Loading...
2012, 05-21 Permit: SW-12001352 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001352 Permit Issued Date: 05/21/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION EDGERTON SEWER Primary Contact Applicant: Address: Phone: Email: OVERLAND EXCAVATION INC OVERLAND EXCAVATION INC P.O. BOX 277 NEWMAN LAKE, WA 99025 (509)939-7984 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 2420 N ELIZABETH RD 35121.5806 ORCHARD AVENUE ORCHARD AVE- NW1/4 B206 EXC PTN WITHIN FOL DESC< BE G AT NW COR OF E1/2 OF SD TR 206 TH W ALG N LN 12.6FT TH SLY 132. 36FT M/L TO S LN OF SD TR TH E ALG S LN 13.5FT TO SW COR OF E1/ 2 OF SD TR 206 TH Water District. Orchard Avenue Irrigation District #6 Owner: Address: Phone: Email: ZINK, MICHAEL G 2420 N ELIZABETH RD SPOKANE VALLEY, WA 99212-1417 Fire District: Fire District 1 Land Area: 0.2151 acres / 9367.89 sgft CONTRACTOR INFORMATION: General Contractor OVERLEI951LE OVERLAND EXCAVATION INC 24811 E WELLESLEY AVE OTIS ORCHARDS, WA 99027 509-226-1127 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125 00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed 05/21/2012 12:3330 Printed by IIS APPPOOLWSP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number SW -12001352 05/21/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER I5 TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed 05/21/2012 12.33.30 Printed by 115 APPPOOLWSP.NET v4.0