Loading...
2012, 06-04 Permit: SW-12001480 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001480 Permit Issued Date: 06/04/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION ROCKWELL PHASE 2 SEWER Primary Contact: POUL CONSTRUCTION Applicant: POUL CONSTRUCTION Address: Phone: Email: 18902 E 2ND AVE SPOKANE, VALLEY, WA 99016 509-979-5872 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 4710 N EVERGREEN RD 45022.1202 TRENTWOOD ORCHARDS TRENTWD ORCH PT OF B6 N8OFT OF S200FT OF W242.25FT Owner: Address: Phone: Email: CHANEY, LUCAS M 4710 N EVERGREEN AVE SPOKANE, WA 99216 Water District: Trentwood Fire District: Fire District 1 Irrigation District #3 Land Area: 0.4449 acres / 19380 sqft CONTRACTOR INFORMATION: General Contractor POULCC*932BQ POUL CONSTRUCTION 18902 E 2ND AVE SPOKANE VALLEY, WA 99027 509-979-5872 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 06/04/2012 13:52:15 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001480 06/04/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/04/2012 13:52:15 Printed by: IIS APPPOOL\ASP.NET v4.0