Por Ageney ttse Only (5) What proceetive m asures vill De taken to Lesure that lealu or •plll• of •ay ehemlcnl• otored or used on aice vill noc be •lloved to percolate to groundvater (chie ineludes eeaeuree to keep clumlcals wt of dlsposal systeas desetibed in 3b(2) and 7b(7)' c Vater Runoff (lncluding •toro vater) (1) DescrlDe che source of nmoif (laeluding •cors water) and metbd of eollectioe aad dispoaal if any (inelude Quaaticies, if kaove) Where vill chis water flov+ Will tAi• water flov Lnco other vatere' If so. desccibe r o u r, d m n. 3 Pa c. e- e~. J (2) .1111 anr ehealeal• be •toreE, handled or uied oo t!►e si[e ir a loa tion vha[e a•pill or leak vill drain eo surface or groundvater oc to a•coro water dlepopl syst m discharaing co surfaee or groundwcer' ~ (3) Could vasce soterial• eater grwnd or surfacs v ters2 If •o, aensrally deseriDe ~Q d Proaosed measures to reduce or coatrol surface. `rwnd. aad cvnoif water lapacta, tf •n7 t the proposed action lie• vithin che Aquifer Seniitive Aru pe •speeially claar on axplaoatioos r relating to facilitie• cooeernio= Seetlone 3D(4). 3D(5), and 3c(2) of thi• cheeklist) G PLA.v'i'S a f'heck or clrcle type of veaetatioa found oa tha •ite deciduow tree alder, maple. aspen, o[her ~ evergreen tree tir. ceder, pine, other .hrub. 2 23 q~o A--gTe.. puture v _ ~ crop or 6rain vet wil pLats, eat[all. bu[tercup. Cullrwh. skumk upbase, other i~ . M cer ylanc• rater lillr. eelgrass, allfoil, other other types ot vegetation D Vhet Iclad and asouet of vegetacion vill De rmoved oT altered! ~nx 7'rGGt~ 6 a.v%A .ee_d s c List threacened or endangered speeies Imown to De oa or near the site t,l o n d Propooed landseaplag. use of ostive pLecs, or otlrsr muuns [o prssesve or eahaace Nsetatioa 0o the sice, if any I ~ T~2 Ltx -v.4cC4-o i v, a aMr1 a rn_.s sw i l 1 b e c, s ee~ 5 ) SPOKANE ENYIRONMEIRAL OROINAJICE (YAC 197-11-960) Section il 10 230(1) B ENVIROtd4EttTA1 EL01E1(T5 (continued) . ' Evaluation For Agency Use Only 5 ANIMALS a Circle any birds anC animals which have been oDServed on or neer the slte or are known to be on or near the 51te birds hawk. heron, eagle. songbirds, other meamals deer. bear. elk, beaver. other fish bass, salnan. trout, herring. shellfish, other other b List any threnteneE or endangered species knarn to De on or near tAe site hl o Y% P c Is the site part of a migratlon routel' If so. explaln JA r-% d Propose0 oeasuns to preserve or enhance wildlife. if any m eN 1= 5 ENERGI' ANO YATURAL RESOURCES a What kinds of energy ectrlc natural gas. Meod stove. solarl will be used~aiert the the completed profect'i"'energy needz7 Descrlbe wAether 1t will be used fo<heetlnq). nanufac- turing, ett b YoulE your project affect the potentlal use of solar energy Dy aqjacent properties' Ii so, generaliy descriDe N n c What kinEs of enerqy conservatlon features are 1nc1u6eE in the plans of this proposal' List other proposed oeasures to reGuce or control energy inpacts. if any 110 N p 1 ENYIROHMENTIIL HEALTH a Are there any enviromental health Aazardi, including exposure to toxic cAemlcals, rtsk ot tire and exploston. spitl, or hazardous weste. that could oaur as a rtsult ot this proposal7 If so. destribe UO-hLF (l) Describe spectal ewrgency services that mlght be requtred ~ 6 ~ SPOKAIiE EHPI4'7[9FL" OIIDIiiA14CL ~ (YAC 197-11-960) Section 11 10 230(1) ~ D EWIROMC1RAL ELMat7T5 (eonclnued) Evalwiioa Por EtNIROtdE21TAL REAL:B (continued) Ageacy Ose Only (2) Proposcd Qeasures to reduee or concrol eavironsental health hasards, if any JV.S~C b Noise (1) lrhat types of noise e:ist in the area vAieh wy a[fnet yout psoject (for esasple craffic, equlpwnt. oyaration, other' ~LY.6.i.~l F (2) What type• aad levels oE noise vould be ereated by or aaoelated vith the ptoject on a ehort-cero or • lons-tere Dasi• (for euaple traffie, eoustruetion. opera[loo, otter)'? Iodicate vhac hwr• noise would cow from the •ita -rv1 c-r e.a s c d ' lTirrL.-~~i~ c o v~. S T µ (3) Proposed enasure to reduee or eontrol noise lopatts, iE aa~ ,~Ln nt F_ e u•ro Arro sKORei.itre usE s Hhat 1• the current we of the site and sdjacent prope[ties' YG..GD,..Y\T- 0. vLd Ao O.r4Yv.C.'r,+ C.crn pi Ut +b wG4-.4-- b [las the sice Deea used Eor agrieulture" If •o. deseribe JY.-0 c Describe any •trvetures on the site un11;= d Vill any •cructures be desolished' If so, vhieh' hv e Whac 1• the curtent saeiag classlfltation oi the siCet V R- 3,~j f Vhac io the eunenc emprehoonive pLn desigaation of the •ite' U2CiAN g If applicable, vhac i• the eurrent •Aoreliae aaacer pcoaras deslaoation of the •ice' h1fd► h Na• ao7 pert of the •ite Deen elaaified as aa 'eoviraunienully wwitiva' •reat If so. •pecify ~v ~ • i Approzimately hov aany people vould ramide or vort ln the compla[ed project• -25 7 • ^ ~ ~ertu. o~nixexae (HAC 197-11-960) Section 11 10 230(1) sroxuRa aXvtso E ENVIROnKnrm Llmmlrf5 (tontlnued) • ~ ~ Evaluatlon For Agency Use Oal' j Apprnaleately hov maoy people vould the toapleted projett di*plsceP ~ k Proposed eeasure• to avoid or reduee d1spLeoent inpsets, if aay ~ Q 1 Proposed measure• to eeuure the proposal !s eofpaciDle vich existing aod projeeted Lnd usas and plans. !f anq u! , l I Fin- I I n w I k e_ -M►rl i vt Q S oEa.l I C~, ial%_FLecau fa-~ tL r~ S 9 ROUSING a Appro:iaately hw aan7 uaits vould be provided. if anyt Iodieat• v6scM r high-, aiddlr . or loriocooe howing 12 bEhL, NA 16 0 t.Z D Ap➢ msimtely hov saar uaits. if aop, vould be •lid otcsdf Indiute vhether high-, aiddls-. or lowincone housing M.5~[2 c ProposeA oY sUT!