Loading...
2009, 09-23 Permit App: 09003020 Arched Entry, Project Number: 09003020 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/23/2009 Page 1 of 2 Project Information: Permit Use: REMOVE CLOSETS TO INSTALL ARCHED Contact: C S CONTRACTING ENTRY Address: PO BOX 546 C - S - Z: NEWMAN LAKE WA 99025 Setbacks: Front Left: Right: Rear: Phone: (509) 994-2422 Group Name: Site Information: Project Name: Plat Key: 003084 Name: EARLY DAWN 02ND ADD District: East Parcel Number: 45262.2901 Block: SiteAddress: 2020 S EARLY DAWN DR Location:: CSV Lot: Owner: Name: VAN TASSEL, RONALD E Address: 2020 S EARLY DAWN DR SPOKANE VALLEY, WA 99037-94 Zoning: R-2 SF Res Suburban District Water District: 010 VERA Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Permits • Released By:_ . Originally Released: 9/22/2009 By: tmelbourn Contractor: C S CONTRACTING Address: PO BOX 546 NEWMAN LAKE, WA 99025 Building Permit Firm: C S CONTRACTING Phone: (509) 994-2422 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation I&2 FAMILY R-3 VB PLAN 0 $2,400.00 0 $2,400.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS R V W < 7999 SQ FT Totals: 0 $2,400.00 0 $2,400.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Operator: jmm Printed By: JD Fee Amount $83.25 $4.50 $33.30 Permit Total Fees: $121.05 Print Date: 9/23/2009 Project Number: 09003020 Inv: 1 Notes: Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/23/2009 Page 2 of 2 Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount $121.05 $121.05 $121.05 $121.05 Amount Paid $33.30 Amount Owing , $87.75 $33.30 $87.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 9/23/2009 Sp®kan e� Valley. Community Development Residential Const: Permit Applicatio Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www .snoka SITE ADDRESS: RECEIVED uct OR PERMIT GENT Ne Construction Accessory Bldg SE? 21 2009 El Ad t ition/Remodel n Deck s3�Ot er: PERMIT NUMBER91.73teD PERMIT FEE: O , az_ ASSESSORS PARCEL NO: LEGAL DESCRIPTION: =Buil'din O» c- = 'L S. _- .r -'<.r i-�` 4 i '.=f `-��5 ,. r.� 'gF :1. .d-' o-..., 'pa v'�.r u4:i it ?t7E'+£: _vt ,1".!c i'E :-- t� �-', ,u'. Contractor i : hF^�=�E'd '�aTie. vr—�._� Name: �� h(� l/�-it'.J 7--A S 5-�7 Name: cs c0 rrl /eAct7i /`�� Address: %•'�/i C✓-�g�yWalete— /a_. City:x i �4f l Al ) LLC LCJ G%`78 25 948:3 -7 - Phonew. Z -`{v -Z —2 4n 9 Address: ''/ �,g12t-�/,�dl,/tJ o17 Zip: CitC m, JfE �/GV r v 29,,:k (Fax: Phone:g9 _ Riocc. Fax: IMPERVIOUS SURFACE AREA: Contr ctor Lic No', xp Dat ' �CCb( GARAGE SQ. FTG: sr n/cJ X f� a9 09 s -i C- bine— tiei'sOL :;-. . +�=: ' .` ); �:?:.:.: �',:-�.: - .... .... r, _,. # OF BEDROOMS: City Business Lic. No: HEAT SOURCE: SEWER OR SEPTIC? Name: C. £/F :P6 Phone. q4eie---2'41-...-2___ Cost of Project:od ;2400 . ,,Describe the scope of work in detail: 61,14OVE c LOS-ff.S — 11—rt ,VciptAz Ci -r7 -72y Proposed Use: nl ,U I & J6 Agt-A **************The following MUST be complete: (write N/A if not applicable)********************** o(� HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2141" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE Method of Payment: El Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard Expires: DATE: 9-R( -09 R] VISA VIN#: Spokane 4Vaitley® For City Use Only c/- PLUS Project Number 30&o Project Address 2 a ZQ S Zet.r Lsi iw r -i 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206' . 509.688.0036 • Fax: 509.688.0037 ♦ permitcenter@spokanevatley.org' As part. of our' on-going commitment to customer service during the revieW process 'of. your project application, we are providing you with a TARGET DATE for the initial technical application review., If for' any reason we cannot meet this date, we will contact you with a reWsed.target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application'.Will.have.had its initial technical- review. echnicalreview. It is not the date for approval or permit issuance.. c1/4 Yos Tips for a Smoother Project Application Review i Submit complete, accurate plans and documents. • . E.rtra time pray be requn ed for re -submittals as project application reviewers rtibrk on multiple applications and it ' may be several days before the' can look at your new or revised information: • • • Designate a specific contact person to communicate with the City. , While the person designated as die applicant's' contact person with the Clty can he Changed,. one'tndtvtdnal wit/i the expertise for dealing with -reviewer comments would be the hest choice.for the entn-e.review p ocess. Call staff regarding the status of your project only after the target date shown at the"top•of the pager Although you should be contacted on or by the -target' date, please feel free to' contact us it you haven't heard from us by your target dale. Staff -may contact you before the target date if the initial review is cwnplete. By following This procedure, von will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your. application has been accepted as counter complete. This means .all of the required documents, as indicated on your Pre -Application Checklist have been submitted :or have been .approved-' for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their.technicalreview. 2. Quality Check. The next step in the process is'a quality check to make sure that the application is, reviewable and free from -substantive flaws that would prevent technical staff from completing the 'technical review once it is started. When this step is complete, your'application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete; it is routed to technical staff for.compliance review. Depending on the type of project, technical staff may include multiple reviewers..You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical corilpliance review is complete.. . 4. Permit -Issuance. When the technical compliance review of the application is complete, including anytsubequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections • of the application are received, a Permit Specialist will process the application and contact the person specified'on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time., WHITE -APPLICANT PINK- BUILDING FILE REV 9/07 pp®kane Valley Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite 133 Spokane Valley, WA 99206 Phone: 509.688.0036 New project El Precious pre -app meeting E Plan revisions 0 Transmittal Date: Monday, September 21, 2009 Site Address: 2020 S EARLY DAWN DR Parcel Number: 45262.2901 Zoning: R-2 Fire District: FD 01 Water District: VERA Project Number: 09003020 Applicant: e-mail: Contact: e-mail: Contractor: C S CONTRACTING PO BOX 546 NEWMAN LAKE WA 99025 (509) 994-2422 C S CONTRACTING PO BOX 546 NEWMAN LAKE WA 99025 (509) 994-2422 C S CONTRACTING PO BOX 546 NEWMAN LAKE. WA 99025 (509) 994-2422 Owner: VAN TASSEL. RONALD E 2020 S EARLY DAWN DR SPOKANE VALLEY, WA 99037-94 e-mail: Occupant: e-mail: Arch / Engineer_ ti e-mail: Project REMOVE CLOSETS TO INSTALL ARCHED ENTRY Description: a Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO CONSTRUCTION PLAN c is TD c Please send all plan review and project comments via e-mail to the highlighted individuals.