Loading...
2009, 09-04 Permit App: 09002826 GarageProject Number: 09002826 Inv: 1 Application THIS 1S NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/4/2009 Page 1 of 2 Project Information: Permit Use: 24 X 24 DET GAR Contact: L & M ENTERPRISES Address: 20814 W MCFARLANE RD C - S - Z: MEDICAL LAKE, WA 99022 Setbacks: Front Left: Right: Rear: Phone: (509) 299-4144 Group Name: Site Information: Project Name: Plat Key: 003084 Name: EARLY DAWN 02ND ADD District: East Parcel Number: 45262.2918 Block: Lot: SiteAddress: 2006 S EARLY DAWN DR Owner: Name: BAYLE, MARTHA M & S MICHAE Address: 2006 S EARLY DAWN DR VERADALE, WA 99037 - Location:: CSV Zoning: R-2 SF Res Suburban District Water District: 010 VERA Area: 13,125 Sq Ft Width: 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: 9/3/2009 By: tmelbourn Landuse/Zoning/HE Conditions Released By: See conditions Originally Released: 9/3/2009 By: mpalaniuk Permits: Operator: JD Printed By: JD Print Date: 9/4/2009 Project Number: 09002826 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/4/2009 Page 2 of 2 Contractor: L & M ENTERPRISES Address: 20814 W MCFARLANE RD MEDICAL LAKE, WA 99022 Description Grp Type Notes GARAGE U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Building Permit Firm: L & M ENTERPRISES Phone: (509) 299-4144 This Application: Total Project: Sq Ft Valuation So Ft Valuation 576 $10,944.00 576 $10,944.00 Totals: 576 $10,944.00 576 $10,944.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $195.25 $48.81 $4.50 $248.56 Notes: If daily or frequent use of the detached garage/shop is expected then a paved driveway must be installed. Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owine $248.56 $248.56 $48.81 $199.75 $248.56 $248.56 $48.81 $199.75 TETSIIR Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 9/4/2009 Sp®kan� galley° Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www. spokaneval ley.or g PERMIT NUMBER: IbZte, PERMIT FEE: New Construction x Accessory Bldg n Addition/Remodel ❑ Deck Other: SITE ADDRESS: % 40O(e 5 • a-' y new - DQ ASSESSORS PARCEL NO: LEGAL DESCRIPTION: ... Bulldmg Owner:: trl', b$,.,.+ rv- . rl, Confr"actod.{ T r & - y g ':- _ - T s •= �+ w .ta-FY.,:'w•. -F. >.-..,mo is t�.. A -- 6. �. Name: n^ ,..ilk., n / Name: i. -P /t% C`,...7_,2 -i,p t..,i_ 2 _rye Address:2 pn 6 r DAµ,\ Address: UNFIN(/BBA/S�EMENT SQ. FTG: /X / A City: /t') e cl /L.d L State: I J Zip: 9 902 City: 5e0 Ko.., 11 o-•t-ec,‘ Stxate: t J R. Zip: 9203.-1 }03r Phone: 9 ,z, ' ,-) `(7 6 Fax: Phone: 9 O O 8 3 7 Fax: 29 5 ci / lv ( 30% SLOPES ON PROPERTY: A/ D Con_rALf/YD m _LT 9x DateZ" 9 �j7:7 )'7) to tCiiiitat,Perstiii"='�,.;.'t ` =.: '. ... % . _..._ `r . `":" ":3' HEAT SOURCE: City Business Lic. No: Name: Mor I n. YDJ ✓r - Phone: q 5'O 02' 3 ) Describe the scope of work in detail: -L)?c 29 >G-2 5 - (7) to. p • Cost of Project: $ /0)0 o Proposed Use: 5 **************The followine MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: I'i ' DIMENSIONS: (l x V Kt # OFSTONES: / IT TOTAL HABFTTABLE SPACE: �/ MAIN FLOOR TOSSQ. FTG: l V // 1 2Nu FLOOR SQ. FTG: FTG: /i1 /' I UNFIN(/BBA/S�EMENT SQ. FTG: /X / A IMPERVIOUS SURFACEd, AREA: %JI /// FINISHED BASEMENT SQ. FTG: // A- GARAGE SQ. FTG: S 7 LC OV- DECK/C V. PATIO SQ. FTG: A/ / A 30% SLOPES ON PROPERTY: A/ D # OF BEDR OMS: /A- CONSTRUCTION TYPE: `77 a k HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. CSIGNATURE -0..e '- T Method of Payment: ❑ Cash ❑ Check ❑ Mastercard Bankcard #: Expires: C DATE:"'. caj • 'Z Authorized Signature: REVISED 2/15/07 ❑ VISA VIN#: RECEIVED CSV PERMIT CENTER SEP 0 2 2009 Project fk �$ZSR— Name Submittal # *Wane� Valley® For City Use Only PLUS Project Number` 10aZ`6 Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review D Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. • Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. • Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 'R siDr aC COW AIMS AflAtEa (-7,4(2N, 6, beivevory SAV rJC1 W E L L 3E Rz:Q U I 1 Fe& NW) Shop/ 4U4 W *DAI(.y u% is Mrit.i PPcr J f eX /05 " RECEIVED CSV PERMIT CENTER SEP 0 2 2009 Project # MCC) 2525'Z Nam, Submittal #___1 PLANNING DEPT. APPROVED Z00 /0S 00 v rt