• to redute or eoetrol housing imyacts, if anr t4ny% p 10 ACSTIIETICS a Vhet in the callest helghc of any proposed •ttueture(e). not loeludint antemasf VAat i• the prfacipal e:Carlor Duildiag "terial(s) proposed• 2z F«-~- h i4ti ~...~eLs2ctrl b Uhat vievs in the imediate +iclaity vould be alcend or obstruecedf U Q~ P c Proposed wasuree to reduce or coetrol aesthstic lapaets. if aay 11 LICHT AND G1.AAL a 'tAat type of llghi ot gLre vlll the pro9ow 1 produee! tfiat ciae of day vould it uainly oeeur' V\ b Could li;ht or aLre fevn the finished projset be a wiet7r daurd or interiare vitA •lewt lYD c What e:iacing off-s1te ewrees oi 11`hc or g Lre aay, aitact your proposalT S) ~4"Qu_)XN d Proposed wsuce• to reduea or control light and 61are Lputs. if any 8 ' ~ ~ SPQfAPL L111TfROtiM'YAL ORDl1iAIiCE ~ (WAC 197-11-960) Section 11 10 230(1) . E EPPIAMUMAL T.i.IDCR7i5 (tontiaved) • ~ evaluation For Ageacy Uee Onlq 12 RFCRtASION a VAat deslgnated and Snformal recceational opporcunities •Le in the iaaediste vicini[y' (,1 v, ~ v c r S i-~- 51L~ ti D Vouid the propossd project disp Lce aay exiicing recreaciooal we@! If so, descriDe J"' r~ c Proposed seasun s to reduee or eontrol la9uc• oe reereation, loeludinQ secru tional opportuoi- ties to be yrovided br the ptoject or appliucc, !t aay Mo p- 13 NIS:'ORIC AND CV[.TU1tAL PRLSBRVATION a Are there any place• or object• listed on or proposed for oational. stat• or local pre prva- tion resiscer• luwvn to Da on or nest to the site1 Ii so. aeoesally deseribe ,U b Geeerally deseribe aa7 laadoark• or evidence ot htstoric arehaeolosieal, seientific ot culcural inporcance lmovn to be on or ae:t to the •ite L" c- c Proposed aasure• to rsduce or cootrol lopacts, if sny Ij ntJ ir 16 T1U11SPORTASION • Identify public •treet@ aad RiaMrt7• sstvina t4s sit• aa8 describe proponed acee q to the e:iotiog •trsec sysce Shoron site pLtu. if an7 Tbe-,~, b Is site currently served Sy pu011e traoalt+ It aot, vtut 1s the spp[o:faste dlstance co the nsarest translt •tap! __Y2_ C__ c Itov aao7 parklos spaees vould the eoaplsted project lavet 9ov saay rould the projeet elidnate' ~.n . d Yill the propo ul nauire any atv raad@ or stteata, oc laprovasac• to esisting rard• or stsMt• not includiag driw+myst It •o. reaesally deocr1De (ladiute vdtMr public or private) han e 1ii11 the projeet wa (ur occur lo the losdiate vieinity oi) water. rail. ot alr tsaasportation• If so, generally desctibe J=g>Ga..l uQ S, FcdcraL xTresS E~-c.. 9 . . ~ SYORAHL EPVTSOtilEIUAL OBDI11A8CL ~ (MAC 197-I1-960) Seetlon 11 10 230(1) ~ B EBVIxOt!ffilLAI, B,II4.1R'g (continusd) a ~ Lvaluation For Agency Use Only f Aov aany vehicuL r crlp• per dey vould be genarated b7 the emyle[ed project' Lf Imovn, indicate vlnn peak vould occur U Y► ~Y101,~ g Proposed, oeasure• to teduee or concrol transportatioa impacts. !f any 15 PUBLIC SERVICBS a ttould the proleet result in an laerueed esad for public •eniea• (for exalopla. fire protsctioo. poliee proteetion. health care. schooL. other)? If •o. Qnnerally deseribe b Proposad veasures to redues or contsol direet iapaet• on puplie eervices. 10 any 16 U'ILITIES a Circle vtlllties turren[1y avai L ble at the sice leecrlcit_.reatural vater) (refu~~ (7ervice~ ~ephonaaoitary uw ~ septie systes. otM r b Descrilbe the utilitie• that are propossd for the projeet, the ut111t7 provldina the •eniet and the gene al co~tcuctioo actlvitie• oo the ait• oc ia the iaa~diate +ici~icr vhich alaht be needed ~ Srr S .~SeW G lr ~ PLL6 C SIGNAT9RL 1. the undersigned. waar under the penalt-y oi petjury tlut the above nspowe• •re tide truthfullr aad to the Msc of sy kawledge I also underscand that. •hould there be aoy villiul siaTepromentacion or villtul luk of Eull disclosure on ey part. the a en sar vitM rav any deterninacion of nonsignifleaace that lc dsht issue in reliaace upon thi• checklist Oa te Ptoponent S C~ ~ E n +ie j~ P G 1[~,S Plesso Print ot iy6e) Proponent C2 AedreN (SiaoaCUre) Phone ~ Z. 1 3 Z. Z_ WA. Person cospleting focm Dtfo,lry -P 1-4PM- Date -t r--- Phone -7'~ Z. 6 ^L3 Z L POR STATT OSE ONLT Staff nAbec(a) sevieviag cAnclclist l-opA Dased on chis staff reviev of the envirooaeaLal eheeklist aad otdst partiuent infoesatlan, the staff ~ AConcludes that tFu re ara no probable mignifi uat adverse iapact• and rec4ssads a deteesination of eonoige►itieaoce s Conclude• that probable •16ttificaat advoerae anvironmntal iapaet• do eslst for the current proyoul and ncosnds a aitigated dnter- siaatlon of nonsi;nificanee vith cooditions C Concludes tAac there are probable slaailiunt adverse nnvironmnntal imput• and recomeods a datenioatioa of •ignifiunce fILZ11C lS - =75 00 10 Z E ' 2'qC. , . ~ ~ t f•• . : SPOKANE COUNTY PLANNING ZONE RECLASSIFICATION APPLICATION PART Z A. GENERAL _INFORMATION: , NAME OF A.PPLICANT/REPRESENTATIVE MAILING A.DDRESS P-0 - ~3DX 9:5r CITY G 2c'i.