2012, 11-01 Permit:: SW-12002481 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002481
Permit Issued Date:
11/01/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: ROCKWELL PHASE 2
Permit Type: SEWER
Primary Contact: LOU -GAR CONSTRUCTION INC
Applicant: LOU -GAR CONSTRUCTION INC
Address: 8320 E DAY RD
MEAD, WA 99021
Phone: 509-466-6768
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
4409 N EVERGREEN RD
45031.2107
Subdivision: TRENTWOOD
ORCHARDS
Assessor's Description: TRENTWD ORCH PT OF B51 N65FT OF S130FT
EXC W135FT
Inspection Area:
Owner:
Address:
Phone:
Email:
SHIELDS, L F
PO BOX 719
NEWMAN LAKE, WA 99025
509-226-2079
Water District: Trentwood Fire District: Spokane Valley Fire
Irrigation District #3
Zoning: Land Area: 8775 Square Feet
CONTRACTOR INFORMATION:
General Contractor
LOUGACI153PS
LOU -GAR CONSTRUCTION INC
8320 E DAY RD
MEAD, WA 99021
509-466-6768
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 11/01/2012 13:19:25
Printed by: IIS APPPOOLWSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002481 11/01/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 11/01/2012 13:19:25
Printed by: IIS APPPOOL\ASP.NET v4.0