Loading...
2006, 03-09 Permit: 06000676 ResidenceSpokan�a Valley BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 1609 N EDGERTON CT Parcel Number: 45073.2715 Subdivision: Block: Lot: Zoning: UR -3 Urban Residential 3.5 Owner: RICHARD JULIANO Address: 14314 E STOUGHTON VALLEYFORD, WA 99036 Building Inspector: MARK HILLABRANDT Water Dist: Project Number: 06000676 Inv: 1 Issue Date: 3/9/2006 Permit Use: NEW RESIDENCE W/ATTACHED GARAGE -GAS Applicant: RICHARD JULIANO 14314 E STOUGHTON VALLEYFORD, WA 99036 Contact: RICHARD JULIANO 14314 E STOUGHTON VALLEYFORD, WA 99036 Phone: (509) 291-3148 Phone: (509) 291-3148 Setbacks - Front: 30 Left: 7 Right: 5 Rear: Group Name: Project Name: Permits Building Permit Contractor: RICIIARD JULIANO INC License #: RICHAJI972RR 1&2 FAMILY BASEMENT U DECK OPEN GARAGE Total Value: FOR BUILDING INSPECTIONS CALL (509) 688-0054. R-3 VB 1,076 R-3 VB 1,004 R-3 VB 160 U -I VB 547 $122,428 12 RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT $1,122.55 $4.50 $449 02 Total Permit Fee: $1,576 07 Mechanical Permit Contractor: RICHARD JULIANO INC License #: RICHAJ1972RR GAS WATER HEATER GAS PIPING CLOTHES DRYER HOOD -TYPE 11 FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. 1 2 1 $10.00 $2.00 $10.00 $10.00 GAS APPLIANCE<=100,000BT. VENTILATING FANS RANGE Total Permit Fee: 3 1 $12.00 $30.00 $10.00 $84.00 Plumbing Permit Contractor: RICHARD JULIANO INC TOILETS/BIDETS TUBS GARBAGE DISPOSAL WATER PIPING - DWV FOR PLUMBING INSPECTIONS CALL (509) 688-0054. 2 2 1 3 License #: RICHAJI972RR $1200 812 00 $6 00 81800 SINKS DISH WASHERS CLOTHES WASHER Total Permit Fee: 3 1 $18.00 $6 00 $6 00 $78.00 Processed By: JANSSEN, CIIRISTINA Printed By: Main, Jodi L Page 1 of 2 PERMIT r NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicantlpermittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessanly Indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/pennittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering, and final. MECHANICAL - rough -in of piping, before covering. metal chimneys before concealment, and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy: completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - pnor to cover. RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall. concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways. City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for eleclncal wrong, State Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilities Otwsion And Industnes 324.2640 477-3604 Penns and inspections fpr onsite septic systen5, Spokane Regional Fire spnnkler and alarm systene: and pnvate access road inspections. Spokane Valley Health Distncl 324-1550 Fire Depanrnent 092-4122 State taw RCW 19 122 requires That pnor to any excavation the 'CALL BEFORE YOU DIG- center must be notified Call before you dig at least 2 working days in advance. 456-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authonzed when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed Owner / Agent Date Staff Approval Date Spokane Valley BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 1609 N EDGERTON CT SPOICANE VALLEY, WA 99212 Parcel Number: 45073 2715 Project Number: 06000676 Inv: 1 Issue Date: 3/9/2006 Permit Use: NEW RESIDENCE W/ATTACHED GARAGE -GAS Permits Payment Summary Total Fees AmountPaid AmountOwing $1,738.07 $1,738.07 $0.00 Tran Date Receipt # Payment Amt 3/9/2006 4545 $1,738.07 Processed By: JANSSEN. CHRISTINA Printed By: Main, Jodi L Page 2 of 2 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, Including manufactured homes. NOTE: This Inspection includes review of the structure's setback from property lines Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are cornplete, and prior to concealing. FINAL — when complete and pnor to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants. fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing. drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for electncal wrong, State Department of Labor Perris and inspections for Sewer Connection, Spokane County Utilities Drnson And Indusines 324.2640 4]]3604 Pemnts and mspecbons for omsle sepbc systems. Spokane Regional Fire spnnkler and alarms systems access road inspectons. and pnvate Spokane Valley Healin Distnd 324-1560 Fee Department 8924122 State law RCW 19.122 requires that pnor to any excavation the 'CALL BEFORE YOU DIG' center must be notified Call before you dig at least 2 working days in advance. 456-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent 7140 .x.o Date 3 -- - O to Staff Approval Date