-~/A c2cS STATE a,,-, ZIp 5'~v( 6 . PHONE 9 Z L - 5 U 7 (work) q2,2 - 7016 (home ) IF APPLICANT IS NOT OWNER, INCLUDE WRITTEN OWNER AUTHORIZATION FOR APPLICANT TO SERVE AS REPRESENTATIVE. LEGAL OWNER'S NAME &;giF-~- SA M -1 PHONE MATLING A.DDRESS CITY STATE ZIP PROJECT/PROFOSAL SITE AREA (acres or sq ft) ~ t A.DJACENT AREA OWNED OR CONTROLLED (acres or sq ft ) N~A ASSESSOR PARCEL #S OF PROJECT/PROPOSAL U 5 Zol ASSESSOR PARCEL #'S OF ADJACENT AREA OWNED OR CONTROLLED w14 STREET ADDRESS OF PROPOSAL EXISTING ZONE CLASSIFTCATTON(S) (DATE ESTABLISHED) U 2 3. S EXISTING USE OF PROPERTY 12A~W G!tj,'IJNd PROPOSED ZONING J 2- ~ 2 COMPREHENSIVE PLAN CATEGORY U2.&~ SCHOOL DISTRICT G~ FIRE DISTRICT WATER PURVEYOR PROPOSED USE OF PROPERTY • Single family dwellings Duplexes Multifamily dwellings (o~j Manufactured homes ( ) Business ( ) Industnal ( ) Mixed Use ( ) Other ( ) - Descnbe LIST PREVIOUS PLANNING DEPARTMENT ACTIONS INVOLVING THIS PROPERTY N/,4 B. LEGAL/ZONE RECLA,,SSZFZCA,TZON INk'ORMATInN LOCATION OF PROPOSAL SECTION 1JE 4 0~ LO TOWNSHIP L 51S RANGE 44 & Wti. NAME OF PUBLIC ROAD(S) PROVIDING ACCESS FTN !Vt WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD 30" ZOIVE, RECLASSIFICATION Arrt,ICATTON • . Page 2 of 4 ; DOES THE PROPOSAL HAVE ACCESS TO AN ARTERIAL OR PLANNED ARTERIAL YES NO NAME(S) OF ARTERIAL ROADS gr%( ~4~- LEGAL DESCRIPTION OF PROPERTY FOR EACH ZONE RECLASSIFICATION PROPOSED S CE A m4 TcNi,-~,> 62 S rTc P t.qj EXISTING ZONE(S) 0A2, ~.S TO PROPOSED ZONE(S) V, FOR THE FOLLOWING DESCRIBED PROPERTY (ATTACH LEGAL DESCRIPTION STAMPED BY LAND SURVEYOR OR PROVIDE BELOW 315E s 'l-€ ALAo.l IF YOU DO NOT HOLD TITLE TO THE PROPERTY, WHAT IS YOUR INTEREST IN IT? AM A-ss I s;A-rJr 51-c.i2 rTRA-Y ):~>2 Q E LL6 r#Jc , w► u A-t-SJ KE IN-6 6 &CA4-L C,zNC9ACiUk FOK• T~f-i C4T3Sr"CTlorJ QF Ttfc BVILD lIJGs. WHAT ARE T'HE CHANGED CONDITIONS OF THE AREA WHICH YOU FEEL MAKE THIS PROPOSAL WARRANTED? i NF c.vHpk6 N&Js(uC Pc,Ad ENw09AG4FS /I vAR (ErY oF NCOS, N6 TOC-46 fh2E A w(D6; 4(-kjGt O~ Di PA5e&r Z cMrF3 td TritF Ae.64 IN Cc ubtArG U 2, 3, S, uIt 7 - ~ ~ b cl Q ZZ. D iRSLR.Y ivc`5,7 of rMC Sc TC , 8TN AJ&JvE tKS 12E t&+ryY 8E54 w(46w6b &A Gwt41`Y Scw6Q- IS 5rL$66 r Nro -IH£ s erLc_ WHAT IMPACT WILL T'HE PROFOSED ZONE RECLASSIFICATION HAVE ON THE ADJACENT PROPERTMS? MIO'M,+L i+iC-2E-45a iN iJQAFFrt, oeJ $'cW 4•rt;.►u6 WHAT FACTORS SUPPORT'THE ZONE RECLASSIFICATION? A~~ttj j?jtE C0HPVH6vsiv6 ~rJ &JCoUgAGcS A c1oViE7+( J-P axjS«JL Wc Cvocb 60 FvrC. ilft;' VtQ 1.1 M4404vM, dut wb Fc'eL OR(t wouc.A 3E R C0MFdQt$c.e. v5C FD2 7"C Si2C oP 'ttIC e2oPCelr R'3 wEu- 43 G c vC, 1k02 E 4lA;0,tG; y oP r+D%)StA- 7D 7W4F AIW-A WHAT MEASURES DO YOU PROPOSE TO MITIGATE YOUR PROPOSAL'S IMPACT ON SURROUNDING LAND USE? bakucw*1 lnvm strE wcc.` abr ORvE-d SI DfwqLK Lyc/ 8774 ,qvepivc Wiu. 81F C*-&4Q0 64Sr ro PA-06?trY uPtw cpMPc.ETianl oF 324 ;avi c.d19G t S irE IvJC C B€CvM PLC TC-c,y CATJD SCAPC-~ ibJb PR.o fESsc on►A t.c.Y M,++out-4,r*6, A S~ G#+7 ag S MU «W P&.+% B r WNPtPTQ AU~" P/LORcAr1 uAZS, Gc3DC 4t-WwS 4v la'n► GS io 6E kc) Aci-~T iAt.t. , oUK 6u(c61N&S wovc.A Bc twi) STURY LcsS 77tft LS Fc'-t ~ 74-c.c. . • '70NE RECLASSIFICATTUN ti.. . LICATION . , Page 3 of 4 PART II THIS SECTION OF THE APPLICATTON WII.,L PROVIDE THE PLANNING DEPARTMENT STAFF WITH WRITTEN VERIFICATION THAT THE APPLICANT HAS HA.D PRELIMINARY CONSULTATION WITH THE AGENCIES IDENTIFIED RESULTS OF THE PRELIMINARY CONSULTATION SHALL BE INCORPORATED IN THE PROPOSAL BEFORE FINAL SUBMITTAL TO THE PLANTIING DEPARTMENT FIRE MARSHALL/FIRE DISTRICT ~ A THIS PROPOSAL IS WITHIN FIRE PROTECTIO T NO ` B ADEQUATE ARRANGEMENTS (HAVE) ( AVE N BEEN MADE TO MEET OUR NEEDS IN PROVIDING FOR AN ADEQUATE WATER SYSTEM AND FACILI'ITES FOR FIRE PROTECTION PURPOSES C RECOMMENDED FLRE FLOW OR UNABLE TO CALCULATE NOW BECAUSE USE IS NOT DEFIlVITIVE, AND W1LL BE DETERMINED AT BUIIrDING PERMIT APPLICATION TIME D REQUIREMENTS INCLUDE , . ll ~ V*urr L~ ~ / 2 -J8• ~ 5 FIRE DISTRICT U rSIGNATURE/TITLE DATE WATER PURVEYOR A. SATISFACTORY ARRANGEMENTS FOR DQMESTIC WATER AND FIRE FLOW REQLJIREMENTS MM4W~ (HAVE NOT) BEEN MADE B REQUIREMENTS/COMMENTS CA.U...A 04sI`{-c. VJFAW ~t%a vv" cAQ.cQ,ssox :F-0 kAle-l- AzC. WATER DISTRICT GNATURE/I'ITLE DATE COUNTY ENGINEER A PRELIMIIVARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR