ZE-007-96
' ~EARYN~'x E~~~R
RE: Change of Conditiflns in the Urban } FINDINGS OF FACT,
Residential-22 (LTR-22) Zvne and tae } CE]NCLUSIONS OF LAW,
Light Indus#rial (I-2} Zone; ~ AND DE~~~~~D
Applicant: Iiland Construction ~
Ca~.npany ~ 2000
File Na, ZE-7A-961ZE-84C-81 ~
SPO1~~ ~UNV ENG04EER
1. SUMMA►RY OF PROPOSAL ANI] DECISIO1V
Propnsal: Application for a change of conditians ta the eonditioiiis and site glan approved far a
prior rezone (Fi1e No. 2E-7-96) of 2.92 acres to the Uxban Residential-22 (U-R-22) zone, to
increase the building square faatage from 8,100 square feet tca 32,996 square fee#; and to revise the
conditions and site plan approved far a prior rezone (File No. ZE-$4-$1) of 6.36 acres to the Light
Industzial (1-2) zone, as revised by a subsequent change of conditions apglication approved for
such rezane (File No. ZE-84A-81), for the gurpose of increasing the building sq-uare f6otage fram
19,900 square feet to 64,867 square feet; all pursua.nt to a unified site plan.
Decisian: Agproval, subject to canditions.
The Hearing Examiner has reviewed the change of canditions apphcation and the
evidence of record, and hereby adopts the follawing findings of fact and conclusiors:
IL BACKGROUN]IFINDING~ OF TACT
A. GeneralInfnrmation:
.
AppGcant: Inland Construction Company, clo John Sweitzer, 107 Sauth Haward, Suite 3007
Spvkane, WA 99204
Owner: Thoma.s E. Clemsan, P. D. Box 14727, Spokane, WA 99214-0727
Site Address: 1618-162$ North MamerRaad, Spokane, WA
LQCatian: Generally locatecl east of and adjacent fia Mamer Road, approxirnately 150 feet
IIOIth of the 1nteI`SeCt1o1~ ~~Mamer Roa3CI a11d M1sS1on ,AVeTlti.le, in the SE 'I'~ of Sectian 10,
Township 25 Narth, Range 44 EWM, Spokane County, Washington,
Legal Description: Assessor's tax parcel #s 451 04.0201, .0202 and .42 10; mare particularly
described as Tract 97, Vera, except tha# parti+on iying northerly ofa 1ine drawn para1le1 ta and
100 feet southerl}r ofPSH No. 2, rr~easured at right angles, and except that partian lying
southwest of the northwest line o#'the Corbin Ditch right ofway, in Spakane County,
Wa:~~~ngton.
HE Findings, Cnnclus~ons and Decfsion ZE-7A-96fZE-84C-81 Page I
-
~
, Zoning: Urban Residen#ia1-22 (LTR-22) and Light Industrial (1-2), subject to the conditians of
apProvai in. File No, ZE-7-9+6 and ZE-84B-$1. The site is axso located in the Aquifer Sensitive
Area (ASA) Overlay zone and the Public Transit Benefit Area designated by the County Zoning
Cade. Camprehensive Plan: Urban category. The property is alsa designated in the Pn-ori#y Sewer
Service ,Area, ASA and Urban T.rnpact Area designated by the Camprehensive Plan. ;
ZXJGA: The 51te, ]s deSIgIIated 1I151C~~ the 1I1teI7m ull'}]an gTUwth are3 bOu]dcilleS designated by
I, the Cau.nty puxsuanf ta the State Growth Managernent Act.
, Environmeatal Review: A Determination ofNonsignificance was issued by the Division
' of Building aad Plannin.g vn October 24, 199?.
Site Descriptxoa; The subject property consis#s of two separate si#es. The site in File No.
ZE-84C-81 co-nsists of 2.92 acres, made up of tax parcel #s 45104.02[}2 and 45104.0210. The
site in File No. ZE-7A-96 cvnsists of appraximately 6.36 acres, arid is made -up of paree1
#451 04,0ZO 1. The svutheriy 1(}% the site in File No. ZEa84Cy81 sIopes steeply upward from
north to south, at appruxirnately 40%, with the remainder ofthe site bcing flat or stoping gently
to the north. A BPA pawer line casernen# crosses the northwest camer of such site. The si#e in
File No. ZE-7A-96 is relatively #lat, with a BPA pawer line easement bisecting such site at a
southwest ta northeast angle. PerTnanent structures are not alIowed within BPA easements.
A 52296 square foot of~'ice buiIding has been constructed primarily in the nartheasterly
por#ion of the site in File No. ZE-84C-$ 1, wi~h the northerly portian of the building encraaching
anto the site in File No. ZE-7A-96. A 10,960 square foot, single-story warehause building has
been constructed sauth of the off ce building an the site in File No. ZE-84C-8 1, A. single-story
building with 9,389 square feet of warehouse space and 1,571 square feet of office space has
been construc#ed south of such warehouse building, in the saultheast partion of the site in File
Nfl. ZE-84C-81. See site plan of Teeard submitted on IVIay 19, 1997.
Surrourtding Conditioas; Interstate 90 borders the cambined site. The Wasiiington State
Deparitment 4f Transpartation (WSDOT) is developing p1ans to install anew freeway
interchange at EvergFeen Road, uFhick~ project would irnpact the northerly portiv~ of the
combined site in terrns ofright ofway acquisition, grade, and slope and construction casements.
1Vlamer Road fronts along the westeriy bvrder of the com.bined site, meeting Nara Avenue at #he
northwest comer, and intersecting Mission Avenue 200 feet south of the cornbined site. Nara
Avenue serves as a frontage road far 1-90 urest of the site. Mtssion Avenue is designated as a
Minar A-rtezia1 by the County AY°terial Raad Plan.
Awater ~ower reservoir is located tn the east, a1vng with svme vaca-nt land owned by
the Spokane County I'arks Department. Single-family residences on land zoned Urhan
Residential-3,5 (UR-3.5) are lacated acYOSS from the combined site along the west side of Marner
Road, and alsa a1ong the south si+de of Nora Avenue just west of Mamer. Undeveloped land
zoned UR-3.5 is fou.nd irnmediateiy south of the combined si#e, with multiple-farnily uses and
medical off ces found alang Mzssion Avenue further ta the south and t❑ the southwest. Office
uses are located axang the south side of Nora Avenue, at some distanee west ofMarner Road.
A mix of Urban Residential-3.5 and UR-22 zoning is found in the area. The site in Fi1e No.
ZIE-$4B-81 represents the only indusfrial zoning in the vicinity.
HE F1ndings, Conclusians and Decision ZE-7A-961ZE-$4C-81 Pacre, 2
J
Project Description: The applicant proposes to significantly modify the site plans that were
submitted for the initial approvals in File No. ZE-84B-81 and ZE-7-96. The Examiner's decision
dated May 3, 1996 in File No. ZE-7-96 required the applicant to submit a modified site plan
providing for relocation of the proposed 8,100 square foot office building out of the .62 acres of
future acquisition area reserved along the northerly portion of the site in File No. ZE-7-96. Tbe
applicant subsequently the current improvements existing on the site. This resulted in a
significant relocation of structures on both sites, as well as a significant increase in building
coverage on the site in File No. ZE-84B-81, than contemplated by the Examiner's decisions.
The Examiner agrees with the Staff Report that these actions probably violated Section
14.504.040 of the Zoning Code, and should not have been allowed by the Division of Building
and Planning without the approval of a change of conditions application by the Examiner.
The site plan of record dated May 19, 1997 illustrates a unified plan for the two sites. The
site plan shows the current improvements on the site, 2 proposed single-story office/warehouse
buildings in the westerly two-thirds of the site in File No. ZE-84C-81, and a 2-story 24,700
square foot office building with below grade parking in the westerly portion of the site in File
No. ZE-7A-96. The net effect of the site plan would be to increase the office space on the site in
File No. ZE-7A-96 from the 8,100 square feet previously authorized by the Examiner to
approximately 33,000 square feet; and to increase the warehouse/office space on the site in File
No. ZE-84C-81 from the 19,900 square feet previously authorized to approximately 64,867
square feet.
The site plan of record shows the landscaping required by the Zoning Code and the
Examiner's previous decisions. This includes 20 feet of Type III landscaping along the west
property line of the site in File No. ZE-7A-96, the 5 feet of Type III landscaping required along
the west property line of the site in File No. ZE-84C-81, the 20 feet of existing trees allowed to
replace landscaping requirements along the south boundary of the site in File No. ZE-84C-91,
the 10 feet of Type III landscaping required to be illustrated along the east property line of both
sites, and the 25 feet of Type II landscaping required along I-90 for developments located in the
UR-22 zone, as required by the Zoning Code.
The site plan of record does not correctly indicate the front yard and rear yard setbacks for
the I-2 zone portion of the proposal, or the side yard setbacks for both zones.
B. ProceduralInformation:
Applicable Zoning Regulations: Spokane County Zoning Code Section 14.504.040, Chapter
14.402, 14.622, 14.6323P 14.629 and 14.806.
Hearing Date and Location: November 19, 1997, Spokane County Public Works
Building, Lower Level, Commissioners Assembly Room, 1026 West Broadway, Spokane, WA.
Notices: Mailed: November 4, 1997 by applicant
Posted: November 4, 1997 by applicant
Published: November 4, 1997
Site Visit: November 18, 1997
HE Findings, Conclusions and Decision ZE-7A-96/ZE-84C-81 Page 3
~
Hearing Pracedure: Pursua,nt ta Resalution No. 96-0171 and Resalu#ion No. 96-0294.
Testimony:
Louis Webster Scott Engeihard
Division of Current P1anning Divisian of Eagineering
1026 West Broadway 1026 West Baoadway
Spokane, WA 99260-0240 Spokane, WA. 99260
Jahn Sweitzer Torn ~~emson
Sauth 1 07 Howard, Suite 300 1 02 East Sprague Avenue
Spokane, WA, 99205 Spokane, WA 99202
Greg Figg
WA. State Department af Transportation
2714 Notth Mayfair S#reet
Spakane, WA 99207-2090
Iterns Noticed: Spakane County Comprehensive Plans Spokane County Zc~ning Cade, and
Spokane County Code. Spakane County Resvlutian ATos. 97-0$74 (revising interim regulations
for Coaxnty IUGAs), 97-0321 (adopting interirn regulatians far County IUfiAs), 96-0787
(amending Industrial Zones Niatrix), 96-4585 (adapting CWW 1996 Update), 96-0294
(Hearing ExaLminer Ru1es af Procedure), 96-0171 (Hearing Examiner Ordinance, 95-0498
(adoptlng Standards for Road and Sewer Constructiorr, and Guidelines for StormwateT
Management, and 85-0900 (adop#ing County Zoning CQde, and Program to Implement).
Procedural Matter: The Hearing Examiner eonsolidated this matter with ZE-7-96 for hearing,
as authorized by Sevtivn 6, Hearing Examiner Rules ofProcedure. Cvnsolidatian was ordered
because the subj ect site and the parcel to fhe north are cantiguaus and in common awnership,
both zoning actians were scheduled for hearing at the same time, aunified site plan was
proposed for both parcels, the applicant tesfiified that the approva~s were each contingent on one
another, there was no objection ta cansolidation and to expedite rnat#ers.
III. FINI]YNGS C1F FACT & CONCLUSIO1VS i]F LAW
LAND USE ANALYSIS
A. A-Dorvval crifieria
The Caun~y Hearing Examiner Ordinance authonzes the Hearing Examiner to grant, deny or
grant with such conditians# modifications and restrictions as #he Examiner finds necessary ta
make a change of conditioris appTication camgatible with the Spakane Caunty Generalized
Comprehensive F1an and develaprnent regulations. See County Resalution Na. 96-4171,
Attaclirnent "A„ , paragraphs 7 (d) and section 11. Development xegulatioris include, without
1imitation, the County Zoning Code, the State Environmenta1 Policy Aet (SEPA) and the
Caunty's Lacal Enviromnental Ordinance (chapter 11.1 0 +af Spakane County Code).
The County Zoning Code references change of conditions applications, but daes not
establish speciic criteria for agproving such applicatlons. Zoning Code 14.504.040 requires that
an application for any significant charrge #o the site devetoprnent plan appraved for a pnvr
HE Findings, Conclusions and Decision ZE-7A.-961ZE-54C-81 Page 4
~ rezone, or to change the conditions of approval imposed on a prior rezone, be approved by the
Hearing Body following a public hearing. Zoning Code 14.402.120 references change of
condition applications related to a prior rezone.
Since a change of conditions application modifies a prior rezone action, the criteria for
approving a rezone is generally applicable. Section 14.402.020 of the Zoning Code authorizes
amendments to the Code based on any one of six (6) grounds, without differentiating between
amendments to the zoning text of the code and amendments to the official zoning map. Zoning
" Code 14.402.020(1) authorizes the Code to be amended if it is consistent with the
Comprehensive Plan and is not detrimental to the public welfare...". Zoning Code
14.402.020(2) authorizes a Code amendment where [c]hanges in economic, technological, or
land use conditions has occurred to warrant modification of this Code.. These are the most
relevant criteria for consideration of a change of conditions application.
Zoning Code 14.100.104 states that Code provisions shall be interpreted to carry out and
implement the purpose and intent of the Comprehensive Plan, and the general plans for physical
development adopted by the Board of County Commissioners. Zoning Code 14.100.106 states
that when the Zoning Code conflicts with the Comprehensive Plan or other adopted plans and
regulations of the County or other regulatory agencies, the more restrictive provisions shall
govern to the extent legally permissible and the Zoning Code provisions will be met as a
minimum.
The Comprehensive Plan itself indicates that it should be used as a reference source and
guide for making land use decisions. See Comprehensive Plan, p. 2. The "decision guidelines"
set forth in the respective sections of the Plan are to be used as a guide to determine whether or
not a particular proposal should be approved, conditioned or denied.
In considering a rezone application, Washington case law generally provides that (1) there
is no presumption in favor of the rezone, (2) the applicant for the rezone must prove that
conditions have substantially changed in the area since the last zoning of the property, and (3) the
rezone proposal must bear a substantial relationship to the public health, safety or welfare.
Parkridge v. Seattle, 98 Wn. 2d 4542 462 (1978); and Bjarnson v. Kitsap County, 78 Wn. App.
840 (1995).
General conformance with a comprehensive plan is usually required before a rezone can be
approved. Citizens for Mount Vernon v. City of Mount Vernon, 133 Wn.2d 861, 873 (1997);
Cathcart v. Snohomish County, 96 Wn.2d 201, 211-12 (1981). Some cases have dispensed with
the changed circumstances requirement where the rezone closely implemented the policies of the
comprehensive plan. Bjarnson v. Kitsap County, supra.; Save Our Rural Environment v.
S'nohomish County, 99 Wn.2d 363, 370-371 (1983); and Tugwell v. Kittitas County, 90 Wn. App.
1, 8, 951 P.2d 272 (1999).
Washington case law indicates that where a comprehensive plan conflicts with zoning
regulations, the provisions of the zoning code will usually prevail. See Weyerhaeuser v. Pierce
County, 124 Wn.2d 26, 43 (1994); and CougarMt. Assocs. v. King County, 111 Wn.2d 742, 755-
57 (1988); and Nagatani Bros. v. Commissioners, 108 Wn.2d 477, 480 (1987).
HE Findings, Conclusions and Decision ZE-7A-96/ZE-84C-81 Page 5
l~
A change of conditions is not a rezone, because it does not change the actual zone of the
property. However, a change of conditions application may sign.ificantly affect conditions of
approval, as well as the permitted uses, location of buildings, landscaping, conditions of approval
and other features in a site development plan, approved in conjuncrion with a prior rezone. The
changed condition application should be justified by the same changes that supported the original
rezone, as modified by any more recent changes in the area.
B. The nronosed change of conditions, as conditioned, generally conforms with the Spokane
Countv Generalized Comprehensive Plan, bears a substantial relationship to and will not be
detrimental to the public health, safetv and general welfare, and complies with the Spokane
Countv Zonine Code and other annlicable develonment reQulations.
A change of conditions application is required for the project, since the applicant seeks to
change the conditions of the previous rezone in File No. ZE-7-96 and change of conditions in
File No. ZE-8413-81, and to make significant changes to the building coverage and location of
buildings respectively illustrated on the previous site plans in such actions. See Zoning Code
14.504.040.
The combined site and the land lying east, west and south of such site are designated in the
Urban category of the Comprehensive Plan. The Industrial category lies eastlnortheast of the site
across I-90, and the Major Commercial category lies north of the site across I-90. The Staff
Report found that the proposal generally conformed to the policies of the Urban category.
The Urban category is intended to provide the opportunity for a"citylike" environment,
including a variety of land uses served by a high level of public facilities and services. It is
primarily a residential category of single-family, two-family, multifamily and condominium
buildings, along with neighborhood commercial, light industrial, public and recreational
facilities. Comprehensive Plan, Section 1.
The Urban category states that the more intensive uses such as light industrial and
neighborhood commercial should be located near the heavily traveled streets, with the less
intensive uses such as residential isolated from the noise and traffic. The Urban category
indicates that "major commercial user[s] would not be compatible within areas of tlle county
designated Urban".
Urban development is recommended in areas having adequate power supplies, water,
sanitary and storm sewers, and school and fire services, provided the other policies of the Urban
category are met. Comprehensive Plan, Decision Guideline 1.1.1. Sidewalk facilities are
recommended along arterials connecting residential areas with community facilities andlor
commercial areas. Decision Guideline 1.5.3. Paved streets, street lights, underground utilities
and public sewer are strongly encouraged in such category. Decision Guidelines 1.3.3, 1.5.3,
1.5.4, 1.5.5. The Urban category recommends that land use proposals identify and mitigate
significant adverse impacts on existing utilities and traffic systems, and conform to applicable
plans, policies and regulations adopted for such facilities. Decision Guideline 1.6.1.
The Urban category discourages residential areas in high noise areas. Qbjective 1.5.d,
1.5.6. The Urban category recommends that buffering and/or landscaping be used to mitigate the
differences between proposed developments and existing uses. Decision Guidelines 1.5.1 and
1.5.2, and Objective 1.5.a. The structure height and architectural character of a proposal relative
HE Findings, Conclusions and Decision ZE-7A-96/ZE-84C-81 Page 6
1 to that in the surrounding neighborhood are to be considered in determining whether the proposal
will change the existing land use character in a negative manner. See Objectives 1.5.e, Decision
Guideline 1.5.8.
The site in File No. ZE-84C-81 is currently zone Light Industrial (I-2). Zoning Code
14.632.100 provides as follows:
• The purpose of the I-2 zone is to meet the needs for industrial land
• identified in the Industrial Category of the Comprehensive Plan.
Industrial uses in this zone will include processing, fabrication, light
asserrcbly, freight handling and similar operations, all of a non-offensive
nature. It is the intent of the I-2 zone to allow for these uses by making
them compatible with surrounding uses. General characteristics of
these areas include paved roads and sidewalks, public sewer and water,
a full line of public services including manned fire protection and public
transit accessibility.
The Board of County Commissioners recently amended the Industrial Zones Matrix, Zoning
Code Chapter 14.629, to allow several new commercial uses in the industrial zones of the Zoning
Code. (County Resolution No. 96-0787). In the I-2 zone, this includes certain designated uses
as well as virtually all uses allowed in the Regional Business (B-3) zone, provided the
development standards of the B-3 zone are met. This amendment recognized the need for a
broader range of commercial uses in the Industrial category to serve industrial uses in the I-2
zone.
The site in File No. ZE-7A-96 is zoned Urban Residential-22 (tJR-22). The Urban
Residential-22 (LTR-22) zone is an implementation tool for the high density residential uses
contemplated in the Urban category, primarily for multiple-family dwellings located near major
or secondary arterials. Offices are permitted in the Urban Residential-22 (UR-22) zone to
provide some of the service needs generated by high-intensity uses. UR-22 zones are typically
served by a high level of public services. The development standards of such zone are intended
to provide a desirable living environment and assure the protection of property values. Zoning
Code 14.622.100.
The project is served by a high level of public services. This does not include public sewer,
but the project is required to be double-plumbed for connecrion to the future area-wide sewer.
The site also appears to be located in an area scheduled to be served with public sewer within 15
years from the date when the County adopted its sewer capital improvement program in 1996.
See Comprehensive Wastewater Management Plan 1996 update, Exhibit V-1. The subject
property is located inside the County's NGA boundaries. The interim regulations adopted for
such area do not restrict the approval of change of conditions applications within the ILJGA for
projects that are not served by public sewer and which do not lie within the County's 15-year
sewer service area, such as the current project.
The application proposes development of additional warehouse and office usage on the site
in File No. ZE-84C-81, in the existing I-2 zone. The I-1 zone is the only industrial zone which
arguably implements the Urban category. However, the proposed use of the site in File No. ZE-
84C-81 is still far more consistent with the Urban category of the Comprehensive Plan than the
tool manufacturing operation approved for the 1981 rezone of such site.
HE Findings, Conclusions and Decision ZE-7A-96/ZE-84C-81 Page 7
. ~-.v..... ° . . c~_ .o_.._a.t.. _r.~_~ • -+.w . i. .
/
The application also proposes additional office space on the site in File No. ZE-7A-96.
Such site is not well-suited to residential use, considering its proximity to I-90 and the proposed
Evergreen/I-90 freeway interchange project. Intensive land uses are considered more appropriate
along freeways, under the Comprehensive Plan. Office uses are common along Nora Avenue to
the west, and office uses and multifamily housing are found along Mission Avenue to the south
and southeast.
' The primary consideration under the Urban category policies is whether the proposed use
of the combined site is adequately buffered from the single-fa.mily uses on land zoned Urban
Residential-3.5 (LTR-3.5) located to the west, the undeveloped County park land and water tower
facility on land zoned UR-3.5 to the east, anci the undeveloped land zoned UR-3.5 to the south.
No public opposition was expressed regarding project by neighboring property owners or public
agencies. The office and warehouse uses constructed on the site are attractive, well-designed
and relatively low intensity. The landscaping required by the Examiner's previous decision
provides a sufficient buffer for the single-family uses to the west.
The record indicates that many of the existing evergreen trees and vegetation located along
the south border of the site were removed when the hillside was regraded to accommodate the
warehouse building installed near the south border. The existing tree cover in a 20-foot strip
along the south property line was allowed by the Examiner's previous decision in File No.
ZE-84C-81, in lieu of the 20 feet of Type I landscaping required by the Zoning Code. The
applicant indicated that the hillside has been hydro-seeded with grass and ground cover bushes.
Trees are still located along the top of the hill along the south property line of the site. The
adequacy of substituted landscaping can be reviewed administratively by the Division of Current
Planning.
A geo-hazard evaluation was prepared for the construction of the proposed warehouses in
the southeast portion of the combined site. The evaluation assesses the geo-hazards presented by
the steep slopes along the southerly 10% of the combined site, and recommends mitigating
measures for the proposed construction. The evaluation assures compliance with the geahazard
provisions of the County Critical Areas Ordinance. The Examiner has added a condition of
approval requiring compliance with such ordinance and the recommendations contained in such
report.
No deficiencies with regard to the ability of the project to comply with development
regulations have been established in the record. The applicant is required to participate in the cost of
a traffic signal at the intersection of Mission Avenue and McDonald Road, and other requirements
for road dedication and improvements. These are based on the traffic study done for the proj ect, and
comments from County Engineering and WSDOT. The project has been conditioned for compliance
with'the development standards of the I-2 zone and UR-22 zone, other applicable provisions of the
County Zoning Code, and the recommendations of the commenting public agencies. The Examiner
has consolidated the conditions from the previous actions which are not modified by the change of
conditions.
No public agencies objected to the DNS issued for the proposal by the County Division of
Building and Planning. The proposal wi11 not have more than a moderate effect on the quality of
the environment, and the Examiner concurs with issuance of the DNS. The procedural
HE Findings, Conclusions and Decision ZE-7A-96iZE-84C-81 Page 8
~ requirements of chapter 43.21 C RCW and chapter 11.10 of the Spokane County Code have been
met.
C. Conditions in the area in which the propertv is located have changed substantially since the
nronertv was last zoned.
In applying the changed circumstances test, courts have looked at a variety of factors,
including changed public opinion, changes in land use patterns in the area of the rezone proposal,
' and changes on the property itself. The Zoning Code references changes in "economic,
technological or land use conditions" as factors that will support a rezone. Spokane County
Zoning Code Section 14.402.020 (2). Washington courts have not required a"strong" showing
of change. The rule is flexible, and each case is to be judged on its own facts. Bassani v. County
Commissioners, 70 Wn. App. 389,394 (1993).
