2012, 06-26 Permit: SW-12001617 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001617 Permit Issued Date: 06/26/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: PEPLINSKI EXCAVATION INC
Project Name: ROCKWELL PHASE II Applicant: PEPLINSKI EXCAVATION INC
Permit Type: SEWER Address: 8919 N ORMAND CT
NEWMAN LAKE-, WA 99025
Phone: 509-226-5150
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning
4416 N ELLEN RD
45022.2111
THROOP &
FITZPATRICK
SUBDIVISION
TRENTWDORCH THROOP&FITZ L11 B1
CONTRACTOR INFORMATION:
General Contractor
PEPLIE1939L9
PEPLINSKI EXCAVATION INC
8919 N ORMAND CT
NEWMAN LAKE-, WA 99025
509-226-5150
DETAILS:
Owner: NELSON, JEFFREY T
Address: 4416 N ELLEN RD
SPOKANE, WA 99216-1316
Phone:
Email:
Water District: Trentwood Fire District: Spokane Valley Fire
Irrigation District #3
Land Area: 0.1496 acres / 6515.4 sqft
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing - Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed: 06/26/2012 08:38:57 Printed by: IIS APPPOOLWSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001617 ,.• 06/26/2012
Expiration Date:
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 06/26/2012 08:38:57 Printed by: IIS APPPOOLWSP.NET v4.0