ROADS AND DRAINAGE HAVE BEEN DISCUSSED WITH THE APPLICANT A COMMENTS ~ bc" ~.A"/ CG X✓ ~ S IGNATUREfI'ITLE DATE COUNTY UTILITIES ' A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR SUBMITTAL OF THIS PROPOSAL (HAVE) (HAVE NOT) BEEN S~ PTISFIE THE DESIGNATED WATER PURVEYOR FOR THIS SITE IS ~Pc~KA~36' C a~Or'Y ~AT~2 ~is-'2c er :W-3 A COMMENTS -Ct~ 0 P- b lJU A`v-E 12 . a ~ Z ` s v SIGNATUREfI'ITLE ATE HEALTH DISTRICT ' A PRELIMINARY DISCUSSION HAS TAKEN PL E AND GE RAL REQUIREMENTS FOR SUBMITTAL OF THIS PROPOSAL (HAVE) CHAVE NOT BEEN SATISFTED. A COMMENTS PV41~ C -fc'Lvl / ~L 45kt~~~ SIGNA E/TI E ~ A SEWER PURVEYOR A PRELIMIIVARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR THE PROVISION OF PUBLIC SEWER A.RE UNDERSTOOD BY THE APPLICANT A COMMENTS CD00JEQ-r TO ~~1S1-I C- :51El,JE/2- ~ 12 g ` SIGNATURE/TITLE bAllE - 1 . - • GONE :ZECLASSIFICAT'ION APPLICATION ' Page 4 of 4 { PART III ~S E` ,S•~~ j SURVEYOR VERIFICATION wA c D, A LICENSED LAND SURVEYOR, HAVE COMPLETED THE INFORMATTON ZONING MAP AND WRITTEN LEGAL DESCRIPTION V y ~o t DATE I Z. l I 9,S" 1 f D S S (V • 9~ 9 j~.. PHONE: 97- ~ 13 L Z a~ Ut,zO F . EXPIRES 7117~ 9 ? -S f:~A lcGi,z~ W At ZIP / 92-1) - tl~ PART IV (SIGNATURE OF PROPERTY OWNERS OR LETTER OF AUTHORLZATTON) I, THE UNDERSIGNED, SWEAR OR AFFIRM UNDER PENALTY OF PERJIIRY THAT T'HE ABOVE RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE I FURTHER SWEAR OR AFFIRM THAT I AM THE OWNER OF RECORD OF THE AREA PROPOSED FOR THE PREVIOUSLY IDENTMZED LAND USE ACTION, OR,1F NOT THE OWNER, ATTACHED HEREWITH IS WRITTEN PERMISSION FROM THE OWNER AUTHORIZING MY ACTTONS ON HIS/HER BEHALF NAME 6ELL"6 l~-~t.2a li~ C. DATE ADDRES S P-6 - &X PHONE G2eo PIC95 ZE? g1or6 SIGNATURE OF APPLICANT OR REPRESENTATIVE DATE STATE OF WASHIIVGTON ) ) ss COUNTY OF SPOKANE ) SIGNED AND SWORN OR A,fFTRMED BEFORE ME ON THIS L$T 14 DAY OF p~~ e_,•~~ r, 199q, B Y p.l1E M. y N ••~ae~• ~i - '~?1 . ~~~a~~, ~ ~I;0 NOTAAY NotarY Public in and for the State of Washington v • • : ~ . ~ s Residing a[ -p- VA• : cl~1 ; PUBLIC '•~'9 '•ti y~~ My appointment expues T~- t 4_9 S O~'i• ~ PART V (TO BE COMPLETED BY THE PLANNING DEPART'MENT) DATE SUBMITTED FILE # DATE ACCEPTED BY TOTAL FEES • RECEIPT # a • ~ - a~ S P O K A N E , ~ C O U N T Y DEPARTMENT OF BUILDING AND PLANNING • A DIVISION OF THE PUBLIC WORKS DEPARTMENT JAMES L MANSON, C B O, DIRECTOR DENNIS M SCOTT, P E, DIRECTOR MEMORANDUM TO: , Jim Red, Spokane County Utilities Department Steve Holderby, Spokane County Health District Wyn Birkenthal, Spokane County Parks & Recreation Department Bill Hemmings, Stormwater Utility Greg Figg, Department of Transportation Glen Niiles, Spokane Regional Transportation Council Chnstuie Fueston, Spokane Transit Authority Susan Winchell, Boundary Review Board Central Valley School Distnct Spokane County Water District No 3 Fire District No 1 FROM: John Pederson, Senior Plannerq DATE: December 29, 1995 ~ RE: Zone Reclassification from Urban Residential-3 5(UR-3 5) to Urban Residential-12 (UR-12) APPLICATION ACCEPTANCE AND DESIGN REVIEW MEETING rTANUARY 10. 1996 AT 1:15 COUNTY PLANNING CONFERENCE ROOM. 2ND FLOOR Please review the above application and use the attached APPLICATION ACCEPTANCE AND DESIGN REVIEW MEETING FORM for your comments The Planrung Department encourages your presence at tlus meeting The sponsor and representative have been invited to also attend if you can not attend, please forward your review comments on the attached form to Lorne Lakshas for the meeting The attached APPLICATION ACCEPTANCE AND DESIGN REVIEW FORMS will be given to the sponsor at the meeting and included in the Planning Department file (so bring three copies to the meeting) Thanks for your cooperation If you have any questions about the application, please contact Lorne Lakshas of the Planning Department at 456-2205 c Belle Terre Inc, c/o Cameron Ball, P O Box 85, Greenacres, WA 99016 Attachments Application Acceptance and Design Review Form, Project Desi;n, Slte Plan 1026 WEST BROADWAY AVENUE • SPOKANE, WASHINGTON 99260 BUt1.DwG PHONE (509) 456-3675 • FAx (509) 456-4703 PLANNING PHONE (509) 456-2205 • FAx (509) 456-2243 TDD (509) 324-3166 Design Review for January 10, 1996 at 1 15 Belle Terre Inc. Zone Reclassification Generally located north of and adjacent to 8th Avenue, approximately 300 feet west of Felts Road in the NE 1/4 of Section 20, Township 25 North, Range 44 EWM, Spokane Counry, Washington COMPREHENSNE PLAN Urban and within the Priority Sewer Service Area (PSSA) PROJECT DESCRIPTION Zone reclassification from Urban Residential-3 5 (UR-3 5) to Urban Residentral-12 (UR-12) for devleopment of 12 multiple farruly residences and those uses allowed in the Urban Residential-12 (UR-12) zone PARCEL NUMBER 45201 1448 SITE SIZE Approxlmately 43,200 square feet APPLICANT Belle Terre Inc c% Cameron Bail POBox85 Greenacres, WA 99016 (509) 922-9076 ASSIGNED PLANNER Lorne Lakshas - , r 1 SPOKANE COUNTY PLANNING ZONE RECLASSIFICATION APPLICATI4N PART I A. GENERAL INFQRMATION: ~ NAME OF APPLICANT/REPRESENTATIVE 9EI'l- TcI.