As stated previously, recent cases have held that changed circumstances are not required if
the proposed rezone implements policies of a comprehensive plan. The project is at least as
consistent with the Urban category as the 1990 rezone proposal previously approved for the site.
Changes have occurred in the area since the site in File No. ZE-84C-81 was zoned in 1981,
since the change of conditions for such site was approved in May, 1996, and since the site in File
No. ZE-7-96 was rezoned in May, 1996. This includes the development of office uses and
multiple-family housing along Nora Avenue and Mission Avenue in the general vicinity, the
extension of public sewer to the general area, increased traffic along Mission Avenue and I-90,
the planned construction of the Evergreen/I-90 Interchange east of the site, increased population
growth in the Valley area of the County, and designation of the combined site inside the
County's ILJGA boundaries.
IV. DECISION
Based on the Findings of Fact and Conclusions of Law above, the above change of
conditions application is hereby approved, subject to the conditions of approval of public
agencies stated below. Any conditions of such agencies which have been added or significantly
revised by the Hearing Examiner are italicized.
Failure to comply with the conditions of this approval may result in revocation of this
approval by the Hearing Examiner. This approval does not waive the applicant's obligation to
comply with all other requirements of other agencies with jurisdiction.
SPOKANE COUNTY DIVISION OF CURRENT PLANNING
1. All conditions imposed by the Hearing Examiner shall be binding on the "Applicant",
which term shall include the owner(s) and developer (s) of the property, and their heirs, assigns
and successors.
2. The change of conditions decision applies to the following described real property: Site
located at N. 1618-1628 Mamer Road, Spokane, WA, more particularly described as Tract 97,
Vera, except that portion lying northerly of a line drawn parallel to and 100 feet southerly of PSH
HE Findings, Conclusions and Decision ZE-7A-96/ZE-84C-81 Page 9
d
No. 2, measured at right angles, and except that portion lying southwest of the northwest line of
the Corbin Ditch right of way, in Spokane County, Washington.
3. The proposal shall respectively comply with the Light Industrial (I-2) zone, the Urban
Residential-22 (UR-22) zone and other applicable provisions of the Spokane County Zoning
Code, as amended.
4. The applicant shall develop the subject property in accordance with the site plan of record
submitted on May 19, 1997. Variations, when approved by the Planning Director/designee for
the Division of Current Planning, will be permitted in accordance with Section 14.504.040 of the
County Zoning Code, as amended. All variations must conform to the conditions of approval,
the County Zoning Code, and other applicable development regulations. Any other modification
must be presented to the Hearing Examiner for review and approval as a change of conditions.
The original intent of the development plans shall be maintained.
5. The applicant shall aggregate parcels or apply for and receive approval for minor lot
adjustments, in order that buildings are set back the required distances from property lines. The
Staff Report indicates that the site plan of record does not correctly indicate the front yard and
rear yard setbackr for the I-2 zone portion of the proposal, or the side yard setbacks for both
zones.
6 The applicant shall install the required landscaping illustrated on the site plan of record.
The Division shall evaluate the adequacy of existing landscaping located along the southerly 20
feet of the site to determine whether this woacld result in as good or better landscaping than the
20 feet of Type I landscaping requared by the I-2 zone along the south border of the site.
7. The applicant shall comply with the geo-hazard provisions of the County Critical Areas
Ordinance, and with the mitigating measures recommended by Strata Engineering in its letter
dated 11-18-97 in the project file.
8. Approval is required by the Planning Director/designee of a specific lighting and signing
plan for the described property prior to the release of any building permits.
9. Direct light from any exterior area lighting shall not extend over the property boundary.
10. A specific landscape plan, planting schedule and provisions for maintenance acceptable to
the Planning Director/designee shall be submitted with a performance bond for the project prior
to release or building permits. Landscaping shall be installed and maintained so that sight
distance at access points is not obscured or impaired.
11. The Division of Current Planning shall prepare and record with the Spokane County
Auditor a Title Notice noting that the property in question is subject to a variety of special
conditions imposed as a result of approval of a land use action. This Title Notice shall serve as
public notice of the conditions of approval affecting the property in question. The Title Notice
should be recorded within the same time frame as allowed for an appeal and shall only be
released, in full or in part, by the Division of Building and Planning. The Title Notice shall
generally provide as follows:
HE Findings, Conclusions and Decision ZE-7A-96/ZE-84C-81 Page 10
~ "The parcel of property legally described as [ ] is the subject of a land use action by a
Spokane County Hearing Body on February 23, 2000, imposing a variety of special development
conditions. File No. ZE-84C-81/ZE-7A-96 is available for inspecrion and copying in the
Spokane County Division of Current Planning."
12. The Division of Building and Planning shall file with the Spokane County Auditor, within
the same time frame as allowed for an appeal from the final disposition, including lapsing of
appeal period, a title notice, which shall generally provide as follows:
"Prior to issuance of any building permit for any building or any use on the property
described herein, the applicant shall be responsible for complying with the provisions of the
Zoning Code for Spokane County, Section 14.706 (Aquifer Sensitive Area Overlay Zone). The
property which is the subject of this notice is more particularly described as follows: [ .
13. The applicant shall contact the Division of Building at the earliest possible stage of
design/development in order to be informed of Code requirements administered or enforced by
the division, e.g., State Building Code Act regulations such as requirements for fire hydrant/flow,
fire apparatus access roads, street address assignment, barrier free regulations, energy code
regulations, and general coordination with other aspects of project implementation.
14. The requirements of County Fire District No. 1 need to be satisfied during the building
pernut process.
15. The Division of Current Planning shall prepare and record with the County Auditor a Title
Notice specifying a future land acquisition area for road right of way and utilities. The reserved
future acquisition area Title Notice shall be released, in full or in part, by the Division of
Building and Planning. The notice should be recorded within the same time frame as an appeal
and shall provide the following:
a. That portion of the site requested by Washington State Department of Transportation in
letter dated Apnl 15, 1996 and submitted as Exhibit A in the record in File No. ZE-7-96,
shall be reserved as a future acquisition area for road right of way and utilities along
Interstate 90.
b. Future building and other setbacks required by the Spokane County Zoning Code shall be
measured from the reserved future acquisition area.
c. No required landscaping, parking, `208' areas, drainfield or allowed signs should be
located within the future acquisition area for road right of way and utilities. If any of the
above improvements are made within this area, they shall be relocated at the applicant's
expense when roadway improvements are made.
d. The future acquisition area, until acquired, shall be private property and may be used as
allowed in the zone, except that any improvements (such as landscaping, parking, surface
drainage, drainfield, signs or others) shall be considered interim uses.
e. The property owner shall be responsible for relocating such "interim" improvements at
the time WSDOT makes roadway improvements after acquiring said Future Acquisition
Area.
HE Findings, Conclusions and Decision ZE-7A-96/ZE-84C-81 Page 11
!
f. If is later determined by WSDOT or a court of law that such area is not needed for right
of way purposes by WSDOT, the future acquisition area shall be released.
SPOKANE COUNTY DIVISION OF ENGINEERING
1. The County Engineering Department conditions of approval contained in the County
Hearing Examiner Committee Findings and Order dated 9-17-81 in File No. ZE-84-81 shall
continue to apply to that portion of the site included in such file number.
2. The County Engineering Department conditions of approval contained in the County
Hearing Examiner Findings, Conclusions and Decision dated May 3, 1996 in File No. ZE-7-96
shall continue to apply to that portion of the site included in such file number.
3. The applicant shall participate in three percent (3%) of the cost of the installation of a
traffic signal at Mission Avenue and McDonald Road. Prior to the release of a building permit
the applicant shall enter into a developer's agreement with Spokane County to determine the
required cost.
SPOKANE REGIONAL HEALTH DISTRICT
1. A combined surface water and sewage disposal detailed plan shall be approved by the
Spokane County Engineer and Spokane County Health District prior to the issuance of any on-
site sewage disposal permit or building permit for this project.
2. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane
County.
3. Water services shall be coordinated through the Director of Utilities, Spokane County.
4. Water service shall be by an existing public water supply when approved by the Regional
Engineer (Spokane), State Department of Health.
5. Disposal of sewage effluent beneath paved surfaces is currently prohibited.
6. Subject to specific application approval and issuance of permits by the health officer, the
use of individual on-site sewage disposal systems may be authorized.
7. The use of private wells and water systems is prohibited.
SPOKANE COUNTY DIVISION OF UTILITIES
1. Pursuant to the Board of County Commissioners Resolution No. 80-0418, the use of on-site
sewer disposal systems is hereby authorized. This authorization is conditioned in compliance
with all rules and regulations of the Spokane County Health District and is further conditioned
and subject to specific application approval and issuance of permits by the Health District.
HE Findings, Conclusions and Decision ZE-7A-96/ZE-84C-81 Page 12
~ 2. A Covenant Agreement shall be signed stating: The owner(s) or successor(s) in interest
agree to authorize the County to place their name(s) on a petition for the formation of a LTLID by
petition method pursuant to RCW 36.94 which the petition includes the owner(s) property and
further not to object by signing of a protest petition against the formation of a LJLID by
resolution method pursuant to RCW 36.94 which includes the owner(s) property. Provided, this
condition shall not prohibit the owner(s) or successor(s) from objection to any assessment(s) on
the property as a result of improvements called for in conjunction with the formation of a ULID
by either petition or resolution under RCW 36.94.
3. Each new unit shall be double-plumbed for connection to future area-wide collection
systems.
4. Any water service for this project shall be provided in accordance with the Coordinated
Water System Plan for Spokane County, as amended.
SPOKANE COUNTY AIR POLLUTION CONTRUL AUTHORITY
1. All air pollution regulations must be met. See memo dated 10-27-97 from SCAPCA to
John Pederson in Current Planning File No. ZE-84C-81/ZE-71-96.
WASHINGTON STATE DEPARTMENT OF TRANSPORATION
1. The applicant shall provide to WSDOT and/or Spokane County slope and construction
easements along this sites frontage at no charge to WSDOT. This easement will be used by
WSDOT to regrade the site's landscape area on the site's I-90 frontage.
2. On the site's northern boundary with I-90, the grading and landscaping of this area shall be
coordinated with WSDOT and Spokane County to minimize the impact to both parties as it
relates to the Evergreen Interchange.
3. Drainage plans for this site will need to be reviewed by WSDOT to ensure drainage areas
adj acent to I-90 are adequate.
4. Signage visible to I-90 will need to be reviewed by WSDOT for conformance to the
Federal and State Scenic Vista's Act.
BONNEVILLE POWER ADiVIIlvISTR.ATION
1. Written approval for any proposed use of the Bonneville Power Administration (BPA)
rights of way is required by BPA prior to the commencement of any activities on the BPA
easement area.
HE Findings, Conclusions and Decision ZE-7A-96/ZE-84C-81 Page 13
WASHINGTON STATE DEPARTMENT OF ECOLOGY
l. The owner of a construction site which disturbs five acres or more of total land 6Hc_1
which has or will have a discharge of storm water to a surface water or to a storrn se`vc,)-.
apply for coverage under Ecology's Baseline General Permit for Storm Water Discliarge.
Associated with Industrial Activities. Owners of sites where less than five acres of tatal xail(j
area will be disturbed must also apply if the construction activity is part of a larger plan of
development or sale in which more than five acres will eventually be disturbed. Discharg:
storm water from such sites without a permit is illegal and subject to enforcement by i})e
Department of Ecology. Application should be made at least 30-days prior to commei7cc:Jx«ni ()f
construction activities. A storm water pernut application form, referred to as a Notice of 1r11c11t,
can be obtained from our office. Even if a permit is not needed, erosion and sedimeni control is
required on all sites to prevent the entry of sediment-laden storm water into any sul•face watc;r.
DATED this 24th day of February, 2000.
SPOKANE COUNTY HEARING EXAIVXYNIEiZ
Michael C. Dempsey, WSBA #82-4 v
NOTICE OF FINAL DECISION AND NOTICE OF RIGHT TO APPEAL
Pursuant to Spokane County Resolution No. 96-0171, the decision of the Hearing Examiner
on an application for a change of conditions is final and conclusive unless within twenty--one (21)
calendar days from the issuance of the Examiner's decision, a party with standing files a land use
petition in superior court pursuant to chapter 36.70C RCW. Pursuant to chapter 36.70C RCW, the
date of issuance of the Hearing Examiner's decision is three (3) days after it is mailed.
This Decision was mailed by Certified Mail to the Applicant on February 24, 2000. The date
of issuance of the Hearing Examiner's decision is therefore February 28, 2000, counting to the next
business day when the last day for mailing falls on a holiday or weekend. THE LAST DAY FOR
APPEAL OF THIS DECISION TO SUPERIOR COURT BY LAND USE PETITIUN IS
MARCH 20, 2000.
The complete record in this matter, including this decision, is on file during the appeal
period with the Office of the Hearing Examiner, Third Floor, Public Works Building, 1026 West
Broadway Avenue, Spokane, Washington, 99260-0245, (509) 477-7490. The file may be
inspected during normal working hours, listed as Monday - Friday of each week, except
holidays, between the hours of 5:00 a.m. and 4:00 p.m. Copies of the documents in the record
will be made available at the cost set by Spokane County.
HE Findings, Conclusions and Decision ZE-7A-96/ZE-84C-81 Pa~e 14
SPOKANE COUNTY HIEARING EXAMINER
RE: Zone Reclassification from Urban ) FINDINGS, CONCLUSIONS,
Residential-3.5 Zone to Urban ) AND DECISION
Residential-22 Zone; ) RECSVE
Applicant Inland Construction ) D
Company/Tom Clemson ) MA Y 071996
File No. ZE-7-96 )
Coo* Ew"
1. SUMMARY OF PROPOSAL AND DECISION
Proposal: Zone reclassification from the Urban Residential-3.5 (UR-3.5) zone to the
Urban Residential-22 zone (UR-22) for an 8,100 square foot office building and those
uses allowed in the Urban Residential-22 (UR-22) zone. The applicant is requesting
development of a unified site development plan that includes adjoining property
owned by the applicant to the south.
Decision: Approved, subject to conditions.
II. FINDINGS OF FACT AND CONCLUSIONS
The Hearing Examiner has reviewed the zone reclassification application and the
evidence of record and adopts the following findings of fact and conclusions:
A. GENERAL INFORMATION:
Applicant: Inland Construction Company
Tom Clemson
102 East Sprague Avenue
Spokane, WA 99202
Agent: John Sweitzer
107 South Howard
Suite 300
Spokane, WA 99204
Address: North 1618 Mamer Road
Locakion: Generally located along the east side of Mamer Road, south of Interstate
90, approximately 500 feet north Mission Avenue, in the SE'/+ of Section 10, Township
25 North, Range 44 EWM, Spokane County, Washington.
I
HE Findings, Conclusions and Decision ZE-7-96 Page 1
,
Legal Description: Tract 97, except the south 475 feet thereof, and also EXCEPT all that
part thereof lying northerly of a line drawn parallel with a distance 100 feet southerly
when measured at right angles from the center line of primary State Highway No. 2,
Vera, according to Plat recorded in Volume "O" of Plats, page 30, in Spokane County,
Washington.
Zoning: Urban Residential-3.5 (UR-3.5) zone
Comprehensive Plan Category: The property is designated in the Urban category of
the Spokane County Generalized Comprehensive Plan.
nvirortmental Review: A Determination of NonSignificance was issucd b,y the
,;~~k,:()r1 Of Pll;ldin(-'; ilrld Flanning on N1iir-ch ?9F 1996.
SItC Ut'.SCI"1pt1t)il: I'ilE.'. SIfC IS 2 C)2 c2~tE:'S ti2 Slt.E_', Y"i:i.li,va_'!)"- 111,31 c311d
undeveloped. A Bonneville Power Adminisfiration (BPA) power line and easenlent
l-Asects the property at a southw(,ct tn Tl{1.rtbE'ast Permanont strtichires cannot he
northerly portion of the site lies within the footprint of the proposed Evergreen I-90
Interchange, and the Washington State Department of Transportation (WSDOT) has
requested that .62 acres of the northern portion of the site be reserved as a future
acquisition area for the future interchange. The applicant owns an adjoining 6.36 acre
parcel to the south, currently improved with two single family homes. A water tower
reservoir is located east of the site, atong with some vacant land owned by the Spokane
County Parks Department Single family residences are Iocated west of the site across
Mamer Road. Mamer Road meets Nora Avenue at the northwest corner of the site and
intersects with Mission Avenue south of the site. Muttiple-family uses and medical
offices are found along Mission Avenue, and single family and affice uses are found
along Nora Avenue. A mix of Urban Residential-3.5 (UR-3.5) and Urban Residential-22
(tJR-22) zoning is found in the area. The adjoining parcel to the south is zoned Light
Industrial (I-2), which is the only industrial zoning in the area.
Projeet Description: The applicant seeks a zone change from Urban Residential-3.5
(UR-3.5) to Urban Residential-22 (UR-22), to allow development of an 8,100 square foot
office on the site. The parcel to the south has an approved site development plan from
a 1981 zone reclassification (ZE-84-81) that permits construction of 28,000 square feet of
building for Light Industrial (I-2) uses. The applicant, by separate application, has
proposed a change of conditions (referenced as ZE-$4B-81) to reduce the aliowed
square footage of Light Industrial (I-2) uses on the adjoining parcel to the south by
8,100 square feet, in effect shifting such usage to the subject site through the current
rezone proposal. According to the applicant, this would allow flexibility in the siting of
HE Findings, Conclusions and Decision ZE-7-96 Page 2
a business within a unified site development plan, and limit the impacts of the overall
development to no greater than that of the approved 1981 site plan.
B. PROCEDURAL INFORMATION:
Applicable Zoning Regulations: Spokane County Zoning Code Chapters 14.402
(Amendments),14.622 (Urban Residential-22 (UR-22) Zone), and 14.806 (Landscaping and
Screening Standards).
Hearing Date and Locaiion: Apri118,1996, Spokane County Public Works
Building, Lower Level, Commissioners Assembly Room,1026 West Broadway,
Spokane, WA.
Notices: Mailed: Apri11,1996 by applicant
Posted: Apri11,1996 by applicant
Published: March 28,1996
Site Visih Apri116,1996.
Hearing Procedure: Pursuant to Resolution Nos. 96-0171 (Hearing Examiner
Ordinance) and 96-0294 (Hearing Examiner Rules of Procedure). The provisions of
Chapter 1.44 of the Spokane County Code and Chapter 14.402 of the Spokane County
Zoning Code are applicable to the processing of the rezone application, except to the
extent they are inconsistent with such resolutions.
Testimony:
Steve Davenport, Planner II and John Pederson, Senior Planner
Spokane County Division of Building and Planning
1026 West Broadway
Spokane, WA 99260-0240
Pat Harper
Spokane County Division of Engineering and Roads
1026 West Broadway
Spokane, WA 99260
john Sweitzer
South 107 Howard, Suite 300
Spokane, WA 99205
Mark Rohwer
Washington State Department of Transportation
2714 North Mayfair Street
Spokane, WA 99207-2090
HE Findings, Conclusions and Decision ZE-7-96 Page 3
.
Items Noticed: Spokane County Comprehensive Plan, Spokane County Zoning
Code, Spokane County Code, Resolution Nos. 96-0171 and 96-0294.
Procedural Matter: The Hearing Examiner consolidated ZE-7-86 and ZE-84B-81 for
hearing, pursuant to Section 6 of the Hearing Examiner Rules of Procedure.
Consolidation was ordered because the subject site and the parcel to the south are
contiguous and are both owned by the applicant, the applications were scheduled for
hearing at the same time, there is a unified site plan for the two parcels, the applicant
testified that the approvals should be contingent on one another, there was no objection
to consolidakion, and to expedite matters.
C. ZONE RECLASSIFICATION ANALYSIS:
To be approved, the proposed zone reclassification application must comply
with the criteria for amending the official Spokane County zoning map, specifically
paragraphs 1 and 2 of Spokane County Zoning Code Section 14.402.020, and the
requirements established under Washington case law for the approval of rezones. The
proposal must also satisfy the requirements of the Urban Residential-22 (UR-22) zone,
and must be consistent with the State Environmental Policy Act and Chapter 11.10 of
the Spokane County Code (Local Environmental Ordinance). The following findings of
fact and conclusions are made:
1. The proposed zone reclassification is consistent with the Comprehensive Plan and
implements the Goals, Obiectives and Decision Guidelines of the Urban categorv for
the propertv and surroundine area.
The Urban category of the Comprehensive Plan is intended to provide the
opportunity for a"citylike" environment including a variety of land uses and public
facilities and services. The more intensive uses such as light industrial should be
located near the heavily traveled streets, with the less intensive uses such as residential
isolated from the noise and traffic. The Urban category indicates that where conflicts
may occur between use types, screening and other performance standards may be
required to make them compatible.
The Urban Residential-22 (UR-22) zone is an implementation tool for the high
density residential uses contemplated in the Urban category, primarily for multiple-
family dwellings located near major or secondary arterials. Offices are permitted in the
Urban Residential-22 (UR-22) zone to provide some of the service needs generated by
high-intensity uses. The zone is also used to provide transition between low or
medium density multiple-family housing and low intensity industrial uses.
The site is located adjacent to the I-90 freeway and a freeway interchange is
planned for east of the site. The property also fronts on Mamer Road, which connects
with Mission Avenue, a significant arterial located a short distance to the south, and
with Nora Avenue, a frontage road that connects with Pines Road to the west There is
Urban Residential-22 (UR-22) zoning all along the north side of Mission Avenue,
HE Findings, Conclusions and Decision ZE-7-96 Page 4
between Mamer and Pines Road, and along the south side of Nora Avenue at some
distance west of Mamer. Office uses are common along Nora Avenue, and office uses
and multifamily housing are found along Mission Avenue.
Location of the proposed office buildings on the eastern portion of the two parcels
provides an adequate buffer and screening for the single family uses to the west, in
conjunction with the landscaping requested by staff along the west boundary of the
site.
Revision of the site plan to allow for the future acquisition area requested by the
County and WSDOT will help implement the Transportation element of the
Comprehensive Plan, which indicates that review of land use proposals should include
provisions for adequate right of way along arterials such as freeways.
2. Conditions in the area in which the propertv is located have changed substantially
since the propertv was last zoned.
A number of changed conditions have been identified since the adoption of the
County Zoning Code in 1986 and the cross-over zorung of the site to the Urban
Residential-3.5 (UR-3.5) zone in 1991 under the Program to Implement the Spokane
County Zoning Code. The population of the area has grown, increasing the demand
for multiple-family housing and office uses to support such housing and population
increase. Office uses and multiple-family housing have been developed along Nora
Avenue and Mission Avenue in the general vicinity, consistent with Urban
Residential-22 (UR-22) zoning. Public services have become more available, including
the extension of public sewer to the area, although not yet reaching the site. The
planned construction of the Evergreen/I-90 Interchange adjacent to the site could be
considered a changed circumstance.
3. The proposed rezone bears a substantial relation and is not detrimental to the
public, health, safety or Reneral welfare.
Offices/warehouses for the purpose of tool manufacturing had been planned for
the parcel to the south under the approved 1981 site plan. The proposed use of the site
and the property to the south for offices would appear to be much more compatible
with the single family residential uses located along the west side of Mamer Road and
the south side of Nora Avenue in the vicinity. The combined traffic impact from
development of the two parcels for offices is projected to be no greater than the
combined impacts from development of the sites under the existing zoning. If a more
intensive use is later proposed for the site under the Urban Residential-22 (UR-22) zone,
a traffic analysis will be required to ensure that adverse impacts are mitigated. The
unified site plan also provides safer access to Mamer Road than the site plan approved
in ZE-84-81.
The design of the project and required buffering ensure compatibility with single
family uses to the west The single family homes on the site are to be removed in a
HE Findings, Conclusions and Decision ZE-7-96 Page 5
subsequent phase of the project County Planning staff generally recommended
approval of the proposal. No opposition to the land use actions in ZE-7-96 and ZE-84B-
81 was expressed by residents of the area, and a number of adjacent owners signed
letters in support of the two proposals. There appears to be adequate infrastructure to
support development of the site as proposed at build-out
The applicant requested alternative landscaping along the west and east property
lines of the site, pursuant to Section 14.806.020 of the Zoning Code. The reduction of
landscaping along the eastern boundary of the site appears appropriate for the reasons
cited on page 9 of the Division of Building and Planning Staff Report However, there
is no basis for reducing the 20 feet of Type III landscaping required along the western
boundary of the site to 5 feet in a future phase of the project, Zoning Code Section
14.806.040, paragraph 2, specifically requires such landscaping for developments in the
Urban Residential-22 (UIZ-22) zone located adjacent to a local access street, such as
Mamer Road. Such landscaping is also needed to screen the proposed development of
the site for offices from the single family neighborhood to the west and traffic along
Mamer Road.
