Loading...
2010, 08-09 Permit App: 10002374 GarageProject Number: 10002374 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 8/9/2010 Page 1 of 2 Project Information: Permit Use: 30 X 26.9 STICK FRAME GARAGE ATT TO MANUFACTURED HOME Setbacks: Front Site Information: Plat Key: Left: Right: Rear: Contact: AQUINO, G RENE Address: 10713 E EMPIRE AVE C - S - Z: SPOKANE, WA 99206-4573 Phone: (509) 953-6589 Group Name: Project Name: Name: Range District: Nort Parcel Number: 45054.0318 Block: SiteAddress: 10703 E EMPIRE AVE Location:: CSV Zoning: MU Mixed Use Water District: 026 IRVIN Area: 46,080 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Lot: Owner: Name: WATSON, G RENE Address: 10713 E EMPIRE AVE SPOKANE, WA 99206-4573 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review ReleasedBy Originally Released: Landuse/Zoning/HE Conditions 8/6/2010 By: tmelbourn Released By: Originally Released: 8/9/2010 By: cjjanssen Permits: Operator: JD Printed By: jmm Print Date: 8/9/2010 Project Number: 10002374 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 8/9/2010 Contractor: OWNER Description Grp Type Notes GAR WOOD U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Building Permit Page 2 of 2 Firm: OWNER Phone: (000) This Application: Sq Ft Valuation 803 $15,257.00 Totals: 803 $15,257.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: 000-0000 Total Project: So Ft Valuation 803 $15,257.00 803 $15,257.00 Fee Amount $265.25 $4.50 $106.10 $375.85 Notes: PURSUANT TO SVMC 19.40.020(B) ALL RESIDENTIAL DRIVEWAYS AND OFF-STREET PARKING AREAS SHALL BE PAVED WITH ASPHALT, PORTLAND CEMENT, GRASSCREETE, PAVER BLOCKS OR OTHER EQUIVALENT HARD SURFACE MATERIAL. (FROM END OF DRIVEWAY EASEMENT TO FRONT OF GARAGE.) Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $375.85 $375.85 $106.10 $269.75 $375.85 $375.85 $106.10 $269.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 8/9/2010 Spokane 4Valley. Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER: t PERMIT FEE: New Construction Addition/Remodel Other: Accessory Bldg Deck SITE ADDRESS: / 0 ? <0 3 em Pi re= /9 ✓ s ASSESSORS PARCEL NO: LEGAL DESCRIPTION: a('!/i ire5, wf i 6ik3 J Building' Owner: DIMENSIONS://r# )C o?lo l Name: {,UtJlt Y_ i? -/✓L, TOTAL HA TABLE SPACE: 41/7i - pApv!/✓a Address: /D 70 3 c. &%'JTfr AV& Address: City: `cnQ 1, _f�I.c6_ State:, / 1�, Zip ,6 e7 Fax: Phonoc /–/7A/ci, State: Contact Person Name: /RR.—ivy A6 0 ///a Phone: 569 953 = 65- 8 9 Contractor �L / F DIMENSIONS://r# )C o?lo l Name: TOTAL HA TABLE SPACE: 41/7i - MAIN FLOOR TO SQ8D33. FTG: Z - C -0K- Address: �� IMPERVIOUS SURFACE AREA: I�' City: / State: Zip: Phone: Fax: CONSTRUCTION TYPE: ,5---h(< ft►9-426 i� Contractor Lic No: Exp Date: 01/9 - City Business Lic. No: Describe tl2e scope of wo�r in detail: • Cost of Project: $ n /3 pOD F iN i /f o1A/1)A-r/ o�> .�7`�c k / r, -r1a D / jA. d5 w/ % I -1/ c .,• ^r.)) Tress /Fmof cAl/ 7.4,5 C' p. Proposed Use: Atix- c/ b G4} -r / **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO J EAI.4.;. / 3 6.,3© DIMENSIONS://r# )C o?lo l OF STORIES: / TOTAL HA TABLE SPACE: 41/7i - MAIN FLOOR TO SQ8D33. FTG: Z - C -0K- 2" FLOOR SQ. FTG: /O UNFIN BASEM NT SQ. FTG: Al IMPERVIOUS SURFACE AREA: FINISHED BASE,M,NT .SQ. FTG: 4/7/11"-- GARAGE SQ. FTG: �„ F-422,--. d ,q DECK/COV. PA,TI SQ. FTG: ,7, -- 30% SLOPES ON _.// ' r-!-' RTY: / G # OF BEDROOMJS AJ/%1` CONSTRUCTION TYPE: ,5---h(< ft►9-426 i� HEAT SO�J //VV EWER �>' SEPTIC? 01/9 - The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the_ dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submi rl this application can be pr— ssed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2115/07 0 Check DATE: 8 0 Mastercard 0 VISA Expires: VIN#: N re ',70 . t PLANNING DEPT. APPROVED Pursuant to SVMC 19.40.020(6)"AII residential driveways and off-street parking areas shall be paved with asphalt, Portland cement, grasscrete paver blocks or other equivalent hard surface material. ELE- �} t Spokane Valley® For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is R49\0 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9/07 Receipt Number: 23741 Projects Miscellaneous Items City of Spokane Valley Building Dept Receipt Customer Number Full Project Nbr Inv Nbr ` y'Fee Amt ' Inv Amt, Owing; PAID Pmt 10002374 1 $375.85 $375;85 $375.85 $106.10 0 Total $375.85 $375 85 r $375 85.; $106.10 Total PAID: $106.10 Tender ;Type Check Acct Balance CC Nbr Exp Date; TENDERED ;VISAxxxxxxxxxxxx9943 05/2011: 106.10 Payer: Total TENDERED: 106.10 Over / (Short) Change Notes: Tran Date / Time: 08/04/2010 3:05:38 PM By: HMORRIS Logon User: BldgCounter Station: CX SV00014A Override By: Printed: 08/04/2010 3:05:40 PM $0.00 $0.00 Page 1 of 1