(ZE )OL. .cl~)"tL~otj 611-~L MAILING ADDRESS PD ~3DX ~ CITY 69-6~'V AC&C-S STATE O'l, ZIP 01 6 PHOIVE 92-Z - qO7 G (work) q Z Z- .7U ?C (home) IF APPLICANT IS NOT OWNER, IIVCLUDE WRITTEN OWNER AUTHORIZATION FOR APPLICANT TO SERVE AS REPRESENTATIVE. LEGAL OWNER'S NAME ~ s4AI€ PHONE MAII.ING ADDRESS CITY STATE ZIP PROJECT/PROPOSAL SITE AREA (acres or sq ft) - ADJACENT AREA OWNED OR CONTROLLED (acres or sq ft ) N/A ASSESSOR PARCEL #S OF PROJECT/PROPOSAL U 5 ZoJ -/U1l9 ASSESSOR PARCEL #'S OF ADJACENT AREA OWNED OR CONTROLLED AJ 14 STREET ADDRESS OF PROPOSAL EXISTING ZONE CLASSIFTCATION(S) (DATE ESTABLISHED) U 2 3, S EXISTING USE OF PROPERTY 2" 6,te,)N'3 PROPOSED ZONING J 12. / Z COMPREHENSIVE PLAN CATEGORY U SCHOOL DISTRICT Cv FIRE DISTRICT -i-P ( WATER PURVEYOR ~ ~DC-P-l-) PROPOSED USE OF PROPERTY • Single family dwellings Duplexes Mulafamily dwellings (4 Manufactured homes ( ) Business ( ) Industnal ( ) Mixed Use ( ) Other ( ) - Descnbe LIST PREVIOUS PLANNING DEPARTMENT ACTIONS IlVVOLVING THIS PROPERTY . B. LECAL/ZONE REC't,ASSIFIC,ATInNIN,FnR ViATiDNI LOCATION OF PROPOSAL SECTTON NF-4 L-)~- LO TOWNSHIP 2 5~ RANGE 44 ~ Wtt NAME OF PUBLIC ROAD(S) PROVIDING ACCESS FTW #VC WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD 30" ZOIVE, RECLASSIFICA7'TnN APPLICATTON Page 2 of 4 , ~ ~ DOES THE PROPOSAL HAVE ACCESS TO AN ARTERIAL OR PLANNED ARTERIAL ¢-1 YES NO NAME(S) OF ARTERIAL ROADS gr4 A-JI4--- LEGAL DESCRIPTION OF PROPERTY FOR EACH ZONE RECLASSIFICATION PROPOSED L;.~ r5v, S cE A rrA 7-cNi,~ 02 S rrc P c-AJ , EXISTING ZONE(S) l) .k, 3.5 TO PROPOSED ZONE(S) v~. FOR THE FOLLOWING DESCRIBED PROPERTY (ATTACH LEGAL DESCRIPTION STAMPED BY LAND SURVEYOR OR PROVIDE BELOW 5 ~T€ A`AW IF YOU DO NOT HOLD TITLE TO THE PROPERTY, WHAT IS YOUR IlVTEREST IN I77 AM A-ss i s 7A-rJr 51-(At7AA-Y 1:.7 fL 96L~LC i~:-fL.2. ~114, 1 w IL.L I; €10t G &C-Aq-L FOK. 7Hi C4435 t"t-Tlor~ oF TOE BUILD 1465. WHAT ARE THE CHANGED CONDITTONS OF THE AREA WHICH YOU FEEL MAKE THIS PROPOSAL WA.RRANTED? ?NF 00MpQ6ltaJsWC pcAd &JwRJd-AGcS dq vOt2 'ErY of HwSf N(- T Hi0 AlzE A w c 05 R f-W GE O~ PA5t& r Z c~t& cd ntc /fi2.fr4 N C.t. uD cjuG U!L , 3,57. cs2 7 AriD cl Q ZZ p '/ZEc.tzY tvc`5Y c~ rMC ScTt-' R Sra ,q06~JvC 04s At c&+my Bc'aJ w(664co &4 Gwtit`f SC.j4e- iS 5rz)S3EA !N m iw S e mc_ WHAT IMPACT WII.L THE PROPOSED ZONE RECLASSIFICATION HAVE ON THE ADJACENT PROPERTIES? M iN'~~4L. r N c.2E4sr IN 72AFFtG aJ 8~+ /~•~r'~-►~ ~ WHAT FACTORS SUPPORT THE ZONE RECLASSIFICATION? 46AI"; n-ftE CUhPlUIki'JSlve bjGuWgAGcS A cllQP-iE-Ty Jf f*-JStNG Wc 60 FvR. j1' Qo2 LZ M4l4mvM, du7' we l-EeL 0 R (2 wouc.A BE R CoMAd&Wc.b . u'SC FoR TW 5i7Z dF 7Ttr: o°2oPCIZTr /4S wFLc A5 Gtv(F &u2E vkRssrY ot OD05cK4 7n 7)4C ARZA WHAT MEASURES DO YOU PROPOSE TO MITIGATE YOUR PROPOSAL'S IMPACT ON SURROUNDING LAND USE) D(ZkuEw1H /+un' Scrc wcu- 66 O&C-A. SiD6wj4iK cc/ 87W A,rc;Utlc . 1,il" 8c C-ici Q0 64Sr 7n plLoPErZ?7 UPoM Cpt-cPc.67IU1 OF 3R6 j3uj c.dr KG r S tM ~vJt L 3E CvMPLC-TC-Ly CA-NOSCAP~~ bJD PR.O~CSS(c+JA t.LY Mkiti7-4wO,A Sj6 FfT 06SMOcric4 ffau% wvLu br wMAcpTE~l ,~;~nrd p2opUh uAZs, Gt;Oc" 4j-wwt (3wLD(N GS to &E 4c)~Fr , `14U. , ovf- 4utc.DlN4S w0vt.6 B,~ 7wO S1URY I.ess 77tft LS ~-c 7*-U. _ ~ =70NE RECLASSIFICAT7r'-T A.PPLICATION Page 3 of 4 . . PART II THIS SECT'ION OF THE APPLICATION WII.L PROVIDE THE PLANNIING DEPARTMENT STAFF WITH WRITTEN VERIFICATION THAT THE APPLICANT HAS HAD PRELIMINARY CONSULTATION WITH TFiE AGENCIES IDENTLFiED RESULTS OF THE PRELIMINARY CONSULTATION SHALL BE TNCORPORATED IN THE PROPOSAL BEFORE FINAL SUBMITTAL TO THE PLANNTNG DEPA.RTMENT FZIZE MARSHALL/FYRE DTSTRICT A THIS PROPOSAL IS WITHIlN FIRE PROTECTIO T NO ~ B ADEQUATE ARRANGEMENTS (HAVE) ( AVE N BEEN MADE TO MEET OUR NEEDS IN PROVIDING FOR AN ADEQUATE WATER SYSTEM AND FACII.IT'IES FOR FIRE PROTECTION PURPOSES C RECOMMENDED FIRE FLOW OR UNABLE TO CALCULATE NOW BECAUSE USE IS NOT DEFINITIVE, AND WILL BE DETERMINED AT BUII,DTNG PERMIT APPLICATION TIME D REQUIREMENTS INCLUDE . . /1 . v*u`l FTRE DISTRICT SIGNATURE/I'ITLE DATE WATER PURVEYOR A. SATISFACTORY ARRANGEMENTS FOR DOMESTIC WATER AND FIRE FLOW REQUIREMENTS (NA"" (HAVE NOT) BEEN MADE B REQUIREMENTS/COMMENTS QYsl+,q- t,r.s~-'~ NbLcJ%a t-~.bi o~...s .nn r,{t ~,.Q, c~Q.c4,ss~c :-o We-i' A(ze- -~6A1 S C.