Since there is a unified site plan for offices on the site and the adjoining parcel
owned by the applicant, the Hearing Examiner concurs with the staff report that
landscaping is not needed along the south boundary of the site.
The applicant also submitted a letter from its legal counsel regarding the validity of
imposing the future acquisition area requested by Spokane County and WSDOT and
the applicant's right to compensation for any land taken by such entities for the
Evergreen/I-90 Interchange. It is appropriate to establish such future acquisition area
under the decision guidelines of the Transportation element of the Comprehensive
Plan. It appears that such land will be needed for the future Evergreen Interchange
and the applicant has indicated it is willing to revise its site plan to mitigate damages
from the taking of such area for right of way purposes. The parties are currently
negotiating on compensation to the applicant for the needed right of way.
4. The proposal, as conditioned, is consistent with the Urban Residential-22 (UR-22),
zone and the Zonin,Q Code. The proposed zone reclassification will not have a
probable, siiznificant, adverse impact on the environment
No significant, probable, adverse environmental impacts were identified during
the environmental review process for the proposal. No basis exists to alter or modify
the Determination of Nonsignificance issued by the Division of Building and Planning.
While the proposal will impact the intersection of Pines Road and Mission Avenue,
which is currently experiencing operational difficulties, the traffic impact on such
intersection from the unified site plan is projected to be no greater than that from
development of the site and the adjoining parcel to the south under existing zoning. If
more intense uses are proposed for the sites, a traffic study and appropriate mitigation
will be required.
HE Findings, Conclusions and Decision ZE-7-96 Page 6
1
III. DECISION
Based on the Findings and Conclusion above, the above zone reclassification
application is approved, subject to the following conditions:
1. Approval is subject to the approval of the applicant's change of condition
application in Spokane County Division of Building and Planning File No. ZE-84B-81.
2. A revised site plan shall be submitted by the applicant, showing the relocation of
the improvements on the site to accommodate the future acquisition area needed for the
Evergreen/Interstate 90 Interchange, showing 20 feet of Type III landscaping along the
west property line and 10 feet of Type III landscaping along the east property line of
the site.
3. Compliance with the conditions of the various public agencies indicated below.
4. Failure to comply with the condiiions of this approval may result in revocation of
this approval by the Hearing Examiner.
5. This approval does not waive the applicanes obligation to comply with all other
requirements of the Spokane County Code, Spokane County Zoning Code and the
applicable requirements of other public agencies with jurisdiction over land
development.
SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING CONDITIONS
1. The proposal shall comply with the Urban IZesidential-22 (UR-22) zone, as
amended.
2. The applicant shall develop the subject property generally in accordance within
the concept presented to the Hearing Examiner. Variations, when approved by the
Planning Director/designee, may be permitted, including, but not limited to building
location, landscape plans and general allowable uses of the permitted zone. All
variations must conform to regulations set forth in the Spokane County Zoning Code,
and the original intent of the revised site plan shall be maintained.
3. Approval is required by the Planning Director/designee of a specific lighting and
signing plan for the described property prior to the release of any building permits.
4. Direct light from any exterior area lighting shall not extend over the property
boundary.
5. A specific landscape plan, planting schedule and provisions for maintenance
acceptable to the Planning Director/designee shall be submitted with a performance
HE Findings, Conclusions and Decision ZE-7-96 Page 7
bond for the project prior to release or building permits. Landscaping shall be installed
and maintained so that sight distance at access points is not obscured or impaired.
6. The Division of Building and Planning shall prepare and record with the Spokane
County Auditor a Title Notice noting that the property in question is subject to a
variety of special conditions imposed as a result of approval of a land use action. This
Title Notice shall serve as public notice of the conditions of approval affecting the
property in question. The Title Notice should be recorded within the same time frame
as allowed for an appeal and shall only be released, in full or in part, by the Division of
Building and Planning. The Title Notice shall generally provide as follows:
The parcel of property legally described as [ ] is the subject of a land use
action by a Spokane County Hearing Body on [ imposing a variety of special
development conditions. File No. [ ] is available for inspection and copying in the
Spokane County Division of Building and Planning.
7. The Division of Building and Planning shall file with the Spokane County
Auditor, within the same time frame as allowed for an appeal from the final
disposition, including lapsing of appeal period, a title notice, which shall generally
provide as follows:
Prior to issuance of any building permit for any building or any use on the
property described herein, the applicant shall be responsible for complying with the
provisions of the Zoning Code for Spokane County, Chapter 14.706 (Aquifer Sensitive
Area Overlay Zone). The property which is the subject of this notice is more
particularly described as follows:
8. The Spokane County Division of Building and Planning shall prepare and record
with the County Auditor a Title Notice specifying a future land acquisitions area for
road right of way and utilities. The reserved future acquisition area Title Notice shall
be released, in full or in part, by fihe Division of Building and Planning. The notice
should be recorded within the same time frame as an appeal and shall provide the
following:
a. That portion of the site requested by Washington State Department of
Transportation in letter dated Apri115,1996 and submitted as Exhibit A in the
record, shall be reserved as a future acquisition area for road right of way and
utilities along Interstate 90.
b. Future building and other setbacks required by the Spokane County Zoning
Code shall be measured from the reserved future acquisition area.
c. No required Iandscaping, parking, '208' areas, drainfield or allowed signs
should be located within the future acquisition area for road right of way and
utilities. If any of the above improvements are made within this area, they shall be
relocated at the applicant's expense when roadway improvements are made.
HE Findings, Conclusions and Decision ZE-7-96 Page 8
, , - _ _ - • F ,
.
d. Th~ future acquisitivn area, until acquired, shall be prxvate property and may be
used as allowed En the zone, except that any improvements (such as landscaping,
garking, surface drainagef drainfield, signs ar athers) shall be cansidered inkerim
j usesi
e. The property owner shall be responsibIe far relocating such "interim"
inlprovements at the time W5DC]T makes r+aadway impravemenks after acquiring
said Future Acquisition Area.
f. If is later determined by WSDOT ar a court of law that such area is not needed
far right of way purpases by WSDOT, the future acquisition area shall be released.
SPOKANE COUNTY DIVISION OF EN~INEERING
Prtar to issuance vf a building permit ar at the recYuest af the County Engineer xn
conjunction with a Cour►ty Road Prvject/Road Improvement District, whichever action
comes first:
1. Applicant shall dedicate 5feet an Mamer Road far right of way and[ slope
easeatents as necessary.
Prior tv release of abuilding permit or use vf the property as praposed:
2. Access permits for approaehes ta the Caunty Road System shall be obtained frnm
the Catinty Engineer.
3. Applicant shall submit for acceptance by the Spokane County Engineer, road,
drairxage and access plans,
4. 7'he applicant shall subrn.it for approval by the Spvkane County Engineer and the
Spvkane Caunky Health I]istrict a detailed cornbined on-site sewage systern plan and
surface vuater disposal plan for the entire project or portion th,ereof if the development
is phased.
5. A parking plan and traffic circulation p1an shall be submitted and apgroved by
the Spokane County Engineer. The design, location and arrar►gement of parking s#alls
shall be in accordance with standard engineering pracfiees. Paving or surfacxng as
approved by the Coun#y Engineer will be required for any portion ~f the project whieh
is to be occupied or traveled by vehicles.
6. The construction of the roadway irrxprovements stated herein shall be
accomplished as appraved by the Spvkane Caunty Engineer.
HE Findings, Conclusivns and Decisian ZE-7-96 Page 9
.
7. The County Engineer has designated a Commercial Local Access standard for the
improvement of Mamer Road which is adjacent to the proposed developmenk This
will require the addition of approximately 8-10 feet of asphalt along the frantage of
the development Curbing and sidewalk must also be constructed.
8. All required improvements shall conform to the current State of Washington
Standard Specifications for Road and Bridge construction and other applicable county
standards and/or adopted resolutions pertaining to Road Standards and Stormwater
Management in effect at the date of construction, unless okherwise approved by the
County Engineer.
9. Roadway standards, typical roadway sections and drainage plan requirements are
found in Spokane Board of County Commissioners Resolution No. 95-0498 as amended
and are applicable to this proposal.
10. No construction work is to be performed within the existing ar proposed right of
way until a permit has been issued by the County Engineer. All work within the public
road right of way is subject to inspection and approval by the County Engineer.
11. All required construction within the existing or proposed public right of way is to
be completed prior to the release of a building permit or a bond in an amount
estimated by the County Engineer to cover the cost of construction or improvements
shall be filed with the County Engineer.
12. There may exist utilities, either underground or overhead, affecting the subject
property, including property to be dedicated or set aside for future acquisition.
Spokane County assumes no financial obligation for adjustments or relocation
regarding these uiilities. Applicant should check with the applicable utility purveyor
and the Spokane County Engineer to determine whether applicant or the utility is
responsible for adjustment or relocation costs and to make arrangements far any
necessary work.
13. After review of the proposed rezone in conjunction with ZE-84-81, Spokane
County Engineering is not requiring a traffic analysis for this proposed development
based on the site plan of record. Should any further request be processed for additional
square footage of buildable area, a detailed traffic analysis will be required.
SPOKANE COUNTY HEALTH DISTRICT
1. A combined surface water and sewage disposal detailed plan shall be approved
by the Spokane Counfy Engineer and Spokane County Health District prior to the
issuance of any on-site sewage disposal permit or building permit for this project
2. Sewage disposai method shall be as authorized by the Director of Utilities,
Spokane County.
HE Findings, Conclusions and Decision ZE-7-96 Page 10
.
Y
3. Water sei-vice sha11 be eovrdinated through the iDirector of FJtilities, Spokane
County.
4. Water service shall be by an existing public water supply when approved by the
Regional Engineer (Spokane), State Department af Hea1th.
5. Disposal of sewage effluent beneath paved surfaces is currently prohibited.
6. Subject to specific application approval and issuance of perrx►its by the health
officer, #1xe use of individual on-site sewage disposal systems may be authorized,
7. Use of private we11s and water systems is prahihited.
SPOICANE COUNTY DIVI~IO1V OF UTILITIES
1. Pursuant ta the Board af County Comaiissivners Resolution No. 80-0418, #he use
of on-site sewer dispasai systems is hereby authorized. T'ws axxthorizatian is
conditianed in compliance with a11 rules and regulations of #1xe Spakane Cvunty Hea1tt
District and is further conditianed and subject fa specific applicaboxt apprvval and
issuance nf permits by the Hea1th X]istrict.
2. A Covenant Agreement shall be signed stating. "7he owner(s) ar successvr(s) in
iftterest agree to authorize the Cvunty tv p1ace their naa1e(s) an a getitian far the
formation of a ULID by petition method pursuant to RCW 36.94 which the petition
includes the owner(s) property and further not to object by signing of a pratest petition
against the €arrnation of a ULID by resolution rnethod ~ursuant to RCV1T 36.94 whuch
includes the owner(s) property. Provided, this candition shall nvt prohibit the
owner(s) or successar(s) frvin abjection ta ar►y assessment(s) an the praperty as a result
of improvennents called for in canjunchan with the formation of a ULID by either
petitian ar resolution under RCW 36.94.
3. Each new unit shall be dauble-plumbed for cornection to future area-wide
ca1lection sys~ems.
4. A.xxy water service for this project shall be provided in accordance with the
Coardinated Water System Plan for Spokane County, as amertded,
SPOYCANE CC)LJIVTY AIR POLLUTION +CONTRC)L AUTHORI'TY
1, A11 air pollution reguiations must be met
2. Air poffution regulations require #hat dust emissians during demolition,
cons#xuctian and excavation projects be controlled. This may require use of water
sprays, targs, sgnnklers or suspension of activity during certain weather conditions.
HE Findings, Conclusions and Decision ZE-7-96 Page 11
Haul roads should be treated, and emissians from the transfer of earthen material must
be controlled, as we1l as ernissioras from a11 vther construction related activities.
3. SCAPCA strongIy recommends fhat all traveled surfaces (i.e., ingress, egress,
parking areas, access raads) be paved and kept clean to rninimize dust ernissions.
4. Measures must be taken to avoid the degositivn vf dirt and Ynud fram unpaved
surfaces onto paved surfaces. If tracking or spi11s occur on paved surfaces, measures
mxxst be taken immediateXy to c1ean these surfaces.
5. SCAPC,A Regulation I, Article V, requires that a 1Votice of Canstruckion and
App1ication for Appraval be sulamitted to and a~proved by aur Agency prior to t.he
canstructian, instarllation or estabIishment of aYr pailution source. 'Y`h.is includes any
f-uel fired equipment rated at greater than 400,004 BTLT f hour (bailers, hot water
heaters, ovens, etr...) as weil as other sources af air contaminants,
6. SCAPCA Regulation I, Article IV requires registration with tltis agency.
7. SCA.PCA. Regulation I, Article N, and SCAPCA Regulation iI, Article IV, address
emission standards. A►11 emissivn standards must be meL
Debris generated as a result ❑f this praject must ke dispased of by means other
than burning (i.e., canstruction waste, ete.).
9. Demvlition and renovatiorr projects must comply with the requirements of CFR 40,
Part 61, Subpart Ivi and of SCAPCA Regulation I, Article DC, both of which address
asbestos concerns. Intent ta Demolish and Penovate farms are available at the SCAPCA
office.
10. Sarne objectionable adors may result from this praject (asphalt fumes). SCAPCA's
regulatians state that effecctive con#rol apparatus and measures must be used tv teduce
odors tv a mirumum.
W,PiSHINGTON STATE DEPARTMENT OF TRANSFORATYO1V
1. The needed right of way shown on attacilment A, dated Apri115,1996, be
reserved as a future acquisikion area for the WSDOT Evergreen f I-90 araterchange, as
lIld1C7ted lIl aboVE` coIlCY1t10I1.S fOI' tle DiVi510n of Bu1ldIng a[,1d PIani11ng. WSDOT
may acquire th.is property at the time when improvements are made by payment af the
fair market value of said future acquisitivn area ignaring the restrictians placed in said
future acquisition area by fhese canditians.
2. Due ta the praxxmify of I-90 and t.he Evergreen Interchange area, signa~e visible ta
1r90 wi11 need to be reviewed by WSDOT.
HE Findings, Conclusions and Derisian ZE-7-96 Page 12
3. Development beyond the 8,100 square foot office building will require that a
traffic analysis be prepared to ensure adverse traffic impacts are mitigated.
4. To ensure that the above conditions are met, WSDOT shall have a signature block
on the building permit
BONNEVItLE POWER ADMINISTRATION
1. Written approval for any proposed use of the Bonneville Power Administration
(BPA) rights of way is required by BPA prior to the commencement of any activities on
the BPA easement area.
WASHINGTON STATE DEPARTMENT OF ECOLOGY
1. The owner of a construction site which disturbs five acres or more of total land
area, and which has or will have a discharge of storm water to a surface water or to a
storm sewer, must apply for coverage under Ecology's Baseline General Permit for
Storm Water Discharge Associated with Industrial Activities. Owners of sites where
less than five acres of total land area will be disturbed must also apply if the
construction activity is part of a larger plan of development or sale in which more than
five acres will eventually be disturbed. Discharge or storm water from such sites
without a permit is illegal and subject to enforcement by the Deparhnent of Ecology.
Application should be made at least 30-days prior to commencement of construction
activities. A storm water permit application form, referred to as a Notice of Intent, can
be obtained from our office. Even if a permit is not needed, erosion and sediment
control is required on all sites to prevent the entry of sediment laden storm water into
any surface water. HE Findings, Conclusions and Decision ZE-7-96 Page 13
• . w
DATED this 3rd day of May,1996.
SPOKANE COUNTY HEARING EXAMINER
Michael C. Dempsey
Chief Examiner
NOTICE OF RIGHT TO APPEAL
Pursuant to Spokane County Resolution No. 96-0171, the decision of the Hearing
Examiner on an application for a zone reclassification is final and conclusive unless
within ten (10) calendar days from the issuance of the Examiner's decision, a party of
record files an appeal with the Board of County Commissioners. The Board will hold a
closed record hearing under procedures to be adopted by the Board. Following the
closed record hearing, the Board may affirm, reverse, modify, or remand the matter to
the Hearing Examiner. The date of issuance of the Hearing Examiner's decision is three
days after it is mailed, as provided in chapter 36.70C RCW.
(This Decision was mailed by Certified Mail to the Applicant on May 3, 1996)
HE Findings, Conclusions and Decision ZE-7-96 Page 14
/
OFFICE OF THE SPOKANE COUNTY ENGINEER
1026 W Broadway Ave, Spokane, WA 99260-0170 (509)456-3600 Fax 324-3478
"ENGINEER'S CONDITIONS OF APPROVAL" ZONE
TO: Spokane County Planning Departmen#
FROM: Division of Engineering & Roads ,
DATE: November 6, 1997 '
PROJECT: C O C SQ FT 19,900 TO 64,867 ~ 81100 TO 32,996
FILE ZE-0084C-81 (ZE-0007A-96) /
Hearing: 11/09/1997 @ 1:30 #1
Review Date: @ #
Sponsor/Applicant: JOHN SWEITZER
Section Township Range: 10-25-44
Planner: LOUIS WEBSTER
Technical Review Date: ( @ )
The Spokane County Engineering Department has reviewed the above referenced
application. The following "Conditions of Approval" are submitted to the
Spokane County Planning Department for inclusion in the "Findings of Fact,
Conclusions and Order/Decision" should the request be approved.
Prior to release of a building permit or use of property as proposed:.
1. Based upon the traffic analysis prepared for this proposal, the
applicant shall participate in 311 of the cost for the installation of
a traffic signal located at Mission Avenue and McDonald Road. Prior
to the release of a building permit the applicant shall enter into a
developer's agreement with Spokane County to determine the required
cost. All previous zone change conditions are applicable.
CC: Applicant JOHN SWEITZER
Engineer/Surveyor
Planner LOUIS WEBSTER
ENGINEER' S RF,`VIEfV SHEET
AS BUiLT PLANS RECENED
REZONE FILE #ZE-007-76 _96
Related File # ( ) , i
~
AARD # ( DRZE-168-96 ) i
,i
Date to Review -Y 04/ 18I1946 # 2
Date tu AA & DR 02/07/ 1996 Time 2:15
Date Received Q 1/30/ 1996
Praject Name UR-3.5 TO UR-22 OFFICE No. Lots o No. Acres 2.92
Range - Township - Section
45104.0201
STTE ADDRESS N MISSION/E MAMERIS NORA PARCEL ~
Applicant's Name TOM CLEMSON Phone # 747-0999 ~
Address INLAND CONST CO Phone 2# i
JOHN SWEITZER
107 S HOWARD STE 300
SPOKANE R/A 99204
,
{
FI.OOD ZONE No W S School 361 Date Coadipons Mailed
~
Bill.ing Name Owner TOM CLEMSON Engineer {No Engineer}
Address Address 102 E SPRAGUE Company
SPOKA.NE WA 99202 Address
,
Signed Ciry Pfione phone 747-0999 Phone/FAX (509) FAX Q
Date
Building Coatact Person: LOREN LAKSHAS/STEVE DAVENPORT Phone # 456-3675 1
Date Submitted Description Initials
DATE FEES RECEIVED
DATE PRIORITY FEES RECEIVED COPY TO ACCOUNTING
FINAL PLAT FEES COMPLETED & COPY TO ACCOUNTIN
I / NOTICE TO PUBLIC a 13 4 6 COMPLETED - OR NEEDS TO BE SIGNED
DESIGN DEVIATION SUBMITTED/DATE COMPLETED - MAILED / J
I I ALTERATION TO PLAT - BLOCKS & LOTS
BOND QUANTITiES 1=0R DRAINAGE ITEM CALCULATED
/ J DATE BOND RECEIVED - BOND AMOUNT RECEIVED f
! I DATE BOND RELEASED - DATE AS BUILT RD PLANS
04/ 18! 1996 HEARiNG EXAM APPROVED )ENIFD )PEALED BCC
APPEALED FROIECT 4PPROVED ENIED
STAMPED MYLARS TO PERMIT TECHNICIAN (SYL/SUZANNE)
a
I I STAMPED 208 LOT PLANS TO ADMINISTRATIVE ASSISTANT (SANDY)
~
,
ENGINEE`R' S kEVIEW SHEET
AS BU1L'I' PLANS RECEIVEU ~
DR REZONE FILE # ZE _
Related File # ( )
AARD tY ( DRZE-168-96 )
Date to Review #
Datc to AA & DR 02/07/1996 Time 2:15
Date Received 01130/I996
Project Name UR-3.5 TO UR-22 OFFICE No. Lats o No. Acres 2.92
Range - Township - Section
45104.0201
SITE ADDRESS N MISSION/E NiAMER/S NORA PARCEL
Applicant's Name TOM CLEMSON Phone # 747-0999
Address INLAND CONST CO Phone 2#
JOHN SWEITZER
107 S HOWARD STE 300
SPOKANE WA 99204
FLOOD ZONE No W S School 361 Date Conditioa5 Mailed
Billing Name Owner TOM CLEMSON Engineer
Address Address 102 E SPRAGUE Company
SPOKANE WA 99202 Address
sig°ed Phone 747-0999
Phone Phone/FAX FAX
Date
Building Contact Person: LOREN LAKSHAS Phone # 456-3675
Date Submitted Dcacription Initials
DATE FEES RECEIVED
DATE PRIORITY FEES RECEIVED COPY TO ACCOUNTING
FINAL PLAT FEES COMPLETED & COPY TO ACCOUNTIN
l I NOTICE TO PUBLIC fi 1 3 4 6 COMPLET'ED - OR NEEDS TO BE SIGNED
l/ DESIGN DEVIATION SUBM[TTED/DATE COMPLETED - MAILED I;
I I ALTERATION TO PLAT - BLOCKS & LOTS
~ I BOND QUANTITIES FOR DRAINAGE ITEM CALCULATED
DATE BOND RECEIVED - BOND AMOUNT RECEIVED
DATE BOND RELEASED - DATE AS BUILT RD PLANS
HEARING EXAM APPROVED )ENIED 'PEALED BCC
APPEAL.ED PROIECT APPROVED ENIED
l 1 STAMPED MYLARS TO PERMIT TECHNICIAN (SYL/SUZAHNE)
STAMPED 208 LOT PLANS TO ADMINISTRATIVE ASSISTANT (SANDY)
~
~
/
,
t ~
_r--', " ~ ~ ~ + ~ ,,,n ,
l
x+ N
~ f1 , Q ,
D , 0 "t ► ' ,
tn
'r~-~, ~
~
~ .MfcqBE. C - . 1 ` f.~• ~ ,
~ - ,
D ~ ~ / 1► ~ ~ ~ ~
. ,
~ ~ p • . ~ ~ l~ r, ~
~S _ ~ ~ ,g • 3~ ~
~y 1~ r 1~~ 4
R ~0p0 20 ~ Z6 Zt
~ '~h , ~~1121 2~ ~ ~ ~
~ y.► ~ j~ 1~ ~ ~ ~1
/►j~ - 16 ~ ~ '
Ra ~
M: v~a~~~~`~ i . ~
1 ~
~ - "►o ~ ' ~ ~ ! ~
5
. p ` t~ ~
r pN r i 1 ~
. ,
r ~
r.t.w
~
yilA
~ -,,,~„i• r~ 1 / , ✓
~ . ~~M ' t+1 • ~ 1 ~'/"i
l `
r r ~
t'
.
~
~v R/!
~
ZE=7=96 "
~
N 1=3
10 RRwIO-
tio RR4310 N . ~ .
. ~ ~
. ~ .
.~fir
-
~ ' ' • • `
. 0
. 3
~
~
~ MisslloN vE.
~
UR•3.5
o , .
U R 2 2 UR_I2 t•.
.
INT UR -22
R O V E
-2 W =
' x
UR •Z#1
Mw3~~ J Z 2 t
► E 5 M E T . ' T ~ C3 ~ ~ ~ ~
ATA'L d' CATALDU . • ~ ; ~
i Q
~ ~ T/► t
w~.~.dv GT. ~
. ~~f. ~ .
