15-063.01 T. LaRiviere: Houk Sinto Maxwell Preservation Spolcane 1,411e r Y CHANGE ORDER NO: 1 DEPARTMENT OF PUBLIC WORKS CONSTRUCTION CONTRACT NO: 15-063.0 PROJECT: Houk-Sinto-Maxwell St Preservation Project CONTRACT DATE: 6/10/2015 PRIME CONTRACTOR: T.Laviviere Equipment& Excavating CIP NO: 220 DESCRIPTION OF CHANGES ` This Change Order pertains to Bid Schedule: B After the bid Modern Electric and Water Company(MEWCO)revealed that fragile Asbestos Cement (AC)waterlines are adjacent to many of the proposed stormwater installations. This change order eliminates or modifies the storm water work to reduce the risk of breaking a waterline which could cut the water supply to numerous adjacent clinics and, possibly,the Valley Hospital. The change order includes the attached CO 1 Specifications. This change results in a reduction to the Contract amount as noted herein. item No. Description Unit Quantity Unit Price Total CO-1.1 ABANDON EXISTING DRYWELL EACH 1 $ 450.00 $ 450.00 CO-1.2 DUCTILE IRON STORM SEWER PIPE 8 IN. DIA LF 72 $ 45.00 $ 3,240.00 CO-1.3 DUCTILE IRON STORM SEWER PIPE 10 IN. DIA LF -87 $ 48.00 $ (4,176.00) CO-1.4 CONNECTION TO EXISTING INLET EACH 2 $ 500.00 $ 1,000.00 CO-1.5 CATCH BASIN TYPE 1 EACH -2 $ 1,800.00 $ (3,600.00) CO-1.6 SPILL CONTROL SEPARATOR-8"X8"X8" EACH 7 $ 225.00 $ 1,575.00 Total Amount of this Change Order(incl.Tax): $ (1,511.00) PHYSICALCOMPLETION Original Contract Working Days: 25 Revision By This Change Order:, 0 Revisions by Prior Change Orders: 0 Total Revised Contract Working Days: 25 CONTRACT AMOUNT THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT AMOUNT: ORIGINAL TOTAL CONTRACT AMOUNT $ 339,647.83 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT(through CO#J $ 0.00 TOTAL CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER $ 339,647.83 NET THIS CHANGE ORDER $ (1,511.00) TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 338,136.83 CONTRACTOR ACCEPTANCE:C���, DATE: 7— g'/,s' The contractor hereby accepts this adjustment under the terms of Section 1-04.4 of the original contract. RECOMMENDED BY: ,/� jjj !�r�v-�;` DATE: 7. 7 f Project Manager APPROVED BY: /f/44‘ DATE: -747/4/5" ` Public Works Director APPROVED BY: n//4 . DATE: City Manager ATTACHMENTS: CO 1 Specifications, Revised Plan Sheets 4, 5,8&7 Distribution: ORIGINAL TO: City of Spokane Valley Clerk's Office COPIES TO: Contractor,PW Project File,Project Inspector,Finance Department r.0 V Form Rlci9014