~J ~ ''~,3 ~ ~ - I ~ ~ `9 ~ WATER DISTRICT I GNATURE/I'ITLE DATE U COUNTY ENGINEER A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIR.EMENTS FOR ROADS AND DRAINAGE HAVE BEEN DISCUSSED WITH THE APPLICANT A COMMENTS 75c°' x //,411 c- ~ w ~ S SIGNATURE/TTTLE DATE , COUNTY UTILITIES A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUII2,EMENTS FOR SUBMITTAL OF THIS PROPOSAL (HAVE) (HAVE NOT) BEEN ~S PTISFIE THE DESIGNATED WATER PURVEYOR FOR THIS SITE IS ~OvKAx3~' C'. D~~'Y ~ATF-2 ~3 A COMMENTS C-D 0~~► rJ AT'e C>`I lJU A`T"~' I~ rvl f~-v' ti ~ ~ L ~ SIGNATURElTITLE ATE HEALTH DISTRICT A PRELIMINARY DISCUSSION HAS TAKEN PL E AND GE RAL REQUIREMENTS FOR SUBMITTAL OF THIS PROPOSAL (HAVE) AVE NOT BEEN SATISFIED A COMMENTS C -fe !:Z~7 ~SIGNA&7 - ~ E A , SEWER PURVEYOR A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUiREMENTS FOR THE PROVISION OF PUBLTC SEWER ARE UNDERSTOOD BY THE APPLICANT MENTS A COM - ~ 2 I ~i F \5 ~ A rE ~ S IGNATUREITITL w. - - C 'r w r ` ♦ • ZONE :ZECLASSIFICATF kPPLICATION Page 4 of 4 ~ • ,t . PART IIZ E, SURVEYOR VERIFICATION WAV. ' ~ D, A LICENSED LAND SURVEYOR, HAVE COMPLETED THE INFORMATTON ZONING MAP AND WRIT'T'EN LEGAL DESCRIP'tION a 1 DATE 9 S" ~s D s s N• 909 F, R d_ PHONE• _,9 Z. . 13 Z2- t, a ur~ EXPIRES 711719 7 ~ple, k 'A t1~ w~ZIP 9 9 Z' 1 1- ' PART IV (SIGNATURE OF PROPERTY OWNERS OR LETTER OF AUTHORIZATION) I, THE UNDERSIGNED, SWEAR OR AFFIRM UNDER PENALTY OF PERTURY THAT THE ABOVE RESPONSES ARE MADE TRUTHFUI.LY AND TO TI-E BEST OF MY KNOWLEDGE I FURTHER SWEAR OR AFFIRM THAT I AM THE OWNER OF RECORD OF THE AREA PROPOSED FOR THE PREVIOUSLY IDENTIFTED LAND USE ACTION, OR,1F NOT THE OWNER, ATTACHED HEREWITH IS WRITTEN PERMISSION FROM THE OWNER AUTHORIZING MY ACTIONS ON HIS/HER BEHALF NAME 6EL~6 !&(I.a /rJ(.. 'DATE ADDRESS P-v •k1( 9' PHONE Gr~~ plws WA. ZIP 9 jo (6 ~ ~fis s r. 5 iLl4e /-*tr ( Z' S IGNATURE OF APPLICANT OR REPRESENTATIVE DATE STATE OF WASHINGTON ) ) ss COUNTY OF SPOK;.A.NE ) SIGNED AND S WORN OR AFFIRMED BEFORE ME ON THIS LZ T14 DAY OF D G 19ABY Co, P r,ow [&r„11 p,~E M• ♦ NJP . : ~1 ~ • : Jv Notary Public in and for the State of Washmgton w Residing at . !~7 '~`~y~ 1~ yiy appointment expLres TK t~4 $ •y ~ i PART V 0 BE M,91LETEB 3Y THE. PLA1ti"``TING DEPARTMEN-0 Dr.?Z t ~-1.91 dFII.E # D rsT E A C Et . B Y TOrI'AL FM: RECEIPT # ~ t . L SPOKANE COUNTY PLANNING ZONE RECLASSIFICATION APPLICATION PART I A. GENERAL INFnRMATION: NAME OF APPLICANT/REPRESENTATIVE MAILING ADDRESS CITY STATE ZIP PHONE (work) (home) IF APPLICANT IS NOT OWNER, INCLUDE WRITTEN OWNER AUTHORIZATION FOR APPLICANT TO SERVE AS REPRESENTATIVE. LEGAL OWNER'S NAME PHONE MAILING ADDRESS CITY STATE ZIP PROJECT/PROPOSAL SITE AREA (acres or sq ft) ADJACENT AREA OWNED OR CONTROLLED (acres or sq ft ) ASSESSOR PARCEL #S OF PROJECT/PROPOSAL ASSESSOR PARCEL #'S OF ADJACENT AREA OWNED OR CONTROLLED STREET ADDRESS OF PROPOSAL EXISTIIVG ZONE CLASSIFTCATION(S) (DATE ESTABLISHED) EXISTING USE OF PROPERTY PROPOSED ZONING COMPREHENSIVE PLAN CATEGORY SCHOOL DISTRICT FIRE DISTRICT WATER PURVEYOR PROPOSED USE OF PROPERTY Single family dwellings O Duplexes O Multifamily dwellings O Manufactured homes ( ) Business ( ) Industnal ( ) Mixed Use ( ) Other ( ) - Descnbe LIST PREVIOUS PLANNIIVG DEPARTMENT ACTIONS INVOLVING THIS PROPERTY B LEGAL/ZONE RECLA,SSIFICATInt4 INFnR V~„i,ATInNI LOCATION OF PROPOSAL SECTION TOWNSHIP RANGE NAME OF PUBLIC ROAD(S) PROVIDING ACCESS WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD J • J »1 ZONL' RECLASSIFICATION APPLICATION Page 2 of 4 DOES THE PROPOSAL HAVE ACCESS TO AN ARTERIAL OR PLANNED ARTERIAL O YES O NO NAME(S) OF ARTERIAL ROADS I LEGAL DESCRIPTION OF PROPERTY FOR EACH ZONE RECLASSIFICATION PROPOSED EXISTING ZONE(S) TO PROPOSED ZONE(S)_ FOR THE FOLLOWING DESCRIBED PROPERTY (ATTACH LEGAL DESCRIPTION STAMPED BY LAND SURVEYOR OR PROVIDE BELOW , IF YOU DO NOT HOLD TITLE TO THE PROPERTY, WHAT IS YOUR INTEREST IN IT? WHAT ARE Tf-E CHANGED CONDITTONS OF THE AREA WHICH YOU FEEL MAKE THIS PROPOSAL WARRANTED? WHAT IMPACT WILL THE PROPOSED ZONE RECLASSIFICATION HAVE ON TI-E ADJACENT PROPER'TIES? WHAT FACTORS SUPPORT THE ZONE RECLASSIFICATION? . WHAT MEASURES DO YOU PROPOSE TO MITIGATE YOLIR PROPOSAL'S IMPACT ON SURROUNDING LAND USE? . ZONE RECLAA55EFTCATION APPLICATION Fage 3 0f 4 PART 11 THIS SECU(]N OF THE AFPLICATIQN WILL P~~VIDE THE PLANNLlNG DEFARTMF-N'i` STA.FF° WI'rH WRITTEN VF,RTFICATIQN THAT T'IM APPLFCANT HAS HAD PRF-LIMINARY C4NSLJI.TA1'ION WITH THE A.CENC]ES IDF-NT=D, fiESULTS OF THE PRELIMIINARY ~ONSULTATION 5HALL BE IlNCORPORA.TEn IN THE PROPOSAL BEFQRE FINAL SUBMMAL TO THE PLANN7NG DEPA,R7MENT FIRE MARSHALLIFIRE I3ISTRIC7` A THiS PRC3POSAL IS W[THIlY F"IR~ ~~OTECTTON DISTRIC7 ND B ADF-QLTA'I'E ARRANGEMENTS (HAVE) (HA'VIE IYD'F) BEEN 1V,(ADE 'Z'O NEET OUR NEEIDS IIN PR(]VIDIlNfi FOR AN ADEQLTATE WATER SYSTEM AND FACILiTFES FOR. FIRE PROTF-CTION FURPOSES ~ ~~OMNfENDED ~M-E FLUW , OR UNABLE TO CALCULATE NOW 13ECALTS£ LFSE IS NDT DEFWMVE, AND WILL BE DE'TERNiII~ED AT BUII.DINC,~ ~ERMIT AFPLICATION 'FIhM. D REQ=MENI'S INCLTJDE FIRE DISTRICT SIO~ATUREtnTLE DA'I'F, WA,TER PL1RVE,YOR i A. SATISFACTORY A.RRANGEI~NTS FOR DONIESTIC WATER AND FIRE FL.OW REQUEREMENT'~ (HAVE} (HAVE NOT) BEEN MADE B REQLTIREMENI'S/COMMENTS WATER DIS'IRICT SIGNATURE/TITLE ~ DA'I"E CDUIYT~ ENGINEER A pRELrMINARY nIScusSrorv HAs rAKEN PLA~E Aivn GEnrERAr.. REQuIREMF-NTS FaR ROAns AN'D I7RAIVAGE H~~E -BREN DISCUSSED VVITH THE APFLICANT A COMA}iENTS 1w'41 ~ J~C-4yt4- SrGN~~/TITT.