09 ZuR -7 a
. ,
AY m AV E
14
~ UR-22 ° .
. I Av Z
. ~
; UR•22 . < URw3. ` ~
o
VG L L ~
t
4/96 HF,C Staff Report for ZE-7-96 Page 2
A
~ =7=96
ZE
~
~0
~ • • ~
.f~ • .~"r,N. ~ ~ a... • •(s 1
:1 • 10~6 ' ; p ""o^..,'
„ ~~y ~.'5
:
oine PIaMe ~ -~v9~ • `
ry SitE Pstk W@ll . . ° ~ + o . . " • _ , ~ ~ .
. _ . ~
• ~ • ~ ~ •~'i • e~~si o i~ ~
• • ~ ' ~ ~ • ~ • i
4 ~ .~`~r wr+`• • ~ M~ ~ ~ • ~ • 2040
~ N~• ~ ~
~ • 1 ~ ~ ~ ~ 1 ~ . • •0~
: y . . ;!o • • ~ , ~
~ ~ • N~~~~- .
• !
~
. i~~~ ~ ° ~ ~ ~ • M ~ • ' ~ _ H M 2023 - 'r2020''
~v"~'+` i• ROA
~`J ~ ~ ~ • ~ .St ~ tW00~ , ~ ♦
, a ~,1
k . ~s N
t . , ~ ~ ~ ~
~ca r . •~io . ~ . ~ ~ ~ ,
' R1NERN WabrTsnk Gn
♦ ~
gj,f ~ . t i~ ~o
Z~3 - ~ • w • I
, . c_ . - • ~ . ~ ~ ; . ' ~ 9d bt~an ~ ~ y
; ~ - ~i~ . . . ~ . ~ • ~ . _ . _ _ .
~ . •`~y6~ ~ i • ~ a . .
~t ~C~ : • ~ _ar^ r- ' ~ J . ' . ,
Y .
. ~ ~ ,jp~0'
~ " . • ` ~ ~ ' . , . &wxD&
' ~ . . ~ ~ ~ X ~OrIOw
' ' • - . .x f.~ ~~c
~ ` ` ~
~ . r~~Or~ ~ , • , ~ ~ r ~ ~ _ .
' •,t t~l~.A~t~~;(ti.~ P eR
. i I~ ~V, • ~ ~ ~a~ ~ .
~OY, ~ .
' ~ t - • r • _ - .
ti ~r ~ , ~4~~_ „ 12
w •
I„f. ~ ^ j 'i'~ ~ ~ ,
y ' • ~ r . % ' ' ~ a ~ 80 ~
r• ' 1 i . r ~xi -
w ~ ~ ♦ ~
„ ~ ~p ~ NE • t~~ti~.~, allivsa-,
.
~ _ ' . • `
_ ~ • . r ~ ' _ .,y.~~s= ~ _ .•A~ { • •
` , ~ , A ~ . ~t~r i ~ ~ti :
~ • ' ' . y ~ ~ •
. . _ • . ~ ~ s a ~ . i „ R - 1 - ~ . ~
4*=t~°'
~val ~ . . ~
~ •i • " • ~ • ~ r
. ~ - i ~ ~ , - ♦
sj
' ~ 1 ' • •
~ u ~ ? • . ~ , f a' t~ ~
~ ' D~
YE •re•e.e~ ~ • .f,r y ~ .
wti
t C • ` ~ ~
I ' ' ` • • ' ~ • r ~ w C ~ , •
t.
YT _
c ~ M . • rOS? • , • o
f ~ ~0~ • ~I ~ 4 . • O
~
,A ~
• v-'-° • .i~ , , ~ _ ^ , ' . ~ ~ ~ : ~ •
; . r e
. . • • 2 - :r.. , , i~ . ~3~ ~ ~
~pwOWA 54,
_ ~ , . ' tl! ' : , s''~ . ~ • _ . • • ~
~ "~+---1 { . ~ _ Y " ~ p • ~ i : Ya
~ ~ !y".~ ~ ' i'~...~ . ,n:' • ~ • •~~~~~~~^'i
. aOiC~, , . • > i
~ I - i _ , /~.~~1 li ~ : • • ~ ~O • • O t
WAM ~ ' • ~ . ~ , . ' • ~ ~ , ~ .
1'~6 $U~U n~ • r ~ ~„r • • ~
►PPO'~T~~T ~ ~ ~ , E - ~ A : ~ ~ ve ~
_ ~ • r~d~i .
r . t
c ; t..,.'~+~± ~ a.
' • . t , ~ - ...r o
i iOML ~ a ~ • • • ~ ~ ~ ~ r S
AvE • . ' i~
PRA6lI~ • ~ Q t~ ~ e a~ ~ • i •
.
CABO- . f •
'v, JP_
s~ r ~ , ~ •d , ~:O~i . ~ • ~ u ~ VP.rB• ~
~ , " i ~ • ~ pN ~ : ~ • ' ti Gi
e . . , ~ ~ . .
mmv
. ~ • : ♦YC -
~ • stY~~ ~ •TM • ~ ~ ~ • • .t a. s "
~ . ~ ' • ~ ~ ~ ~ ~ • s ~ ~ ~ ' •
"000 • ~ ' . _ ' 'i~• r ' r'' • •
.._..r 2p/~~ ~ a e ~ ~ ~
A~,6
v£NUE I ' '6^ ~ .
_ r,'_~ ~ ~ i~ ~ a ° e _ ~ O • ~ ^ ~ '
~ 4 ~ • , • ~ ~ ' - '
•
staWe r~W~ll ~ #0' ~ q
. o • • Adsa~~ ~ • ~i Q'~ . 1 . "vda. i
0,22 R7- ~
~ Page 3
4196 HEC Staff Report for ZE-7-96
A
ZE=7=96
~j • 3 " iacaa~~vw ~ • e_'-- ' ~
• ~ . . • . . - - - - ~ ~ , :r Yr .
0016
0 ~ ~ ~ ~ ~Y..:..i'
~
NERN .i ~ia i ' r~ • • • i.
oR . •
rl Water Tenk -
7 '
Grav „ : ~ .
1993 ~ Z :`.~•r~,<.~ y~ / ~tx ~ ~
. W ~,~,~,~•fv,~:,~! ~ ~ i
• • ~ - ~x~- ~ •z~
~ / ir ti ~ YII r ~ • , 1~,`'r ' }
~ . J/ y~ I~ • • - • • 4L
~ \ - ~ • -►,.-1` ; ' I-. ~ ► . iSub tation
rcnt ' j ' 'n` : - ~
use
994 + v + f~ . • r
' • , j ~ ~ ~''k ~ _ ` ~ j0/ ~ •
~ • .
• S ' ~Well
ZOD4
\ ~ 1 • 1 ~
~y
~ ~ II ~t/.Q ~
t. ~•r L y ~ ~ . ~ • COffOW
~ , i a ; • . ~ 1 Z CA 0 1t . 400
1 N'l. N 0 ~ @tM;R I'R ~ ~ ~~4 ' ~ •
~ •
` ~zo o , 9 9owe
~
~ t~ ` , _10
1 l ~ L~ .~~r~ ~ 1 Y ~ ~ + r •
~ t ! r ~ `r'fa P
T1 eorrowx
_s..'►~ . 'W .T.,{SP_~KANE _ _ ~ fNTFRNA ~ `P~t,
_ ~_.5 N ~ o• - - . ^ . i ~i~~_~ .Q~,~• ti Sullive ~
Vp
• n ~ • , Park
_ _ ' ~ ~ r ~ Y t`~j 4, ~
. ~ ~ ' A , 11 ' O . • ~ ~ M ~ ~ .
. J ~ ~ O _ ~ • ~ n J` ~I Q ~ " ~
MISSiew ~ ~ , • ~1 ~~o _ " ~ • ~ ~
SpOke 0~/s~~ ~ A ~1~ ~ 3 ~ ~~IOp~ ~ ~~~F ~ y ~
Ho - tl a.~ ~ ~ p , c • ~J''
i ~t , ~ a.. . ~ - ~ I ' ~ ~ . ~ • .p:R ~
TT Trr~Jr ' ~Jr
i
A{/E
a •
~ 0 a • ~ ~ ~ ~ 1 • - ' i ' ~ 1• •
t
•WT
4 _ ~ ~r ~ • ~ ~ a°'~ BR 0 1111 :
i 1 A
2-M
~ e " , ' £ '4 ' • ,
1 C---~ ~ • _ ...~irrr~a: us O j• o ~ 1
•effrem
~ - ; well ,
, . . . ~
Y ,
~ " JOS? u
' ?+Os6Q . . ~a , J~ • ~
AV.
WAY "'t~ . ~ . ~
...U StBt 'f1 f . y V LC Y • . ~t • ~
`
tOPPORTUNIT . ~ ]J I ~ • ° ° • ° . ~
~ -~-~j o •
~
~ ~ VeradaIe
A l1E S _ O2~ ~ O ~ q j ~dl~~ ~ ~ • • ~ • . ~ ~ •
t V~AI~ ~ ~ . , . .o~ - . . ,t. , . . . . . ,
o..... • ~ o of ao •.o
. .o
ST
K .
ALfJrMlf ~ •4, o $t Marys . Al . , ;
h • ' . 3eb • • . r i•~~-~
0 • O • ti
' ~ o ~ i ~ ' " ' ' • .
~ t" _ _ _ ,~3, . . • ' ~ ~
~+~tn • ~ ~ . . io-• . 1
Ka~retano ~ Well r_ ~ • '
•i~• •gr
~5CI1
?oi~ •11~~CC~oh C~6 Adam• . . =0Z~
` ~ •~.ist i~ ~"F oo
2 n . ~
2'
t ~ ~ ' • . Z ~ : .l. , - Ceattsi Vallqq
: la:t~ ~ . • , HiaH !t~
' '1~' ~ ~ ~ • •J~~`i ~'!2~+ • ~
. = ~:d _ 1='~'- . ; - - I : . ~ . • ~ , ~
~ ~ • ~ ~ /
. 10 1~ • ~ • • ' I
K^ss ta~:r¢ 'Ui.= 3~ • l~ ~ • • p~ ~ ~ ~ ' , ' . ~ ,
~
12Thf _LAVfNUf • j_~~ • iZ.:c ~ _ •
~':~•G-,. ~ ~L~T~ it~ i ~~+►_T.f v~.~_'~a r'C~I~--r = ~ ~ r•/ Xio
~ • j • ~ ~ ~ •t~~• • •
j 1 L 2060 • oc o o ° p ~ i i r ~'i
T ,c ~ ' ~ .scs:... ~ ~ ~ • ~
• ' ~ ~ ~ i~
~ ~ ~ ' ~ o • ~11~~~ . ~ ~1 ~ i
--.4~► Wel~ N i~.-~-~---~~ _ ^ • ~ !
\ J~/
4/96 HF.C Staff Report for 2E-7-96 Page 4
i
,
4~b
ll~.
~-A
co
~
~
rn
m ' Ac uNi,vt~f
c/> zONE~ CHANCE Rcx.INC rl r.: •
r
c+ - i • i
SL r ~ ~ ~
~ ,~rr w.nowrrwmw e~L. Fa+•SSbCtlts'nPl
fi Sao•!'OMyap
1ot~an N.1HIYnwRaO fMpa 55'pCL/!S'qPl ~ • l
Rem►roNln 4S10/A~Ot ~ M•• ~ `
~
(D a+nroHBOtsc.r,c ' - t
~
NN 191.115YQ0]IiCes) r
Q Rfpurtllm0~ap~ dcfh 20" TYpo
~ w y,r••.~, '
I ` _owe plopopE a 11!'ll EN7 2011 7v" I I
YWY III TMAI ~
hooora uw omloll n etlo. Mo 14 ' I
peq~ LwdocmOnO Mam bll Tlm ■ !
Q` Ld Cw~rp p! Et~ I.NI EoW ron . t
!at IOA Trpr W ~ ~ -
. ~.~i PWUp RwAi1rA' 21 po011 Ww TV" N M
~ Orr b1 '~1a 11W1 ~ i j • 1 ,
PROPOSfD YY5001 iROPfR1Y 1!E RI'
ZONE CHANGE ~~NTF,~
srq rF ~ . .
c0 ~ -''y-...
0)
s... . _ .-i"" r' - - - ~ IANOSCAfE
y, • ~ ~ i' i ~ ~ ~+ti - ~p~~~y
~ ~ ` _ _ ~ - _ ~ I I r~~ IIKiI~l1
~ , i, • - 4-1- 7 nre fu
~ I ; u }i r~r 2 i '
( r .t...~ i ~ IANOKA
I ~ r ~ 1 ~ ~ f „ ~
~ w ' ~ 1 ,1 ~ ~ / . ~r~ `4~T1~ " ' ~ ,
~ • ~IIY~ 1~ •YrnWnm1OK11i~IV~W ••M r~ ` ~r~ IIY
~ M~~/I~
/RIOR101DRRNIE ,nZoB~ ~ ` ~ ~47'
~ ~ ' ► ~ Ta. BPA EASE ENT• ~1 , _ f~% ~ ~
~ ~ ~ y • a~a ro ~ non ~ f ` • / ~ i ~ ~ } ~ I
I ~ I
r ,MENO, aEGARDIF4 WSWT . . . ~ , , ~
4~~/~+1 ' ~e~~~w* ~++~xr a ►aA„►w+~n, i
~ Oftice BJildinR rcrao~r~►~
: 8100 d
i . \ ~ -I ~3iip1~ Srory I
~ ` 10 ' % I ~`~1 - ~ - ~ ~ ~
- - - - - - - - 1 _ f
, I' ~w"••~' . - l L
. . • `1 - - ~ , , ~ 1
~ ~ ~ - - • • .
'O
a
~
SlTE PCAN
`n 0F RECORD
7 J
h
. ~
DIVISION OF BUILDING A1VD PLANNING STAFF REPORT
TO: SPOKANE COUNTY HEARING EXAMINER
FROM: CURRENT PLAN1vING SECTION
DATE: APRIL 18,1996
SUBJECT: ZE-7-96; ZONE RECLASSIFICATION FROM URBAN
RESIDENTIAL-3.5 TO URBAN RESIDENTIAL-22
1. GENERAL INFORMATION
Applicant: Inland Construction Company
Tom Clemson
102 East Sprague Avenue
Spokane, WA 99202
(509) 747-5162
Agent: John Sweitzer
107 South Howard
Suite 300
Spokane, WA 99204
(509) 747-0999
Contact Planner: Steve Davenport
Location: Generally located east of and adjacent to Mamer Road, south of
Interstate 90, approximately 500 feet north of Mission Avenue in the SE 1/4 of Section
10, Township 25 North, Range 44 EWM, Spokane County, Washington.
Proposal: Zone reclassification from Urban Residential-3.5 (UR-3.5) to Urban
Residential-22 (UR-22) for an 8,100 square foot office building and those uses allowed
in the Urban Residential-22 (UR-22) zone. The applicant is requesting development of
a unified site development plan including the subject property and the adjoining
property to the south.
The parcel to the south has an approved site development plan from a 1981 zone
reclassification (ZE-84-81) that permits construction of 28,000 square feet of building
for Light Industrial (I-2) uses. In a sepazate application, the applicant is requesting an
8,100 square foot reduction of the 1981 approval. This reduction is then proposed to be
utilized for this proposed zone reclassification on the subject property. This transfer of
development rights is requested to allow flexibility in the siting of the business within a
unified site development plan and would limit the impacts of the overall development to
no greater than that of the approved 1981 site plan. See file ZE-84-81 for details of
adjacent proposal.
II. SITE INFORMATION
A. Site Size: Approximately 2.92 acres
4/18/96 HE Staff Report for ZE-7-96 Page 6
t
B. Comprehensive Plan ~
1. Land Use Plan: The site is located within the Urban category of the
Comprehensive Plan. The Urban category is intended to provide for the
development of a city-like environment including a variety of land uses. The
Urban Residential-22 zone is intended to implement the Urban category and
considering the location of the site, the proposed use is consistent with the
Urban category.
2. Arterial Road Plan: The Spokane County Arterial Road Plan identifies
Mamer Road as a local access street. The Spokane County Engineer is
requesting 5 feet of dedication on Mamer Road.
Interstate 90 and Everareen Road Interchanae
Interstate 90 is north of and adjacent to the proposal. The proposal is effected by
planned development of the Evergreen Road and Interstate 90 interchange. A
portion of the site is included in a right of way access plan that was jointly
developed between the Washington State Department of Transportation
(WSDOT), Spokane County, and the Price Hanson Development Company.
WSDOT has expressed concem that siting of building could create a potential
conflict with acquisition of property as specified in the right of way access plan.
WSDOT has submitted recommended conditions to address the needs for future
right of way and are in discussion with the applicant concerning acquisition of
said right of way.
C. Site Characteristics: The site is relatively flat and a single family residence has been
recently removed from the site. A Bonneville Power Administration easement and
power line crosses the site.
D. Zoning Analysis:
Proposal: Urban Residential-3.5 (UR-3.5) established in 1991, previously
classified as Agricultural (A) (ZE-24-42)
North: Community Business (B-2) (Interstate 90)
South: Light Industrial (I-2) established in 1991, previously classified as
Restricted Industrial(R-I) (ZE-84-81).
East: Urban Residential-3.5 (UR-3.5) established in 1991, previously
classified as Agricultural (A) (ZE-113-56)
West: Urban Residential-3.5 (UR-3.5) established in 1991, previously
classified as Agricultural (A) (ZE-24-42)
A mix of Urban Residential-3.5 (UR-3.5) and Urban Residential-22 (UR-22) zoning is
found in the area. The Light Industrial (I-2) zoning to the south is the only industrial
zoning in the area.
E. Land Use Analysis:
The surrounding area consists of a mix of office, single family and multi-family
residential uses. Multi-family uses and medical offices are found along Mission
Avenue to the south of the proposal with single family and office uses found along
Mamer Road and Nora Avenue.
Site: Vacant, BPA power line.
North: Interstate 90
South: Single family residence.
East: Water tower reservoir.
4/18/96 HE Staff Report for ZE-7-96 Page 7
ti
West: Single family,residences.
F. Circulation: The proposal is adjacent to Mamer Road which will provide primary
access to the site. Internal access will be provided by a private driveway. The
Washington State Department of Transportation (WSDOT) has expressed some
concerns about the effect of the unified development plan on right of way acquisition
plans for the Evergreen Road and Interstate-90 (I-90) interchange. See discussion
under IIB of this report.
G. Design: The proposed site plan illustrates a 8,100 sq. ft. office building with
associated landscaping and pazking. The site plan could be significantly impacted by
the planned acquisition of right of way for the Interstate 90 and Evergreen Road
Interchange. Additional freeway right of way or implementation of a future
acquisition area for the freeway would require setbacks that would force relocation of
the proposed building. The site is additionally restricted by a Bonneville Power
Administration easement which does not allow permanent structures within the
easement.
The applicant is intending to develop the site in conjunction with the parcel to the
south, within a unified development plan (see file # ZE-8413-81).Should the applicant
develop the site in a unified development plan a lot line adjustment could be applied
for to eliminate the requirement for a rear yard setback on the subj ect property.
1. Site Plan Data
Proposed Site Plan:
Use: Office.
Proposed Buildings: One
Building(s) Footprint Area: 8,100.
Site Coverage: Approximately 6.4%
Structure Height: Single story (50' maximum allowed in zone).
Building Setbacks: Pronosed ReQUired
Front yard (Mamer) 450+ feet 55/25 feet
Flanking yard (I-90) 35 feet 25 feet
Side yard (east) 25 feet 5 feet/story
Rear yard (south) 25 feet 15 feet
Parking 3 5 spaces 23 spaces
Landscaping/Buffering: The applicant is requesting modifications to the
required landscaping as provided for in Section 14.806.020 of the Spokane
County Zoning Code. This section allows the Division of Building and
Planrung to permit alternative landscaping when the overall site development
plan provides as good as or better results per the criteria set forth in Section
14.806.080. The applicant is requesting the following revision to the required
landscaping:
ReauiredProposed
East property line 20' of Type 110' of Type III
West property line 20' of Type III 5' Type III, Future phase
4/18/96 HE Staff Report for ZE-7-96 Page 8
«`~P~~7P R'"'i • " 'r
n
~
East Propertv Line . tk
The reduction of landscaping on the east line may be appropriate considering
that the adjacent use,is a water tower and the landscape screening requirement
was intended to buffer residential uses from industrial uses. The proposed
alternative landscaping does provide as good of a result as the required
landscaping.
West Propertv Line
The request to eliminate the requirement for landscaping along the west property
boundary is not supported by administrative criteria. The Division of Building
and Planning does not support this request.
Note: Landscaping along the south boundary of the subject property is not
required.
Other Site Plan Considerations: The site plan submitted for review by the
Hearing Examiner is general in nature. Detailed review to determine
compliance with a11 Code regulations and conditions of approval is
recommended to be administrative and to occur at the Building Permit sta.ge.
H. Drainage: A drainage plan is required. This plan must be reviewed and approved by
the County Engineer's Department prior to development.
1. Water Supply/Sewage Disposal: The proposal is within the Vera Water and Power
service area. Sewage disposal will be by septic tank and drainfields. Appropriate
provisions for water and sewer service are required prior to the issuance of building
pernuts.
J. Fire Protection: The proposal is within Fire District No. 1. The Fire District and the
Division of Buildings Department (Fire Mazshall) are required to approve fire
protection provisions prior to the release of building permits.
K. Critical Areas: None have been identified.
L. Cultural Resources: None have been identified.
III. ENVIRONMENTAL REVIEW:
An Environmental Checklist was submitted by the sponsor and was reviewed by the
County Planning Department. The review considered the specifics of the proposal,
other available information, County ordinances, other regulations and laws, possible
standard Conditions of Approval, the Generalized Comprehensive Plan, and other
County policies and guidelines. The Planning Department has deternuned that "No
probable significant adverse impacts" would result from the proposal being developed
and has issued a Deternunation of Nonsianificance ("DNS").
The "DNS" was circulated to 16 other agencies of jurisdiction and other
agencies/departments affected by the future development for review and comment. The
"DNS" comment period ends April 16, 1996 and was advertised 15 calendar days before
said date in the newspaper, by letter to adjacent property owners within 400 feet of the
proposal, and by notice on a sign posted on the proposal site. The Hearing Examiner
may consider additional environmental related testimony at the public hearing.
4/18/96 HE Staff Report for ZE-7-96 Page 9
r
. `
IV. DIVISION OF BUILDING AND PLANNING SUMMARY AND RECOMMENDATION
The proposed zone reclassification is requested to allow the applicant flexibility in the
siting of his business within a unified development plan which includes property to the
south. The proposed transfer of development rights from the property to the south would
constrain overall development of both parcels to the intensity of the originally approved site
plan in 1981. The Diviston of Building and Planning is generally supportive of this
proposal providing concerns of other agencies are adequately addressed. The Division of
Building and Planning generally supports the request for alternative landscaping as outlined
in this report except for the request to eliminate the landscaping requirement along the west
property boundary which is not supported by the administrative criteria.
V. CONDITIONS OF APPROVAL
i. All conditions imposed by the Hearing Examiner shall be binding on the
"Applicant", which terms shall include the owner or owners of the property,
heirs, assigns and successors.
U. The zone reclassification applies to the following real property:
Tract 97, except the South 475 feet tbereof, and also Except all that part thereof
lying northerly of a line drawn parallel with a distance 100 feet southerly when
measured at right angles from the center line of primary State Highway No. 2
Vera, according to plat recorded in Volume "O" of Plats, page 30, in Spokane
County, Washington.
SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING
1. The proposal shall comply with the Urban Residential-22 (UR-22) zone, as amended.
2. The applicant sha11 develop subject property generally in accordance within the concept
presented to the Hearing Body. Variations, when approved by the Planning
Director/designee, may be permitted, including, but not limited to building location,
landscape plans and general allowable uses of the permitted zone. All variations must
conform to regulations set forth in the Spokane County Zoning Code, and the original intent
of the development plans shall be maintained.
3. Approval is required by the Planning Director/designee of a specific lighting and signing
plan for the described property prior to the release of any building permits.
4. Direct light from any exterior azea lighting fixture shall not extend over the property
boundary.
5. A specific landscape plan, planting schedule and provisions for maintenance accepta.ble to
the Planning Director/designee shall be submitted with a performance bond for the project
prior to release of building permits. Landscaping shall be installed and maintained so that
sight distance at access points is not obscured or impaired.
