Loading...
2005, 08-19 Permit: 05002984 AdditionSpokose anne\st., _#Valley BUILDING DIVISION 11707 E. Sprague Avenue. Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 1007 S EDGERTON RD Parcel Number: 45193.0318 Subdivision: Block: Zoning: UR -3 Lot: Urban Residential 3.5 Owner: KEEN, RICHARD R & VERNA L Address: 1007 S EDGERTON RD SPOKANE VALLEY, WA 99212 Building Inspector: MARK HILLABRANDT Water Dist: Project Number: 05002984 Inv: 1 Issue Date: 08/19/2005 Permit Use: 14 X 14 ADDITION TO RESIDENCE WITH ATTACHED DECK Applicant: KEEN RICHARD R & VERNA L 1007 S EDGERTON RD SPOKANE VALLEY, WA 99212 Phone: (509) 484-4910 Contact: KEEN, RICHARD R & VERNA L 1007 S EDGERTON RD SPOKANE VALLEY, WA 99212 Phone: (509) 484-4910 Setbacks - Front: Left: 51 Right: 46 Rear: 76 Group Name: Project Name: Building Permit Contractor: OWNER Permits - I License 4: OWNER DECK KITCHEN ADDITION Total Value: FOR BUILDING INSPECTIONS CALL (509) 688-0054. R-3 VB R-3 VB 284 RESIDENTIAL PERMIT FEE 196 STATE SURCHARGE RESIDENTIAL PLAN REVIEW $18,897 28 $307.25 $4.50 $122 90 Total Permit Fee: 5434 65 Plumbing Permit Contractor: OWNER License 4: OWNER SINKS GARBAGE DISPOSAL FOR PLUMBING INSPECTIONS CALL. (509) 688-0054. $6 00 DISH WASHERS 5600 Total Permit Fee: $600 $18.00 Payment Summary Total Fees AmountPaid AmountOwing 5452.65 5452.65 50 00 Tran Date 08/19/2005 Processed By: JANSSEN, CHRISTINA Printed By: KURTZ, KARI Page I of I Receipt 4 Payment Amt 2446 5452.65 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property Ines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the venfication or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering, and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and pnor to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-OF-WAY/APPROACH - pnor to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Perms and inspections for electrical wrong. Stale Department of Labor Perm's and inspections for Sewer Connection, Spokane County Utilites Division And Industnes 324-2640 477-3604 Penis and inspections la on-site septic systems, Spokane Regional Fire spnnkier and alarm systems and pnvale access road inspections, Spokane Vatiey Health Disinct 324-1560 Fire Department 892-4122 State taw RCW 19 122 requires that pnor to any excavation the'CALLBEFORE YOU DIG' center must be notified Call before you dig al least 2 working days in advance. 456-8000 PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authonzed when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. X / Date 61/42.1/ Staff Approval Date