~ ~ATE CoUNTY UTzz.,ITzEs ' A PRELIMINARY DISCUSSIOIV HAS 7'AKEN PLACE AhTD GEIr[ERAL REQUfIREhEN'TS FOR SUBMITTAL OF THIS PROPOSAL (HAVE) (HAVE IYOT) BEEN SATISFIED THE DESIGNATED WATER FLTRVEYC7R FOR THIS SITE IS A COMMENTS _ , S IGNAT[JRE/I'ITLF, DA'I'E HEALTH DISTRICT . A PR£LIMINARY DISCUSS~ON HAS TAKEN 1'LACF, AND GENERAL REQUIREIVENT'S FOR SLTBMITTAL OF THTS PFtQPOSAL (HAVE) {HAVE NOT} BE,EN SA`I'lSFIED A COMMENTS ~ S IGNA7'UREMTLE DATE R SEV4'ER PLIRVEI'OR , A PRELIMINARY DISCUSSION HAS TAKEN PLACE AiVD GENERA1, REQUIREhENTS FC}R TffE PROVXSXON OF PL7BLIC SEWER ARE UNDERSTDOD BY THE APPLICAhIT A COMMEN°TS SICANAT[JR.EfI'ITLE I7ATE . • w ! 't 2,0iNq1~,1'ZECLASSIFTCATI0N APPLICAT'ION Page 4 of 4 PART III SURVEYOR VERIFTCATION I, THE UNDERSIGNED, A,LICENSED LAND SURVEYOR, HAVE COMPLETED T'HE INFORMATION REQUESTED FOR THE ZONING MAP AND WRITTEN LEGAL DESCRIP"I'ION SIGNED DATE ADDRESS PHONE. ZIP PART IV (SIGNATURE OF PROPERTY OWNERS OR LETTER OF AUTfiORIZAT10N) I, THE UNDERSIGNED, SWEAR OR AFFIRM UNDER PENALTY OF PERNRY THAT THE ABOVE RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE I FURTHER SWEAR OR AFFIRM THAT I AM THE OWNER OF RECORD OF 1'HE AREA PROPOSED FOR THE PREVIOUSLY IDENTIFIED LAND USE ACTTON, OR, IF NOT THE OWNER, ATTACHED HEREWITH IS WRITTEN PERMISSION FROM THE OWNER AUTHORIZING MY ACTIONS ON HIS/f-iER BEHALF NAME DATE ADDRESS PHONE ZIP SIGNATURE OF APPLICANT OR REPRESENTATIVE DATE STATE OF WASHINGTON ) ) ss COUNTY OF SPOKANE ) SIGNED AND SWORN OR AFFTRMED BEFORE ME ON THIS DAY OF , 1994, BY NOTARY SEAL Notary Public in and for the State of Washington Residing at - My appointment expires PART V (TO BE COMPLETED BY THE PLANNING DEPARTMENT) DATE SUBMITfED FILE # DATE ACCEPTED BY TOTAL FEES RECEIPT # - 9MIT CENTER PASSPORT Date Number ~ Name C Phone Address Comments CUSTOMER ROUTING r1 s cx ~BUILDING Department ~ PCANNING Department-r, t~&GINEER'S department ry} L Addressmg i Admin Exception _ Approach Permit , Building Permit _ Artenal Rd Plan Info = F7ood Plam Permit i Code Information ~ Binding Site Plan Info _ Public/Pnvate Roads i Commercial Review _ CerL of Fxemption i Res Bldg Petrnit Rev. _ Conference i Comprehensive Plan _ Site Drainage Info s Energy Code Info ~ Cond Use Permit i Subdivision Review i Fire Safety Review i Nonconforming Use ~ UtiLty Percnit s Manufactured Homc i Permit Review *-OnneangeR view Mechanical Perniits Shorelines Info Other Pemiits Short Plat Info NO -•E RFQUIRED ! ! 11pviewer Time out _ Plumbing Pem»ts i Subdivision Info ~ J S U ` Pnvate Road Info i Temp Use Perrnit ~UTIUTIES D~e-piartmt-nt i Residential Review i Vanance Appl i APA Payment ~ Sewer Permits i Zone C7ieck ~ Cert of Exemption Zone Info Subdrvision Review ULID/Sewer Info _ Zone Change Review NO • •E REQUIRED NO • •E RTQUIIZED Reviewer Time out Reviewer Tirne out Reviewer Time out ~ I 4AS'iLR1Fi1SSPORI CiR 211&'93 PERMIT CENTER rCE S(,.,> _)ULE ~ ZLCCIP'1'INF,0RMA770N '[.ANN[NG DP.PAItTMP.NT 77ZANSAC j-1 UN # 793 S(?Q I# UNITS ICOST I DGSCRIPT[ON QF WORK frtiti POl $54 1 Administratrve Exccption ~ Any One Foot Uimension rP02 5110l ~ AllOthers RECU1'1'?'i# '•,.>ti ,P03 $54 1 CertiCcate of Euemption ~ Pre-1978 ' p04 ~ 1 $811 ~ f3ctwcen S& 10 Acres N POS $811 1 Minor Lot lane Adiustment r"A { { w P06 ~ 1 $711 ~ All Others p07 ~ 1 2981 Conditional Use Pcrmits ~ Dependent Rclatrve ppg ~ 1 $3401 ~ Prrvate DoR Kennel DEPARTAl.Ts1VT COMMEN7S P09 $625 1 ~ All Others = or < 10 Ac P10 $1651 ~ Ea Add'I 10 Ac. PLANNING P11 $33IConditional Use Permits - Renewal ~ Dependent Relatrve ° P12 ~ 1 $541 ~ AllOthers P13 I S75 IEnvironmental ChecklLst ~ P14 ~ S61 ~Home Profcssion Permit ~ P32 $215 ~ Interpretations ~ Wntten/Adrtunistratrve P15 $65 ~ NonvonforrtiunA Status ~ LarstelSmall Animals P16 ~ 1 $3801 ~All Others = or < lOAc. P17 ~ 1 $811 ~ Ea. Add'I 10 Ac. P18 ~ 1 $331 Pre -Conference Fee ~ Admin F_xcxption P19 ~ 1 $331 ~ Conditional Use P20 ~ 1 $331 ~ Nonconforcrung StaWs P21 ~ 1 $331 ~ Temporary Use Permit P22 ~ 1 $331 I Variance P24 ~ 1 $245 1 Temporarv Use Permit ~ P25 ~ I S870IVariance - Afcer Construcaon ~ SO - $100,000 P26 ~ 1 $1,3001 ~ Over $100,000 P27 $545 I Vanance - Before Constniction ~ P28 $325~Zone Review I Mining p29 ~ ( =325 1 ~ Industnal P30 ~ 1 $2701 ~ Business P31 I I 5215 + 1 I Multi-family + ~ I S11 l I Each Apartment Unit ENaiNEP.R'SDEPAR'TMP.NT : . ,~t' ^<y ENGINHERS ~ E01 ~ 1 $30 lAdmintsiratrve Vaziance E02 ~ 1 $50 IAppcals ~ `kE03 ' + $20 JADproach inspection E04 Permit r EOS $SO ~ChanRe of Canditions ~ Plat E06 $50 Zone E07 $SO ~ Conditional Use ~ E26 $30 ~ Design Deviation I E24 $75 lEnvirocunental Checl.list ~ COS . 1:,'~` . =20 1 F1ood Plas n k ~ ~ • ~ In„~spccUon. _ _ . . . E09 ~ .f~ S10 ~ ~M x ~ r ;,Permir ,818 N $1.000 ~ Perfornfancc Btynd ' 208 ti , ~ Cltlven 819 ~ %,sI00 . 