Loading...
2009, 09-16 Permit: 09002969 ReroofSCIn of P ne Valley PERMIT CENTER 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Site Information Project Information Site Address: 1209 S EVERGREEN RD Parcel Number: 45233.1922 Subdivision: Block: Lot: Zoning: R-3 SF Res District Owner: COPPINS, MARILYN Address: 20100 FAIRWEATHER ST SANTA CLARITA, CA 91351 Building Inspector: EAST Water Dist: VERA Building Permit Project Number: 09002969 Permit Use: REROOF Inv: 1 Issue Date: 09/16/2009 Applicant: PERRENOUD ROOFING INC PO BOX 7174 SPOKANE WA 99216 Contact: PERRENOUD ROOFING INC PO BOX 7174 SPOKANE WA 99216 Phone: (509) 483-7100 Phone: (509) 483-7100 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: Permits I Contractor: PERRENOUD ROOFING INC License #: PERRERI964RA REROOF R-3 VB 0 RESIDENTIAL PERMIT FEE WSBCC SURCHARGE Total Value: $2,042.00 FOR BUILDING INSPECTIONS CALL (509) 688-0054. Total Permit Fee: $83.25 $4.50 $87.75 Payment Summary Total Fees Amount Paid AmountOwing $87.75 $87.75 $0.00 Tran Date Receipt # Payment Amt 09/16/2009 20008 587.75 Processed By: DAVIS, JENNA Printed By: MORRIS, HEATHER Page 1 of 1 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection Includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessanly indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access. on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails. skirting, etc. installed, and prior to occupancy: completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for eiectncal wiring. State Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilibes Division And lnduslnes 324-2640 477-3604 Permits and Inspections for on-site septic systems. Spokane Regional Fire spnnkier and alarm systems and pnvale access road Inspections, Spokane Valley Health Dtstnd 324-1560 Fire Department 892-4122 Slate law RCW 19 122 requ,res that pnor to any excavation the -CALL BEFORE VOL) DIG. center must be notified. Call before you dig at least 2 working days In advance. 456-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning -work, or c)•afterttwo years from the date of permit issuance, regardless of whether the work is r - . ew . finished. If a permit is expired for times n-petrmit maybe otilained for half the permit fee based on the value of the remainder of the work to finish the original permit. ( ({ !:,`J-oi� All refund requests must be made` imwriting by'the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date Receipt Number: 20008 Projects Miscellaneous Items Tender City of Spokane Valley Building Dept Receipt Customer Number Full ProiectNbr Inv Nbr Fee Amt b1' l,nt Owing PAID Pmt 09002969 1 .. $87.75 $87.75 _ $87.75 $87.75 Total: • $87.75 $87.75_% i. - $87.75 $87.75 Total PAID: $87.75 .Type Check Acct - Balance CC Nbr Exp Date. TENDERED VISAxxxxxxxxxxxx9767 ;+. 11/2011 87.75 Payer: j Notes: Tran Date/ Time: 09/16/2009 11:13:55 AM By: HMORRIS Logon User: BldgCounter Station: CX_SV00014A Override 13y: Printed: 09/16/2009 11:13: 56 AM Total TENDERED: 87.75 Over / (Short) $0.00 Change $0.00 Page 1 of 1