2012, 07-18 Permit: SW-12001780 SewerSPOKANE CO,�INTY-3UILDING AND PLANNING
PERMIT
Application Number: SW -12001780
Permit Issued Date:
07/18/201'2
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
ROCKWELL
SEWER
Primary Contact: HULSEY, MARLENE J & GREGORY S
Applicant: HULSEY, MARLENE J & GREGORY S
Address: 4421 N EVERGREEN RD
SPOKANE, WA 99216-1277
Phone: 509-279-8777
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
4421 N EVERGREEN RD
45031.2109
TRENTWOOD
ORCHARDS
TRENTWD ORCH PT OF B51 N65.75FT OF
S260.75FT EXC W135FT
Owner:
Address:
Phone:
Email:
HULSEY, MARLENE J & GREGORY S
4421 N EVERGREEN RD
SPOKANE, WA 99216-1277
509-279-8777
Water District: Trentwood Fire District: Spokane Valley Fire
Irrigation District #3
Land Area: 8876 Square Feet
CONTRACTOR INFORMATION:
General Contractor
OWNER
OWNER
NOT KNOWN AT TIME OF ENTRY
UNKNOWN, UK 00000
DETAILS:
Class
Type
Quantity Unit Charge
Value
SEWER
SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
$125.00
Total Fee:
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOIJ DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 07/18/2012 09:04:32
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE CO!JNTY-SUILDING AND PLANNING
PERMIT
Application Number: SW -12001780
Permit Issued Date:
07/18/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 07/18/2012 09:04:32
Printed by: IIS APPPOOL\ASP.NET v4.0