Loading...
HomeMy WebLinkAbout2008, 04-11 Permit App: 08001349 Additionl ;rSpokane .000Ualley- Community. Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER: I . CI PERMIT FEE: ❑ New Construction Addition/Remodel n Other: U Accessory Bldg Deck SITE ADDRESS: zctD (, 110, Ror OrcLc rL Arc ktpi t (3I K l5/ ASSESSORS PARCEL NO: `15O-12.- -1-/7Q5- $K 23' LEGAL DESCRIPTION: l0 1 S 4 - I lg- riot - ZZ -S S-7 t/ ti-lg Building Owner: Contractor: 3 Name: Roy. $ 1 ` f -O -P SCIna_ Name: Address: 2SOL NA LulaviaAddress: 2"D FLOOR SQ. FTG: 44 Fa Si City: Spoko-y.a. \%ua4, State: WA__ Zip: ete2IZ City: State: Zip: Phone: SOc1- q2 , - i$ Fax: Phone: Fax: DECK/COV. PATIO SQ. FTG: i2/�-.4- Contractor Lic No: Exp Date: Contact -Person- - CONSTRUCTION TYPE: - i . /lined City Business Lic. No: r n SCIke Ar Name: OA Phone: SO°- la3-1 50 Desct-ibe the scope of work in detail:, Cost of Project: $ 8,c154.L S , oua. a<4ltcttu b (rc. r3t 1 )\ ry". 'tiov-as: �a . np pluw 6111 I . 5a �C Proposed Use: (7'0-r01/4 )2. d 51-6Yc. **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMEENSII9NS:/ CO r RIES: # OF STORI J-I TOTAL ABIITABLE SPACE: MAIN FLOOR TO SQ. FTG: rlf l �/231t- 2"D FLOOR SQ. FTG: 44 Fa Si UNFIN BASEMENT SQ. FTG: /1 /A IMPERVIOUS SURFACE AREA: r ✓)44 FINISHED BASEMENT SQ. FTG: y'/„//4-- _c • GARAGE SQ. FTG: LI`6Q SC- DECK/COV. PATIO SQ. FTG: i2/�-.4- 30% SLOPES ON7 j PROPERTY: (I' # OF BEDROOMS: L... CONSTRUCTION TYPE: - i . /lined HEAT SOURCE: atL L. ORSEPTIC? SEWER'// � A r r / A - The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15101 ❑ Check DATE: L f -/ /- O J- ❑ Mastercard ❑ VISA Expires: VIN#: ppokane Valley Site Address: 2806 N ELLA RD Parcel Number: 45072.4705 Zoning: R-4 Fire District: FD 01 • Project Transmittal City of Spokane Valley Communny Development Department 11703 E. Sprague .Ave, Suite B3 Spokane Valley, \\+A 99206 Phone: 509.688.0036 New project Previous pre -app meeting o Plan revisions ❑ Transmittal Date: Friday, April 11, 2008 Water District: Project Number: 08001349 pfiza Applicant: SCHAFER, RONALD E & NICOLE R 2806 N ELLA RD SPOKANE, WA 99212-2119 (509) 993-7850 e-mail: e-mail: Contact: SCHAFER, RONALD E & NICOLE R Occupant: 2806 N ELLA RD SPOKANE, WA 99212-2119 e-mail: (509) 993-7850 e-mail: Owner: SCHAFER, RONALD E & NICOLE R 2806 N ELLA RD SPOKANE, WA 99212-2119 Contractor: OWNER () - 0 Arch / Engineer: e-mail: ECEIVE 114 MD LIHN Project ADD 480 SQFT GAR e90 STa&y Description: Building Landuse Engineer Utilities Health 772 6-44,416. #W7.4 Assessor, Fire Dist Y APPLICATIO I SITE PLA PLAN c Z Please send all plan review and project comments via e-mail to the highlighted individuals. Spokane _#Va!ley® For City Use Only PLUS Project NumberO(`� I . t i� Project Address 2-500 )\ k 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 1 permitcenter®spokanevalley.org. As part of our on-going commitment to customer service during the review' process of your 'project application, we are providing -you with a TARGET DATE for the initial technical application review. If for' any reason we cannot meet this date, we will contact you with a revised target dilate. C 11 Your application review TARGET DATE is • The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review i Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. r Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person With the Citv can he changed, one individual wIdt the evpernse far dealing with reviewer comments would be the hest choice for the entire veriest, process. Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heardf oma us by your target date. Stull May contact you before the target date of the initial review is complete. By following this procedm e, you will same time and allow the reviewers to conplete the work more expeditiously. Steps in the Permit Process I. Counter Complete. \ our application has been accepted as counter complete: This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routcd to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings Of required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK- BUILDING FILE REV 9/07 ! —I I- i La I I � ,-. -PLANNING DEPT: APPROVED - Oe - • -DATE: la' O V T LI pa - to 'Pro pcSA-A. E ITS 36 1f 2`60ko £kla -73' 2sb \ J a\ 0. c City of SPOKANE VALLEY BUILDING DEPAR HENT 11707 E. Sprague venue n1 DS, Spokane Valley, Washington 99205 - Tel 5O9 -533-0D35 - Fax 5D3-333-0037 Following is a typial cess-ser5on for a resi3enEal garage. It may not represent be proposed project If you are using Eu d:ta as a p iron of your plan submittal, ple.ase complete the requested infornaUon in the bis provided on both sids of Iiis sheet Ths completed sheet, along with any addii53nal inftrmatton needs b be subri d with your apTh Son and be on sib al the Ems of Pspeclon. PROTECTION MD OPENINGS BETWEEN DWELLINGS AND PRNATE GAP -AGES SHALL HAVE: 1) MATERIALS APPROVED FOR ONE HOUR FIRE RESISTIVE CONSTRUCTION ON THE GARAGE SIDE: s/r TYPE 7C GY? BOARD (HABITABLE SPACE ABOVE) VL' GY? BOARD (PESIDENQVATihC, FLOOPJCERJNG) 2) OPENINGS BETWEEN GARAGE AND RESIDENCE' SHALL BE EQUIPPED WITH SOUD WOOD DOOR, SOLID OR HONEYCOMB CORE STEEL DOORS NOT LESS THAN 1 316', OR 20 MINUTE FIRE RATED DOORS. ALTERNATE FOUNDATION FOR ACCESSORY BUILDINGS FROM 400 SO. FT. TO 3000 SQ FT. SECTION A -A NOTE Diagonal wall bracing required on Each comer and every 25 fret of wed. Wads within 3 feet of a property fine or within3 feet of a dw JBmg must be 1 hour rated. (Sr type 'X' gypsun sheathing on both sides of wad)_ Openings are not per td in these wads Garages ove 3,000 sq. ft require protection when closer 0 -an 20 Feet to the property One. Parapets may be required. ENGINEERED TRUSS OR RAFTER SIZE AND SPACING ext_@zyo.a ROOFING MATERIAL ROOFING PAPER ROOF SHEATHING SOLID BLOCKING BETWEEN.TRUSSES WALL SHEATHING SIDING DOUBLE TOP PLATE WALL HEIGHT 2x @ztip.c. 6' MIN. 24' MIN. PRESSURE TREATED SOLE PLATE 3-1tr CONCRETE SLAB In= 6' MIN. 5x12* FOOTING ANCHOR BOLTS 1273' MUt (P INTO CONCRETE) 6' O. C. OR APPROVED ANCHOR CNSTAL LED PEA MANUFACTURER FOUNDATION PLAN PLEASE COMPLETE THE FOLLOWING INFORMATION AND ADD ON THE DRAWING BELOW. BUILDING DIMENSIONS: IIo'c3J GARAGE OPENING AND HEADER SIZE \-2- INDICATE -Z INDICATE THE LOCATION AND SIZE OF ALL WINDOWS AND DOORS ON THE PLAN. 7 E Lim WIDTH I IQ 1 1 A L 1 L J .___.1 Please note that while every effort is made b assure the accuracy of the information contained in this brochure is not warranted for accuracy. This document is not intended to address all aspects or regulatory requirements for a project and should serve as a starting point for your investigation. For detailed information on a particular project, permit, or code requirement refer directly to appricable file and/or code/regulatory documents or contest the appropriate division.