6. The Division of Building and Planning shall prepare and record with the Spokane County
Auditor a Title Notice noting that the property in question is subject to a variety of special
conditions imposed as a result of approval of a land use action. This Title Notice shall serve
as public notice of the conditions of approval affecting the property in question. The Title
Notice should be recorded within the same time frame as allowed for an appeal and shall
4/18/96 HE Staff Report for ZE-7-96 Page 10
I
only be released, in full or in part, by the Divisio:. of Building and Planning. The Title
Notice shall generally provide as follows:
The parcel of property legally described as [ ] is the subject of a land use action
by a Spokane County Hearing Body or Administrative Official on [ imposing a
variety of special development conditions. File No. [ ] is available for inspection
and copying in the Spokane County Division of Building and Planning.
SPOKANE COUNTY DIVISION OF ENGINEERING
1. Prior to issuance of a building permit or at the request of the County Engineer in
conjunction with a County Road Project/Road Improvement District, whichever action
comes first:
2. Applicant shall dedicate 5 feet on Mamer Road for right of way and slope easements as
necessary.
Prior to release of a building permit or use of the property as proposed:
3. Access permits for approaches to the County Road System shall be obtained from the
County Engineer.
4. Applicant shall submit for acceptance by the Spokane County Engineer, road, drainage
and access plans.
5. The applicant shall submit for approval by the Spokane County Engineer and the
Spokane County Health District a detailed combined on-site sewage system plan and
surface water disposal plan for the entire project or portion thereof if the development is
phased.
6. A parking plan and traffic circulation plan shall be submitted and approved by the
Spokane County Engineer. The design, location and arrangement of parking stalls shall
be in accordance with standard engineering practices. Paving or surfacing as approved
by the County Engineer will be required for any portion of the project which is to be
occupied or traveled by vehicles.
7. The construction of the roadway improvements stated herein shall be accomplished as
approved by the Spokane County Engineer.
8. The County Engineer has designated a Commercial Loca1 Access standard for the
improvement of Mamer Road which is adjacent to the proposed development. This will
require the addition of approximately 8- 10 feet of asphalt along the frontage of the
development. Curbing and sidewalk must also be constructed.
9. All required improvements shall conform to the current State of Washington Standard
Specifications for Road and Bridge construction and other applicable county standards
andlor adopted resolutions pertaining to Road Standards and Stormwater Management
in effect at the date of construction, unless otherwise approved by the County Engineer.
10. Roadway standards, typical roadway sections and drainage plan requirements are found
in Spokane Board of County Commissioners Resolution 95-0498 as amended and are
applicable to this proposal.
4/ 18/96 HE Staff Report for ZE-7-96 Page 11
~
11. No construction work is to be erformed within the existing or proposed right of way
until a permit has been issued ty the County Engineer. All work within the public road
right of way is subj ect to inspection and approval by the County Engineer.
12. All required construction within the existing or proposed pbulic right of way is to be
completed prior to the release of a building permit or a bond in an amount estimated by
the County Engineer to cover the cost of construction or improvements shall be filed
with the County Engineer.
13. There may exist utilities, either underground or overhead, affecting the subject property,
including property to be dedicated or set aside for future acquisition. Spokane County
assumes no financial obligation for adjustments or relocation regarding these utilities.
Applicant should check with the applicable utility purveyor and the Spokane County
Engineer to determine whether applicant or the utility is responsible for adjustment or
relocation costs and to make arrangements for any necessary work.
14. After review of the proposed rezone in conjunction with ZE-84-81, Spokane County
Engineering is not requiring a traffic analysis for this proposed development based on
the site plan of record. Should any further request be processed for additional square
footage of buildable area, a detailed traffic analysis will be required.
SPOKANE COUNTY HEALTH DISTRICT
1. A combined surface water and sewage disposal detailed plan sha11 be approved by the
Spokane County Engineer and Spokane County Health District prior to the issuance of
any on-site sewage disposal permit or building permit for this project.
2. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane
County.
3. Water service shall be coordinated through the Director of Utilities, Spokane County.
4. Water service shall be by an existing public water supply when approved by the
Regional Engineer (Spokane), State Department of Health.
5. Disposal of sewage effluent beneath paved surfaces is currently prohibited.
6. Subject to specific application approval and issuance of permits by the health officer, the
use of individual on-site sewage disposal systems may be authorized.
7. Use of private wells and water systems is prohibited.
SPOKANE COUNTY DIVISION OF UTILITIES
Not available at time of printing.
SPOK.A,NE COUNTY AIR POLLUTION CONTROL AUTHORITY
1. All air pollution regulations must be met.
2. Air pollution regulations require that dust emissions during demolition, construction
and excavation projects be controlled. This may require use of water sprays, tarps,
sprinklers or suspension of activity during certain weather conditions. Haul roads
4/18/96 HE Staff Report for ZE-7-96 Page 12
r • + ~
~
should be treated, and emissions from the transferof earthen material must be
controlled, as well as emissions from all other construction-related activities.
3. SCAPCA strongly recommends that a11 traveled surfaces (i.e., ingress, egress, parking
areas, access roads) be paved and kept clean to minimize dust emissions.
4. Measures must be taken to avoid the deposition of dirt and mud from unpaved surfaces
onto paved surfaces. If tracking or spills occur on paved surfaces, measures must be
talcen immediately to clean these surfaces.
5. SCAPCA Regulation I, Article, V requires that a Notice of Construction and
Application for Approval be submitted to and approved by our Agency prior to the
construction, installation or establishment of air pollution source. This includes any
fuel fired equipment rated at greater than 400,000 BTU/hour (boilers, hot water heaters,
ovens, etc. as well as other sources of air contaminants.
6. SCAPCA Regulation I, Article IV requires registration with this agency.
7. SCAPCA Regulation I, Article IV, and SCAPCA Regulation II, Article IV, address
emission standards. All emission standards must be met.
8. Debris generated as a result of this project must be disposed of by means other than
burning (i.e., construction waste, etc.).
9. Demolition and renovation projects must comply with the requirements of CFR 40, Part
61, Subpart M and of SCAPCA Regulation I Article IX, both of which address asbestos
concerns. Intent to Demolish and Renovate forms are available at the SCAPCA office.
10. Some objectionable odors may result from this project (asphalt fumes). SCAPCA's
regulations state that effective control apparatus and measures must be used to reduce
odors to a minimum.
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
1. That the needed right of way shown on the attached may be reserved as a future acquisition
area for the WSDOT Evergreen Interchange. The definition of "future acquisition area"
will be that language typically used by Spokane County.
.
2. Due to the proximity of I-90 and the Evergreen Interchange area, drainage and signage
plans will need to be reviewed by WSDOT.
3. Development beyond the 8,100 square foot office building will require that a traffic analysis
be prepared to ensure adverse traffic impacts are mitigated.
4. To ensure that the above conditions aze met, WSDOT shall have a signature block on the
building permit.
BONNEVILLE POWER ADMINISTRATION
1. Written approval for any proposed use of the Bonneville Power Administration (BPA)
rights-of-way is required by BPA prior to the commencement of any activities on the BPA
easement areas.
4/18/96 HE Staff Report for ZE-7-96 Page 13
~
.
~
Washington State Eastem Region
Department of Transportation 2714 N Mayta►r ~trt~:
, Spokane. WA 99%07-2C90
Sid Morrison -
Sccretary ol Transportation (509) 324-6CCO
April 15, 1996
Mr. Tom Clemson
Inland Construction Company
102 East Sprague
Spokane, WA 99202
Re: Rezone Request at Evergreen and
~
I-90 (ZE-7-96)
Dear Mr. Clemson
After reviewing your site plan the Washington State Department of Transportatiori
(WSDOT) and Spokane County Engineers have determined that the northerly portion of
this site for which the rezone is requested lies within the future Evergreen Interchange
footprint. Both WSDOT and Spokane County Engineers realize that this interchange will
be needed to accommodate the continued urbanization of the Spokane Valley. Protectiorl
of this needed right of way will be beneficial to the development community, Spokane
County and WSDOT to serve the growinQ transportation demand that this urbanization
will create.
As a result of the above we ask that the future acquisition area shown on the attached map
be esiablished for this portion of property which lies within the future Evergreen
Interchange as part of this zone change request. Both WSDOT and Spokane County have
agreed that the future acquisition area shown on the attached map is the real estate needed
from this parcel for the Evergreen Interchange right of way. The standard Spokane
County language shall be used for the future acquisition area..
If you should have any question please feel free to contact either myself at 324-6199 or
Ross Kelley at the County Engineers at 456-3600.
Sincer ly,
- GAR J , PE
WS nt Regional
Admin' r velopment
~
~
OSS KELLEY, P
Spokane County roject Management
Engineer
LCC/_gjf
cc: Jim Haines, Spokane County Engineer-s
John Peterson, Spokane County Planning
Fat Hetper, Spokane Counly Engineers
_ ,
. . • f
. . v
ti *
f ~ .
P n
1#j - - - - - - - - - -
^n __.,.,_..._-ti `n + ~.s r~ ~re
►4-
, Exisrrrvc
1y90 ~ ~ j . ♦ . , ~ v' • ~ . • ~ ~ ~ .
! ~ ~c
~ . , • . A VENUE PRpp
. - ~ . . . . .t{ ; ~ T .t. OsEo W_ ~
~`t~~~;_ i . • ~ ~ ~ _ . EqCQUlS1j-1QN A~ ~S RqMp
REq ' .
~ P l . ,i.
q
~ ;~~j~.~.;:~ ; , . ~ ` 1 . CQUI$t710tV qn
EA
r R r:r: , , , - ; . .0.62
- ,.-~.:.°"`~;.<c; i, ~i; ~ • ~ . ` t . . ~ A C• 58.z'
' 'j T •t. . . . L•,<:• • - , ~ , . . , . .
~1~it~.}.♦~'.T'~r` i~~1. . ~
~Ff.tf,l;~'V',I-~~~ ~ ' • . ' .d , ! . ' . .
y. •.~,fi; ~1~~ 'i' " • . ' . . ' ,
~ , .
AC.
IpT Al. ACRES
~d
,
.
~ .
1 ~
- ~ !
1 '
t ~
{
1 5
~ . .
' ~ -
1
1
1 -
. ~
~ r
,
~ -
►
- ~ -
_ ~ M~wr~~r•r ~r '
_~r~ ~ ' ♦
. • ~ ~
~
qU 7 _ ~'1f 1.~~
Z C (3
wS D2)-r
~
Vor,V.
.
f ,
C'
. ,
OFFIGE OF THE COUNTY ENGINEER
SPOK.ANF COUNTY, WASNINGTON
A p r i 1 119 1996
T----: SpoE. ane Coi_inty Planni nq nepar tment (Cur rent P 1anninq
Administrator)
F'rom: :~poI:ane County Enyineer's Department
Sub ae c t: Cond i tions of Appr-Dva l. Zone Change Non ZE7w9E
App 1ie~.~nts Name C 1 emsiDn~ M_µ
Section lU, Townsha.p _v ~N9 Ranqe 44 EWM
re__Zo-.ining
The fo11r-owinq "Conditions r-if Apprc)val " for the above referenced :one
chanqe are submittQC~ to the SpoE•ane Coi_tnty !-iearinq Er.amii-ier for
inc1i_isic-i-i in the "Planninp Report" and "Findinqs and OrdEr" for the
Pl_thlic I-iearLi-ig sefiPdul.ed April_18, 1996r
E36A Prior~ to issuance of a laiAi 1rJiiiq permit or a1: thP request of the
Coun•ty Engineer in con junction with a Cr_)unty Roaci Pro.ject/Road
TmprovQment Dis'trict, whichiever actic-n romes firste
E,37 App]. a. car7t shal 1 dedi cate r feeton hlamer_Road for riUht cif way
and s1-Dpe easements as i'iPCP5G5ary,
Prii-nr to re1ease of a bLtildinq pprmit c-r Ltse cif the prc-pErty as
propcised u
E:40 Access permits for approarhes to the CoLtnty Road Sys•tem shall be
obtaa.iied from the Gount;y Cnqineer.
E43 Applicclnt sriall sLtbmi.t for ~.-cceptance by the Spok:anP CoLtnty
Engineer r-Dad, drain~.~qe and aCCE'S5 plans.
E44 Thie applicant sha11 submit for approval tay thP ~poF•.anP Coi_inty
Engineer aiid tt-~~ ~pol.ane County Health Distric~ a detailec~
combined on-site sewaqe sy~tc-m plan and surface water dispc-sal
plan fc-r the eritire pro.ject or p►,rtion thereci•f if the
cievel-Dpment is phasecl.
E45 A pairE..inq plan and traffx.c circu1atzon plan sha1.1 be si_ibmx.tted '
and approved by the Sp-DF;ane County Enqineer. ThP desiqn,
location and arranqement of park i nc1 stal is sha1 1 be in
accc-rdance with~ standard enc7ineeririq practir_es. Pavinq or
surfacinq as approved by the County Enqineer will be requa.red
✓
. ~
p a qE'
fiDY' ci fl y poYt1on o'f t fi E P rc► j@ct Wh1 Ch 15 to k] C oc cLtp ied Cir
trClveled by vehicl.es
F48 The construCtion of the roadway impriDvements stated hereiri sha11
be aecornpla.shed as approved by the Spokane County Enqineern
E50 The County Enqineer has desicanaterJ a Commercial_Loca1~ACCE'Ss
s{:andard for the zmprovement of Mamer_Road which wi~~ad.jacent to
the propiDsed development p This wx 1]~require the additic-n r-o•f
approximately 8_10 ft. of asphalt alc-nca the frc-intaqe of thP
devel-apmentn Curbing and sidewalk- mi_tst a].5,^- bP constructedu
E51 A 1 1 req+_« rPd imprcIvement s sl-ia 1 1 con form to t I-ie ci_tr reni: State of
Washinqtori Standard Speci.ficaticons for Road and Bridge
constrLtcticin ~.nd other applir_able cOlAnty standards and/or
adopterJ reso1utiuns pertaininq pertaininq to Road Stand~.~rds and
~tormwater Ihan~..~qement in effier_t at the ciate of construction,
Ltnle~s otl-ierwise appr-Dveci by the Courity Enqx.neero
E55 R-Dadway standards9 typical r-aacJway sectiona and draa.n~.~qe plan
Yequ11" e(Tt E' f l t 5 cl 1'' C fouf'1d i n ~poka1'1 eBoc"1 Y Cj of Goi_l I'1 ty Com m ission e r s
resolution 95-0498 as amended and are applicabl~ to this
prc-pc-sa1 a
E58 No construction w~.~rk is to be performed wi.triin the existing or
prciposerJ ri qh tc-f way i_tnti 1a permi t has been issi_tpd by t hP
Coun•ty Engineerm All worE:: wx.thin the pub11c rr-~ad riqht of way is
si_tb,7ec-t to inspectir-ii-i and approvat by the County Enqineera
E59 Al l required constrLtction within the existinq or proposed pLtbl i c
ra.ql-~t of way i~ to be compl.eted prior to the relPase of a
bLtildinq pprmit or a bc-ind in an amount estimated by the County
EriqinePr tc- CoVe1' tFIE'_' Coat of G-Df15tYltCtlofl izi1' 1.fripYoVelTiel'lt5 5hall
be fileci wath the r-_-unty Enelineer.
E90 T he re m a y exi s t uti 1it ies, e ither under c1 roui7 d orcov e r h ead 9
afifectinq the SUb)ect property, includinq property to be
declicated or set asicie for future ar_qlAisiticine Spokane County
c`i SSLt f Tl C 5 f 1o f i nan c ia1 ob1iQ at1ofl fci1'' c, d)u5tf Tl eI'1 ta ciY' YeloCat 1c1('1
reqardlnq these i_itilita.es. Applicant shOUl.ci checE• wa.ti-1 the
apRlicable utilx.ty pLtrveyor anci the Spokane County Enqineer t-D
determine whether applicant or the uta.lity is responsihle for
aCj ,Ju~'itment ~.:aY' Y'E'l►wiCatl.oI"1 L:osts aflC~ to iTlaF.E' al'1''clflqe(Y121'1t5 for al"lY
necessary worF;.
~
(.aaQP 3
Sper_ia1 Gonditions:
After revx,ew c-f the proposPd r~zzone in -njunction wa.th ZE 84-81
SpoE:ane C~~~Unty Enqinering is ri~-nt requirinq a traffic anc-Alysia for
this proposecl devel.opment basecl on the site plan of recorda ShoLtld
any further requeSt be processeci •for additional squ4~r~ footage of
buildabl.e area a detailed trafific analysis will be reqLtired.
e . '
0
DETERMINATION OF
NONSIGNIFICANCE - "DNS"
SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING
RESPONSIBLE OFFICIAL, JAMES L. MANSON, DIRECTOR RECpvED
. WAC 197-11-970 and Section 11.10.230(3)
SPOK:ANE ENVIRONMENTAL ORDINANCE ApR Q.11996
FILE NUMBER(S): ZE-7-96
com Ea~'tneeri~
DESCRIPTION OF PROPOSAL: Zone Reclassification from Urban Residential-3.5
(UR-3.5) to Urban Residential-22 (UR-22) for an 8,100 square foot office building and those
uses allowed in the proposed Urban Residential-22 (LJR-22) zone.
APPLICANT: Inland Construction Co. AGENT: John Sweitzer
Tom Clemson 107 South Howard
102 East Sprague Suite 300
Spol:ane, WA 99202 Spokane, WA 99204
(500,) 747-5162 (509) 747-0999
LOCATION OF PROPOSAL Generally located east of and adjacent to Mamer Road,
south of Interstate 90 approximately 500 feet north of Mission Avenue in the SE 1/4 of Section
10, Township 25 North, Range 44 EWM, Spokane County, Washington.
LEAD AGENCY: SPOKANE COUNTY DNISION OF BUILDING AND PLA,NNING
DETERMINATION: The lead agency for this proposal has determined that it does not have
a probable significant adverse impact on the environment. An Environmental Impact Statement
(EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of
a completed environmental checklist and other information on file with the lead agency. This
information is available to the public on request.
This DNS is issued under WAC 197-11-340(2); the lead agency will not act on this proposal
for at least 15 days from the date issued (below). Comments regarding this DNS must
be submitted no later than 4:00 p.m., April 16, 19969 if they are intended to
alter the DNS. All comments should be sent to the contact person listed
below.
By: Steve Davenport Title: Planner II
Phone: (509) 456-2205
Address: Spokane County Division of Building and Planning (MS-P)
West 1026 Broadway
Spokane, WA 99260 . DATE ISSUED:~Q,I~C 1996 SIGNATUR : , ~ ~ ' •
~ - U
COMNIQNTS RFGARDING FNVIRONME1q'I'AL CONCEItNS ARE VOELCONE AT TliE H[EARING.
tiolitit
APPEAL OF THIS DETERMINATION, after it becomes final, may be made to the
SPOK;.ANE COUNTY DIVISION OF BUILDING AND PLANNING, (MS-P), 2nd Floor,
West 1026 Broadway, Spokane, WA 99260. The appeal deadline is the same as the above
project's appeal deadline, being ten (10) calendar days after the signing of the decision to
approve or disapprove the project. This appeal must be written and the appellant should be
prepared to make specific factual objections. Contact the Division of Building and Planning to
assist you with the specifics for a SEPA appeal.
This DNS was mailed to:
1. WA State Department of Ecology (Olympia)
2. WA State Departrnent of Health
3. Spokane County I-[ealth District
4. Spokane Counry Division of Engineering
5. Spokane County ,kir Pollution Control Authority
6. Spokane County Parks Department
7. Spokane County Boundary Review Board
8. Spokane Regional Transportation Council '
9. WA State Department of Transportation
10. Spokane Transit Authoriry
11. Central Valley School District
12. Vera Water and Power
13. Fire District No. 1
14. WA State Department of Natural Resources (Colville)
15. WA State Department of Fish and Wildlife (Spokane)
16. Bonneville Power Adtrunistration
,
' ~ .
,
~
SPOKANE ENVIRONMENTAL ORDINANCE
SECTION 11.10.230 _1=
t
~
. , • ~ ` 1`~ SPOK/1NE EI(ViROldIENTAL ORDINAI(CE ~
(WAC 197-11-960) Section 11 10.230(1) ' • ~
Environmental Checkllst
, Ftle No.
Pvryose of Checkltst:
The State fnviroroental vollcy Act (SEPA) chapter 43.21C Rt1t. requtres all govermental agencles to consiEer the envtro rcaental iaDatts of a Oraposal
before making Aecisions. An Environaentel lmpect Staterent (EI5) m+rst be prepered tor all oroposals rttn Drobable signtticant edverse impacts on
the Quality ot the envlroment. The puroose of this Cfietkltst is to Orovtde info►netion to he1D you enG the aqency identlfy lmpatts fraa your
proposal (anE to reCuce or avoiE Snqacts irom the proposal. 1f 1t cen be Qone) and to hel0 the egenty detide vhether an EIS is reQutred.
lnstructlons for Applicants
Th1s environmental theckltit asks you to desCrtpe iax baslt informatlon •Dw t your Oroposal. Governmental &gencles uie this checklisi t0 detereine
vhetber the cnvfronaental iaqacts of your proposal are signiflcent. reQulrSny pre0+ration of an E1S. AnsMer the questions briefly. w1tA tAe wost
pretise tnforwation knarn, or glve tAe Oest Eestrlptlon yw can.
rau wust answer each Questlon aCturately anG carefuliy. to the best Of your knwledge. In a+ost tases. ya sRould be able to enswer the questions
trom yout own obserrations or proSett plens wlthout the need to hirt ex0erts. If you ra lly do not know tne answer. or tf a Questlon does not appiy
to your proposal. write 'do eot know' or •does not apply.' CamDlete answers to the questlons now aiay avold unnecessary delays later.
Soae Queztions ask about qovern.ental regulattons. zuch as zoninq. shorellne. and landmark Cestqnetlons. Answer these Questlons 1f you cen. If you
Aave proble*s, the govermental •yenctes can assist you.
the chectlist questtons •pply to a11 parts of your proposel. even 1f you Olan to do thda ovtr a perio0 0f itme or on Elfterent o+rtels of lsnd.
Attach any •Edittonat lnfona+tloA that v111 Cescrlbe your proposal or Its envlronnental etfects. TAe e9ency to whlcn you submlt this cAeckllst aey
•sk You to exolain your answers or Orovlde addttlonal infort.ation reasonaDly related to dete mtning 1t tnere may be stgniftcent adverse fmpaet.
Use of cAeckitst for nwnproject proposals: .
Cenplete this che dclfit for nonproject Orooosals, even though questSons may be ansvered 'dx s not ao01r'•
IN ADOITION. tauplete the SUPPLE?1EMTAL SHEET FOR fIONPROJECT ACTIOriS(Pert D).
For nonpro,)ett attioni, tht refen ntes in the theckllit to tRe w rES 'DrOJtCt.' 'applltint.' and 'property or sltt' ihould be reaC •S 'OraDasal."
opro0oser.• •nE 'aftetted yeoyraphit erea.' resoecttvely.
A. BACKGROUl10
1. ti.me of proposed project, i+ apollcable• Inland Construeti.on ComQany OFFice Building
z. K,.r of Appliunt: In ] and Construction : Tom Clemson
3. Address .ne onone nmaer of app 1lcant or tontect person: .)Ohf'1 T. Sw e i t z e r ,
S. 107 Howard Street, Ste. 300
509/747-0999
t, Oate cl+etklist OnDired: 1,~ 1c; f 46 •
s. Agevicr naue:ting cnecklisc: c3,okane County Plannina Deoartment
6. Proposed tiainq or sthcdule ffncludSn9 pAesinq. it •ppllceblel: r[i R-;fi t`tin t i[]tl t Q b e a i n lf1 t h e s o r i n q
Aofiil F 1995, 7. Oo you have aoy plans for future aEEltions. ezpanslon. or further attlv/ty relate0 to or tom ected w1tA this DroPasal' if yes. explatn.
Applicant/purchaser of site also owns the 6.358-acre parcel to the
fauth. which is approved for 28,000 sf office/warehouse (Cont, )
b. Oo you wm or havc optlons on lnnd neerby or adjecent to thts proposal' it res. e,cplatll. A13nl i cant/pu,rchaser Of Slte
also owns the 6.358-acre parcel to the south. The applicant/purchaser
has plans to develop the site with 2 office/warehouse buildings with
vi t O't.31 t] i i1 1 rii^ v a r P a nf 9,Q0.... Sf-
8. llst any enrironmntal infornatlon you knov about that has been Orepared. or will be OreoareE. atrea lr ret.cea co this proposal.
