2009, 09-23 Permit App: 09003020 Arched Entry, Project Number: 09003020 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/23/2009 Page 1 of 2
Project Information:
Permit Use: REMOVE CLOSETS TO INSTALL ARCHED Contact: C S CONTRACTING
ENTRY Address: PO BOX 546
C - S - Z: NEWMAN LAKE WA 99025
Setbacks: Front Left: Right: Rear: Phone: (509) 994-2422
Group Name:
Site Information: Project Name:
Plat Key: 003084 Name: EARLY DAWN 02ND ADD District: East
Parcel Number: 45262.2901 Block:
SiteAddress: 2020 S EARLY DAWN DR
Location:: CSV
Lot:
Owner: Name: VAN TASSEL, RONALD E
Address: 2020 S EARLY DAWN DR
SPOKANE VALLEY, WA 99037-94
Zoning: R-2 SF Res Suburban District
Water District: 010 VERA Hold: ❑
Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Permits •
Released By:_ .
Originally Released: 9/22/2009 By: tmelbourn
Contractor: C S CONTRACTING
Address: PO BOX 546
NEWMAN LAKE, WA 99025
Building Permit
Firm: C S CONTRACTING
Phone: (509) 994-2422
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
I&2 FAMILY R-3 VB PLAN 0 $2,400.00 0 $2,400.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS R V W < 7999 SQ FT
Totals: 0 $2,400.00 0 $2,400.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Operator: jmm Printed By: JD
Fee Amount
$83.25
$4.50
$33.30
Permit Total Fees: $121.05
Print Date: 9/23/2009
Project Number: 09003020 Inv: 1
Notes:
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/23/2009 Page 2 of 2
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount
$121.05 $121.05
$121.05 $121.05
Amount Paid
$33.30
Amount Owing
, $87.75
$33.30 $87.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD
Print Date: 9/23/2009
Sp®kan e�
Valley.
Community Development
Residential Const:
Permit Applicatio
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www .snoka
SITE ADDRESS:
RECEIVED
uct OR PERMIT GENT Ne Construction Accessory Bldg
SE? 21 2009 El Ad t ition/Remodel n Deck
s3�Ot er:
PERMIT NUMBER91.73teD
PERMIT FEE:
O , az_
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
=Buil'din O» c- = 'L S. _- .r -'<.r i-�` 4 i '.=f `-��5
,. r.� 'gF :1. .d-' o-..., 'pa v'�.r u4:i
it ?t7E'+£: _vt ,1".!c i'E :-- t� �-', ,u'.
Contractor i :
hF^�=�E'd '�aTie. vr—�._�
Name: �� h(� l/�-it'.J 7--A S 5-�7
Name: cs c0 rrl /eAct7i /`��
Address:
%•'�/i C✓-�g�yWalete— /a_.
City:x i �4f l Al ) LLC LCJ G%`78 25
948:3 -7 -
Phonew. Z -`{v -Z —2 4n 9
Address:
''/ �,g12t-�/,�dl,/tJ o17
Zip:
CitC m, JfE �/GV r v 29,,:k
(Fax:
Phone:g9 _ Riocc. Fax:
IMPERVIOUS SURFACE
AREA:
Contr ctor Lic No', xp Dat '
�CCb(
GARAGE SQ. FTG:
sr n/cJ X f� a9 09
s -i
C- bine— tiei'sOL :;-. . +�=: ' .` ); �:?:.:.: �',:-�.: - .... .... r, _,.
# OF BEDROOMS:
City Business Lic. No:
HEAT SOURCE:
SEWER OR SEPTIC?
Name: C. £/F :P6
Phone. q4eie---2'41-...-2___
Cost of Project:od
;2400 .
,,Describe the scope of work in detail:
61,14OVE c LOS-ff.S — 11—rt ,VciptAz Ci -r7 -72y
Proposed Use: nl ,U I & J6 Agt-A
**************The following MUST be complete: (write N/A if not applicable)**********************
o(�
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2141" FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE
Method of Payment:
El Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
❑ Mastercard
Expires:
DATE: 9-R( -09
R] VISA
VIN#:
Spokane
4Vaitley®
For City Use Only
c/-
PLUS Project Number 30&o
Project Address 2 a ZQ S Zet.r Lsi
iw r -i
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206' .
509.688.0036 • Fax: 509.688.0037 ♦ permitcenter@spokanevatley.org'
As part. of our' on-going commitment to customer service during the revieW process 'of. your project
application, we are providing you with a TARGET DATE for the initial technical application review., If for'
any reason we cannot meet this date, we will contact you with a reWsed.target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application'.Will.have.had its initial technical-
review.
echnicalreview. It is not the date for approval or permit issuance..
c1/4 Yos
Tips for a Smoother Project Application Review
i Submit complete, accurate plans and documents. • .
E.rtra time pray be requn ed for re -submittals as project application reviewers rtibrk on multiple applications and it '
may be several days before the' can look at your new or revised information: • •
•
Designate a specific contact person to communicate with the City. ,
While the person designated as die applicant's' contact person with the Clty can he Changed,. one'tndtvtdnal wit/i the
expertise for dealing with -reviewer comments would be the hest choice.for the entn-e.review p ocess.
Call staff regarding the status of your project only after the target date shown at the"top•of the pager
Although you should be contacted on or by the -target' date, please feel free to' contact us it you haven't heard from us
by your target dale. Staff -may contact you before the target date if the initial review is cwnplete. By following This
procedure, von will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your. application has been accepted as counter complete. This means .all of the required
documents, as indicated on your Pre -Application Checklist have been submitted :or have been .approved-' for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their.technicalreview.
2. Quality Check. The next step in the process is'a quality check to make sure that the application is, reviewable and free
from -substantive flaws that would prevent technical staff from completing the 'technical review once it is started. When
this step is complete, your'application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete; it is routed to technical staff for.compliance
review. Depending on the type of project, technical staff may include multiple reviewers..You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical corilpliance review is complete.. .
4. Permit -Issuance. When the technical compliance review of the application is complete, including anytsubequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections •
of the application are received, a Permit Specialist will process the application and contact the person specified'on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.,
WHITE -APPLICANT PINK- BUILDING FILE REV 9/07
pp®kane
Valley
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite 133
Spokane Valley, WA 99206
Phone: 509.688.0036
New project El
Precious pre -app meeting E
Plan revisions 0
Transmittal Date:
Monday, September 21, 2009
Site Address: 2020 S EARLY DAWN DR
Parcel Number: 45262.2901
Zoning: R-2
Fire District: FD 01
Water District: VERA
Project Number: 09003020
Applicant:
e-mail:
Contact:
e-mail:
Contractor:
C S CONTRACTING
PO BOX 546
NEWMAN LAKE WA 99025
(509) 994-2422
C S CONTRACTING
PO BOX 546
NEWMAN LAKE WA 99025
(509) 994-2422
C S CONTRACTING
PO BOX 546
NEWMAN LAKE. WA 99025
(509) 994-2422
Owner: VAN TASSEL. RONALD E
2020 S EARLY DAWN DR
SPOKANE VALLEY, WA 99037-94
e-mail:
Occupant:
e-mail:
Arch / Engineer_
ti
e-mail:
Project REMOVE CLOSETS TO INSTALL ARCHED ENTRY
Description: a
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
CONSTRUCTION PLAN
c
is
TD
c
Please send all plan review and project comments via e-mail to the
highlighted individuals.