920 ~ 1"~3250 Q1fbCtli f ' r _3\J~/~/J ~ ' ~ r 1 fJ J 1 < 1 f 1~~1 i I% IBonds On1Y Arht). ~ . , B10 ~ $200 1 Prel►minarv BindinA Site Plan ~ E11 ~ $200 IPreliminary Plats ~ LonR L~12 5100 Short E23 5100 Final Q13 , 11 1,% S10 ISpecialPccmit E14 ~ 1 $SO 12 Lot Admin Drvtsioci ~ E15 ~ 1 $SO IVariance ~ U77IJTIns E16 $100 Work in Right-of-Way ~ . _ . asp [e Without Permil r E17 1 $200 IZoninR Permit I L725 1 $10 INSF CharRe ~ tIT[1.1T1P.S DIIPARTMI:NT U01 ~ 1 $20 I C.erUficate of Exemption Rcvicw ~ UQZ $20 1 Land Usc Action Review ~ AIASTER/YASS POR I.DQC ( U4" Belle Terre Inc. or ¢ ¢ ~ ~ WAY N N f- N i ON v J ~ r • . ac ~ • o j < w MAIN tiu1 ~ ~ w+ t N o vE r J ~ Q RivERStDE ~ a 3 ; • ~ U ~ ~ Z w Fire ^ - Z totion ~ ~1 FL. /9B ' N A COUNTY • ROAD Ns 22 Q j Q I .S't P~ Ae~o~o ~Q,4,va ~ h//LWAUKEE RA/ L RDA, "r-r..ftr"` - ' - - - _ _ _ . . - _ . - - ' ` • ~ rcl Av 6 i • • • w.•..... t ~ ~ • ' FOV RTN AVE T AV E - ~ - a Q, U < w S - 16 ih • ' . N ~ T1n SEv ` ~ ~ f~,_ F• ~ ~ J , W E1 G M H 2p AvE 8 T H TH • - 9 T H 9 Ttl RCNEW N.~ a 9tA A Vf . ~ 10 ~ IbIA AYZ • •f'- ~ Q ~ ' i~C• Z 2 ~ . ~ ~ t ♦f; ~ . : 1'S1~• . ~ ~ J :T.. i2 H . • ~ ~ J ~ C. • • C = V ` J ~ . dT r rs~ a . ^ L. /99! ' a ~ i 'T . W~ ~ . . . a ~ • -f ~ . . N,..~ a• N STH ~9 Thr Lq/ ~ L TM 7 • ~ Or 1 ~ Cb, ~ r' f OO ~ ` V ' 4 3j! - \ % aas niEAa 940irooni N t29 E ~1► r ' ,~1,~ , reue v+au7 - - I ~ a vLEx I FAllt[L A I ~ _.j ~ p uut I» rttr a r1~■ •jtrltff i i 30 a # fo I KkE f 37 1 I ~ L / 129 I 1 ~ ~ u I:~ i I a ; ~ I ~ I Or1h I ~S 0 • 9 PLE% PROPERTY DESCR/PT/ON ~ ~ k 77/C f0[~rll lID/!!70! TNL NFJT M!!L7 7.Ya TN! MN7A' lA0 ~ I a rt[rarrxttwra.ror[rroieioc,rt»orcapparruwrr 129 a AJ Pfi9 PLFT rIICTfO! RlMAO[0 iN INlNVr r N P4ITI KGf 0\ n ' i ° ~ z° ~1 P I r tu id ry! ~~.et1~ CYCfPl7NAr/WiT/ON OCICR/8f0 Af /bICONl ~I ~ P/RCfL B OCL/NATTNCJlCGtNEAA'JA/DOlOC.IlJI THLMflMOR/p \ L I ~ ALONL 7W6lF1T[/N[0lELOfK1J1 A0/lr4*fCOFKO/f!T I 1 I TNfNCf MfJT PpA,V[[f[ l//rN TNC JWTM LlNf 0lQ10lA' 123 ~ ~ I ACIlIAAYf OF ~/fCT TNfNCf MO~tTiY AOlJf/AY( KJ00 J ~ ~ /Yfl TNCNflf.4JT,00IJTANfCO!/976Fff1I0TMClOjI I I 4 FLEM I $ G/Nf OrR[OCR IJJ, rm:A'CC SOf/7M100/CL770 TNLPo/Nt0! O I I 2 I ~ JfC/MN/HG g I ~ I I i I J L f-ewie y s~_w~K~J J „0 v i 90 I i ~ ,y \1 .w,r w ~ 1 1 V I 3 1 ~y M Q \ ~~71M1p~ . `1~ ~ 1 I ' I f~ tN.`J 1 ~ I I wr~ ~ ~ 1 I VECINITY MdP E%iSTINC ZO iE I PROPOSED ZONE I aCREB n SOFT I vA2s I uR-n I .x.ooson I CAMERON BALL ~ I F I 04VA(0/NL 10pAM.1T/OM SQ fT 1400 JJ/7 _ a a a ~ I v. arevua.+c coscr,vc[ +i% PRELIMINARY RE2QNE MQP L(_ evrtw,rc uftt FI/RTMCNT! :"r ~ T a ~ LYNOJCpifO BRLO n, loo ra /r NE V4 Of SEC 20T 25N„R 44 E W M : ~ I 7YPf WlANA7C9P1NG 7rpr d - - - - - - - ~ I m ' M1 0lP.ORRIMG JNK[J,tlOW.flO I %I OCR LWLLL/AY. - i acvr.vJa,areVnwot.aortos,xv_ra ' ~ -----I----- Ilw~aveure~i-.~r~. ~ re e ..i, sro A ~ ~ IdUlldN6 Nl1LNfM ttrT qNl ENCINEERS k UND SURVEYORS N 909-ARGONNE ROAO TPOKANE VA, 99212-2789 WbNE t4091 926'1722 FAX (369) 926-1721 8iH AvE pq~µ eT 1 OMM IOAI[ NU/lSIDROLCT xOI~RAWlClIQ OIFQI(0 BYI I0A1I I I)29/ ! ~ s , i * ~ + . • ' " ` f v ~ ~~~~1~2 I 1■ ' }.&b.,►. 4 PLEX FqncEL °A ~ ~ b4Iry~.ra I ~ q i j + Yj} 0 xi SD ' a ~ f i ~~J , I I ~ ~ ,~"'~•r•~° ~ i ~ ~ d,did,n~ ~49+4.~K~ rJ 9 r~1~'~ ' 41 +x ~ A A FLEx < PROPFRrr OESCRrprtanr W nvc savrN 1san-Zr a~ rHO ,vrsrscreCr', pMC rW4r nWrN aoa f( , PW rrcr ar r,vr sovrH dISa rerr af Xacx ?J3 aF aP~WrrfxfrY ' 4~, ~ 1r t~ AS P£R P[~CT T7VE+l~G~ R£~OCa I,k xf(nME' A''tYR"Fd-NGE . Erea.or nrqrfw+rlajv arsutlBta 0t ",Ezora ` ~ ~ ~ ~"•~-qa~dir.~ 6r1~+A1~ I~j PIRCfL ~ @~6/NrIT7Nr $C[A~IRdd fAr lW QLOGfd]]iTNCNF~A@NT~i' ~ x a,vc nvr "sruxecrAWOxuJ aasrd,4rraF40 1727; . ~ rg ' f w' _ rWArt ,&rar ~~ae~er A?rk rKr sdr►rvAMe oreraex 0a~ - - c a ~i AVsfAN[£ a►~nr4 r!!fi, TN~Cf ,vMTW ROrfr~+er6 LV'~ ~ ►~CT, TAr.Wr dpJTp j=TaRr£arl4xa MET FO W CAf r w t ~PL" uNC Q~rel4Cjr oi, AV~A'cd SAIIrN~Aaf£fr rA rxd PeYNyN " • ~ J ~ , • , , 5., ~ , . f /uildf S~+hasli~ ~ %4 • i ~ so ~ f p ~ + n e1 ~ i~ I 4 y Y r ~ ~ Iwri rrt ~ SITE PLAN OF REC4RD ' . . ~ y ~ ~~I ~ ~ ` E]fIBTIR~ 20~fE iW4PO5~0 ZOkE [AtIREB or~ 50.F? , + r ~ ~ ~ ~ y ~ b ~ r.a•s.s ~ u~-~: nx~osarr CAMERON $At,L . , o ~ oc sai7 , , - • ~ ' Bp~e,plNa ►NJ~R►a+T~ $Q rr 4~ . ~ a rrea~n~ccs~act ' ~ nPRELIMINAFt~( REIONE MAR • , ~ runa,vs ~r~~ fMWrwrxn s ` • ' ' _ ~ , ~ ~ - ' ianca,+61ZAca OAW ; r~ ine ~ rr !V E Il4 OF 3E1C.2@T 25N. ft 44 F-Yf #1 . a 0, rn9ta-cOarcaNws ~ ria~r, d ~ ~ yy ~ n ' ~ S d l ;n.crfsvAtnva r►~vca'rdrow~r~o ' ►vs Flovya~~lt~+u ~c~te t~ } + r 1 y~A~~wrT~rr~ra~~ n N ~ j ' II7Y ` ^ ^ ~ r 4~ 1NAft SETZWR57f1~1,~SAW(f~l1/f7lV * ~ ~r,.4 a~r;~.m~.rd.~vi~ ' ~n~ a VtNp ~k`VEYpkS p : ~ • y~~~~ ~ re~ ~ H, +J49~G~E 5PIWAM,V~► 9921~27, • PIOw ~ OR~1WI R'~ GMN 1! i~/!f tIMAC{ ~ 9 MEl i hti ~ BTH kVE • 'i ' ' '~t. , . n ' , nsv~ r ► er~5r Wr ~ R~ l T~ ~ ~ -7 ~ ~ ~ .~*I