INls~nd Pacif ic Enoineerina has completed a t'Road Grade and
Access Analyeis" for this site and Mam-er Road.
aev.2iii8s ~
. ' (UAG 147-I1-960) Sec: to-i 11 1Q :30( SPOTrViL L:tV1A0NlENUL ORDIN&NCE ~
• ~
• EAG7CGROU'lU (con;.oueE)
9 Do vw knov vhctler appllcatlorts arc penGing tor governaentel epp[ovela of othcr p[ono u 1s !lreec:v a°`ec:.-iG the pTOnecoverr,4 by ~our
p ropoeal' 1[ yes, .zpleto
• C~
,V--Uek
,
10. Llst any government approvale or permice tAat vlll t>e needed [or your pcopoeal, lf 1cnown Z O(") E c h a n q e a p p r o v a 1 O f
the site From 11uR-3 _ S iLD b4L_tbP ~~nlcnne CnuntTH 8.~.1 - *,6
Examiner Committee and Board of County Commissioners; approval oF
access by the Spokane County Engineers; approval of septic tanksf
E drainfield permits by Spokane County Health District} approval
of storm drainage by Spokane County Utilities Oepartment.
11. Glve • briei, complete descriptlon o[ rour proposal, including the pioposed uses and the sise ot the yco:cct and •lte -ere are several Questloeu Lter tn tAi• checlclist tAat •sk rou co describe cectain aapeet@ of yout Droposal. Y a, do noc -ieeC to rep u t thoae ansvers on this
pege
Aoolicant is orooosing to devA.j-op an R%100 qf nfFi c-P hui 1 rl; na
on the sub.ject site with a total of 30 oFf-street parkinq spaces. ,
fhere wi 11 '02 S, 4% of building site coverage on this 2.92-acre
site, and aooroximately 17% coveraae ❑f imoPrviouc --j-LrFa__c; _
Landscaping around the building, parkinq areas, and site borders •
w i 11 b e o 1 a n t e d. 1~t~ aAdk~ .(/1 AaA ~/t I
L~~a
Loution of the propoaal Givc w(flcicnt tntor r~cion to s peTsoa co undersund the r ~
r,,cl..:~lt.c. !on o` +our propoecG pto k ct, includinp a
street address, anv, and sectlon, :onv h!p anQ cinge, if knovn. It • propo u 1 vould occur over e:angc o[ erea, provtde the ranFe or
boua.!artee o( the slte(*) ProvtAe a 1 ega2 descTiptton, sice plan. K tlniey aap, and topograohic oap, :easoneDt, ava! a ble :hile vou
ahoulE su0olt aav p:ans reQutred by the •gency, vou •re not reQulred to duqltuEe oaD• or decalleE plan• suaoteted vtcA an. permlt application ~
reLced to cNe checkllsc ~
N. 1618 M a m e r R o a d_ U.- =.j-tLP i-
aRr~roxi t 1/? mi 1 P Past aF p~M~ ~3oad, adiacent and to the AA6.-
nn
south of I 90, adiacent and to the east of Mamer Road; approximately
1001 to 200' north oF Mission Avenue. The site is located in
Section 10, Township 25N, Range 44 E.W.M. in Spokane County, State ~
of Washington; Spokane County Assessor's Parcel No. 45104.0202.'
11. Does :he proposed aceion lte vichin the Aq%..t'er Se nsi[ive ♦rea (ASA)• -he General Sever Se M ce Area' ''►e Prloritv Sewer SerW ce Aree" 7 he ~
Cttv oi Spokane' (See Spolcanc Coun:y'• ASA ')verlAy '_one Ntlas [or poundaries). n, ~j/n
The ~ub d_ect 1 i es w i th i n the ASA and the PRSA _ TD~i
'O 6E COMFLe-LD 6T APPL:CANT
E. @PCIAOP~lf~.AL Q.L~SE`r5
EvsluaClo^ coT
AgenC~ .9e anlq 1
1. EAF-'
a .'.enetal descrlpeion o( the sice (circle or+e)• (L c, rolling. htlly. steep slopes, souetatnws,
ot'+er:
The site i.s rectanaular shaoed. and fairlv
level with Mamer Road. The I-90 Freewav to(Cont.) .
b '1at ls the sceepesc slope on the •Ste ;appro:lmace pereent •lope)' ~
1
The site is fairlv level. The hiqh point is (Cont.)
c general :vpes of aoiln aTe ieund on the sltc (for example, clay, sand. grave:, peat, oucr)' i
•ou knov the classlficacion o( agriculcural sotls, •petify thee •nd note •ny prlne farnland
The subiect soils are GqA (Garrison), suitable
for cultivation, The soil is gravel. This (Cont.)
d i:e chere surface :nClcetlons or htetor• o( unscable •oile tn the tomedlate vie:nity' I` eo,
ie :c Tiee
No indications or known historv of unstable
soils in the immediate vicinity.
. . ' -
. • ~ SPOKAHE EHVIRONKENTAL ORDINAHCf ~
(uAC 197-11-960) Settton 1130 230(1)
. . ~
B. ENYIROI+iENTAL ELEMEMTS(continued)
Evaluetion For
Agency Use Only !
e Describe the purpose, type, end approximate quantIties of eny f1111ng or grading pro0osed ~
lndicaie source ot ftll, t
Minimal Ara(71 in8 wi 1 1 h o rPq I I ; rAr-I F r-i r-
preparations, Footings, and foundations, (Cont.)
f. Could erosion o a ur as a result of clearin9. constructlon. or use' lf so, generelly descrloc.
Minimal erosion will occur during contruction. ,
i
~
g. About whet percent of the slte vill be Covered wlth impervious surfaces efter project construc- ;
tion lfor e.ample, •sphalt or bu1141ngs)'
Aooroxa.matelv 17% or 21,623 sf of this site
will be covered with impervious surFaces ~
including'buildings, driveways, sidewalks, ~
~
oarkina lot. Bui 1dinQ : 8. 100 sf other :13,623.
h. Proposed n+easures to reduce or control erosion. or otl+er impacts to the earth. 1f eny:
Potential of wind erosion durinq construction
nt,r aP, mav be reduced bv water sprays. The
completed development's impervious surfaces,
landscaping and 11208" swale area, will
Z AIR minimize the potential ot wind b water erosion. ;
a. Vhat type of enizsions to the eir would result frcn the proposal (t.e., dust, eutamoblle. oaors s
~
industrial, wooQ srnoke) during construttton and when the project ts convleteE' if eny. j
generally descriDe and give approzimate quantites 1f knwn. :
TPS levels will increase from site preparation. jnr_rPa~Q in hydrocarbons from asphalt installation.
Thereafter, automobile and truck emissions will(Cont.')+
p. Are there eny off-site sources of emtsslons or oEor that m+y •ffect your proposal' If so,
generally describe.
Traffic alonq I-90 to the horth.
~
~
c. ProDOSM measures to reduce or tontrol emiiiions or other lmpetts to a1r. it eny: ~
Compliance with SCAPA regulations; paving ~
and landscaping in the "completed" phase. ~
(
;
,
,
,
;
~
3. unTER ~
a SurfaCe' ~
(1) 15 there any surfate water body on or fn the tasnediate v1t1n1ty of the slte tncludiny yeer-
round and seasonal streaas, saltwater. takes. Donds. vetlands)? If yes. destrlbe ty9e e M l,
provide narnes. 1f apDroprtate. state what stream or rtver it flows into. y
N/A. ~
(2) Yill the project reQutre any voric over. tn. or adjacent to (wlthin 200 feet) the descrtbed
waters' If yes, pleese descrlbe anC attach ava11a01e plans.
N/A.
3
i
(aAt 1-17-11-960) Sectlon 11 SPOrJ1l~ ERQIROlQCM'AL ORDINAPCE ~ ^C
lb 230i1) ~
' S. CNVIRONliENTAL Ei.EKE?t':'S (conilnued)
Eveluation For
Agency Uoe Only
(3) Eet! m te the •uounc ot tiil and dredge sa[erlal that wuld be placed in or removed froo the
surtace weter or vetlande and ladicgte the •rea of the slce that vw ld be •ffected. lodlcate
the eource of lill oacerlal
N/A.
(6) vtll the proposal reQuire surfu e y[et withd n w 1s or diversionsf Cive a general deserip-
tion, purpose, •nd approxinate Quaotitiet. if knovn.
No. ,
(5) Does the proposel L1e vichin a 100-7ear flood p Linf Ii so. note lou c3en oo ct►e slce pLo. ~
3
No. , i
(5) Ooes the propo a 1 levolve •ny disehacQes oi v"te rucerials co surfsee vacete• :t so. ;
deicriDe the trpe of vaste and anticipated volume ot dlscharge.
b. Ground: _
(1) Vill groundvater be vicAdtavn, or vill vater be disclu csed to =TOVndvater'• Clve aeneral
descrtption, pur9ose. •nd spproxieate Quantities, if lmorn.
Discharqe of surface water to 11208"
storm water swales.
(2) Describe wste aaterial chac vill se disehar6ed lato the 6round from •eptic tank• or ochar
saoitary vasce traataeot taeility. DescriDe the general •ite ot the srstem. the avaDer ot
houses to be •erved (1f •pplieable) ot the oumber oi pereooi the sysceo(@) are eYpeeted to
serve ,
The oroiect will utilize an on-site
septic tank/drainfield sewage system on an
interi1m basis. This project will be required(Cont.)
(7) Deacs3Ee any srstems, otl+er cAaa those Aesigaed tot the dispow 1 of sanitary vaate.
lascallcd fot the purpose of diselu rgiaa ilulds belov the $round turtace (leelude• srstem• sueh
as chose Eor the dispoul o[ .corm vacer or draloase iram tloor draler). DeseriDe the c7pe ot
systen. the •oouot of satecial to ee disposed oi throu;d cM systea and the type• ot mteTials
likely co be disposcd ot (Lacludin; mterials vhlch aay eotar the qscs lesdverteatly thrwth
•pilla or a• a result of tiCefightlnt activities).
No other systems are required or proposed:.
(i) Will any chsicals (erpeciallr ocsanlc solve¢cs oc pnttoleua fw ls) be •iosed in asovr
arouad or uaderarouad storage caaka? If ao, vhat types ind Quanticie• o[ sa[ecials vill be
•tortd'
In the develoQed "completed" phase, Fertilizer
E oe!jt, icides wi1 1 be apolied to the landscaped
areas.
6
~
, . . ~ lPOIUNZ @7VIBOR!(LN'[AL OBDINANGY I
(VAC 197-11-960) Seccion 11 10 210(1) , (i""Q ~
. ~
S. eRVIRONIMN7AL SLQDN';'S (conclnued) . ~ ,
' Evaluatloo For
Ageacy Uee O~ly
(5) uhec protective meaeucee vill be cakea to lnwre that laake or apllls o[ •oy chemlcala t
stored or used on elce wtll not be slloveE to pereolate to groundvnter (chle lncludee aeasuree ~
to keep chenlcsle out of disposel eyeceas described Ln 3b(2) •ad 3b(3)•
Compliance with AS~A Standards For the :
. t
storaqe oF chemicals (fertilizers), where
applicable.
c Vater Runofi (including storn vacer)
(1) Describe che •aurce of evnof[ (including scoca vater) and met:wd of collection and dispoaal
if •ny (lnclude Quaaclcies, lf kaovn). Vhere vill thl• vter [lov• Yill this vacer flov lnto
othec vatera' If •o, descrlDe
Storm water will be diverted to 11208"
storm water areas.
(2) Jill anr cheaical• be s[ored. handled or used oe the site !n a lou tioa vhete a spill or
leaY vill draln to surface or groundwater or to a•torn vater dispo u 1•)stm discharaing to
•urfaee or grouncfvater'
No.
~
J
Could vaste ea[erials encer ground oc •urtace woters? if so. generally detcrlbe.
p
N o. A ~ j j ~ul rS~
~
d. Propased oessures to reduce os control •ur[aee. grounE. and cunoff vater inpaccs, tt an• (!f
t the proposed action lie• vithin che Aquifer Sensicive Aru be aspeeially elear on erplaoatioos
r relatiog to faeilitie• coaeecnieu Sectioas 3b(6), 7p(S), •nd 3C(2) of this c!►eckllsc)
The development of an on-site storm
drainage system that meets Spokane County
Utility Department Standards and complies
with 1120811 standards.
a. vuvrs
a Check or elrcle trpe ot vege u tion found on tAe •ite•
X declduous tree: alder, oaple, aopen, othet
:vergreen tree• tir, cedar, plne, other.
htvDs
X grass
pasture
crop or Sraio.
vet soil plAncs. eattail. Euttereup. Du11rw h, •kumlc c.ee.ae, other.
racer plancs: Nter llllr. aelgrass. allioil, othec.
other cype• of vesetation.
D. Vhat kirtd and uount of vegetation vlll De resoved or altercd" T h 1 S Z. g 2- a e r e
site is currently improved with a single-
family residence, garage, chicken coop, ~Lont.)
c List threatened oc eadaogered species Imora to be on or near the •lte.
N❑ knowledbe,of threatened or endangered species.
d. Proposed landscapiog, use of oative plants. or otlu rse uures to preserve or enhance vesecatloo
on the slce. if aar
Lawn, trees, and shrubs will be planted around
the buildings, parking lot and north;-seast property lines. All landscaped areas will r
be irrigated with on-site sprinkler system.
SPOKAlfE ENViRQfMENTAL OROIHAHCE
(tlAC 197-11-960) Sectton 11 1b 230(1)
B. ENVIROtcMENT111 ELEMENTS (continued)
Evaluation for
A9ency Use Only
5 ANIMAl.S
a Circle any oirds end animals vhich have been ooserved on or neer the 51te or are knoNr+ to be on
or near tne site
birds nawk, neron, eegle. songbirds, other Robins. CI^OWS. qUall, pheasant.
rtamnals deer, bear, elk, beaver, ocner• R o d e n t s.
fish bass, salmon, trout, herring. shellifsh, other
Other .
b. list any threatened or endengered ipeties knwn to be on or near the stte.
c. ls the site part of a migration raute' lf so, exAlatn. -
d. ProOOSeG neasures to prrserve or enhance wi1011fe. if any:
Installation of landscaoed areas will help
preserve habitat for birds.
5. Er+ERGr ann VATURAL RESOURLES
a. Nhat kinds of energy (electric. natural gas. wood stove, solar) wtil be used to meet tne
the comoleteE project's energy needs' Destribe Mnether 1t w111 Ce usrd for Aeating, nunufat-
turiny, etc. ,
Flor-+r: ni*y from Vera Power; Aacs from WWP _
b. Nould your pro)ett effect the potentlal use of solar enerqy Dy aQjacent oraperties' :f so.
generally EescriDc.
No. .
c. Whet kinds of energy conservetion feetu*es are included in the ptens of this OroDOSaI' lfst
other aroDOSed measures to reduce or control energy tmpatts. 1f eny'
UBC Construction standards; convenient off- '
street parking.
7. ENVIROtIl4ENTAL HfALTH
a. Are there any envtronmentel nealth hazarCS. lncluding exposure to toxic chmlcals. rSsk of ftre
and ezplosion, spill. or nazardous waste. tnet covld occur as a result of tAis proposall if so.
describe. ~
~n _ I
(1) Describe speciel emergency servltes thet mlght be reeuired.
. Police, Fire, and medical.
6
.
• spoKANE cxvisota¢xrni. oantNAtta
- (UAC•197-11-960) Section ll 10 230(1) \ \
• B. eWI RO HFEHHIAL eLl.MSZTS ( c on t i nued )
Lvalwtlon Foc ,
Ageacy llse Only
EIIVIiiOti~tT:AL NEAL-f1 (contiaued) ;
~
(2) Proposed measure• to reduce or concrol eovlroaacotal health hacacda, li aa7 i
1
f'.mm~ 1 i anr_o w i i-S-► a 1 1 ~.g,t.o anri f: i t`i Ri i i_1 rf i nT !
Code reouirements. ComAliance with all the !
Zoning Standards and conditions of approval. b. Nolee
(1) Vhat cypeo of aolsc e:iat la the aTer vhich aay affnct your project (for anaeplc trai[Sc,
eQuip m nt. operation, ocher•
Traffic noise from I-90 to the nnrth.
(2) Vhat t7pes and leve!• ot noisc vould be ereated br or a uoeiattd vith the project oo a
short-tecm or a lons-teta basis ([or exaople: tratfic, cotittvction. operation, otl+ct)' indlcate
vhac hwrs aoise vould come fms tt+e •ite.
.ghnrt t-F+1^m • f-;rarl i nn anrl r.nnatrtir_t i nn '
' Lonq term: Primarv qenerators of noise will ~
be traffic, HVAC systems, vehicles 9 people. .
Hours of peak noise levels will occur (Cont.) ;
i
(7) Proposed veasure co reduce or control noise tepatts. !t an7: ~
Landscaping and orientation of building toward I-90. ,
s. u•ro AND SHORFLIIIe use
a. Vhac is che current use ot the site and adjaeent 9ropetties! qiJ_-o i e i ic o ri F n r
a sin4le-Familv residence. Qaraae, (Cont.)
b. its• che site been used for agrieulcure' If •o, deseribe. _~Lr_~ ~ fil-~~► t?a~t
oortion of this site has been used as
horse pasture.
c. DescriDe any atcuccurea on che slta. IJIP S 1 1']8 lA_ f am i v r.si d_n _P
is a wood frame bunqalow style house,
approximately 1,000 sf, constructed in 1949.
The wood frame, 2-car garage was constructed (Cont.)
d. Will •ny struccure• De desoilshed• If •o, vhich'
EpL- this phac;e, the imorovements will remain.
e. irut is the current soaing classification of the sitet C u r r e n t z o n i n q 1 S
"UR-3.511, Urban Residential 3.5.
t. WMt ts the current cmpteheosive plan dealgnacioo of the aice'
Urban.
g. If applicable, vhac 1• the eurreat shoreline maacer progcsa desi6nacion ot the slte'
U / 0
n. Na• aay parc ot clu site been claesiEled as ao "eavicossntally Nnsitive' aTea? I1 •o.
•pecify
IYU -
1. Appro:laa[ely hov oaar people vould reslde or vock la the tompleted pco}ect'
Inland Construction Comoany employs approximately
50 people, with approximately 30 in the field
7
(Cont.)
. . / `
• ~ ~ ~
(WAC,197-11-960) Sectlon 11 2.0 230(1) 9YOICAFL EVIRALdMFLL OBDINAPCZ
B. eNVIROFild11TAL Q.ZMEFtS (conciaued) , ~ • , ~
tveluation Foc
Agencp Use Only
~ Approxioacely hov maay people vould the coopleted proJect disp Lce' N O d i s p 1 a c e m e n t
For this ~hase.
k Proposed oeasure• to avol or redueedisplac menc lspaccs, 1t any:
No measures needed.
~
1. Proposed snasura• to easura tha proposal i• coapatiple vitA e:istiaa aed pro,}ected Lnd uses and ~
plans. lE anr: `
Compliance with all zoning standards and j
zone change.=condition of approval. ~
~
~
~
9. HOUSINC ~
a. Appro:iaatcly hw many unfc• vould be provided. if anrt Iodicate vtnttr r higM . aiddle-, ot }
lov-incose how in6.
N/A 6
~ ~ ~
D. Apyrosio~telr hov ~nr uaite, it aay. voald aolidoatedt Iodiu te vha[ Mr hleh-. aiddle-, or ~(1~
lowirtcone housing. ~ ! 09 None. - ~ t
c ProposeA oeasure• to reEuce or concrol houaing lapacts. lt aor. '
No measures required.
io. AEsTnertcs
tahac is cAe callest Aeitht of anr proposed sttueture(*), ooc locluding aocanaas! V1uc 1s che
prlncipal e:terior Dulldiaa saterial(s) proposed!
The structures will not exceed 30' in height.
The owner of Inland Construction Company
is considering stucco or cedar siding for
:
the exterior with pitched roor. D. uT►at vievs in the latmedlate vlclnlty vwld Do altered or obstcutted9
None. ~
,
c. Ptoposed measures to reduce or coetrol aeschetic ispacts. if ao7:
Placement of utilities underground. '
,
i
11. LIGH7. AND G1.ARE i
a. 1lut trpe ot 1igAt oc gLre vill tM p[opo"l peoduce! :tAat cise ot day vould Lc aalaly oeeut' ~
Parking lot lights, building exterior lighting ;
6 vehicle lights in the evening.
b. Could lighc oT gLce fcoa the finished pcoyecc be a safec7 hassrd or loteriere vith •iewt
With "down liqhtinq" and use of landscaping(Cont;)
c. tfiat existlna off-*ite souree• ot 1Seht or gLTe may aficet your proposal• ,
Lights from I-90 traffic and along Nora.
d. Proposed aeasures to reduce or control lisltt aad = L ce inyacts, lf aoy:
Down lighting and screening and landscaping.
~
,
~
8
. • ~ ~ ( ' / ~
' (4AC V97-11-960) Section i1-610 210(1) SPOT.ARE QMRONlENTAL ORDIHAHCE
e GRGLROtaiLlrTAL II.MEN1'S (continued) • j evelua[ton For ~
Agency Uee Only ~
12. RECREA7i011
e Uhec destgnatcd •od Ln(ornal retceaclonal oppotcuniciee are to chc laaediate vlcinicy`
Valley Mission Park is located approximately
3/4 of a mile west. This park is 7 acres
in size.
b Would the proposed projeet disp Lce any existing recrn [looal uses' It no, deacribe '
No.
c. Proposed ueasures to reducc or conttol ispacce on ree[eacion. ineludleg recreatio wl opportuo!-
cies co be provideE by the projecc or applieant. !f anq•
None reauired. '
~
~
,
13. HIS:'ORIC AND CIJLTURAL PRLSERVA-ION ~
a. Are t!►ere anr places or objeets listed oa or proposed for tutional. •[ate or loeal preserva- i
tion reglster• knovn to De on or next to the •itet If so, geeerally describe. ~
NO. '
i
1
b. Gtnerally describe aar landmrk• or evldence of hlstoric •rchaeological, ecieot![ic or culcur4l ,
LIDpoitantt lmwn to be on or nen to tRs sLte.
N/A '
~
c. Ptoposed neasurts to reduce or cootrol iopacts. it •ar:
NIA. i
,
14, ;F.At1SPOR:ATION ~
s
Identl[y puDllc screets aod hlghvays •erving the site and dcsc[iDe pTOposed aece u to the ~
existing street eyetm. SAoron site pLa, tt •ny. ~
The subject has approximately 270' of r
frontage along Mamer Road on the west. ~
Mamer is a'tlocal access road't that has ~
approximately 24' of= paved surtace with lLOnt.)
b Ls site curccntly •ervsd by publie tcansLt' If noc. vhat 1• the •pprosLace dietancs co the
neares[ cranal[ scop?
Public transportation is available along
Mission Ave. to the south.
c.. Rov sany paclcing •paces vould the comyleted project hane! Bov aaay vould che pro}aec elid oate•
-Claicz nr.rniPC-t- wi 1 1 have 30 oFf -street oarkinq
spaces; the Spokane Zoning Code requires
24 spaces ( 1 per 350 sf of off ice bui lding
d. Vill the psoposal repuire any aev road• or streate. or laproramenta co ezistina roads or •craece
noc ineluding drivevayst If •o, Senecally deatribe (lodi ute vhether puDlic or private).
According to the Sookane County Traffic-. .
Enqineer, Nora (fronting subject) will be ;
required to be upgraded with additional ~
roadway widening (5' to 101) curbs 6 sidewblks. ~
a Vill che pcojact vae (or oeeur io tlu imrdiace vicioity ot) water. rail. or air tzsosporcatlonl ~
If eo, geoerally describe ,
9
~ R~. o~t~~
r
(vnr 197-11-960) Seccion 11 Ib.230(1) S
. ~ ~
" S. ENVIROtBMEN'fAL II.e'E11'['S (coocteuad) • ~ ,
Eoaluatioe For ,
Agency Use Oo17 ~
f Hov orny vehicular [rlps pec day vwld be geaerated by the cavpleted project' If knovrt,
indlcate when pe+k vould oceur
Accordin4 to the Institute of TransQOrtation ,
Engineers (ITE), Trips Cenerated Manual, 5th ;
Edition, the proposed g,ipp af office for (Cont.1 '
~
g. Proposed aeasures [o reduee or eonctol transporcatioa impaecs. it •oy: '
Location of access points onto Mamer as per ;
Spokane County Traffic Engineer's requirements.
