2010, 10-18 Permit App: 10003419 Egress WindowProject Number: 10003419 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/18/2010 Page 1 of 2
Project Information:
Permit Use: 1 EGRESS WINDOW Contact: DMI REMODELING
Address: 11323 E DISHMAN MICA RD
C - S - Z: SPOKANE, WA. 99206
Setbacks: Front Left: Right: Rear: Phone: (509) 924-3438
Group Name:
Site Information: Project Name:
Plat Key: 001865 Name: ORCHARD AVE ADD TR 1-228 District: Nort
Parcel Number: 45063.2319 Block:
SiteAddress: 3603 N EDGERTON RD
Location:: CSV
Lot:
Owner: Name: KOKER, CHRISTOPHER A
Address: 3603 N EDGERTON RD
SPOKANE, WA 99212-1924
Zoning: R-2 SF Res Suburban District
Water District: 002 ORCHARD AVENUE Hold: ❑
Area: 7,840 Sq Ft Width: 60 Depth: 141 Right Of Way (ft): 34
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 10/18/2010 By: tmelbourn
Permits: ,
Building Permit
Contractor: DMI REMODELING Firm: DMI REMODELING
Address: 11323 E DISHMAN MICA Phone: (509) 924-3438
SPOKANE VALLEY WA 99206
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation So Ft Valuation
1&2 FAMILY R-3 VB EGRESS 0 $1,300.00 0 $1,300.00
WINDOW
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $1,300.00 0 $1,300.00
Units Unit Desc Fee Amount
1 SELECT $69.25
1 SELECT $4.50
1 SELECT $27.70
Operator: JD Printed By: jmm
Permit Total Fees: $101.45
Print Date: 10/18/2010
• Project Number: 10003419 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/18/2010 Page 2 of 2
Notes:
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $101.45 $101.45 $27.70 $73.75
8101.45 $101.45
$27.70 $73.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 10/18/2010
Sbokane
•
Valley
Community Development
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.snokanevalley.org
PERMIT NUMBER:/O - 34/ f i
PERMIT FEE:
Residential Construction New Construction Li Accessory Bldg
Permit Application n Addition/Remodel Deck
Other:
SITE ADDRESS:
.4003 M. GA Oen 93;)Q,
ASSESSORS PARCEL NO: 24 50(o 3 . D3 I LEGAL DESCRIPTION: f t -C {r l igNie sd SsL F4
gay
Building.00wner:
�tt rl _ o' ► �_ r�
Address: r • 3 , • ' •' As �� q
• • 1 (� ate: • Zip: a 11'1
Phone: Fax:
Contractor: ` '
Name: Minn.ton-r 0a01 In
Address: \ \ 3,a,3 C.'t 1 sk'tr an a) 1(A CA
lq�
City:State: (x c a
�YI Q.
•Pb [J3)9,3(8
q �Ztp1
Phone: o s _ /) 9'3/ l� () Fax: 5G9 /o Q -3 i c1
UNFIN BASEMENT SQ. FTG:
Contractor Lic�N "tie ?' 9Datx Date: 3_ as_ ) a
Contact Person -
GARAGE SQ. FTG:
City Business Lic. No:r-� o
�3
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
T (Qi� 1 c�i 3JU5
Name: / A )C'A d S:
SEWER OR SEPTIC?
Phone: / 9 ei--ssQGl
L
Describe the scopof work in detail: Cost of Project: $ �3 00—
cur r?iSIWC ?&O WALL. 'TO CNLACbc et�tlnfb Lop NLL' - ofEtJlt lrF,(Prolvl VA.29 yt`ty')
._ 1<. aft`-). S (09-420StS. /AL.Y)at i, (u int of "ta-C,` J 0c L
. Proposed Use: S3fl C t P-,
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:14 r F 1
DIMENSIONS: n I I
# OF STORIES: -'
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2"FLOOR SQ. FTG:IV
u
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes o nances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application c. be p •cessed.
SIGNATURE
Method of Payment:
El Cash V Check ❑ Mastercard ❑ VISA
Bankcard #: Expires: VIN#:
yl.D DATE:
io -- iG
Authorized Signature:
REVISED 2/15107
pokaane
Valley,a
For City Use Only I'
PLUS Project Number h (}Sl e3 -t 1 q
Project Address '• •
•
11703 E Sprague Ave Suite B-3 •, Spokane Valle'y'WA 99206;
509.688.0036 • Fax: 509.688.0037 • perrhrtcenter@spokanevalley.org
As part of our on-going commitment to customer: service during the, review ` process 'of..your: ,project
application, we are'.providing you with a TARGET DATE for the initial technical, application review; If,for
any reason we cannot meet this date, we will'contact you with a revised target'date:;'
Your application review TARGET DATE is
•
The TARGET DATE is the date we estimate your•project application;wilF.have.had-its. initiaLtechnical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
i Submit complete, accurate plans and documents.
Ertra time mar he require(/,/0/ re-suhniittals as project application ,reviewers, work.on/multip/e'aytp/ications mud,
it
run' he .several dors belbre ther JOH 100k at rour neiw.
P•} ' ` .4t V. t
l e . ...
. i Designate a specific contactperson to communicate with the City. •
1Vhile the person designated as the appllcart's'contact person with the Cih,can he changed, one //U/1 diad with the .
ecperl,se /or dealing frith reviewer continents would be 1/w best' choice for the eutire renew, process. '" ' ' '
ilr
Call staff regarding the status of your project only after the target date shown at the top of,the page.;
Although yott should he contacted 0/2 or by the target date. please jeel/ree ta•contact tis'if yanhaven'1 lrearddram ti.s
by roar target date. Staff /nay contact you he/ore the target date if the'Mild! 1eview'lsComplete. /3yJollowhig, this
procedure. you trill save time and allow the reviewers tai complete the work more.e.yeditkiu.sh'. ' '
Steps in the Permit Process
1. Counter Complete. Your application . has. been accepted _as,coitnter coniplete..This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved", for mdeferred.
submittal. This docs not'prcvcot technical staff from requesting additional information as'a result of:their technical review.;
2. Quality Check. The next step in the process is a quality check to Make 'sure that thel'application is revied'able'and free
from substantive flaws that would prevent technical staff'from; completing tho teclinical reJiew once.it'is.statted. • When .
this step is complete, your application will be routed to the appropriate staff and remain in their. review queue.unttl it
comes up for review.
3. Technical Compliance. Once an application is administratively complete; it is routed to technical staff for compliance •
review. Depending on the type ofproject, technical staff may include multiple reviewers.-Youshould be •contacted by •
phone, fax, email, or mail by your TARGET DATE once the initial technical.compliancc review is complete.:
4. Permit Issuance. When the technical compliance review of the applicttion:is cbthplete, including re-mittals, each reviewer will approve their section of the applicanon'and route it to the Perrnit Center: When all sections
of the application are received, a Permit Specialist will process the application and contact the,person specified on your ; •
application Mr permit pick-up. Information regarding fees and preyconstruction meetings (if requircd),will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07