~
~
15. PIJBLIC SERVZC£5
a. uould the project resnlc in ao loeru ssd aeed for public sarvtee• (Eoc eiasple. tite protaetion,
police protectlon, health care, schools, othec)1 If •o. genetally deseribe.
This orooosal mav result in an incregsed need '
for fire protection, police protection, and ~
other governmental services, including ;
Planning, Building Codes, Health District, ~
~
Spokane Lounty trat-tic 5 Utilities b Postal service. ~
b Proposed neasures to reduce or coetrol direec impact• on publlc soervices, 1' •ny:
Addi fii ona1 tax dol 1a1^r-- wi 1 1 h 1p ta o~Fczr?t tl-~e
increased cost for additional services.
16. l.: ILITIBS
a. Circle utillties eunentlY •vai L ble st che •ice: elaetciettr, nacural ga*, wacer. celvae
•arvice, celephone, sanitsrp •ever, sepcie srstem. otM r. .
ALI utljyties are available exceot ou lic
sewer; an on-site seQtic tank drainfield system
b. oe.c"EfbtEtie jt7Qi4At :k.t PT6p?b'"pot:~~ tt,.l p aj: ~lk~ IfiMY ~ro„ielag the ..t.►i« .oa
the general conscruction aetivicies oo the site or lo the lawdiate wieieitr vhleh aigAc be
oeeded. Electricit,y will be provided by Vera Power;
gas by WWP; water by Consolidated Irrigation
District; telephone by U.S. West Communications.
,
4
C. SICNATIIRE
1. the undersigned. evear under the penalt7 ot perjucy that the aEove respooss• are sade truchtully and co tAe best ot ■r lcawledge. I also
unde[stand ch&c. •hould these be aor villful d@representatioa or villiul lact of tull disclosure on sy yan . t►+c iRener may vttfidrav aoy
decerainacion o[ noosigoiEicaoce chac it d ghc issue lo reliaaee upon chls eheetlist.
oace: ,lan iaro 1_9_., '_a96PTOvonenc Tnl and Cnncztrur-_tion Comp,-Iny
(P1eue Tsiot ot 7ype)
Proponent: , C/D _ lohn T. Rwei tzer Mer..a: _ 1O7 Howard. Riji te 300
(slgn.cnrc)
mone: 509/74_7-0999 Sookane, WA
Perwn eompletlo,g focs: • Date; 11 (J1 I Y
P,,oRe: 509/747-09
roR srnrr ose oxi.T
Statf smber(*) revieving cheekllsc:
based n ~ •taff reviev oE the eoviroela~dtal el~eetlisc and otAnr pertinalit ln[onatlon. the statf:
A. ,r~Conclude• chac chere •te no pTObaele s16alfiuet advecse iapact• and racasmod• a dete nioatioo o[ aons isniticance.
6. Coacludes ctvc probaple •16niticaot adverse enviroamntal lmpacts do e=ist tor the eucrent proposal aod reeoaend• a aitl6ated decer
alaaeion of notu iEoitleanet vlch eooditiow .
C. Goncludes ttut t!►ere •re probable si6niiluot advetee eavironmencal lapaet• &od recco+eod• • daterslw cion of stgnificance.
TILIRG TU - =75.00
10
'ZE •'t •G~to
f
Continued from nage 1: 7 a:
In the future, the applicant hopes to replace the existing structure (house, garage, and bam)
with a second office building. At this time, however, he has no plans for the second office,
and it may be five to ten years before he proceeds with a second phase.
Continued from nage 2: B 1 a. -17
the north is slightly above grade, and ivi;,slon avenue to the south is approximately 50 f
~
higher in elevation.
Continued from page 2: B lb.
the south line, which is approximately 5' higher then at the northwest cotner.
Continued from page 2: B 1 c.
series is made up of somewhat excessively drained, gravely or stony soils.
Continued from nai!e 3: 8 e.
~
Driveways and parking.
Continued from bage 3; 2 a.
~
increase existing CO levels; mi.nimal increase, however.
Continued from naee 4: B b(21
- , .
to double plumb for future sewer hook-up. The proposed office complete will generate
minimal sewage.
Continued from paee 5: 4 b.
and bara. A majority of the site is used for horse pashu-e. The pashue will be replaced with
the proposed 8,000 sf office.
Continued from page 7: b. (2)
s
between 7:30 am to 9:00 am and 4:30 pm to 6:30 pm.
Continued from page 7; 8 a.
barn, chicken coop, and pasture; site to the south has riuo single-family residences and
~ ik sol do tt(o
.
. r
~
, ,
garage.
Continued from vatre 7: $c
in 1963; the barn and chrcken coop was constrracted in the 1950's.
Continued from vaRe Hi
(on jgb site). There will be approximateLy 13 off'~ce persannel warking from the grapvs~d Office
building.
Continued from paae 1 lb
#he pvtential far light and glare safety hazard or interference is minxznal.
Continued from oap-re 9; 14a
"na" curbs or sidewalks. Access will be from Marner Road. An accesslslope analysis prepared
by Inland Paci~'~c Engtneering will be attached.
Cantinued from Daae 10: Bf
Inland Canstructian Company wiTl generate approxirnately 129 average weekday, 2-way vehicIe
trips.
Ixxland has 13 employees that work in this off`~ce. Inland Cotastxuction ha.s indicated that the
estimated 129 averarge weekday two-way vehicle trips is twa to #.hree times m~~e traffic than
what his existing business generates. Acc.ording to Wand Canstruction, there wiil be a
tnaxunum af 50 to 60 average weekday two-way vehicle trips utilizing #he SulIivan Raad
inteTchange.
Approxintately fve (5) af #.he office staff typzcaliy arrive at w~rk between 7015 and 7:45 a.m.
and depart for home between 4:15 p.m. and 4:45 g.m. Amajvrity of #hose working at the o#'f'ice
are project rnanagers who arrive at vuark between 6:00 a,m. and 7:15 a,m. and depart for hame
betweea 3:30 p,m. and 7:00 p.m., dependYng on the jab.
xnland Coastructivn has noted that the primazy acc.ess for the property from 1-90 will be Suliivan
Road ovet`pass and in the neaz future wiil utilize t.he new Evergreea overpass. he has indicated
that amajority af his staff will utilize the Suliivan Roadl1-90 interchange rather than the Pines
Road/I-90 intezchange. -
~
TE owl
4
~ i •
~
SPOKANE COUNTY DIVISION 4F
BUILDING AND PLANNING
ZONE RECLASSIFICATION APPLICATION
PART I
A . GENERAL I FQRMATIQNI
NAME OF APPLICAIVT/REPRESENTATTVE: T n 1an d C o ngt r u c t i o n C o m p a n y
MAILING ADDRESS: c/o John T. Swe i tzer , S. 107 Howard St., Ste. 300
CI'ry; Spokene STATE: wA ZIp; 99204
PHONE: 5 0 9/ 7 4 7- 0 9 9 9 (work) (home)
IF APPLICANT IS vOT OWNER, INCLUDE WRITTEN OWNER AUTHORIZATION
FOR APPLICANT TO SERVE AS REPRESENTATIVE. c J o J o h n T. S w e i t z e r
LEGALOWNER'SNAME; Tom Clemson (Purchaser) PHONE: ,509/747-0999
MA.II.ING ADDRESS: E. 102 Sprague Avenue
CI'ry: S p o k a n e STATE: W A ZIP: 9 9 2 0 2
PROJECT/PROPOSAL SITE A.REA (acres or sq. ft) 127,195 s f (2.92 a c r e s)
ADJACENT AREA OWNED OR CONTROLLED (acres or sq. ft.) 276, 9 5 4 (6.358 a c r e s) t o s o u t h
ASSESSOR PARCEL #S OF PROJECT/PRQPOSAL 45104 . 0201
ASSESSOR PARCEL #'S OF ADJACENT AREA OWNED OR CONTROLLED 45104.0202
and 45104.0210
STREET A.DDR.ESS OF PROPOSAL N. 1618 M a m e r R o a d
EXISTING ZONE CLASSIFICATION(S) (DATE ESTABLISHED) U r b a n R e s i d e n t i a 1 3.5 ( U R- 3. 5)
EXISTIINGUSEOPPROPERTY Sinqle Family residence, garage and barn (rental )
PROPOSED ZONIlVG __.„1R-22 . Urban Res i dent i a 1 - 22 Zone
COMPREHENSIVE PLAN CATEGORY U r b a n
SCHOOLDISTRICT East Valley School District (361)
FIREDISTRICT Fir9t district No. 1
WATER PURVEYOR V e r a
PROPOSED USE OF PROPERTY:
Single family dwellings Duplexes Multifamily dwellings
Manufactured homes ( ) Business ( ) Indusvial ( ) Mixed Use ( )
Other Describe: 8 ..10 0 s f o f f i c e -
LIST PREVIOUS PLANNING DBPARTMENT ACTIONS IlWOLVING THIS PROPERTY: Z o h e
chanqe to AQricultural Zone 4/24/42; crossover to UR-3.5, 1/1/86
B . LEGA►,I~LMNE RECLASSIFICATION INFOR MATIQ~;,
LOCATION OF PROPOSAL: S p o k a n e V a 11 e y; N. 1618 M a m e r R o a d
SECTTON I n _ TOWNSHIP Z5 RANGE 44
NAIvfE OF PUBLIC ROAD(S) PROVIDING ACCESS: Mamer Road
WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD: 1501 o n M a m e r R o a d o n w e s t
47 co, 07 .A
,
ZONE RECLASSIFICATION APPLICATION Page 2 of 4
DOES THE PROPOSAL HAVE ACCESS TO AN ARTERIAL OR PLANNED ARTERIAL YES (X) NO
NAME(S) OFARTERIAL ROADS Access on Mamer Poad (local access road
intersects with Mission Avenue on the south.
LEGAL DESCRIPTTON OF PROPERTY FOR EACH ZONE RECLASSIFICATION PROPOSED.
1618 N. Mamer Road; Tract 97, EXCEPT the South 475 feet thereof,
=and also EXCEPT all that part thereof lying northerly of a line
~
drawn perallel with a•distance 100 feet southerly when measured
at riqht angles from the center line of primary State Highwa~ No.
Z, VERa, accordinq to plat recorded in Volume "O" oP Plats, page
30, in Spokane County, Washington.
EXISTIING ZONE(S) U R- 3. 5 TO PROPQSED ZONE(S) _ U R- 2 2
FOR THE FOLLOWING DESCRIBED
PROPERTY. (ATTACH LEGAL DESCRIPTION STAMPED BY LAND SURdEYOR OR PROVIDE
BELOW.
IF YOU DO NOT HOLD TITLE TO THE PROFERTY, WHAT IS YOUR INTEREST IN TT? _
Pendino aoreement to purchase
WHAT ARE THE CHANGED CONDITIONS OF THE AREA WHICH YOU FEEIe MAKE THI~S
PROPOSAL WARRANTED? Comprehensive Plan adoption anuary , 1981;
New Zoning Ordinance; Population and traffic increase in the
Spokane Valley, consistent with office development along Nora
i r, naGt 18 : ears .
WHAT IMPACT WII.L THE PROPOSED ZONE RECLASSIFICATION HAVE ON THE ADJACiENT
PROPERTIES? This property is an example of "fill in" deve opment.
The proposed project may result in an increased~demand t-or orrice
,
development along Nora between Pines and Mamer.
WHAT FACTORS SUPPORT THE ZONE RECLASSIFICATION? C o n s i s t e n t w i t h
Comorehensive Plat.;- (i.e. Urban category and development criteria
e l ona h i ahwavs ; cons i stent w i th prev i os zone chenges thet hev e
b._n ap❑roved„1,n__gT_gg (Nora frontaqe) : with condition of approval
will be c-om_eatitle with adjacent land use, will be a more attractive
VV~IAT MEASI;lRES DO YOU PROPOSE TO MITIGATE YOUR PROPOSAL'S IMPACT ON 1 a n d u s e a 1 o n g "
SURROUNDINC3 LAND USE? I_ g p,
Required road improvements to Mamer Road; required landscaping;
asphalt paving of all imprevious surfaces; required "down lighting"
for all exterior liqhtinq; planning conditions of approval that
wil11 requi re this oro iect to be •developed in substantial conformance
with the proposed site plan.
E• ~9
~
N~ .
• f
ZONE RECLASSIFICATION APPLICATION Page 3 of 4
PART II
THIS SECTION OF THE APPLICATION WII.L PROVIDE THE FLANNING DEPARTMENT STAFF WITH
V'iRITTEN `JERIFICATION THAT THE APPLICANT HAS HAD PRELIMINARY CONSULTATION WITH THE
AGENCIES IDENTIFIED. RESULTS OF THE PRELIMINARY CONSULTATION SHALL BE INCORPORATED
IN THE PROPOSAL BEFORE FINAL SUBMITTAL TO 1'HE PLANNING DEPARTMENT.
FIRE MARSHALL/FIRE DISTRICT
A. THIS PROPOSAL IS WITHIN FIRE PRlJTECTION DISTRIGT NO. I
B. ADEQUATE A►RRANGEMENTS (HAVE) ( BEEN MADE TO MEET OUR NEEDS
, IN PROVIDING FOR AN ADEQUATE VVATER FACILITIES FOR FIRE
PROTECTION PURPOSES.
C. RECOMMENDED FIRE FLOW: OR UNABLE TO CALCUI.ATE NOW
BECAUSE USE IS NOT D ; AND WILL BE DETERMINED AT BUII.DING PERMIT
APPLICATION TIME.
D . REQL'RREMENTS INCLUDE: F I: t/~~~Sb
FIRE DISTRICT IGNATURElfITLE DATE
WATER PURVEYOR
A. SATTSFACTORY ARRANGEMEN'TS FOR DOMESTIC WATER AND FIRE FLOW
REQU2REMENTS MUME) (HAVE NOT) BEEN MADE.
B. REQUIREMENTS/COMMENTS : '
p).,.~c~~
WATER DISTRICT SI NATUREffITLE DATE ,
COUNTY ENGINEER
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR ROADS
AND DRAINAGE HAVE BEEN DISCUSSED WITH THE APPLICANT.
A. COMMEIVTS:
~
SIGNA E ATE ,
COUNTY UTILITIES
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR
SUBMITTAL OF THIS PROPOSAL (HAV )(HAVE NQ'1) BEEN SATISFIED. THE DESIGNATED
WATER PURVEYOR FOR THIS SITE IS f4
A. COMMENTS: ~ 2ad} t C e
N
s ~ - & e-I., ir. (rzq
SIGNA E DATE ,
HEALTH DISTRICT
A PRELIMINARY DISCUSSION HAS TAKEN P RAL REQUIREMENTS FOR
SUBMITTAL OF THIS PROPOSAL (HAVE) HAVE NOT) BEEN SATISFIED.
A. COMMENTS:
, 7GrNATURE(IlTLE DATE ,
SEWER PURVEYOR
A PRELIMINARY DISCUSSION HAS TAI{E1V PLACE AND GENERAL REQUIREMENTS FOR THE
PROVISION OF PUBLIC SEWER ARp UNDERSTOOD BY THE PLICANT.
A. COMMENTS: tn-tj St
SIGNATURE/ITTLE DATE
7-F -01 • ~ ~
. •
l
ZONE RECLASSIFTCATION APPLICATION Page 4 of 4
PART III
`~PR JASy:!L1,9 SURVEYOR VERIFICATION
°F
~SI . D, A LICENSED LAND SURVEYOR, HAVE COMPLETED THE INFORMATION
TSq?AR ZONING MAP AND VV:RITTEN LEGAL DESCRIPTION.
o
~,~'•.,,9~ I0401 ~Oet~ .
G~~T£4.
s.Q•• • o~~ DA'I'E:
ADDRE . c° PHONE:
-!`~SPI•
EkPfRcS 4123114v
. ZIP:
wMa
PART IV
(SIGNATURE OF PROPERTY OWNERS OR LETTER OF AUTHORIZATION)
I, THE UNDERSIGNED, SWEAR OR AFFIRM UNDER PENALTY OF PERJURY THAT THE ABOVE
RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE.
I FURTHER SWEAR OR AFFIRM THAT I AM THE OWNER OF RECORD OF THE AREA PROPOSED
FOR THE PREVIOUSLY IDEN1'IFIED LAND USE ACTION, OR, IF NOT THE OWNER, ATTACHED
HEREWITH IS VV:R.ITTEN PERMISSION FROM THE OWNER AUTHORIZING MY ACTIONS ON HIS/HER
BEHALF.
NAME: DATE:
. .
ADDRESS'--J 104 C70/.%44uPHONE: 1 y7-S74,Z
(U ZIP: 9~r-v Z1
v U /
Gl ~
IG ATURE OF A.PPLICANT OR REJOESENTATNE DATE
STATE OF WASHINGTON )
) ss:
COUNTY OF SPOKANE )
SIGNED AND SWORN OR A,FFIRMED BEFORE ME ON THIS DAY OF
, 1996, BY • %%0O -zI
.~%~4~' ' "V
~ ' i
NO ~ Q
~
~ N~`aar : -
Notary Publlc in and for the State of Washington
4, pUBLIG OResiding at:
I9 .
vj~p y91 4 #MY aPPointment expires: / 99~
P WABON~~~~ .
~1!! I t1t~ G~
PART V
(TO BE COMPLETED BY THE DIVISION OF BUII.DING AND PLANNING)
SUBMITTED: l I a ~
DATE . ~ FILE ! CP
DATE ACCEPTED: B y; ~ . L •
TOTAL FEES: D D RECEIPT ~ ~4
C~ ~•~-g
`Z to
!
~ f •
Washington State Eastern Region
W, Department of Transportation 27 1,1 r, tilayza;r streei
Spokane bvH 992o7-2a9o
Sid Morrison
Sacretary of Transportation (509) 324-6000
t
February 7, 1995
Mr. John Pederson ~
Spokane County Planning Department
1026 West Broadway Ave.
Spokane, WA 99260
Re: Inland Construction Rezone Request
at Evergreen and I-90
Dear Mr Pederson.
After reviewing the information that was provided to us along with the design review notice
the Washington State Department of Transportation (WSDOT) has the following comments
on this development proposal:
In a cooperative effort between WSDOT, Spokane County, and the Price/Hanson
Development Company to serve the anticipated traffic volumes in this area, the construction
of the I-90 Evergreen Interchange has been proposed which would impact the northern
portion of this property. In order to construct this interchange and related improvements, a
right of way/access plan has been developed showing the needed property required for the
interchange.
As a result of this process it is our intent to acquire the needed right of way to construct the
Evergreen Interchange. To ensure this right of way can be acquired and to ensure
transportation impacts are adequately addressed we would ask that the following conditions in
italics be applied to this rezone request:
• That the needed right of way shown on the attached map be reserved as a future
acquisition area for the WSDOT Evergreen Interchange. The deftnition of `future
acquisition area" will be that language typically used by Spokane County.
• Diie to the proximity of I-90 and the Evergreen Interchange area, drainage and signage
plans will need to be reviewed by WSDOT.
• Development beyond the 8,100 square foot office building will require that a iraffic
cmalysis be prepared to ensure adverse traffic impacts are mitigated.
• To ensure that the above conditions are met WSDOT shall harve a signature block on the
building permit.
.
Nir. Pederson
• r .
February 7, 1996
Page 2
In addition to the above requested conditions of approval on this project, we would ask that
the applicant meet the following condition prior to a SEPA deternunation being rendered on
this re-zone request.
• Due to the operational problems currently being experienced at the Pines Road and
Mission Avenue intersection and to the need to treat all developments in an equitable
manner, the applicant shall demonstrate that this proposal will not have an adverse impact
on this intersection. We would ask that this issue of intersection capacity be addressed
prior to a SEPA determination being issued for this re-zone request.
If you should have any questions on this matter please feel free to contact myself or Greg Figg
- in our planning department at 324-6199.
Sincerely,
~4L
LE NARD C. CASH, PE
Regional Planning Engineer
attachment: JCL
LCC/gf
cc: Pat Harper, Spokane County Engineers
Dave Carlson, Hanson Industries
ti
.r'
• r .
OFF I CE ClF THE CQUhITY ENG I NEEa
SPOKAIVE CQUNTY, WFiSHIh1G'TOiV
Feb rLtar y 7 q 1996
T-:,o Sp-Dkane C~Dunty Planninca Department (Ciarrent Planninq
Admini5trate-or )
From: 513okane Gounty Enqinper's DepartmentQ.~o~J
5ub)ectp Canditic-ns of Approval Zone ChanUe I\Iop DRZE_168s96 Applicai7ts Name ClemsiDn~~Nr
Secticii-i ici, Township N, Ranqe 44 EWM
re: _Zoning
The fo1 1c-,winq "Condi tions of Approval " for the above referenced :c-ne
chanqe arP sLibmitteci to the SpiDk:ane County I'lanninq Department for
a.ncli_tsion in the Desiqn Reuiew Meeting scheduled FEbruary_7, 1996»
E36A Prior to issi_iance ----f a builciinq permit or at the rPquPSt r-of the
County Enqineer in con)unc{:a.on wi th a CoLtn-ty Road Prc-,jectlRoad
TmprinvPment nastri.et, whichever action c-Dmes firstw
E37 Appl i cant shal 1 decii cate 5 feet on Mamer_Road for riqht c-f way
and slcipe easements as necessary.
Prior to release ofi a biiildinq permz tor i_«e of the property as
proposed:
E40 Ac cess permits fiDr approaches to the Coi_irity Roacl Syatem shal l be
obtained from the County EnUineer p
E43 Applicant shall SLtbmit for acceptance by trie SpoE::ane COLirity
Eiiqineer road, drainaqP and 2CCE'~S5 planso
E44 -rhe appl i cant shal l submit for approval by the SpoE•.ane Coi_trity
EnUineer and the 5pokane Coi_tnty Wea1th District a detailed
combined ori-site sewage system plan and surface water c1isposa1
plan fior the entire pro.ject or portion thereof zf the
deve 1opment 15 pf iased n
E45 A parE:ing plan and traffic circulation plan shall be SLtbmitted
and approved by the Spcikane Co!_tnty Enga.neer. The de5iqnr
locaticin and arranqement o-F park:a.nq sta] 1s shall be in
accordance witfi standard eiigiiieerinq pr~..~ctices. i'aving or
surfarinq as approved by the Ccounty Fnqineer wi11 be requxred
I
• ~ .
paqe 2
fiDr a n y por tionofi t he p rojec t w hi c h i s to be occi_i p x ed or
traveled by vehicles
E48 "fhe ccinstrLtcticon of the rcoaclway improvements stated tierein shall
lae accc-mp1ished as appr-Dved by the Spoaf~.~ne Ccii.tnty Enqineer.
E50 The County Engineer has clesigriated a Commercial_Local_Access
standard fc-r the improv@ment of P1amer_Riaad wi-ilch a.s aci.aacent to
the proposed development. 'This will reqLtire tl7e acidition of
approa.Ymately 8`10 fta of asphalt alonq the frontaqe of the
development4 CUrbing and sidewalE- mList alSo be coristrLic~ed.
E51 A11 required improvements shal 1 confor-m to the current State of
Washinqton Standarcl 5pec:ificatir-ins fc-r Road and Bridqe
construction and other applicable county standards ~.~ndlor
adopted resoluticins pertai.ning pertaininq to Rciacl 5tandards and
StiDrmwater Manac7ement in e'FfE?Ct at thc date of constructiiDn,
Ltn1ESs otherwise approvecl by the County Enqineera
E55 R-Dadway rtandards, typical rr-iadway secti-Dns and drainaqe p].an
requirements are fOLtnd in SpoE•:ane Board Of COLtnty Commissx.r-oners
resolution 95-0498 as amended anci are applicable t-D this
prop-Dsal.
E58 No cc-nstruction worE; a.s t(a be perf-Drmed within the e;%i.stinq cir
p~~~~posed riqh-t of way until a permxt has been issLted by i:he
Coun t y E n gin eer . A 1l wor E: w i t ha. n t he pub 1 ie road r igfy tof way i~
sub ject to inspection and ~pproval by the County Enqineer.
E59 All required constritction within the exx.sta.nq cor proposed pLtblic
r i qhto•f way i s to be com p l. e ted p rior to t he r e 1 e~~e ofa
buildinq permit or a bond in an amount estimated by the Coiirity
Engineer tn GoVG?1'' tfie CoS't of CoIl5t1ruCtio1'l oY 1fY1pYovements Sllall
be filed with the County Enqineer.
E'Do l'here rnay e••.ist uti 1itiesq e1 tlier underqround or cnverhead,
affiectinq the sLtbject proper•ty9 including property to be
dedicated or set aside for futi_tre acqui.sitiono 5po~:ane County
e7 5 5uf Tl es f'1 o f i n a n c i a 1 obl1 Q at1orl foY ad)u5 t f Tl @ r1 t 5 oY Y' el-DCat 1of l
reqardinq these uti1 a.ties. Appl i cant should ciieck: with the
appl icab1E Uti I ity pUrveyc-r and the SpoE-ane County Engineer to
determine whether app1 icant or the i_tti 1 ity i5 responsible for
adjustment or relocafiion cr.ti5t5 and tci mak:e arrariqements for any
11eCes5aYy Wo1''k■
- A ,
~
~ I pa qe 3
Special Conditicins»
After• revlew of the pr-oposed rezc-nP a.n con junction with ZE 84-81
Spokane Cot_tnty Enqa.ncrinq i.s not reqi_ta.ranq atraffic analysis for
ths.s proposed development ba=>ecl ori the site plan of recorci. Shoul.d
any fiArther reqLtest be processed f-Dr adda.ti-Dnal sqLtare fr-lotaqe Uf
bux.lciable area a detailed traffz r analyais wil l. be requa.red.
PAGE 1 10:10:59 31 JAN 1996
Road# Road Names.......... MPost. Reference-Desc-riptio Road Log Info..........
03068 MAMER CT (START) 00.000 24TH AV U 19 PAVED 36
00.040 NORTH END OF ROAD U 19 PAVED 36
02956 MAMER RD (START) 00.000 20TH AVE U 19 PAVED 36
MAMER RD 00.180 17TH AV (START) U 19 PAVED 36
M11MER RD ( END ) 00.250 16 TH AVE U 19 PAVED 36
02957 MAMER RD (START) 00.000 SOUTH END TO 9TH AVE U 19 PAVED 40
MAMER RD 00.060 9TH AV (START) U 19 PAVED 40
00.120 8TH AV U 19 PAVED 40
MAMER RD (END) 00.180 7TH AV (END) U 19 PAVED 40
02958 MAMER RD (START) 00.000 BROADWAY AV U 19 LIGHT BITUM. 22
MAMER RD 00.490 MISSION AV U 19 LIGHT BITUM. 22
MAMER RD ( END ) 00.700 NORA AV ( END )
03106 MAMER RD (START) 00.000 32ND AV U 19 PAVED 40
MAMER RD 00.050 31ST AV (START) U 19 PAVED 40
MAMER RD (END) 00.080 30TH AV U 19 PAVED 40
03144 MAMER RD (START) 00.000 7TH AV U 19 PAVED 40
MAMER RD 00.060 6TH AV (END) U 19 PAVED 40
MAMER RD ( END ) 00.120 5 TH AV ( END ) U 19 PAVED 40
03184 MAMER RD (START) 00.000 MAIN AV U 19 PAVED 40
MAMER RD 00.100 VALLEYWAY AV U 19 PAVED 36
MAMER RD (END) 00.230 NORTH END OF ROAD
03225 MAMER RD (START) 00.000 46TH AV U 19 PAVED 36
MAMER RD (END) 00.230 43RD AV (START) U 19 PAVED 36
8 Records Processed
PAGE 1 10:11:30 31 JAN 1996
Road# Road Names.......... MPost. Reference-Descriptio Road Log Info..........
03320 NORA AV (START) 00.000 WEST END TO PARK RD U 19 GRAVEL 30
NORA AV 00.210 PARK RD U 19 LIGHT BITUM. 18
00.280 EDGERTON RD (END) U 19 LIGHT BITUM. 18
00.360 CENTER RD (END) U 19 LIGHT BITUM. 18
00.490 ELLA RD (END) U 19 LIGHT BITUM. 18
NORA AV (END) 00.690 VISTA RD U 19 LIGHT BITUM. 18
03321 NORA AV (START) 00.000 VISTA RD U 19 PAVED 40
NORA AV 00.060 SIPPLE RD (START) U 19 PAVED 40
00.120 BESSIE RD (START) U 19 PAVED 40
00.180 LAUR.A RD ( START ) U 19 PAVED 40
NORA AV (END) 00.250 SARGENT RD U 19 PAVED 40
03348 NORA AV (START) 00.000 WOODRUFF RD U 19 PAVED 40
NOR.A AV 00.060 WALNUT RD (END) U 19 PAVED 40
00.120 HERALD RD (END) U 19 PAVED 40
NOR.A AV ( END ) 00.170 DARTMOUTH RD ( END ) U 19 PAVED 40
03357 NORA AV (START) 00.000 FELTS RD (END) U 19 PAVED 40
NOR.A AV 00.060 BALFOUR RD (START) U 19 PAVED 40
NORA AV (END) 00.120 RAYMOND RD (END) U 19 PAVED 40
03383 NORA AV (START) 00.000 WEST END OF ROAD R 09 PAVED 36
NORA AV 00.020 GLENBROOK RD R 09 PAVED 36
NORA AV (END) 00.120 EAST END OF ROAD
0 3 3 2 2 NOR.A AV ( START ) 00.000 LOCUST RD ( END ) U 19 PAVED 40
NORA AV (END) 00.240 WOODRUFF RD U 19 PAVED 40
03323 NORA AV (START) 00.000 SR 27 (PINES) U 19 PAVED 22
NORA AV (END) 00.890 MAMER RD (END) U 19 PAVED 22
03384 NORA AV (START) 00.000 UNIVERSITY RD U 19 PAVED 36
NOR.A AV (END) 00.120 GLENN RD & CT (START U 19 PAVED 36
03372 NORA AVE (START) 00.000 WILBUR RD U 19 PAVED 32
NORA AVE (END) 00.060 EAST END OF ROAD U 19 PAVED 32
9 Records Processed
^
P ~
~
~
S ip C), I< "k T'r ]-:::w
DEPARFMENT OF BLiILDIRiG ANi? PLAI+TNING .P1 DIViSION OIF THE I'LJBLIC WoRICS DEPARTMENT
JA[YiES L. LYAAL'3.ONr C B.'V rDii\EcToR LJENN.3 1Y1 JI.oTTR 1.Et LJli\ECFOR
I
~~~ORANDUM
TC1: Pat Harper, Spokane County Division of Engineering
Jim Red, Spokane Caunty Utilities Departrrrent
Steve Holderby, Spokane County Health District
Wyn Birkenthal, Spokane County Parks Recreation DeFartment
Bi11 Hemrnings, Stormurater Utility
Greg Figg, Depattment of Transpartatian
Glen Nhles, Spokane Regivnal Transportation Council
Christine Fuestvn, Spolcane Transit Authority
Susan Winchell, Boundary FLeview Baard RECE1VED
Central Vallry School District
Vera Water and Power JAN 3 0 1996
Fire Distnct No. I
FROIVI; John Pederson, Senior Planne
DATE: January 29, 1996
RE: Zone Reclassificatian frorn Urban R,esidential-3.5 (UR-3.5) to Urban
Ftesidential-22 ([JR-22)
APPLICATIO1V ACCEPTAN~E ANI] DESIGN RE"~~EW 1VXEETING
FE,BRUARY 7. 1996 AT 2:15
COUNTY PLANNING CONFERENCE RDOM. 2ND FLOOR
P1ease review the above applicatiafl and use the attaehed APPLICAMN ACCEPTANCE AND
aESI~~ ~VIEw MEETIN~ ~ORM for yvur comments. The Planrting Department
encourages your presence at th'rs tneeting. The sponsor and representative have heen
invited to aiso attend. If you can not attend, please forward your review comments on the
attached form to Larne Lakshas for the meeting. The atCaChed APPLICATTON
ACCEPTANCE AND DESIGN REVIEW FORM5 will be g,iven to the sponsor at the meeting and
included in the Planning Department fiie (so bring three copies to the meeting). Thanks
€or your cvogeration. If yau have any questivns abaut the applicatxan, please contact
Larne Lalshas af the P1anning Department at 456-2205.
C: John Sweitzer, South 107 Haward, Suite 300, Spokane, WA 99204
Inland Constnuction, 102 East Sprague, Spokane, WA 99204
AttaChrnent5: Application Acceptance attd Design Review Forrn, Proaect Design, Site Plan
1026 WF5T BR[]AD1NAY AVENLTE • 5POKANE, VV'AsxrtvGraN 99264
BUiL'DING PHC7NE- (509) 455-3675 • PAX (509) 456-4703
PArrNnNc PHaNE. (509) 456-2205 • FAx (504) 456r2243
Tnn fKf7M
Y r
Design Review for February 7, 1996 at 2:15
Zone Reclassification from Urban Residential-3.5 (UR-3.5) to Urban
Residential-22 (UR-22)
Generally located east of and adjacent to Mamer Road, south of Interstate
90, approximately 500 feet south of Mission Avenue in the SE 114 of
Section 10, Township 25 North, Range 44 EWM, Spokane County,
Washington.
COMPREHENSIVE PLAN: Urban and within the Priority Sewer Service
Area (PSSA)
PROJECT DESCRIPTION: Zone Reclassification from Urban Residential-3.5
(UR-3.5) to Urban Residential-22 (UR-22) for an 8,100 square foot office
building and those uses allowed in the Urban Residential-22 (UR-22) zone.
PARCEL NUMBER: 45104.0201
SITE SIZE: Approximaltey 2.92 acres
APPLICANT: Inland Construction Company
Tom Clemson
102 East Sprague
Spokane, WA 99202
AGENT: John Sweitzer
107 South Howard
Suite 300
Spokane, WA 99204
(509) 747-0999
ASSIGNED PLANNER: Lorne Lakshas
. ~
/ . , ►
SPOKANE COUNTY DIVISION OF
,
BUILDING AND PLANNING
Z4NE RECLASSIFICATION APPLICATION
PART I
A. GEZgERAL INFORMATION-
NAME OF APPLICAN'tlREPRESENTATNE: T n 1 a n d C o nst r u c t i o n C o m p a n y
MAILING ADDRESS: c/o John T. Swe i tzer , S. 107 Howard St., Ste. 300
CI'ry: Spokene STATE: WA ZIp: 99204
PHONE: 5 O 9/ 7 4 7- O 9 9 9 (work) (home)
IF APPLICANT IS NOT OWNER, INCLUDE WRITTEN OWNER AUTHO1tIZATION
FOR APPLICANT TO SERVE AS REPRESENTATIVE. c/ o J o h n T. S w e i t z e r
LEGAL OWNER'S NAME: Tom Clemson ( Purchaser ) pHONE: 509/747-0999
MAII,TNGADDRESS: E. 102 Sprague Avenue
CI'ry: Spokane STATE: WA ZIp: 99202
PROJECT/PROPOSAL SITE AREA (acres or sq. ft) 127,195 s f (2.92 a c r e s)
ADJACENT AREA OWNED OR CONTR4LLED (acres or sq. ft.) 276,954 (6.358 a c r e s) t o s o u t h
ASSESSOR PARCEL #S OF PROJECT/PROPOSAL 45104.0201
ASSESSOR PARCEL #'S OF ADJACENT AREA OWNED OR CONTROLLED 45104 . 0202
and 45104.0210
STREET ADDRESS OF PROPOSAL N. 1618 M a m e r R o a d
EXISTING ZONE CLASSIFTCATTON(S) (DATE ESTABLISHED) U r b a n R e s i d e n t i a 1 3. 5 ( U R- 3. 5)
EXISTING USE OF PROPERTY Sinqle Family residence, garage and barn (rental )
PROPOSED ZONING _,UR-22. Urban Res i dent i a 1 - 22 Zone
COMPREHENSIVE l?LAN CATEGORY U r b a n
SCHOOLDISTRICT East Valley School Oistrict (361)
FTRE DISTRICT F i r s t G1 i s t r i c t N o. 1
WATER PURVEYOR V e r a
PROPOSED USE OF PROPERTY:
Single family dwellings Duplexes Multifamily dwellings
Manufactured homes ( } Business ( ) Industrial ( ) Mixed Use ( )
Other Describe: 8,100 s f o f f i c e LIST PREVIOUS PL,ANNING DEPARTMENT ACTIONS IIWOLVING THIS PROPERTY: Zon e
chanqe to Aqricultural Zone 4/24/42; crossover to UR-3.5, 1/1/86
B . LEGA►I,/ZONE RECJ,AS$IFICATIQN IJFQRUATIO~jj
LOCAITON OF PROPOSAL: Spokane Va 11 ey ; N. 1618 Mame r Road
SECI'ION in TOWNSHIP P„5 RANGE 44
NAME OF PUBLIC ROAD(S) PROVIDING ACCESS: M a m e r R o a d
WIDTH OF PROPERTY FRONTING ON PUB LIC ROAD: 1501 o n M a m e r R o a d o n w e s t
ZONE RECLASSIFICATION PLICATION Page 2 of 4
DOES THE PROPOSAL HAVE ACCESS TO AN ARTERIAL OR PLANNED ARTERiAL YES (X) NO
NAME(S) OFARTERIAL ROADS Access on Mamer Poad (local access road
intersects with Mission Avenue on the south. LEGAL DESCRIPTION OF PROPERTY FOR EACH ZONE RECLASSIFICATION PROPOSED.
1618 N. Mamer Road; Tract 97, EXCEPT the South 475 feet thereof,
~and also EXCEPT all that part thereof lying northerly of a line
drawn perallel with a distance 100 feet southerly when measured
at riqht anvles from the center line of primary State Highway No.
z. VERA, accordinq to plat recorded in Volume "0" of Plats, page
30, in Spokane County, Washington.
EXISTING ZONE(S) U R- 3. 5 , TO PROPOSED ZONE(S) U R- 2 2
FOR THE FOLLOWING DESCRIBED
PROPERTY. (ATTACH LEGAL DESCRIP'ITON STAMPED BY LAND SURVEYOR OR PROVIDE
BELOW.
IF YOU DO NOT HOLD TTTLE TO THE PROPERTY, WHAT IS YOUR INTEREST IN TT? _
Pendina aareement to purchase
WHAT ARE THE CHANGED CONDITIONS OF THE AREA WHICH YOU FEE~I, MAKE THI
~S
PROPOSAL W D? Comprehensive Plan adoption anuary , 1981;
New Zoning Ordinance; Population and traffic increase in the
Spokane Valley, consistent with office development along Nora
i n na-,t- 18 v^e_ars .
WHAT IMPACT WII,L THE PROPOSED ZONE RECLASSIFICATION HAVE ON THE ADJAG1ENT
PROPERT'IES? Th i s prope rty i s an examp 1 e of "f i 11 i n" deve opment .
The proposed project may result in an increased-'aemand for orfice
development along Nora between Pines and Mamer.
WHAT FACTORS SUPPORT THE ZONE RECLASSIFICATION? C o n s i s t e n t w i t h
Comprehensive Plat;,, (i.e. Urban category and development criteria
alonq hiqhways; consistent with previos zone changes that have -been aRnro~~R~+ in area (Nora frontaQe); with condition of approval
will be com atible with adjacent land use, will be a more attractive
WHAT MEASURES DO YOU PROPOSE TO MTTIGATE YOUR PROPOSAL'S IlViPACT ON 1 a n d u s e a 1 o n g
SURROUNDING LAND USE?
I-90.
Required road improvements to Mamer Road; required landscaping;
asphalt paving of all imprevious surfaces; required "down lighting't
for all exterior liqhtinq; planning conditions of approval that
wiql rga ui_re this oro iect to be developed in substantial conformance
with the proposed site plan. . - • . . .
IN
ZONE RECLASSIFICATI. APPLICATION Page 3 of 4
~ r A
PART II
THIS SECTION OF THE APPLICATION WILL PROVIDE THE PLANNING DEPARTMENT STAFF WITH
WRITTEN VERIFICATION THAT THE APPLICANT HAS HAD PRELIlUIINARY CONSULTATION WITH THE
AGENCIES IDENTIFIED. RESULTS OF THE PRELIMINARY CONSULTATION SHALL BE INCORPORATED
IN THE PROPOSAL BEFORE FINAL SUBMITTAL TO THE PLANNING DEPARTMENT.
FIRE MARSHALLJFIRE DISTRICT
A. THIS PROPOSAL IS WITHIN FIRE PROTECTION DISTRICT N0. I
B. ADEQUATE ARRANGEMENTS (HAVE) ( VFN4T) BEEN MADE TO MEET OUR NEEDS
IN PROVIDING FOR AN ADEQUATE WATER ~S-'T-EIvf- AND FACILITIES FOR FIRE
PROTECTION PURPOSES.
C. RECOMMENDED FIRE FLOW• OR UNABLE TO CALCULATE NOW
BECAUSE USE IS NOT DEFINTTIVE; AIVD WII.L BE DETERMINED AT BUILDING PERMIT
APPLICATION TIME.
D . REQUIREMENTS INCLUDE:
,
J;~ ),5~i
i!...:~h t i.~' ~I_Y ~ !F~ ~L ~ i^. ✓
FIRE DISTRICT ~ IGNATUREJTITLE DATE
WATER PURVEYOR
A. SATISFACTORY ARRANGEMENTS FOR DOMESTIC WATER AND FIRE FLOW
REQiJIREMENTS (M4V&) (HAVE NOT) BEEN MADE.
B. REQUIREMENTS/COMMENTS:
\ / C-~ f.~~3.~ 1 Z_r' ~.'z- l'~ ~ , ~ ~ ' ~ ~ - ~ j ~ / ' ~ ~
l~ 33
WATER DISTRICT SIGNATUREfI'ITLE DATE
COUNTY ENGINEER
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR ROADS
AND DRAINAGE HAVE BEEN DISCUSSED WITH THE APPLICANT.
A. COMMENTS:
~
SIGNATUI&TITLE ATE
COUNTY UTILITIES
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR
SUBMITTAL OF THIS PROPOSAL (HAVNf--,& i(HAVE NOT) BEEN SATISFIED. THE DESIGNATED
WATER PURVEYOR FOR THIS SITE IS rA
,
A. COMMENTS: C r'r, t
\
- SIGNATURElTITLE DATE ,
HEALTH DISTRICT
A PRELIMINARY DISCUSSION HAS TAKEN PL CE A&D-GEblE-RAL REQUIREMENTS FOR
SUBMITTAL OF THIS PROPOSAL (HAVE) HAVE NOT) BEEN SATISFIED.
:
A. COMMENTS: «G, 7L1'1- (/C.~~s~..~- ~ 5•~
~
$46NATURE!'TITLE DATE ,
SEWER PURVEYOR
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR THE
PROVISION OF PUBLIC SEWER ARF- UNDERSTOOD BY THE A . COMMENTS: I 7PLICANT.
~a~
,
GLMl%
~
SIGNATUREfI'ITLE DATE
,
ZONE RECLASSIFICATIG. xPPLICATION Page 4 of 4
PART III
r
~ L•• ~'9~ ~ SURVEYOR VERIFICATION
.a
: ~r`ERoSI ,yfD, A LICENSED LAND SURVEYOR, HAVE COMPLETED THE INFORMATION
~kQI~FOR~ ZONING MAP AND WRITTEN LEGAL DESCRIPTION.
r~ ~ C=! -
@ . fi.c i'':+f;l ,r` ; • ~
DATE: / ~C/
_ DRE ,S: ZJ, . PHONE:
G~S a:i_'~~I& ~
ZIP: _
PART IV
(SIGNATURE OF PROPERTY OWNERS OR LETTER OF AUTHORIZATION)
I, THE UNDERSIGNED, SWEAR OR AFFIRM UNDER PENALTY OF PERJURY THAT THE ABOVE
RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE.
I FURT'HER SWEAR OR AFFIRM THAT I AM THE OWNER OF RECORD OF THE AREA PROPOSED
FOR THE PREVIOUSLY IDENTIFTED LAND USE ACTION, OR, IF NOT THE OWNER, ATTACHED
HEREWITH IS WRITTEN PERMISSION FROM THE OWNER AUTHORIZING MY ACTIONS ON HIS/HER
BEHALF.
~
NAME: ~I Ci- ~ ~ cl ~ ! ~ ~ f-.~ , DATE:
c - ,
ADDRESS: PHONE:
ZIP:
~Sj9NATURE OF APPLICANT OR IZ~P~ESENTATNE DATE
STATE OF WASHINGTON )
) ss:
COUNTY OF SPOKANE )
SIGNED AND SWORN OR AFFIRMED BEFORE ME ON THIS DAY OF
.
, 1996, BY
~ `,~~1t l l f l//~~I
OV•''~~~
♦ • ~i
No
eft No~Aar : -
~
Notary Public in and for the State of Washington
~ cn pUBIIG ~ Zo
~ 9~•~,9r ~~q..~p` Residing at:
~~/~F~~'~~.••~N~~►;My appointment expires: i~~~
''~~~l~~
PART V
(TO BE COMPLETED BY THE DIVISION OF BUII.,DING AND PLANNING)
DATE SUBMITI'ED: FILE
DATE ACCEPTED: BY:
TOTAL FEES: RECEIPT
~po i ` County
• .
Memo
To: Pat Harper, Spokane County Division of Engineenng
Frorm Louis Websber, AlCP C. +l.
Dam December 10, 1996
Re: infand Consbvc.bon Business Park
Attached is a copy of the Traffic Impact Analysis for the above referEnced projecL The design review
meeting to consider the proposai is schedu{ed for January 16, 1997.
~
• Page 1
~
. .
Inland Construction Company Rezone
,
f ~
~ o
` M
~ 1 N
~I iron~o u , ~
.
kt \ ~ N
r
~
~
N ~
. V • N
+~~I 411A NJ Ai INY -
: ,r,.•. i,~,J
f ~
01
".......::v
MISStON AVE-1 j w
. . .
t _ •
,
INT St i ,
= t
o
< N i s..... ~ _ `
SM E's ~ M 1. S) Q ~ ~ ~ t G
~T^L CATAl.DO iz N ~ • t ; dr
► %►~4r.tcrv cr, ~ ~ " UTI► • t
da w
A Y ~w m
~ - avF
14
e n
v
w
ALKI
AV ~ nc.K. V .
~
~
` . . ~ VaLL
~
~ - ~ - _ 1NTEp 5 TA TE 9
O
~ .
ONE GHANGE
Z ,o
we+•..r . ~r*E 1Y ~Y►~pSCw~E ~
' _ ~ 1~ NOSLA►! lAN Ca^~
1~ ' , - ' ~ . ~ ~ • '7....'+.•....-'~•.... ~ . ~ N~~~~+
~ ~ ~ + ~ ~,r• _ - ~„r,,,,,_ ~y . ' ~ - ' I.y....~ ~ ~K~ i410~~~
. ~.+~j/"~~....:_ r _ _ ~ - " _ ` r, ,yFt , • _ ytlt=~
• .N / ti11.~
~ J' . - • pit& •Lok~
!N • u f~
' ' ' - ~ ~ ~ - • - • ' _ ' . - . ~
1 ~ - • _ . Xr■~ - ~ r _ ~ - _ . " ~ - 1... ►"vd'~
~ 641~
,
~`Y~` ~ ~ _ ~ ~4 ~ I'f ~ ` ~ ~ ~•i
~ . .......'r"", _ ' ~ . r ~ w,^• O~~~CC ge~td ~ ' ~ 'i{rM4 ~d~
fwt. SS
t ~ ' ....f , , .
_ • - ~~~5
! a
1 t` / ~ ~ ' • ~ •A' 1
Z~.'t"r 1 . . , J '
j'" r„M~~ . 1.i' f,~'~~~►- / ''s -
* lW
Z,Ob ~ y,"
~
, . L , ~ . - ` ~ ~ptth
,
~r.:~."► ~ _ qQ:
~ ~ ~ ~ Plan ~N
~
,
~ 1 ~ ~ ~f ■ I ~ ■ ~ ~ , , ' T
~ ~',G,,. Y-- y , ~
V► - ~ ► ~ ' ~
I ~
► ~ ~
, .r ~ ~ ~ - - ~ , ~ i ~f ~
ir
_ ♦
~ ~ I ~ _ ~ ~+~t ~ ~ 1~ ~ 1
. ~ t ~ 1
~ w ~ h L• I LA
f) c.♦
~ N ' ' ' { .
1 ~ ~ 1
~ i
r• ~ a,~ N ~ ~ r ~ ~ ~ ~
• ~ ~ _r r~~
. ~ ~ ~r,r,~•,,,,,
~ ~ .
y0 A
s